RFQ 00241 - High Speed Camera for Microscope.pdf

PDF 2 MB Posted

Attached to
High-Speed Camera for Microscope
Solicitation number
00241
Issued by
Oakland County, Michigan

About this file

This document is a Request for Quote (RFQ) issued by Oakland University (OU) in Rochester, Michigan, soliciting proposals for a high-speed camera to be attached to a current university microscope. The RFQ (File 00241) was issued on July 16, 2025, with questions due by July 23, 2025, at 2:00 PM ET, and quotes due by July 31, 2025, at 2:00 PM ET. The university requires a high-speed camera with specific technical specifications, including the ability to work with a microscope, shoot up to 1,400 frames per second at a 2560x1600 resolution, and achieve a maximum frame rate of 290,000 fps. The project aims to have the camera and onsite setup completed by September 30, 2025.

The RFQ includes detailed technical requirements for the camera, such as 12-bit CMOS sensor technology, color sensor capabilities, and various frame rate and resolution specifications. Vendors must provide product documentation, warranty information, and technical support. The university requires FOB Destination shipping, with the supplier paying for shipping and customs clearance. Optional items include extended warranty and onsite training. Suppliers must submit an insurance certificate and comply with various terms and conditions, including non-discrimination policies and background check requirements. The university reserves the right to accept or reject any quotes and will evaluate proposals based on the greatest benefit to OU, not necessarily the lowest price.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oakland University

REQUEST FOR Quote (RFQ)

High-Speed Camera for Microscope

FILE 00241

Issue Date: July 16, 2025

Questions Due: July 23, 2025 by 2:00 PM ET

Quotes Due: July 31, 2025 by 2:00 PM ET

RFQ High-Speed Camera for Microscope

Contents

SECTION I – BACKGROUND

1.01 Oakland University Background Information

1.02 RFQ Overview

SECTION II – SCOPE OF SERVICES

2.01 Statement of Work

SECTION III - RFQ QUOTE REQUIREMENTS AND SPECIFICATIONS

3.01 Proposal Content

3.02 Cost/Fees

3.03 Freedom of Information Act Requests

SECTION IV – EVALUATION

4.01 Evaluation of RFQ Response

4.02 Process for Award

SECTION V - PROCUREMENT PROCESS

5.01 Submission Method, Date and Time

5.02 Questions and Interpretations

5.03 Withdrawal of Quotes

5.04 Price and Scope of Work Changes

5.05 Mistakes in Quotes

5.06 Execution of Quotes

5.07 Procurement Schedule

SECTION VI – GENERAL CONDITIONS

6.01 Terms and Conditions

6.02 Conflict of Interest

6.03 Cost of Quote

6.04 Form of Purchase

6.05 Government Restrictions

6.06 Nonconformance to Conditions/Specifications/Scope of Services

6.07 Assignment or Transfer

6.08 Patents - Licenses and Royalties

6.09 Permits and Licenses

6.10 Taxes

6.11 Insurance Requirements

6.12 Proof of Insurance

6.13 Standards of Conduct

6.14 Background Checks and Debarment

6.15 Removal of Employees

6.16 Supervision

6.17 Performance Evaluation Meeting

6.18 Federal, State and Local Reporting Compliance

6.19 Project Personnel

6.20 Notices

6.21 Cancellation

6.22 Travel

6.23 Non-Discrimination

SCHEDULE A – Addendum Acknowledgement

SCHEDULE B-INSURANCE REQUIREMENTS ACKNOWLEDGEMENT

SCHEDULE C-COSTS

SCHEDULE D - DETAILED PROPOSAL

SCHEDULE E – SPECIFICATION EXCEPTIONS

SECTION I – BACKGROUND

1.01 Oakland University Background Information

Oakland University (University) is a world-class academic institution located on 1,443 acres of wooded hills and meadows in Rochester, MI. The university was established in 1957 through a generous donation from founders Alfred and Matilda Dodge Wilson. Oakland University celebrated the 50th anniversary of its founding in 2007. When it opened in 1959, 570 students were enrolled, and the charter class graduated in 1963 with 125 students receiving diplomas. Today, nearly 16,000 students attend classes at OU, and our alumni total has grown to approximately 100,000.

As a state-supported institution of higher education, Oakland University has been recognized and is classified as a doctoral research university by the Carnegie Foundation for the Advancement of Teaching. With 139 baccalaureate degree programs and 127 graduate degree and certificate programs, Oakland provides a distinct educational experience with flexible class schedules and state-of-the-art facilities, student services, classroom technologies, research labs, internships and research opportunities with corporate partners. Located in the heart of Oakland County's Automation Alley, the university has forged hundreds of partnerships with hospitals, Fortune 500 companies, cities, government agencies and educational institutions.

All questions regarding this Request for Quote should be directed to:

Julie Hamilton Buyer Oakland University, Purchasing Department 411 Pioneer Drive Rochester, Michigan 48309 Phone: (248) 370-4199 Email: hamilton@oakland.edu

1.02 RFQ Overview

Oakland University (OU) is soliciting proposals for a high-speed camera to be attached on a current University microscope.

SECTION II – SCOPE OF SERVICES

2.01 Statement of Work

The following specifications outline the minimum specifications and unique features that are needed. If the proposed equipment differs from these specifications, please denote differences clearly in your bid response.

Minimum Required Specifications:

• Camera needs to be able to work with a microscope and include standard mounting mechanism (e.g. C-mount)

• Camera must be capable of shooting 1,400 frames per second (FPS) at a full, un-interpolated resolution of 2560x1600.

mailto:hamilton@oakland.edu

• Camera must be capable of a maximum frame rate of 290,000 fps.

• Camera must be capable of 2,800 FPS at a minimum resolution of 1920x1080.

• Camera must be capable of 5,700 FPS at a minimum resolution of 1280x720.

• Camera must be capable of 14,000 FPS at a minimum resolution of 512x512.

• Camera must be capable of a minimum of 1 µs exposure.

• Camera must allow partitioning in Camera to incorporate 12-bit 2560x1600 CMOS image sensor technology with selectable 24,36,48-bit color CMOS array.

• Camera must have a color CMOS sensor with a minimum Base ISO of 1250 D sensitivity.

• Camera to provide 8-steps of E.I. (exposure-index).

• Camera sensor to have 12-bit pixel depth AND convert A to D at 12 Bits, view all video in 12

Bits and save video in a 12 Bit file structure incorporating 4096 Bits per/pixel.

Preferred Specifications

• Camera manufacturer should provide EMVA 1288 sensor measurements standards report.

• Camera should have minimum pixel size of 10 µm (diag).

• Camera should be capable of 1 Gigabit and optional 10 Gigabit Ethernet technology for data transfer.

• Camera should incorporate (4) Multi-I/O programmable ports.

• Camera should incorporate an internal shutter for remote black reference.

• Camera should have HD-SDI and HDMI outputs.

• Camera should be capable of 72 GB of onboard RAM p

• Camera should have a secondary power port,12V DC, 12W auxiliary.

• Camera should incorporate IRIG SMPTE or MISP timestamp for multi-camera syncing

(modulated or unmodulated)

• Camera should incorporate a minimum 1.73 µs straddle-time.

• Camera should provide: Range Data Input

• Camera should include OCC (on-camera controls) to change internal setting w/out a PC connected.

• Camera chassis should be no larger than 5 x 5.5 x 5” (12.7 x 14 x 12.7 cm) and no heavier than 5.6 lbs (2.5 kg).

Additional Requirements:

Onsite set up of the proposed equipment is required by the awarded vendor.

SECTION III - RFQ QUOTE REQUIREMENTS AND SPECIFICATIONS

3.01 Proposal Content

Respondents are instructed to complete, sign (if required), and return the following documents in the following order as their proposal submittal.

Responses must include the following OU required documents:

• A signed copy of the RFQ indicating the Supplier agrees to the RFQ in its entirety, including

Oakland University’s Terms and Conditions

• Schedule A - Addendum Acknowledgement

• Schedule B – Insurance Acknowledgement

• Schedule C – Cost Proposal

• Schedule D – Detailed Proposal

• Schedule E – Specification Exceptions

Failure to submit information in accordance with the RFQ requirements and procedures may be cause for disqualification. Not submitting the insurance certificate may cause your company to be disqualified.

3.02 Cost/Fees

Quotes must include a fee schedule for the goods and/or services being proposed. The schedule should indicate all proposed costs will be held firm for a period of at least on hundred twenty (120) days following submission of the quote.

Firms must clearly and unambiguously specify the cost of the services in their quotes. Any reimbursable fees should be identified separately.

Any other taxes, fees or commissions applicable to the proposed contract are the responsibility and liability of the proposer who must include these cost items in the price of the goods and services.

3.03 Freedom of Information Act Requests

The Supplier understands that the University complies with the Michigan Freedom of Information Act (“FOIA”) and that the University may provide Confidential Information to other persons or entities upon receipt of a FOIA request. Section “z” of the FOIA states that security information is exempt from disclosure.

A FOIA request must be submitted in writing to the FOIA Office (or Coordinator). The request may be transmitted in hard copy, by email, or by facsimile. Refer to Oakland University’s website for procedures and guidelines to submit a FOIA request - https://www.oakland.edu/policies-regulations/FOIA/.

SECTION IV – EVALUATION

4.01 Evaluation of RFQ Response

Quotes will be evaluated by the University. If there are portions of any quote the University finds unacceptable or otherwise in need of clarification or revision, the University reserves the right to negotiate with any or all Suppliers. Any exceptions to the specifications or any other special considerations or conditions requested or required by Supplier will be enumerated by the Supplier and submitted as part of its Quote, together with an explanation as to the reason the specifications cannot be met. Each Supplier will be required and expected to meet the specifications in their entirety, except to the extent exceptions are expressly noted in its quote.

4.02 Process for Award

Without limitation and at its sole option, OU reserves the right to accept or reject any or all quotes, to take exception to these RFQ specifications, to negotiate with finalists, or to waive any informality. Firms https://www.oakland.edu/policies-regulations/FOIA/ may be excluded from further consideration for failure to fully comply with the specifications of this

RFQ.

OU may decide to reject all quotes and/or to reissue this RFQ with modifications.

OU will not award contracts to proposers that are debarred, suspended or otherwise determined ineligible by, nor to proposers that OU has determined to be non-responsible.

OU reserves the right to make an award based solely on the original quotes received or to negotiate further with suppliers. The supplier selected for the award will be chosen on the basis of an assessment of the greatest benefit to OU, not necessarily on the basis of lowest price. OU also reserves the right to negotiate and award any element of this RFQ, make multiple awards, reject any or all quotes or waive any minor irregularities or technicalities in quotes received as the best interest of OU may require.

SECTION V - PROCUREMENT PROCESS

5.01 Submission Method, Date and Time

One (1) copy of the sealed quote shall be submitted electronically. All responses must be submitted online via Grizzfiles. If you plan to submit a quote, please request an upload link at least five days prior to the bid submittal by emailing hamilton@oakland.edu. Put the proposal number and name in the subject line. Quotes must be received July 31, 2025 @ 2:00 P.M. Eastern Time. Quotes will not be opened publicly. It is the firm’s responsibility to ensure that its quote is delivered at the proper time and place.

The document shall be 8 ½” x 11” format, no smaller than 11-point font, up to 35 pages, and should not contain unnecessary elaborate brochures or other presentations beyond those minimally required to present a complete and effective quotation.

Expenses for developing and presenting responses to this RFQ shall be the entire responsibility of the Supplier and shall not be chargeable to the University. All supporting documentation and manuals submitted with this quote will become the property of the University.

Unless otherwise stated above, quotes submitted are to be in accordance with the outline and specifications contained and are to remain in effect a minimum of 120 days from the date of submission, and may be subject to further extensions as negotiated.

Submitted unit prices and labor costs are to be held for three years of the date of contract.

OU reserves the right to accept or reject any or all quotes, and may cancel this solicitation at any time for any reason at the university’s discretion.

5.02 Questions and Interpretations

All inquiries to this RFQ must be submitted in writing to hamilton@oakland.edu by July 23, 2025 @ 2:00 P.M. Eastern Time. Questions should be emailed to Julie Hamilton. Put the RFQ name in the subject. An Addendum will be issued with responses to all questions received.

mailto:hamilton@oakland.edu

5.03 Withdrawal of Quotes

Quotes may be withdrawn by written notice to the prescribed OU Buyer, prior to the quote deadline date. Negligence on the part of the Supplier in preparing the quote confers no right of withdrawal or modification of the quote after the quote deadline has elapsed.

5.04 Price and Scope of Work Changes

All quotes should be firm and not subject to change by the Supplier for a period of one hundred twenty days (120) from the quote deadline date. Note, however, OU reserves the option to negotiate prices downward and to negotiate additional scope of work and cost changes based on final negotiations with the selected Supplier.

5.05 Mistakes in Quotes

If a mistake in a quote is suspected or alleged, the quote may be corrected or withdrawn prior to the due date for this solicitation. If negotiations are not held, or if best and final offers have been received, the Firm may be permitted to correct a mistake in its quote and the intended correct offer may be considered based on the conditions that follow:

The mistake and the intended correct offer are clearly evident on the face of the quote.

The Firm submits written evidence which clearly and convincingly demonstrates both the existing offer, and such correction would not be contrary to the fair and equal treatment of other Firms.

Mistakes discovered after award shall not be corrected unless OU Counsel makes a written determination that it would be disadvantageous to OU not to allow the mistake to be corrected. The approval or disapproval of requests of this nature shall be in writing by OU’s Legal Counsel.

5.06 Execution of Quotes

The original quote must contain a manual or electronic (date and time stamped) signature of an authorized representative of the Supplier. The quote must be typed or printed in ink. All corrections made on the quote sheets must be initialed by the authorized representative. The company name must appear on each sheet. The quote must include all documents, materials and information required herein.

5.07 Procurement Schedule

The University intends to conduct the procurement process expeditiously. Suppliers are expected to comply with the procurement schedule, including any modifications thereto which may be made by the University. The University will notify suppliers of any and all such modifications. Suppliers who fail to comply with the schedule may not receive further consideration.

The anticipated procurement schedule for the RFQ process is as follows; the University will make every effort to adhere to the schedule, and at its discretion is subject to :

Issue Request for Quote July 16, 2025

Deadline for Written Questions Regarding the RFQ July 23, 2025 by 2PM ET

Addendum Issued July 25, 2025

Sealed Quote Submission July 31, 2025 @ 2PM Eastern Time

Readiness for Service/Contract Commencement September 30, 2025

SECTION VI – GENERAL CONDITIONS

6.01 Terms and Conditions

Any contract resulting from this Request for Quote is subject to and shall be performed in accordance with the University’s General Terms and Conditions for Agreement located at the following: OU Terms & Conditions.

The University’s preferred payment method is with a University credit card (Pcard). The University will not accept convenience fees or increased pricing due to Pcard payment. The University it tax exempt, State of Michigan tax is not applicable.

Any person, firm, corporation or association submitting a quote shall be deemed to have read and understood all the terms, conditions and requirements in the specifications/scope of work.

Upon University request, the awarded supplier must agree to provide independently audited financial statements including its statement of financial position, statement of operations, and statement of cash flows for at least the past three years. Furthermore, the Contractor must agree to permit the University, upon request, to audit privileges, related to the University’s account. Failure to agree to this may result in disqualification of your bid.

Purchase Orders issued to the Supplier throughout the term of an agreement for services shall be subject to any and all of the provisions noted in this RFQ. If there is a discrepancy between the information stated in this RFQ and the University’s T&Cs, the T&Cs will apply.

This RFQ in no manner obligates the University to the eventual purchase of any products or services described, implied, or which may be proposed, and may be terminated by the University without penalty or obligation at any time.

Expenses for developing and presenting quotes will be the entire responsibility of the Supplier and will not be chargeable to the University. All supporting documentation and manuals with this quote will become the property of the University.

The Supplier understands that the University complies with the Michigan Freedom of Information Act (“FOIA”) and that the University may provide Confidential Information to other persons or entities upon receipt of a FOIA request. Section “z” of the FOIA states that security information is exempt from disclosure.

https://www.oakland.edu/legal/legalforms/ https://www.oakland.edu/legal/legalforms/

Smoke Free Campus: Effective Fall 2013, the University is smoke-free. Contractors are responsible to ensure that all employees and all subcontractors’ employees are in compliance anytime they are on Oakland’s main, or extension center campuses. The complete policy can be found at Policy 475.

6.02 Conflict of Interest

The Supplier affirms that to the best of its knowledge there exists no actual or potential conflict-of-interest between the Supplier's family, business, or financial interests and providing the Services. The Supplier will not attempt to influence any University employee by the direct or indirect offer of anything of value. The Supplier also warrants that no officer or employee of the University has or will have a direct or indirect personal financial interest in the Agreement. The Supplier also affirms that neither the Supplier nor any of its employees has paid or agreed to pay any person, other than bona fide employees and consultants working solely for the Supplier, any fee, commission, percentage, brokerage fee, gift or any other consideration contingent upon or resulting from the execution of an Agreement.

In the event of change in either Supplier’s interests or Services under this Agreement, the Supplier will inform the University regarding all possible conflicts-of interest which may arise as a result of such change. The Supplier agrees that conflicts-of-interest will be resolved to the University’s satisfaction or the University may terminate the Agreement.

Oakland University reserves the following rights: to accept or reject any bid; to reject all bids’ to waive any formalities or irregularities contained in a bid that do not comply with the terms and conditions of the invitation to bid, any modifications to the invitation to bid, or any specifications; to select the bid and/or items that in the sole and absolute discretion of Oakland University are in Oakland University’s best interest whether or not the bid selected is the lowest monetary bid received.

6.03 Cost of Quote

Suppliers are responsible for all their costs associated with the preparation of quotes, the demonstration and interview process and the contract negotiation process. All costs incurred, directly or indirectly, associated with the preparation of quotes shall be the sole responsibility of and shall be borne by the respondents.

6.04 Form of Purchase

The acceptance of the proposed Firm’s offer for the services specified herein will be made by issuance of a duly authorized contract or purchase order prepared by OU. Suppliers are cautioned to make no assumptions or accept any representations by any employee, member, officer or representative of OU concerning the award until a contract agreement is executed.

6.05 Government Restrictions

In the event any governmental restrictions may be imposed which would necessitate alteration of the material, quality, workmanship or performance of the goods or services offered, it shall be the responsibility of the successful Firm to immediately notify OU in writing specifying the regulation which requires alteration. OU reserves the right to accept any such alteration, including any reasonable price adjustments occasioned thereby, or to cancel the contract at no expense to OU.

6.06 Nonconformance to Conditions/Specifications/Scope of Services Services will be inspected for compliance with specifications. Services not conforming to specifications may not be accepted at the Firm’s expense. Services not provided in accordance with the Scope of https://www.oakland.edu/policies/generalgovernance/475/

Services may result in the Firm being found in default. In the event of default all procurement costs may be charged against the Firm. Any violations of these stipulations may result in the Firm’s name being removed from OU’s proposal mailing list.

6.07 Assignment or Transfer

The successful Firm shall not assign or transfer any interest in any subsequent contract, in whole or part, without written approval of OU. Claims for sums of money due, or to become due from OU pursuant to the contract may be assigned to a bank, trust company or other financial institution. OU is hereby expressly relieved and absolved of any and all liability in the event a purported assignment or subcontracting of the contract is attempted in the absence of the Firm obtaining OU’s prior written consent.

6.08 Patents - Licenses and Royalties

The successful Firm shall indemnify and save harmless OU and its employees from liability of any kind, including cost and expenses for or on account of any copyrighted, patented, or not patented invention, process or article manufactured or used in the performance of the contract, including its use by OU. If the Supplier uses any design, device or material covered by letters, patent, or copyright, it is mutually agreed and understood that the quote prices shall include all royalties or cost arising from the use of such design, device or materials involved in the work. Further all residual right to Patents, Licenses and Royalties (e.g., software and license to use same purchased) shall revert to OU at the end of the Agreement.

6.09 Permits and Licenses

The successful Firm shall obtain all permits and licenses that are required for performing its work. The Firm shall pay all related fees and costs in connection with required permits and licenses. Proof of ownership shall be made on all software used in the execution of the contract. The Firm will hold OU harmless for any violation of software licensing resulting from breaches by employees, owners, and agents of the Firm.

6.10 Taxes

The successful Firm is responsible for all state and federal payroll and/or social security taxes. The Firm shall hold OU harmless in every respect against tax liability.

6.11 Insurance Requirements

The awarded Supplier will be required to obtain insurance protecting Oakland University, Supplier and any subcontractor of Supplier performing services covered by the RFQ. The awarded Supplier agrees to immediately comply with the insurance provisions and maintain insurance levels at its sole expense.

Supplier shall provide acknowledgement and evidence of such insurance prior to execution of the Contract, found in Schedule B. If you cannot currently meet the requirements, quotes must include a statement agreeing to meet these requirements at no additional cost by the time of contract signing.

Failure to meet this requirement may cause the quote to be considered non-responsive and subject to disqualification. You must submit an insurance certificate (informational only) with your bid response.

6.12 Proof of Insurance

The successful Firm shall furnish to OU a certified copy of the policy or policies covering the work as required in the specifications as evidence that the insurance required will be maintained in force for the entire duration of the contract with OU. OU must be listed as an additional insured.

6.13 Standards of Conduct

The successful Firm shall be responsible for maintaining satisfactory standards of its employee’s competence, conduct, courtesy, appearance, honesty, and integrity. It shall be responsible for taking such disciplinary action with respect to any of its employees as may be necessary.

6.14 Background Checks and Debarment

Contractor has performed a police records check and/or criminal background check and that neither the Contractor nor any of its directors, members, officers, employees, volunteers, servants, agents, representatives and designees, and subcontractors, properly appear on the Michigan Public Sex Offender Registry or has been convicted of a felony, criminal sex offense, forcible assault or any crime against a minor or any other person; and (ix) Contractor is not suspended, debarred, proposed for debarment, declared ineligible or voluntarily excluded from the award of contracts from United States federal government programs and/or agencies and is not listed in the List of Parties Excluded from Federal Procurement or Non-procurement Programs (collectively “Not-Debarred”) pursuant to Executive Order 12549 and the regulations promulgated thereunder, 2 CFR 180, and any additional regulations promulgated by an applicable federal agency, and will obtain identical certifications from Contractor’s lower tier contractors and suppliers that they are also Not-Debarred.

6.15 Removal of Employees

OU may request the successful Firm to immediately remove from assignment to OU and/or dismiss any employee found unfit to perform duties due to one or more of the following reasons:

1. Neglect of Duty.

2. Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words or actions or fighting.

3. Theft, vandalism, immoral conduct, or any other criminal action.

4. Selling, consuming, possessing, or being under the influence of intoxicants, including alcohol, or illegal substances while on assignment at OU.

6.16 Supervision

The successful Firm shall always provide adequate competent supervision during the performance of the contract. To that effect, a qualified consultant and one or more alternates shall be designated in writing to OU prior to contract start. The Firm or his designated representative shall be readily available to meet with OU personnel. The successful Firm shall provide the telephone numbers where its representative(s) can be reached.

6.17 Performance Evaluation Meeting

The selected Firm shall be readily available to meet with representatives of OU weekly during the first month of the contract and as often as necessary thereafter. A mutual effort will be made to resolve all performance problems identified at these meetings.

6.18 Federal, State and Local Reporting Compliance

The Firm shall provide such financial and programmatic information as required to comply with all Federal, State, and local law reporting requirements.

6.19 Project Personnel

Except as formally approved by OU, the key personnel identified in the accepted quote shall be the individual who will complete the work, at the proposed levels of effort. Changes in staffing must be proposed in writing to OU and approved.

6.20 Notices

All written notices required to be given by either party under the terms of the contract(s) resulting from the contract award shall be addressed to the Firm at their legal business residence as given in the contract. Written notices to OU shall be addressed as provided in the contract.

6.21 Cancellation

Irrespective of any default hereunder, OU may also at any time at its discretion cancel any subsequent contract related to this solicitation, in whole or in part. In the event of cancellation, the Firm shall be entitled to receive equitable compensation for all work completed and accepted prior to such termination or cancellation as shall be indicated in the contract.

6.22 Travel

All travel and miscellaneous expenses related to this solicitation will be borne by the Firm unless otherwise provided in the contract for services.

6.23 Non-Discrimination

In accordance with the U.S. Constitution and all federal legislation and regulations governing fair employment practices and equal employment opportunity including, but not limited to Title VI (42 USC 2000d, et seq.) and Title VII )42 USC 2000e, et seq.) of the Civil Rights Act of 1964 (P.L. 88-352, 78 Stat.

241) and the U.S. Department of Justice regulations (28 CFR Part 42, et seq.) and the U.S. Department of Labor regulations (29 CFR Part 1601, et seq.) issued pursuant to those Titles, Executive Order 11246 (September 24, 1965) as amended, the Michigan Constitution and all state laws and regulations governing fair employment practices and equal employment opportunity, including but not limited to the Michigan Civil Rights Act (P.A. 1976 No. 453) and the Michigan Handicappers Civil Rights Act (P.A.

1976 No. 220), the Contractor agrees that it shall not discriminate against any employee or applicant for employment with respect to hire, tenure, terms, conditions or privileges of employment because of religion, race, color, national origin, age, sex, sexual orientation, height, weight, marital status or handicap that is unrelated to the individual’s ability to perform the duties of a particular assignment or position. The Contractor hereby recognizes the right of the United States and the State of Michigan to seek judicial enforcement of the foregoing covenant against discrimination, against itself or its subcontractors connected directly or indirectly with the performance of this Contract.

ACCEPTANCE

Please indicate your acceptance of Oakland University’s Terms and Conditions and the provisions stated in this RFQ in the space provided below. Complete the information at the bottom of this document and return this signed page with your RFQ response.

Thank you.

ACCEPTANCE ACKNOWLEDGEMENT:

I have reviewed and do accept Oakland University’s Terms and Conditions as stated on the University web page. I have read and agree to abide by the terms of this RFQ. I also acknowledge that I am a legally authorized representative of the business entity noted below and, as such, have the authority to enter into agreements and make commitments on its behalf:

Company: ____________________________ Address: ______________________________ Authorized Signature:____________________ Date: ________________________________ Printed Name: __________________________ Title: _________________________________ Phone #: _______________________________ Email: ________________________________

NOTE: OAKLAND UNIVERSITY RESERVES THE FOLLOWING RIGHTS: TO ACCEPT OR REJECT ANY BID; TO REJECT ALL BIDS; TO WAIVE ANY FORMALITIES OR IRREGULARITIES CONTAINED IN A BID THAT DO NOT COMPLY WITH THE TERMS AND CONDITIONS OF THE INVITATION TO BID, ANY MODIFICATIONS TO THE INVITATION TO BID, OR ANY SPECIFICATIONS; TO SELECT THE BID AND/OR ITEMS THAT IN THE SOLE AND ABSOLUTE DISCRETION OF OAKLAND UNIVERSITY ARE IN OAKLAND UNIVERSITY’S BEST INTEREST

WHETHER OR NOT THE BID SELECTED IS THE LOWEST MONETARY BID RECEIVED.

SCHEDULE A – Addendum Acknowledgement

ADDENDA:

The undersigned affirms that the cost of all work covered by the following Addenda are included in the price of this quote.

Addendum No. ____ Date: _________ Addendum No.____ Date: _________

Addendum No. ____ Date: _________ Addendum No.____ Date: _________

Addendum No. ____ Date: _________ Addendum No.____ Date: _________

Firm Name: __________________________________________

SCHEDULE B-INSURANCE REQUIREMENTS ACKNOWLEDGEMENT

You must submit an insurance certificate (informational only) with your bid response.

_____________________________________, at its sole expense, shall cause to be issued and maintained in full effect for the term of this agreement, insurance as set forth hereunder:

Workers’ Comp: Statutory Limits & EL $1,000,000 Commercial General Liability: $1,000,000 per occurrence, $2,000,000 aggregate Auto Liability: $1,000,000 Excess (Umbrella): $2,000,000 per occurrence

Respondents must provide an insurance certificate as part of their quote submittal showing evidence of insurance. If you cannot currently meet the requirements quotes must include a statement agreeing to meet these requirements at no additional cost by the time of contract signing. Failure to meet this requirement in your RFQ response may eliminate your company’s quote.

1. Oakland University and its Board of Trustees must be listed as an “Additional Insured” on the Certificate of Insurance.

2. Supplier must provide an insurance certificate before commencing service delivery, must keep the certificate up-to-date, and must forward copies of all revised certificates of insurance to the Risk Management Department at Oakland University within thirty (30) days of the change.

3. Notice of cancellation must be submitted thirty (30) days prior to the termination of the insurance coverage.

4. Awarded Supplier shall notify the University of any Accidents and/or claims, including without limitation accidents or claims involving bodily injury, death or property damage, arising on or within the Licensed Premises. Such notice shall be provided in writing as soon as practicable, however in any event within five days of Awarded Supplier’s receipt of notice of the accident or claim.

5. Required insurance coverage and any self-insured retention may be required to be modified by the University if, in the sole judgment of the University, the levels of risk associated with Awarded Supplier’s operations require modification of such coverage.

6. Failure of the Awarded Supplier to obtain and maintain appropriate insurance as specified by the University, without gap, may be deemed a material breach of this license and at the sole discretion of the University may be cause for contract termination.

Exceptions to the above insurance requirements are to be approved, in writing, by the Office of Risk Management. Exceptions are determined by the type and nature of the contract and the individual contractor.

SCHEDULE C-COSTS

Supplier Name: ____________________________________________

All items proposed by the Supplier should meet or exceed Oakland University’s requirements. The University reserves the right to reject any equipment at its sole discretion.

The undersigned, as bidder, declares that he/she having examined the specifications with related documents hereby proposes to furnish the equipment in accordance with the specifications, within the time set forth therein, and at the cost stated below.

EQUIPMENT COST: Attach a detailed quote listing pricing for each individual item Item Description Manuf/Part # Qty Total Cost

1 High-Speed Camera for Microscope 1 $ 2 Onsite set-up of equipment N/A 1 $ 3 Shipping – FOB Destination Schedule D, Question 8 1 $ 4 Discount N/A Lot $

GRAND TOTAL: $

OPTIONAL ITEMS: Attach a detailed quote listing the products and pricing for the proposed camera system including the individual item below:

• Extended Warranty / Service Contract (provide pricing and all terms – Schedule D, Question 2b)

• Onsite training (provide pricing and all terms – Schedule D, Question 6a)

All prices are to be quoted in U.S. Currency

Comments/Restrictions:

Submitted by:_______________________________________________________________________________

Signature:__________________________________________________________________________________

Title/Date:_______________________________________________________________________________ (Title) (Date)

Phone:____________________________________________Email:___________________________________

SCHEDULE D - DETAILED PROPOSAL

IMPORTANT: The Following must be included with your bid response:

1. Product Documentation with detailed specifications – attached and marked for identification as:

2. Warranty Documentation

a. Standard warranty – attached and marked for identification as: ___________________

b. Extended warranty – attached and marked for identification as: ___________________

3. Provide detailed information on the software and any required license agreement. Information attached and marked for identification as:____________________________

4. Guaranteed Shipment (Days): ___________________

5. Supplier must provide technical support during normal business hours. Please provide details on how to access and what is included with the free technical support.

6. The University would prefer onsite (at Oakland University) training for laboratory personnel. Please provide information on what is included and number of individuals allowed to take the training.

6a. If there is a cost for providing onsite training, provide the cost and what is included.

6b. If onsite training is not available, provide information on other training options.

7. The University requires FOB Destination, freight pre-paid and added. The supplier will pay for shipping

(including custom clearance and duties) and add the freight cost to the University’s invoice, with the University taking ownership of the equipment only upon delivery at Oakland University’s dock location.

Does your firm agree to these terms: _______________________

8. Please state where your product is manufactured. _________________________________

SCHEDULE E – SPECIFICATION EXCEPTIONS

IMPORTANT: The Following must be included with your bid response:

Firms must state if their proposed equipment meets or exceeds all system requirements as stated in Section

2.01 Statement of Requirements.

Mark the appropriate box for each item whether it meets, exceeds or is an exception to the listed specifications. If exceeds or is an exception, provide in a separate document detail for each.

High-Speed Camera for Microscope:

Requirement Meets Exceeds Exception Minimum Required Specifications:

• Camera needs to be able to work with a microscope and include standard mounting mechanism (e.g. C-mount)

• Camera must be capable of shooting 1,400 frames per second (FPS) at a full, un-interpolated resolution of 2560x1600.

• Camera must be capable of a maximum frame rate of 290,000 fps.

• Camera must be capable of 2,800 FPS at a minimum resolution of

1920x1080.

• Camera must be capable of 5,700 FPS at a minimum resolution of 1280x720

• Camera must be capable of 14,000 FPS at a minimum resolution of 512x512

• Camera must be capable of a minimum of 1 µs exposure

• Camera must allow partitioning in Camera to incorporate 12-bit

2560x1600 CMOS image sensor technology with selectable 24,36,48-bit color CMOS array

• Camera must have a color CMOS sensor with a minimum Base ISO of 1250 D sensitivity

• Camera to provide 8-steps of E.I. (exposure-index)

• Camera sensor to have 12-bit pixel depth AND convert A to D at 12 Bits, view all video in 12 Bits and save video in a 12 Bit file structure incorporating 4096 Bits per/pixel.

Preferred Specifications:

• Camera manufacturer should provide EMVA 1288 sensor measurements standards report

• Camera should have minimum pixel size of 10 µm (diag).

• Camera should be capable of 1 Gigabit and optional 10 Gigabit Ethernet technology for data transfer

• Camera should incorporate (4) Multi-I/O programmable ports

• Camera should incorporate an internal shutter for remote black reference

• Camera should have HD-SDI and HDMI outputs

• Camera should be capable of 72 GB of onboard RAM p

• Camera should have a secondary power port,12V DC, 12W auxiliary

• Camera should incorporate IRIG SMPTE or MISP timestamp for multi-camera syncing (modulated or unmodulated)

• Camera should incorporate a minimum 1.73 µs straddle-time

• Camera should provide: Range Data Input

• Camera should include OCC (on-camera controls) to change internal setting w/out a PC connected

• Camera chassis should be no larger than 5 x 5.5 x 5” (12.7 x 14 x 12.7 cm) and no heavier than 5.6 lbs (2.5 kg)

SECTION I – BACKGROUND
1.01 Oakland University Background Information
1.02 RFQ Overview
SECTION II – SCOPE OF SERVICES
2.01 Statement of Work
SECTION III - RFQ QUOTE REQUIREMENTS AND SPECIFICATIONS
3.01 Proposal Content
3.02 Cost/Fees
3.03 Freedom of Information Act Requests
SECTION IV – EVALUATION
4.01 Evaluation of RFQ Response
4.02 Process for Award
SECTION V - PROCUREMENT PROCESS
5.01 Submission Method, Date and Time
5.02 Questions and Interpretations
5.03 Withdrawal of Quotes
5.04 Price and Scope of Work Changes
5.05 Mistakes in Quotes
5.06 Execution of Quotes
5.07 Procurement Schedule
SECTION VI – GENERAL CONDITIONS
6.01 Terms and Conditions
6.02 Conflict of Interest
6.03 Cost of Quote
6.04 Form of Purchase
6.05 Government Restrictions
6.06 Nonconformance to Conditions/Specifications/Scope of Services
6.07 Assignment or Transfer
6.08 Patents - Licenses and Royalties
6.09 Permits and Licenses
6.10 Taxes
6.11 Insurance Requirements
6.12 Proof of Insurance
6.13 Standards of Conduct
6.14 Background Checks and Debarment
6.15 Removal of Employees
6.16 Supervision
6.17 Performance Evaluation Meeting
6.18 Federal, State and Local Reporting Compliance
6.19 Project Personnel
6.20 Notices
6.21 Cancellation
6.22 Travel
6.23 Non-Discrimination
SCHEDULE A – Addendum Acknowledgement
SCHEDULE B-INSURANCE REQUIREMENTS ACKNOWLEDGEMENT
SCHEDULE C-COSTS
SCHEDULE D - DETAILED PROPOSAL
SCHEDULE E – SPECIFICATION EXCEPTIONS
Company:
Address:
Date:
Printed Name:
Title:
Phone:
Email:
Addendum No:
Date_2:
Addendum No_2:
Date_3:
Addendum No_3:
Date_4:
Addendum No_4:
Date_5:
Addendum No_5:
Date_6:
Addendum No_6:
Date_7:
Firm Name:
at its sole expense shall cause to be issued and:
Supplier Name:
ManufPart HighSpeed Camera for Microscope:
fill_12:
fill_15:
fill_17:
fill_20:
fill_21:
CommentsRestrictions 1:
CommentsRestrictions 2:
Submitted by:
TitleDate:
Phone_2:
Email_2:
Product Documentation with detailed specifications attached and marked for identification as:
Standard warranty attached and marked for identification as:
Extended warranty attached and marked for identification as:
Provide detailed information on the software and any required license agreement Information:
attached and marked for identification as:
to access and what is included with the free technical support 1:
to access and what is included with the free technical support 2:
to access and what is included with the free technical support 3:
provide information on what is included and number of individuals allowed to take the training 1:
provide information on what is included and number of individuals allowed to take the training 2:
provide information on what is included and number of individuals allowed to take the training 3:
6a If there is a cost for providing onsite training provide the cost and what is included:
6b If onsite training is not available provide information on other training options 1:
6b If onsite training is not available provide information on other training options 2:
6b If onsite training is not available provide information on other training options 3:
University taking ownership of the equipment only upon delivery at Oakland Universitys dock location:
Please state where your product is manufactured:
MeetsMinimum Required Specifications:
ExceedsMinimum Required Specifications:
ExceptionMinimum Required Specifications:
MeetsCamera needs to be able to work with a microscope and include standard mounting mechanism eg Cmount:
ExceedsCamera needs to be able to work with a microscope and include standard mounting mechanism eg Cmount:
ExceptionCamera needs to be able to work with a microscope and include standard mounting mechanism eg Cmount:
MeetsCamera must be capable of shooting 1400 frames per second FPS at a full uninterpolated resolution of 2560x1600:
ExceedsCamera must be capable of shooting 1400 frames per second FPS at a full uninterpolated resolution of 2560x1600:
ExceptionCamera must be capable of shooting 1400 frames per second FPS at a full uninterpolated resolution of 2560x1600:
MeetsCamera must be capable of a maximum frame rate of 290000 fps:
ExceedsCamera must be capable of a maximum frame rate of 290000 fps:
ExceptionCamera must be capable of a maximum frame rate of 290000 fps:
MeetsCamera must be capable of 2800 FPS at a minimum resolution of 1920x1080:
ExceedsCamera must be capable of 2800 FPS at a minimum resolution of 1920x1080:
ExceptionCamera must be capable of 2800 FPS at a minimum resolution of 1920x1080:
MeetsCamera must be capable of 5700 FPS at a minimum resolution of 1280x720:
ExceedsCamera must be capable of 5700 FPS at a minimum resolution of 1280x720:
ExceptionCamera must be capable of 5700 FPS at a minimum resolution of 1280x720:
MeetsCamera must be capable of 14000 FPS at a minimum resolution of 512x512:
ExceedsCamera must be capable of 14000 FPS at a minimum resolution of 512x512:
ExceptionCamera must be capable of 14000 FPS at a minimum resolution of 512x512:
MeetsCamera must be capable of a minimum of 1 s exposure:
ExceedsCamera must be capable of a minimum of 1 s exposure:
ExceptionCamera must be capable of a minimum of 1 s exposure:
MeetsCamera must allow partitioning in Camera to incorporate 12bit 2560x1600 CMOS image sensor technology with selectable 243648bit color CMOS array:
ExceedsCamera must allow partitioning in Camera to incorporate 12bit 2560x1600 CMOS image sensor technology with selectable 243648bit color CMOS array:
ExceptionCamera must allow partitioning in Camera to incorporate 12bit 2560x1600 CMOS image sensor technology with selectable 243648bit color CMOS array:
MeetsCamera must have a color CMOS sensor with a minimum Base ISO of 1250 D sensitivity:
ExceedsCamera must have a color CMOS sensor with a minimum Base ISO of 1250 D sensitivity:
ExceptionCamera must have a color CMOS sensor with a minimum Base ISO of 1250 D sensitivity:
MeetsCamera to provide 8steps of EI exposureindex:
ExceedsCamera to provide 8steps of EI exposureindex:
ExceptionCamera to provide 8steps of EI exposureindex:
MeetsCamera sensor to have 12bit pixel depth AND convert A to D at 12 Bits view all video in 12 Bits and save video in a 12 Bit file structure incorporating 4096 Bits perpixel:
ExceedsCamera sensor to have 12bit pixel depth AND convert A to D at 12 Bits view all video in 12 Bits and save video in a 12 Bit file structure incorporating 4096 Bits perpixel:
ExceptionCamera sensor to have 12bit pixel depth AND convert A to D at 12 Bits view all video in 12 Bits and save video in a 12 Bit file structure incorporating 4096 Bits perpixel:
MeetsPreferred Specifications:
ExceedsPreferred Specifications:
ExceptionPreferred Specifications:
MeetsCamera manufacturer should provide EMVA 1288 sensor measurements standards report:
ExceedsCamera manufacturer should provide EMVA 1288 sensor measurements standards report:
ExceptionCamera manufacturer should provide EMVA 1288 sensor measurements standards report:
MeetsCamera should have minimum pixel size of 10 m diag:
ExceedsCamera should have minimum pixel size of 10 m diag:
ExceptionCamera should have minimum pixel size of 10 m diag:
MeetsCamera should be capable of 1 Gigabit and optional 10 Gigabit Ethernet technology for data transfer:
ExceedsCamera should be capable of 1 Gigabit and optional 10 Gigabit Ethernet technology for data transfer:
ExceptionCamera should be capable of 1 Gigabit and optional 10 Gigabit Ethernet technology for data transfer:
MeetsCamera should incorporate 4 MultiIO programmable ports:
ExceedsCamera should incorporate 4 MultiIO programmable ports:
ExceptionCamera should incorporate 4 MultiIO programmable ports:
MeetsCamera should incorporate an internal shutter for remote black reference:
ExceedsCamera should incorporate an internal shutter for remote black reference:
ExceptionCamera should incorporate an internal shutter for remote black reference:
MeetsCamera should have HDSDI and HDMI outputs:
ExceedsCamera should have HDSDI and HDMI outputs:
ExceptionCamera should have HDSDI and HDMI outputs:
MeetsCamera should be capable of 72 GB of onboard RAM p:
ExceedsCamera should be capable of 72 GB of onboard RAM p:
ExceptionCamera should be capable of 72 GB of onboard RAM p:
MeetsCamera should have a secondary power port12V DC 12W auxiliary:
ExceedsCamera should have a secondary power port12V DC 12W auxiliary:
ExceptionCamera should have a secondary power port12V DC 12W auxiliary:
MeetsCamera should incorporate IRIG SMPTE or MISP timestamp for multi camera syncing modulated or unmodulated:
ExceedsCamera should incorporate IRIG SMPTE or MISP timestamp for multi camera syncing modulated or unmodulated:
ExceptionCamera should incorporate IRIG SMPTE or MISP timestamp for multi camera syncing modulated or unmodulated:
MeetsCamera should incorporate a minimum 173 s straddletime:
ExceedsCamera should incorporate a minimum 173 s straddletime:
ExceptionCamera should incorporate a minimum 173 s straddletime:
MeetsCamera should provide Range Data Input:
ExceedsCamera should provide Range Data Input:
ExceptionCamera should provide Range Data Input:
MeetsCamera should include OCC oncamera controls to change internal setting wout a PC connected:
ExceedsCamera should include OCC oncamera controls to change internal setting wout a PC connected:
ExceptionCamera should include OCC oncamera controls to change internal setting wout a PC connected:
MeetsCamera chassis should be no larger than 5 x 55 x 5 127 x 14 x 127 cm and no heavier than 56 lbs 25 kg:
ExceedsCamera chassis should be no larger than 5 x 55 x 5 127 x 14 x 127 cm and no heavier than 56 lbs 25 kg:
ExceptionCamera chassis should be no larger than 5 x 55 x 5 127 x 14 x 127 cm and no heavier than 56 lbs 25 kg:

File details come from the government source that posted it. Updated .