This document is a Safety Appendix for an MD Parapet Repairs project at Ames National Laboratory, detailing comprehensive safety requirements and deliverables for contractors and subcontractors. The appendix mandates strict compliance with Department of Energy (DOE) worker protection policies, including adherence to ACGIH Threshold Limit Values (TLVs), submission of documentation such as training records, medical clearance, and Safety Data Sheets (SDS), and protocols for handling potential hazards like mercury compounds, asbestos, radiation, crystalline silica, and noise exposure.

Key safety provisions include requirements for chemical management, traffic control, lifting procedures, fall protection, personal protective equipment (PPE), respiratory protection, and specific guidelines for working with generators, ladders, scaffolding, and in areas with potential electrical or utility hazards. Contractors must complete a Subcontractor Affirmation Form, identify and mitigate potential hazardous atmospheres, survey construction debris, and follow detailed safety protocols for wall/ceiling/floor penetrations, machine guards, and pinch point identification. The document emphasizes the importance of proactive safety measures and immediate notification of Ames National Laboratory Environmental Safety and Health (ESH) if unforeseen hazards are encountered.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MD Parapet Repairs Safety Appendix

Safety Requirements and Deliverables

This appendix is not intended to be a comprehensive list. Additional documentation and requirements may arise as the project progresses.

1. Per DOE policy, CFR 851 Worker Protection Plan, Ames Laboratory contractors and subcontractors must demonstrate compliance with ACGIH TLVs, typically by industrial hygiene monitoring or objective third-party data.

2. All documentation must be available to Ames Laboratory upon request including, but not limited to:

training records, medical clearance, SOPs, and SDSs shall be provided in conjunction with the hazard evaluation and hazard management statements.

3. Copies of SDS for all chemicals, compounds, coatings, paints, etc. which will be brought on-site must be submitted in conjunction with the hazard evaluation documentation, or as soon as it is determined it will be used.

4. Contractors may encounter mercury compounds while working in laboratory space, elemental mercury when removing drain traps, or mercury vapor via broken fluorescent lamps.

5. Subcontractors are not to access interstitial spaces due to potential contamination unless approved by

Ames National Laboratory ESH. (Beryllium, Radiological, Asbestos, etc. concerns)

6. Asbestos hazards or Potential Asbestos Containing Materials (PACM) will be identified by Ames National

Laboratory. If asbestos is positively identified, or is a PACM that could not be tested, a mitigation plan will be developed by subcontractor and Ames National Laboratory.

a. If unidentified material is discovered while work is being performed, Ames National Laboratory

ESH should be notified immediately.

7. Radiation hazards will be identified by Ames National Laboratory. If Radiation contamination is positively identified, a mitigation plan will be developed by subcontractor and Ames National Laboratory.

a. If unidentified material is discovered while work is being performed, Ames National Laboratory

ESH should be notified immediately.

8. Crystalline Silica Exposures- Note that the Department of Energy requires that their contractors comply with the ACGIH TLV-TWA for respirable crystalline silica (RCS) as the exposure limit. This is a more stringent standard than the OSHA PEL (TLV=0.025 mg/m3 RCS; PEL=0.050 mg/m3 RCS).

a. Work pause and the reassessment of work practices and personal protection with the Industrial

Hygiene department are required if visible dust is observed in an operation.

9. Nuisance dust may be generated during work activities, if visible dust is observed, a reassessment of work practices and personal protection by Ames National Laboratory is required.

10. Identification of hazardous environments, including thermal stress such as extreme cold, heat or high humidity, shall be identified and accounted for in the work planning and control procedures. (Hazard

Management Statements)

11. Activities that produce noise above 85 dBA using ACGIH standards shall be accounted for using engineering control, or using PPE such as earplugs, earmuffs or a combination of.

12. Traffic interruptions, foot traffic, vehicle traffic, etc., are prohibited without a Traffic Control Plan developed, reviewed and approved by Ames National Laboratory and Iowa State Department of Public

Safety.

13. Lifting of objects over 50 pounds shall be completed using a two person lift or using a lifting device.

14. Subcontractor Affirmation Form needs to be completed and signed by all subcontractor’s and sub-tier subcontractor’s company representatives to acknowledge that all rules and regulations listed in the Terms and Conditions, along with any other safety related documents and or conversations, are being communicated and adhered to through all tiers of subcontractors. It is the responsibility of the subcontractor awarded the contract to make sure all sub-tier subcontractors are following all rules and regulations at all times, and enforce proper escalation protocols if rules and regulations are not being followed.

15. A list of all chemicals being used, along with current SDS sheets for all chemicals being brought on site must be supplied. Personal exposure records for any of the chemicals being brought on site can be requested by Ames National Laboratory.

16. Contractors shall supply Ames National Laboratory with a list of, and current SDS for all chemicals being brought on site. If the total quantity of chemicals to be brought or stored on site exceeds 4 Liters, arrangements for proper storage shall be made in advance or chemicals exceeding 4 liters shall be removed from the site at the end of the workday.

17. Any activity that may create a hazardous atmosphere must be identified in the scope of work, along with all engineering, and or administrative controls being put in place to mitigate the hazard.

18. All construction debris will be surveyed before being removed from work area.

19. Wall/ceiling/floor penetrations necessitate a review of historical records, engineering plans, and as-built drawings that pertain to the area/location where the penetration is planned.

a. Failure to understand what may lie behind a penetration may lead to contact and exposure to hazardous materials, electrical and other utilities. Contact may result in serious injury, death and/or property damage.

b. Non-destructive scanning should be performed.

c. All drilling or cutting work should use double insulated tools and wear appropriate insulating gloves in the event a hidden live feed is encountered

20. Make sure a generator is properly grounded and the grounding connections are tight. Consult the manufacturer’s instructions for proper grounding methods.

21. Never operate a portable generator inside a building or near windows and doors. It produces deadly carbon monoxide gas.

22. A Fall Protection Program must be submitted and reviewed before any work is allowed to be performed in the proximity of floor openings, on elevated work platforms, or on scaffolds.

a. For any leading-edge work, barriers and warning flags must be installed during the duration of the project.

b. All scaffolding usage will comply with 29 CFR part 1926, subpart L.

i. Scaffolding must be erected and inspected by a trained competent person.

1. That competent person is to be on-site any time scaffolding is in use.

2. Certification must be made available when requested.

c. Usage of portable manlifts will comply with 29 CFR 1910 Subpart F.

23. All ladder usage will comply with 29 CFR 1910.23 or 29 CFR 1926.1053 as applicable.

a. All ladders will be visually inspected daily prior to use.

24. Standard PPE must be worn by persons performing or assisting with performing the work. This includes but is not limited to safety glasses with side shields/safety goggles and hard hats where overhead hazards exist.

a. Additional PPE may be required depending on hazard and mitigation requirements.

25. Respirators may be required, but are not limited to, when:

a. Airborne concentrations are elevated and ventilation/engineering controls cannot sufficiently reduce airborne exposures

b. Large surface areas and substantial hand work are involved

c. When respirators are used a respiratory protection program must be developed and implemented which complies with 29 CFR 1910.134 or CFR 1926.103 as applicable.

d. Note that the Department of Energy requires that their contractors comply with the ACGIH TLVs

(time-weighted averages, short-term exposure limits, ceilings).

26. All machine guards must be installed to protect against rotating parts.

27. Potential pinch points shall be identified before work is to proceed and all parties are to be notified and given clear instructions on how to avoid being in or around pinch points before work is to be performed.