This document is Addendum Number 001 for the Metals Development Parapet Repair project (RFP SC-25-668) at Ames Laboratory, issued on June 2, 2025, with a bid due date of June 12, 2025. The addendum addresses several contractor questions and modifications, including providing scalable drawings in the original 30 inch by 42" format, confirming the project's tax-exempt status, and specifying details about parapet reconstruction, such as matching existing coursing patterns with a false header course.

The addendum includes additional information about site access, noting an existing utility/walkway tunnel connecting to Spedding Hall, and requires contractors to provide a staging plan with shoring reinforcement if equipment drives over the tunnel. It also adds an alternate for selective tuckpointing (estimated 50 SF) and expands acceptable manufacturers for roofing-related materials, specifically adding Sika/Sarnafil as an approved manufacturer for self-adhered sheet air barriers, PVC thermoplastic single-ply roofing, and fluid applied roofing. The document explicitly rejects IB Roof Systems as an approved equal for this project, emphasizing compatibility with an upcoming reroof project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10FOLD / JUNE 2, 2025

METALS DEVELOPMENT PARAPET REPAIR

AMES LABORATORY

ADDENDUM NUMBER 001

ADDENDUM NUMBER 001

ADDENDUM DATE: June 2, 2025

PROJECT: Metals Development Parapet Repairs Project

RFP SC-25-668

BID DUE DATE: June 12, 2025

The information contained in this Addendum modifies, supplements or replaces information contained in the Bidding Documents dated May 12, 2025, and is hereby made a part of the Contract Documents.

Acknowledge receipt of this Addendum by inserting its number on the Proposal Form.

Addendum consists of two pages.

ADDENDUM INDEX

GENERAL ITEMS Item #1.

APPLICABLE TO THE PROJECT MANUAL: Item #2 ADDITIONAL ACCEPTABLE PRODUCTS AND SYSTEMS Item #3.

ATTACHMENTS: None

GGENERAL ITEMS:

ITEM #1: QUESTIONS/COMMENTS FROM CONTRACTORS:

A. Comment: Please provide scalable drawings. The drawings provided with the RFP were printed in a landscape view on a portrait page format.

Response: Original formatted 30 inch by 42” drawings have downloaded to the RFP SC-25-668 project online drop box.

B. Comment: Please confirm this project is tax exempt.

Response: Yes, this project is tax exempt.

C. Question: Existing 3-wythe brick parapet has tie courses (seen in attached pics as header courses). Reconstruction calls for CMU/Brick veneer. Is the intent to lay back the new brick with false header course or use running bond for all lay back of brick.

Response: New parapet work to match existing coursing pattern and include false header course.

D. Question: During Pre-Bid meeting, it was mentioned that there are underground tunnels on the South Elevation. Are there any drawings that show the locations and/or the weight capacity of equipment that can be utilized on that side (or any side) of the building. Some elements of the existing building to be removed and reinstalled will need to be done using lift equipment and cannot be done by just manpower.

Response: Site plans shown on sheet G0.0 do show the location of the existing utility/walkway tunnel (yellow dotted line) connecting to Spedding Hall. It is believed that no other utility tunnels are located at the perimeter of this building that would affect this project. The

10FOLD / JUNE 2, 2025

METALS DEVELOPMENT PARAPET REPAIR

AMES LABORATORY

ADDENDUM NUMBER 001

Contractor will be responsible for providing staging plan including shoring reinforcement should equipment be driving over tunnel (Site Access Note G).

E. Question: IB Roof Systems is submitting for your review the IB Single Ply Roofing Materials listed on the *accompanying attachment(s) and hereby requests that said Materials be approved as an acceptable alternate to the corresponding products for the above referenced project.

Response: IB Roof Systems will not be an approved equal for this project. The majority of the work is to be the replacement of the masonry parapet wall that will include a PVC membrane wrap to be tied into an upcoming reroof project. The membranes specified are to be compatible with reroof project membranes specified.

APPLICABLE TO

PROJECT MANUAL:

ITEM #2: SECTION 01 23 00 – ALTERNATES

A. ADD Paragraph 1.03.E Alternate No. 4:

2. Estimated quantity of selective tuckpointing: 50 SF. See elevations for marked locations.

DRAWINGS:

None

ADDITIONAL ACCEPTABLE PRODUCTS AND SYSTEMS:

ITEM #3:

Section # Title Paragraph # Acceptable Manufacturer

07 27 13 Self-Adhered Sheet Air Barrier 2.02.A 3. Additional manufacturers:

Sika/Sarnafil

07 54 19 PVC Thermoplastic Single-Ply Roofing

2.01 D. Sika/Sarnafil

07 56 00 Fluid Applied Roofing 2.01 D. Sika/Sarnafil

ATTACHEMENTS:

None

END OF ADDENDUM 001