RFQ_1-27_Scope_of_Work_-_Traffic_Counts.pdf

PDF 214 KB Posted

Attached to
Cheyenne MPO 24 Hour Traffic Counts - 2026
Solicitation number
RFQ 1-27
Issued by
Natrona County, Wyoming

About this file

This Scope of Work document is issued by the Cheyenne Metropolitan Planning Organization (MPO) in Wyoming for a traffic data collection project. The project requires bidders to collect 24-hour traffic volume counts at 400 locations within the Cheyenne urban area. The scope includes 300 standard counts capturing date, time, and total volume data, and 100 specialized counts providing date, time, vehicle classification, 85th percentile speeds, and total volume. All data collection must occur between September 1, 2026, and November 26, 2026, with counts performed exclusively on Tuesdays, Wednesdays, and Thursdays. The contractor is required to communicate collection schedules to the Project Manager via email and must avoid construction zones and periods of adverse weather.

The contractor must secure a Right-of-Way permit from the city of Cheyenne (no fee) and obtain proper licensing to work in Cheyenne (fee required). Any recounts necessitated by data quality issues or other factors must be completed within the specified project timeline. The Cheyenne MPO reserves the right to request additional count locations at the contractor's cost to the MPO. Bidders should submit cost proposals addressing the expenses associated with completing all 400 counts within the stated parameters.

View the file

Other files

File Type Posted
Cheyenne_MPO_24_Hour_Traffic_Counts_-_2026.pdf PDF
RFQ_1-27_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 28, 2026

The Cheyenne MPO is bidding a project to collect 24-hour volumes within the Cheyenne urban area. If you are interested in this work, please send the Cheyenne MPO a Bid/Cost Proposal for collecting this Traffic Data. The data we are requesting is:

I. 300 standard counts 24-hour Volume Counts (ADT). (date, time and total volume)

II. 100 specialized counts 24-hour Volume Counts (ADT) with % Heavy Trucks classifications and 85% Speeds. (date, time, classification, speed and total volume)

A Total of 400 Locations:

All counts, including any recounts that may be required, need to be collected during the months of September & November 2026. Counts shall start on September 1, 2026, and be completed by November 26, 202.

Contractor shall communicate to the Project Manager on locations when counts will be collected via email.

Counts will be collected during Tuesday, Wednesday, and Thursday ROW permit will need to be applied for from the city (no fee), proper licensing to work in Cheyenne will be required (fee).

Costs to the MPO if additional count locations are requested.

Construction, bad weather needs to be avoided.