This document is an Addendum #1 for the Ames Lab MD 150 Metallic Construction project, issued on August 22, 2025, by Ames National Laboratory. The addendum modifies the original Request for Proposal (RFP) and provides clarifications, updates, and additional details for the construction project located at 2408 Pammel Dr, Ames, Iowa. Key modifications include revisions to specifications, drawings, and project requirements, such as updating the Substantial Completion date to 08/18/2026, adding new sections for Structural Steel Framing and Built-Up Bituminous Roofing, and making changes to various drawing sheets.
The addendum addresses multiple aspects of the project, including demolition, new work, piping, and mechanical and electrical systems. Specific changes include infilling existing pits, modifying wall penetrations, revising piping details, and updating equipment connections. The project involves coordination with a concurrent roofing project and requires careful handling of existing equipment and systems. The bid date is set for September 5th, 2025, at 4:00 pm, and the addendum contains 11 items that contractors must review and incorporate into their proposals. The project team includes Roseland, Mackey, Harris Architects, Tometich Engineering, and Resource Consulting Engineers LLC.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1
General, Mechanical & Electrical Construction
Project Title RFP-SC-25-665 MD 150 Metallic Construction 2408 Pammel Dr, Ames, IA 50011
Owner Ames National Laboratory 2408 Pammel Dr Ames, Iowa 50011
(515) 294-3483
Architect Roseland, Mackey, Harris Architects, PC 1615 Golden Aspen Drive, Suite 110 Ames, Iowa 50010 515-292-6075
Structural Engineer Tometich Engineering Inc.
10501 Buena Vista Court Urbandale, IA 50322 515-280-8022
Mechanical & Electrical Engineer
Resource Consulting Engineers LLC 301 Alexander Ave Suite C Ames, IA 50010 515-292-2500
Addendum Issue Date August 22, 2025
Bid date Friday, September 5th, 2025 at 4:00 pm
Addendum #1 contains 11 items.
https://www.google.com/search?q=ames+lab+address&rlz=1C1UEAD_enUS992US992&oq=ames+lab+ad&gs_lcrp=EgZjaHJvbWUqBwgAEAAYgAQyBwgAEAAYgAQyBggBEEUYQDIGCAIQRRg5MggIAxAAGBYYHjIICAQQABgWGB4yCAgFEAAYFhgeMgcIBhAAGO8FMgoIBxAAGIAEGKIE0gEIMjAwN2owajeoAgCwAgA&sourceid=chrome&ie=UTF-8
ADDENDUM NO. 1
Issued August 22, 2025
To all General contract bidders on the Work titled: RFP-SC-25-665 MD 150 Metallic Construction. The proposed Contract Documents are modified as follows:
ITEM 1. ADDENDUM NO. 1 Q
QUESTIONS AND ANSWERS.
1. Drawing Sheet A3.0 Elevation/Section 1, 2, 3, & 4 has a note that states "Patch all imperfections walls/ceiling...". This note is very vague and can produce a lot of risk when left to interpretation. Please provide an estimated quantity for patching.
1.1. Refer to the Drawings, Sheet A3.0, Drawing 1; revise the note regarding wall patching and infill to state “Contractor shall patch and repair cracks, chips, and blemishes in existing masonry walls within remodeled areas where larger than ½" in any dimension.
Smaller nail holes and minor imperfections may remain unless otherwise noted.”
2. Please provide updated structural and MEP drawings sheets once the all the equipment has been selected and the weights and utility requirements have been coordinated.
2.1. Equipment to be provided is not able to be provided as apart of this addendum. Once Contractor has a signed contract, an NDA can be executed for access to drawings for equipment to be installed.
3. Please provide product data and cut sheets for the New Unit Substation #3 and PD-Lab equipment that are OFCI
3.1. See the attached MEP addendum.
4. Is commissioning required for this project? If so, please provide a commissioning specification section.
4.1. Systems commissioning, exclusive of the electrical transformer, is to be done outside of this contract and be provided by Ames Lab directly. Contractor will need to aid and assist in the start-up process of all systems for the commissioning agent.
5. Please confirm the commissioning agent is provided by Ames Lab. The contractor is only commissioning assist.
5.1. Systems commissioning, exclusive of the electrical transformer, is to be done outside of this contract and be provided by Ames Lab directly. Contractor will need to aid and assist in the start-up process of all systems for the commissioning agent.
6. Please provide a schedule of delivery for the OFCI equipment to include the equipment we are tying into as well.
6.1. See the proposed schedule for equipment delivery from supplier:
PAM: 06/03/2026
VSC: 07/01/2026
EB: 08/03/2026
6.2. Equipment to be provided is not able to be provided as apart of this addendum. Once Contractor has a signed contract, an NDA can be executed for access to drawings for equipment to be installed.
7. Please provide a list of areas that will require escorting by Ames personnel.
7.1. Contractor will need to be escorted and provide proper training certifications for access to specific areas of the building.
• Technology closets o Ames Lab escort required
• Contractor to not access interstitial spaces due to potential contamination.
• Tunnels o Confined space training required for access to tunnels for all work as apart of project scope. Training to be sourced from 3rd party resource by Contractor. Training to comply with CFR1910.146 and CFR1926 Subpart
AA.
SPECIFICATIONS.
ITEM 2. ADDENDUM NO. 1
Refer to the specifications; Section 00 3000 SPECIAL CONDITIONS; 1.01; Revise the date for Substantial Completion to 08/18/2026 in lieu of 08/18/2025.
ITEM 3. ADDENDUM NO. 1
Refer to the specifications; Add new Section 05 1200 STRUCTURAL STEEL FRAMING in its entirety, bound to this addendum.
ITEM 4. ADDENDUM NO. 1
Refer to the specifications; Add new Section 07 5100 Built-Up Bituminous Roofing in its entirety, bound to this addendum.
DRAWINGS.
ITEM 5. ADDENDUM NO. 1
Refer to the Drawings, Sheet A2.0, Drawing 1; delete this sheet and insert revised sheet bound in this addendum including the scope to infill part of the pit where indicated.
ITEM 6. ADDENDUM NO. 1
Refer to the Drawings, Sheet A2.1, Drawing 1; delete this sheet and insert revised sheet bound in this addendum including the scope to demolish existing structure supporting the pit plating to be demolished where indicated.
ITEM 7. ADDENDUM NO. 1
Refer to the Drawings, Sheet A2.2, Drawing 1 and Drawing 3; delete this sheet and insert revised sheet bound in this addendum reflecting the changes involved with infilling the pit where indicated and the related section.
ITEM 8. ADDENDUM NO. 1
Refer to the Drawings, Sheet A2.3, Drawing 1; delete this sheet and insert revised sheet bound in this addendum revising wall penetration and patching for argon piping source where indicated. Drawing 2, see the revised extents of the new pit plates.
ITEM 9. ADDENDUM NO. 1
Refer to the Drawings, Sheet A3.0, Drawing 1; delete this sheet and insert revised sheet bound in this addendum including the scope to infill part of the pit where indicated.
ADDITIONAL INFORMATION.
ITEM 10. ADDENDUM NO. 1
Contractor shall coordinate with the concurrent roofing project on this building, scheduled for construction commencement in the spring of 2026. Contractor to coordinate all roofing penetrations, including exhaust vents and the opening scheduled to be created for the installation of the transformer, with this concurrent project.
Contractor is responsible for timing, flashing, curbs, and repairs per roofing manufacturer’s requirements to maintain warranty, and shall include all coordination, protection, cutting, patching, and repairs in their scope.
ITEM 11. ADDENDUM NO. 1
See attached MEP Engineering addendum for additional information.
END OF ADDENDUM NO. 1
Ames Lab - MD 150 Metallic Construction 05 1200 - 1 STRUCTURAL STEEL FRAMING
07/23/2025
SECTION 05 1200
STRUCTURAL STEEL FRAMING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Structural steel framing members.
1.02 RELATED REQUIREMENTS
A. Section 05 1213 - Architecturally-Exposed Structural Steel Framing: Additional requirements for structural steel members designated as architecturally-exposed structural steel (AESS).
B. Section 05 3100 - Steel Decking: Support framing for small openings in deck.
1.03 REFERENCE STANDARDS
A. AISC (MAN) - Steel Construction Manual; 2023, with Errata (2025).
B. AISC 303 - Code of Standard Practice for Steel Buildings and Bridges; 2022, with Errata
(2025).
C. AISC 325 - Steel Construction Manual; 2023.
D. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2019.
E. ASTM A242/A242M - Standard Specification for High-Strength Low-Alloy Structural Steel;
2024.
F. SSPC-SP 3 - Power Tool Cleaning; 2024.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Shop Drawings:
1. Indicate profiles, sizes, spacing, locations of structural members, openings, attachments, and fasteners.
1.05 QUALITY ASSURANCE
A. Fabricate structural steel members in accordance with AISC (MAN) "Steel Construction
Manual."
B. Structural steel members designated as architecturally-exposed structural steel (AESS) to also comply with Section 05 1213.
PART 2 PRODUCTS
2.01 MATERIALS
A. Steel Angles and Plates: ASTM A36/A36M.
B. Steel Shapes, Plates, and Bars: ASTM A242/A242M high-strength, corrosion-resistant structural steel.
2.02 FABRICATION
A. Shop fabricate to greatest extent possible.
2.03 FINISH
A. Prepare structural component surfaces in accordance with SSPC-SP 3.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that conditions are appropriate for erection of structural steel and that the work may properly proceed.
3.02 ERECTION
A. Erect structural steel in compliance with AISC 303.
Construction 05 1200 - 2 STRUCTURAL STEEL FRAMING
07/23/2025
3.03 FIELD QUALITY CONTROL
A. An independent testing agency will perform field quality control tests, as specified in Section 01
4000 - Quality Requirements.
END OF SECTION
Construction 07 5100 - 1 BUILT-UP BITUMINOUS ROOFING
07/23/2025
SECTION 07 5100
BUILT-UP BITUMINOUS ROOFING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Built-up roofing membrane, conventional and protected membrane application for roof cutting and patching.
B. Vapor retarders.
1.02 RELATED REQUIREMENTS
1.03 REFERENCE STANDARDS
A. ASTM C1289 - Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board; 2022a.
B. ASTM D226/D226M - Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing; 2017.
C. ASTM D448 - Standard Classification for Sizes of Aggregate for Road and Bridge Construction;
2012 (Reapproved 2022).
D. ASTM D1863/D1863M - Standard Specification for Mineral Aggregate Used on Built-Up Roofs;
2005 (Reapproved 2024).
E. ASTM D3909/D3909M - Standard Specification for Asphalt Roll Roofing (Glass Felt) Surfaced with Mineral Granules; 2022.
F. ASTM D4263 - Standard Practice for Indicating Moisture in Concrete by the Plastic Sheet Method; 2024.
G. ASTM E1980 - Standard Practice for Calculating Solar Reflectance Index of Horizontal and Low-Sloped Opaque Surfaces; 2024.
H. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes; 2019a.
I. NRCA (RM) - The NRCA Roofing Manual; 2025.
J. UL (FRD) - Fire Resistance Directory; Current Edition.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Provide data indicating membrane and bitumen materials, base flashing materials, insulation, vapor retarder, and surfacing.
1. Sustainable Design Submittal: Include test documentation of solar reflectance and thermal emissivity of membrane, and calculation of solar reflectance index (SRI).
C. Warranty: Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.
1.05 QUALITY ASSURANCE
A. Installer Qualifications: Company specializing in performing the work of this section with minimum three years documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. See Section 01 7419 - Construction Waste Management and Disposal for packaging waste requirements.
B. Deliver materials in manufacturer's original containers, dry and undamaged, with seals and labels intact.
C. Ensure storage and staging of materials does not exceed static and dynamic load-bearing capacities of roof decking.
Construction 07 5100 - 2 BUILT-UP BITUMINOUS ROOFING
07/23/2025
1.07 FIELD CONDITIONS
A. Do not apply roofing membrane during unsuitable weather.
B. Do not apply roofing membrane to damp or frozen deck surface or when precipitation is expected or occurring.
C. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed the same day.
D. Schedule applications so that no partially completed sections of roof are left exposed at end of workday.
1.08 WARRANTY
A. See Section 01 7800 - Closeout Submittals for additional warranty requirements.
B. Correct defective work within a 2-year period after Date of Substantial Completion.
C. Provide 5-year manufacturer's material and labor warranty to cover failure to prevent penetration of water.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Built-Up Bituminous Roofing:
1. CertainTeed Corporation: www.certainteed.com/#sle.
2. Elevate: www.holcimelevate.com/#sle.
3. GAF: www.gaf.com/#sle.
4. Substitutions: See Section 01 6000 - Product Requirements.
2.02 ROOFING - CONVENTIONAL APPLICATION
A. Built-up Bituminous Roofing: Asphalt felt membrane, four plies plus base sheet, with vapor retarder and insulation.
B. Roofing Assembly Requirements:
1. Solar Reflectance Index (SRI): 78, minimum, calculated in accordance with ASTM E1980, based on 3-year aged data.
a. Field applied coating may not be used to achieve specified SRI.
2. Roof Covering External Fire Resistance Classification: UL (FRD) Class A.
C. Acceptable Insulation Types - Tapered Application: Any of types specified.
2.03 SHEET MATERIALS
A. Vapor Retarder Felt: Asphalt-saturated organic, ASTM D226/D226M Type I, No. 15 felt, unperforated.
B. Fire-Resistant Vapor Retarder: Reinforced Kraft paper laminate complying with requirements of fire rating classification; compatible with roofing and insulation materials.
1. Fire-retardant adhesive.
C. White Cap Sheet: Asphalt-saturated glass fiber roll roofing surfaced with flexible acrylic coating and ceramic granules; complying with ASTM D3909/D3909M.
1. Solar Reflectance: 0.75, minimum, initial, and 0.60, minimum, 3-year aged, certified by
Cool Roof Rating Council.
2. Thermal Emissivity: 0.80, minimum, initial, and 0.85, minimum, 3-year aged, certified by
Cool Roof Rating Council.
2.04 BITUMINOUS MATERIALS
2.05 INSULATION
A. Polyisocyanurate (ISO) Board Insulation: Rigid cellular foam, complying with ASTM C1289.
1. Classifications:
a. Type I: Faced with aluminum foil on both major surfaces of the core foam.
Construction 07 5100 - 3 BUILT-UP BITUMINOUS ROOFING
07/23/2025
1) Class 1 - Non-reinforced core foam.
2) Compressive Strength: 16 psi (110 kPa), minimum.
3) Thermal Resistance, R-value (RSI-value): At 1-1/2 inches (38 mm) thick; 9.0
(1.59) at 75 degrees F (24 degrees C).
2. Board Size: 48 by 96 inches (1,220 by 2,440 mm).
3. Board Thickness: 1.0 inch (25 mm).
2.06 SURFACING MATERIALS, CONVENTIONAL
A. Aggregate: ASTM D1863/D1863M Sound, hard washed river gravel; 1/4-inch (6.4-mm) minimum to 1/2-inch (12.7-mm) maximum size.
B. Walkway Pads: Suitable for maintenance traffic, contrasting color or otherwise visually distinctive from roof membrane.
1. Composition: Asphaltic with mineral granule surface.
2. Surface Color: White.
2.07 BALLAST MATERIALS, PROTECTED MEMBRANE
A. No.4 Aggregate: Sound, hard, washed crushed gravel, ASTM D448 Size Classification 4, 3, 24, 2, or 1.
2.08 ACCESSORIES
A. Conductive Primer for Electronic Leak Detection (ELD): Enables ELD of conventional roofing assemblies by providing required conductive substrate directly below roofing membrane.
1. Apply primer directly under roofing membrane on nonconductive surface in accordance with manufacturer's requirements.
2. Products:
a. Detec Systems; TruGround Conductive Primer: www.detecsystems.com/#sle.
b. Substitutions: See Section 01 6000 - Product Requirements.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that surfaces and site conditions are ready to receive work.
B. Verify deck is supported and secure.
C. Verify deck is clean and smooth, flat, free of depressions, waves, or projections, properly sloped and suitable for installation of roof system.
D. Verify deck surfaces are dry and free of snow or ice.
E. Verify that roof openings, curbs, and penetrations through roof are solidly set, and cant strips are in place.
3.02 PREPARATION - CONCRETE DECK
A. Fill surface honeycomb and variations with latex filler.
B. Do not begin work until elevated concrete substrate has cured at least 28 days and moisture content is five percent or less.
1. Test for Concrete Moisture Content: No beading water under plastic after 16 hours when tested in accordance with ASTM D4263.
2. Test for Relative Humidity in Concrete: Not greater than 75 percent when tested in accordance with ASTM F2170.
3.03 INSTALLATION - VAPOR RETARDER, CONVENTIONAL
A. Extend vapor retarder under cant strips and blocking.
3.04 INSTALLATION - MEMBRANE
A. Install built-up bituminous roofing system in accordance with manufacturers recommendations and NRCA (RM) applicable requirements.
Construction 07 5100 - 4 BUILT-UP BITUMINOUS ROOFING
07/23/2025
B. Equiviscous Temperature (EVT) at Point of Application: Comply with NRCA (RM) recommendations.
C. Apply membrane plies, weather lap edges and ends, and mop with 20 lb/100 sq ft (9 kg/9.3 sq
m) of bitumen per ply. Apply plies two on two in same direction.
D. Apply smooth, free from air pockets, wrinkles, fish-mouths, or tears.
E. At end of day's operation, install two plies membrane and bitumen glaze coat for cut-off. Glaze exposed felts. Remove cut-off before resuming roofing.
F. At intersections with vertical surfaces:
1. Extend membrane and base sheet over cant strips and up a minimum of 4 inches (100
mm) onto vertical surfaces.
2. Mop on base flashing of two additional plies of felt and one ply of base flashing material.
G. Around roof penetrations, mop in and seal flanges and flashings with two additional plies of felt.
H. Coordinate installation of roof drains and related flashings.
3.05 APPLICATION - AGGREGATE SURFACING, CONVENTIONAL
A. Apply uniform flood coat of bitumen at rate of 60 lb/100 sq ft (27.2 kg/9.3 sq m).
B. While flood coat is hot, embed aggregate at rate of 400 lb/100 sq ft (181 kg/9.3 sq m).
C. Evenly distribute aggregate and ensure bond with flood coat; extend aggregate to bottom edge of cant strips.
3.06 APPLICATION - SURFACING, PROTECTED MEMBRANE
A. Apply uniform flood coat of bitumen at rate of 6 lb/100 sq ft (2.72 kg/9.3 sq m).
B. Place insulation boards; butt in close contact. Place channel cut face down. Bevel insulation to allow snug fit at cant strips. Cut neatly around protrusions through roof.
C. Install ballast, and evenly distribute ballast aggregate.
3.07 CLEANING
A. See Section 01 7000 - Execution and Closeout Requirements for additional requirements.
B. Remove bituminous markings from finished surfaces.
C. In areas where finished surfaces are soiled by bitumen or other source of soiling caused by work of this section, consult manufacturer of surfaces for cleaning advice and comply with their documented instructions.
D. Repair or replace defaced or damaged finishes caused by work of this section.
3.08 PROTECTION
A. Protect installed roofing and flashings from construction operations.
B. Where traffic must continue over finished roof membrane, protect surfaces using durable materials.
END OF SECTION
UP
A
B
C
D
E
F
G
H
I
J
K
1 2 3 4 5 6 7 8 9 10 11 12 13 14
NOT EXCAVATED
NOT EXCAVATED
NOT EXCAVATED
NOT EXCAVATED
NOT EXCAVATEDNOT EXCAVATED
PIPE TUNNEL PIPE TUNNEL
MD150 PIT
NOT EXCAVATED
PIPE
TUNNEL
MECH ROOM BD17
MECH ROOM BB16 CORRIDOR BB18
LOBBY BE17
ELEV. EL. EQUIP BE19
INFILL OF
EXISTING PIT;
SEE 3/A2.2
FOR SIM
Consultant
Revision Record
Print Record
1615 Golden Aspen Drive Suite 110 Ames, Iowa 50010
515 292 6075 Phone 515 292 6370 Fax mail@rmharchitects.com www.rmharchitects.com
Project Number
A2.0
BASEMENT LEVEL FLOOR PLAN
AMES LAB - MD 150 METALLIC
CONSTRUCTION
07/23/2025ISSUE
07/23/2025
24023
2415 Pammel Dr, Ames, IA 50011
N1/8" = 1'-0"1
BASEMENT
1 ADDENDUM 1 08-22-2025
UP
DEMO MEZZANINE & ALL
RELATED COMPONENTS
H
I
J
K
7 8 9 10 11 12 13 14
D08
D08
D02
D02
D02
D09
D02
D05
D02
D08
D06
LAB 150
LAB 150A
D08
D08
EXISTING PIT
@ -4'-0"
EXISTING PIT
@ -6'-0"
EXISTING PIT
@ -1'-0"
EXISTING PIT
@ -1'-0"
D10 D11
V E R
IF
Y
V E R
IF
Y
D11
DEMO EXISTING
CONCRETE
EQUIPMENT BASE
D03 D03D03
DEMO PIT FLOOR
PLATES
D02
REMOVE QUARRY TILE & ASSOCIATED
SUBSTRATE; INFILL& GRIND SMOOTH
FOR FINISH FLOOR INSTALLATION
V E R
IF
Y
/2
V E R
IF
Y
EXISTING EQUIPMENT
TO REMAIN
ACCESSIBLE DURING
CONSTRUCTION;
PROTECT W/
SCAFFOLDING &
PLYWOOD ENCLOSURE
D08
3' - 4"
D01
D08
NOTE: SALVAGE BRICK MASONRY
@ EXTERIOR FOR INFILL WHERE
INDICATED ON THE EXTERIOR
D09
D13
D13
D13D14
DEMOLISHED CHECKERPLATE PIT
COVER PLATES
DEMOLISHED QUARRY TILE
FLOOR FINISH & ASSOCIATED
MORTAR BED
DEMO EXISTING BEAMS
SUPPORTING PLATES
WHERE INDICATED
EXISTING LAB ROOM 150 (LOOKING WEST) EXISTING LAB ROOM 150A (LOOKING NORTH) EXISTING LAB ROOM 150A (LOOKING SOUTH) EXISTING LAB ROOM 150 (LOOKING NORTHEAST) EXISTING LAB ROOM 150 (LOOKING EAST)
Consultant
Revision Record
Print Record
1615 Golden Aspen Drive Suite 110 Ames, Iowa 50010
515 292 6075 Phone 515 292 6370 Fax mail@rmharchitects.com www.rmharchitects.com
Project Number
A2.1
1ST FLOOR EXISTING/DEMO PLAN
AMES LAB - MD 150 METALLIC
CONSTRUCTION
07/23/2025ISSUE
07/23/2025
24023
2415 Pammel Dr, Ames, IA 50011
N1/4" = 1'-0"1
1ST FLOOR - EXISTING/DEMO
DEMOLITION ITEMS
D01 EXISTING TO REMAIN
D02 REMOVE DOOR, FRAME, AND HARDWARE
D03 DEMO FLOORING & ASSOCIATED FASTENERS & ADHESIVE
D04 REMOVE & REINSTALL ACT AS REQUIRED BY MC
D05 DEMO EXISTING WINDOW UNIT, TRIM, & ASSOCIATED FLASHING
D06 DEMO CASEWORK/CABINETS
D07 DEMO ACCESSORY
D08 DEMO MASONRY WALL CONSTRUCTION
D09 DEMO MEP FIXTURE (SEE MEP)
D10 DEMO EXISTING SITE PAVING
D11 DEMO EXISTING LOADING DOCK, METAL STAIRS, AND ASSOCIATED RAILINGS
D12 DEM EXISTING ACOUSTICAL CEILING TILE SYSTEM
D13 DEMO EXISTING MORTAR/CONCRETE EQUIPMENT PAD TO LEVEL FINISH OF
EXISTING SURROUNDING FLOORING
D14 DEMO EXISTING PIT COVER PLATES; PRESERVE STRUCTURE FOR NEW
PLATES
1" = 40'-0"2
EXISTING INTERIOR FACILITY IMAGES
ALL DEMOLISHED MATERIALS WILL NEED TO BE SURVEYED BY ES&H, TRACKED AND
REPORTED FOR ALL MATERIAL TYPES AND WEIGHTS. PRIORITIZE DEMOLISHED ITEMS
FOR RECYLING OR REUSE.
GENERAL DEMO NOTE
LAB 150 A3.0
A3.0
H
I
J
K
7 8 9 10 11 12 13 14
150C
150B
PATCH & INFILL FLOOR @
LOCATION OF DEMOLISHED
WALL; TYP
PATCH & INFILL FLOOR @
LOCATION OF DEMOLISHED
WALL & TILE FLOOR FINISH; TYP
PATCH & INFILL FLOOR @
LOCATION OF DEMOLISHED
ITEM; TYP
EXISTING UNDERGROUND TUNNEL
SYSTEM TO REMAIN. PROTECT DURING
CONSTRUCTION
7' - 6"
20' - 0" 15' - 0" 15' - 0" 15' - 0" 15' - 0" 15' - 0" 15' - 0"
EPOXY FLOOR SCOPE
BASE BID: ENTIRE ROOM TO BE EPOXY.
ALTERNATE 2A: ONLY 12'-0" STRIP ALONG SOUTH WALL OF ROOM.
CLEAN & SEAL CONCRETE FLOOR TO REMAIN.
ALTERNATE 2B: REMOVAL OF THE ENTIRETY OF THE SCOPE OF EPOXY.
CLEAN & SEAL THE ENTIRE CONCRETE FLOOR TO REMAIN.
INFILL ~1'-0" DEEP
PIT W/ NEW
CONCRETE FLOOR
FINISH
PATCH & INFILL FLOOR @
LOCATION OF DEMOLISHED
CONC. BASE; TYP
PATCH ALL IMPERFECTIONS
@ WALLS/CEILINGS; PAINT
ALL EXISTING WALLS,
CEILINGS, & DOORS/FRAMES
A2.8
REFER TO ELECTRICAL
NEW PIT ACCESS LADDER;
MODIFY STEEL COVER
PLATES FOR ACCESS
INFILL ~1'-0" DEEP
PIT W/ NEW
CONCRETE FLOOR
FINISH
NEW DIAMOND
PLATE PIT ACCESS
FLOOR PLATES
EXISTING EQUIPMENT
TO REMAIN & BE
ACCESSED DURING
CONSTRUCTION;
PROTECT W/
SCAFFOLDING &
PLYWOOD
150A
PAINT
EXISTING
EQUIPMENT
INFILL MORTAR BED W/ NEW CONCRETE; PREP FOR EPOXY FLOOR FINISH
REMOVE & REINSTALL PIT
PLATE STRUCTURE AS
REQUIRED FOR
INSTALLATION OF WATER
TANK; REFER TO MEP FOR
SIZE & LOCATION
CORE DRILL CONCRETE
WALL & PATCH AS NEEDED
FOR PIPING IN PIT;
COORDINATE W/ MEP
INFILL, PATCH, & FINISH
FLOOR @ EXISTING
PIPING REMOVAL
PATCH WALL @ NEW LARGE WALL
PENETRATIONS; COORDINATE W/ MEP
WORK
5 5
ALT 2A
BASE BID
V E R
IF
Y
VERIFY
10' - 6"
NEW DIAMOND PLATE PIT COVER
PLATES
NEW CONCRETE INFILL; MATCH
EXISTING THICKNESS AND FINISH
LEVEL
OVERFLOW TANK TO BE
INSTALLED BELOW FF
LEVEL; REFER TO MEP
NOTE: TOOTH IN MASONRY AROUND ALL MEP
OPENINGS CREATED DURING INSTALLATION.
REFER TO MEP FOR LOCATIONS
*MODIFY COVER PLATES AS
NEEDED FOR MEP PENETRATIONS*
A2.3
INFILL 6'-0" DEEP PIT & FINISH
WITH NEW CONCRETE SLAB
INFILL 4'-0" DEEP PIT & FINISH
WITH NEW CONCRETE SLAB
A2.2
TYP. @ 4' PIT
EXISTING LAB ROOM 150 (LOOKING SOUTHWEST) EXISTING LAB ROOM 150A (LOOKING EAST) EXISTING LAB ROOM 150 PIT EXISTING LAB ROOM 150 PIT EXISTING LAB ROOM 150 (LOOKING WEST) EXISTING LAB ROOM 150 EQUIPMENT TO REMAIN
1ST FLR
0"
10" GRANULAR
FILL
ANCHOR EXISTING STEEL BEAM
TO NEW FOUNDATION WALL
NEW STEEL PLATE PIT COVER
8"
NEW CONCRETE
FOUNDATION WALL
NEW 6" CONCRETE SLAB
OVER VAPOR BARRIER
EXISTING STEEL BEAM TO BE
MODIFIED TO NEW LENGTH REQUIRED
COMPACTED FILL
DOWEL TO EXSTG
DEMO EXISTING SLAB
DOWEL TO NEW WALL
REINFORCE W/ #4 REBAR
@ 12" O.C. BOTH WAYS
Consultant
Revision Record
Print Record
1615 Golden Aspen Drive Suite 110 Ames, Iowa 50010
515 292 6075 Phone 515 292 6370 Fax mail@rmharchitects.com www.rmharchitects.com
Project Number
A2.2
1ST FLOOR NEW WORK PLAN
AMES LAB - MD 150 METALLIC
CONSTRUCTION
07/23/2025ISSUE
07/23/2025
24023
2415 Pammel Dr, Ames, IA 50011
N1/4" = 1'-0"1
1ST FLR - NEW WORK
PROJECT MATERIAL LIST
1 EXISTING TO REMAIN
2 EPOXY FLOOR (GRINDING/SCABBING,PATCHING, AND LEVELING WILL NEED TO BE
PERFORMED TO PROVIDE LEVEL FINISH FOR INSTALLATION.)
3 NEW DOOR (REFER TO SCHEDULE)
4 INFILL MASONRY FROM SALVAGE STOCK
5 PAINT SURFACE
6 NEW CONCRETE FLOOR SLAB & SUPPORTING WALLS FOR LOADING DOCK
7 NEW EXTERIOR POURED-IN-PLACE CONCRETE STAIRS
8 NEW OVERHEAD PREFAB CANOPY
9 NEW STEEL BOLLARD W/ PLASTIC BOLLARD COVER
10 CONCRETE SLAB ON GRADE (THICKNESS AS INDICATED)
11 NEW DISPLAY MONITOR; REFER TO MEP
12 REINSTALL ACT SYSTEM WHERE REMOVED AS REQUIRED BY MC
13 FINISH EXISTING CONCRETE/MORTAR BED TO MATCH SURROUNDING FINISH
14 NEW VINYL BASE @ EPOXY FLOORING
1" = 40'-0"2
EXISTING INTERIOR FACILITY IMAGES #2
1/2" = 1'-0"3
PIT INFILL SECTION
K
3 4 5 6 7
LAB 160
ROOM (ABOVE) 285
PATCH WALL AROUND MEP
PENETRATION FOR ARGON
PIPING
PATCH WALL AROUND MEP
PENETRATION FOR ARGON
PIPING
PATCH WALL AROUND
MEP PENETRATION
FOR ARGON PIPING
LAB 150
Room 161Room 162ARoom 162Room 163
Room 159
J
K
7 8 9
3' - 10" 4' - 3" 3' - 6" 4' - 4" 3' - 8" 4' - 4" 4' - 4" 4' - 2"
E Q
E Q
E Q
E Q
E Q
NOTE: FIELD VERIFY ALL EXISTING PIT STRUCTURING LOCATIONS
PRIOR TO FABRICATION FOR APPROVAL BY AMES LAB & ARCHITECT
CONFIRM PLATE DESIGN @
ACCESS LADDER DURING SHOP
DRAWINGS
A2.3
V E R
IF
Y
VERIFY
10' - 6"
OVERFLOW TANK TO BE
INSTALLED BELOW FF
LEVEL; REFER TO MEP
A2.2
1ST FLR
0"
EXISTING STEEL ANGLE
EXISTING STEEL W BEAM
NEW DIAMOND PLATE STEEL PIT
COVERS W/ 3"X3" STIFFENING
MEMBERS ON UNDERSIDE
REMOVE ALL DEBRIS &
CLEAN PIT FLOOR
EXISTING CONCRETE
FLOOR SLAB
EXISTING CONCRETE
FOUNDATION WALL
EXISTING CONCRETE FLOOR
SLAB
NOTE: FIELD VERIFY ALL EXISTING PIT
STRUCTURING LOCATIONS PRIOR TO
FABRICATION FOR APPROVAL BY AMES
LAB & ARCHITECT
NEW OVERFLOW TANK;
SEE MEP
REMOVE PIT PLATE STRUCTURE
AS REQUIRED FOR INSTALLATION
OF WATER TANK; REFER TO MEP
FOR SIZE & LOCATION
EXISTING PIT PLATES (LOOKING EAST) EXISTING PIT PLATES SUPPORT
EXISTING PIT PLATES (LOOKING WEST)EXISTING PIT PLATES SUPPORT
EXISTING PIT PLATES ANGLE REINFORCEMENT
Consultant
Revision Record
Print Record
1615 Golden Aspen Drive Suite 110 Ames, Iowa 50010
515 292 6075 Phone 515 292 6370 Fax mail@rmharchitects.com www.rmharchitects.com
Project Number
A2.3
1ST FLOOR NEW WORK PLAN -
AMES LAB - MD 150 METALLIC
CONSTRUCTION
07/23/2025ISSUE
07/23/2025
24023
2415 Pammel Dr, Ames, IA 50011
PROJECT MATERIAL LIST
1 EXISTING TO REMAIN
2 EPOXY FLOOR (GRINDING/SCABBING,PATCHING, AND LEVELING WILL NEED TO BE
PERFORMED TO PROVIDE LEVEL FINISH FOR INSTALLATION.)
3 NEW DOOR (REFER TO SCHEDULE)
4 INFILL MASONRY FROM SALVAGE STOCK
5 PAINT SURFACE
6 NEW CONCRETE FLOOR SLAB & SUPPORTING WALLS FOR LOADING DOCK
7 NEW EXTERIOR POURED-IN-PLACE CONCRETE STAIRS
8 NEW OVERHEAD PREFAB CANOPY
9 NEW STEEL BOLLARD W/ PLASTIC BOLLARD COVER
10 CONCRETE SLAB ON GRADE (THICKNESS AS INDICATED)
11 NEW DISPLAY MONITOR; REFER TO MEP
12 REINSTALL ACT SYSTEM WHERE REMOVED AS REQUIRED BY MC
13 FINISH EXISTING CONCRETE/MORTAR BED TO MATCH SURROUNDING FINISH
14 NEW VINYL BASE @ EPOXY FLOORING
N1/4" = 1'-0"1
1ST FLR - NEW WORK 160 AREA
N1/2" = 1'-0"2
MD150 PIT PLATE LAYOUT
1/2" = 1'-0"3
PIT SECTION
ALL DEMOLISHED MATERIALS WILL NEED TO BE SURVEYED BY ES&H, TRACKED AND
REPORTED FOR ALL MATERIAL TYPES AND WEIGHTS. PRIORITIZE DEMOLISHED ITEMS
FOR RECYLING OR REUSE.
GENERAL DEMO NOTE
1" = 40'-0"4
EXISTING PIT IMAGES
14 14
PATCH ALL IMPERFECTIONS
@ WALLS/CEILINGS; PAINT
ALL EXISTING WALLS,
CEILINGS, & DOORS/FRAMES
150A
5 5
TOOTH-IN CMU WHERE
DEMOLISHED; TYP.
TOOTH-IN CMU WHERE
DEMOLISHED; TYP.
PATCH ALL IMPERFECTIONS
@ WALLS/CEILINGS; PAINT
ALL EXISTING WALLS,
CEILINGS, & DOORS/FRAMES
14 14
PATCH ALL IMPERFECTIONS
@ WALLS/CEILINGS; PAINT
ALL EXISTING WALLS,
CEILINGS, & DOORS/FRAMES
150C
150B
1ST FLR
0"
LOW ROOF DECK
16' - 4"
7 8 9 10 11 12 13 14
5 PATCH & PAINT WALLS WHERE ANY
DEMOLISHED MEZZANINE ITEMS IMPACTED
FINISH SURFACE
TOOTH-IN CMU WHERE
DEMOLISHED; TYP.
NEW PIT ACCESS
FLOOR PLATES
INFILL OF EXISTING PIT;
SEE 3/A2.2 FOR SIM
EXISTING PIT TO REMAIN
5 5 5 55
CLEAN & SEAL EXISTING
CONCRETE FLOOR WHERE
TO REMAIN
PATCH ALL IMPERFECTIONS
@ WALLS/CEILINGS; PAINT
ALL EXISTING WALLS,
CEILINGS, & DOORS/FRAMES
NEW PIT ACCESS
LADDER
A3.0
MASONRY INFILL @ DEMOLISHED
DUCTWORK; REFER TO MEP FOR
SIZES @ LOCATION
1ST FLR
0"
ROOF PLAN
26' - 8 1/4"
2ND FLOOR
12' - 5 1/2"
7891011121314
VERIFY INFILL @
GRILLE DEMO W/ MEP
1ST FLR
0"
1' - 6"
STEEL LADDER W/ 2 1/2" X 1/2"
STRINGERS, 3/4" DIA RUNGS & 2 1/2"
X 1/2" BRACKETS W/ 3/8" DIA BOLTS
TO FLOOR AND WALL
0'-0" - LOADING DOCK
0' - 0"
Consultant
Revision Record
Print Record
1615 Golden Aspen Drive Suite 110 Ames, Iowa 50010
515 292 6075 Phone 515 292 6370 Fax mail@rmharchitects.com www.rmharchitects.com
Project Number
A3.0
ELEVATIONS / SECTION
AMES LAB - MD 150 METALLIC
CONSTRUCTION
07/23/2025ISSUE
07/23/2025
24023
2415 Pammel Dr, Ames, IA 50011
1/4" = 1'-0"3
INT WEST ELEVATION
1/4" = 1'-0"4
INT SOUTH ELEVATION
PROJECT MATERIAL LIST
1 EXISTING TO REMAIN
2 EPOXY FLOOR (GRINDING/SCABBING,PATCHING, AND LEVELING WILL NEED TO BE
PERFORMED TO PROVIDE LEVEL FINISH FOR INSTALLATION.)
3 NEW DOOR (REFER TO SCHEDULE)
4 INFILL MASONRY FROM SALVAGE STOCK
5 PAINT SURFACE
6 NEW CONCRETE FLOOR SLAB & SUPPORTING WALLS FOR LOADING DOCK
7 NEW EXTERIOR POURED-IN-PLACE CONCRETE STAIRS
8 NEW OVERHEAD PREFAB CANOPY
9 NEW STEEL BOLLARD W/ PLASTIC BOLLARD COVER
10 CONCRETE SLAB ON GRADE (THICKNESS AS INDICATED)
11 NEW DISPLAY MONITOR; REFER TO MEP
12 REINSTALL ACT SYSTEM WHERE REMOVED AS REQUIRED BY MC
13 FINISH EXISTING CONCRETE/MORTAR BED TO MATCH SURROUNDING FINISH
14 NEW VINYL BASE @ EPOXY FLOORING
1/4" = 1'-0"2
INT EAST ELEVATION
1/4" = 1'-0"1
BUILDING SECTION 1
3/16" = 1'-0"5
N ELEV VIEW
1/2" = 1'-0"6
PIT LADDER ELEVATION
Addendum #1
Project: Ames Lab - MD150 Metallic Construction
Location: Ames, IA
Date: 8/22/2025
Owner: Ames Laboratory
Project Number:
Engineer: Resource Consulting Engineers, LLC
Project Number: 2024.011.00
ADDENDUM #1 IS ISSUED TO ALL PLAN HOLDERS:
1 26116.11 Section
4.05
None Add "Engage a Square D factory authorized representative to perform the scope of work per
Schneider Electric document 1910DB1302-120213
Scopes of Work for Electrical Acceptance Testing.
Engage a Square D factory authorized representative for set up of the power monitoring and breaker metering, integrating new devices into the existing BACnet system, and commissioning the system."
2 26999 26999 Add Section 26999 - Owner Furnished Square D
Electrical Gear Package to Project manual. NOTE:
this equipment is expected to ship in late May
2026.
3 P1.1 Revise piping as shown on attached sheet P1.1.
4 P8.0 Revise piping details as shown on attached sheet
P8.0.
5 M1.1 Revise keynotes as shown on attached M1.1.
6 M1.3 Revise keynotes as shown on attached M1.3.
7 M2.0 Revise piping as shown on attached M2.0.
8 M2.1 Revise piping as shown on attached M2.1.
9 M7.1 Revise piping as shown on attached M7.1.
10 M8.0 Revise VFD schedule as shown on attached M8.0.
11 M8.1 Delete schedule as shown on attached M8.1.
12 M9.1 Revise sequence and points list as shown on attached M9.1
Bidders shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form by inserting its number. Information included in this Addendum forms part of the Contract Documents by revising the originally issued Drawings and Project Manual. Failure to acknowledge this Addendum may result in a Bid not being considered.
All items included in this Addendum shall supersede, modify, and/or change all statements or drawings to the contrary in the Drawings and Project Manual. The previously issued Drawings and Project Manual perpared for this Project are hereby modified, amended, or clarified as stated herein.
CHANGES TO PROJECT MANUAL
CHANGES TO DRAWINGS
Addendum Item
Section/
Drawing Sheet
Paragraph/
Location Attachment Change
13 ED1.1 ED1.1 Revise PA speaker scope as shown on attached sheet.
14 E2.2 E2.2 Delete bus duct between substation secondary breaker and PD-LAB and replace with field installed conduit and wire as shown on attached sheet.
15 E2.2 E2.2 Add one CAT6 data cable with terminations in 1" conduit from the new substation secondary breaker to the existing data rack in Room B3. Add one CAT6 data cable with terminations in 1" conduit betweeen new substation secondary breaker and PD-LAB.
16 E3.1 E3.1 Revise System Plan as shown on attached sheet.
17 E5.0 E5.0 Revise Electrical Riser Diagram as shown on attached sheet.
18 E7.0 E7.0 Delete General Note B from Details 7 and 8 as shown on attached sheet.
END OF ADDENDUM
Resource Consulting Engineers, LLC www.resourcece.com
Internal
Proposal Name: AMES LAB - Metals Development Room 150 Substation Prepurchase Quote Name: 1-AMES Substation Dwg R02-14-2025
Proposal Number: P-250403-5156567
Quote Number: Q-5858411
Quote Date: 06/18/2025
Through Addenda Number: 0
Sales Representative: Douglas Atkinson
Conditions of Sale
This Quotation is subject to Coordinated Project Terms. See https://www.se.com/us/en/download/document/0100PL0043/
Quoted price in currencies other than U.S. Dollars is per the annual Schneider Electric exchange guidance.
Quote is valid for 30 days. Quoted lead times are approximate and subject to change.
Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without penalty or charge as a result of any event beyond its control arising from or due to the current Covid-19 epidemic or events subsequent to this epidemic / pandemic including changes in laws, regulations, by laws or direction from a competent authority.
Clarifications and Exceptions The bill of material is based on our best interpretation of the information provided with the request for quotation. The quotation supplied for this project may not meet the local code/ordinance requirement unless specifically identified in the customer documentation supplied for review. The bill of material should be reviewed to ensure that the equipment quoted meets the project requirements. The following clarifications are provided to emphasize issues not specifically stated in the bill of material.
This proposal is based on standard lugs for copper conductors unless noted otherwise. Lugs for oversized aluminum conductors may affect the quoted price.
None:
1) Furnished by others unless noted otherwise: Studies, LV & spare MV Fuses 261116.11, 2.4, D., 3., NETA Testing, NEC Testing, IR Scanning, Voltage Monitoring, Primary & Secondary Injection Testing.
2) 261116.11, 2.6. - Busway Specifications have not been provided. Proposing Copper conductors.
3) 261116.11, 2.4., A., 1. - Metal Enclosed Switchgear is not arc-resistant, although inherent arc-limiting characteristics are inherent:
Switch Compartment:
• Sealed for life in SF6 gas
• Interruption in sealed enclosure
◦ No external arcing The qualities of SF6 gas are used to extinguish the electrical arc. The arc appears when the fixed and moving contacts separate. The combination of the current and the magnetic field created by the current cause arc rotation around the stationary contact.
This rotation produces arc extension and cooling until the arc is extinguished at current zero. After this, the distance between the fixed and moving contacts is sufficient to withstand the recovery voltage. This system provides extended electrical endurance due to very low wear on the contacts.
4) 261116.11 - PZ4 UL1558 LVDO Switchgear: E., 3.6 - Slow closing not available.
5) Drawing E1.0EP, Metering Note 2.: Junction Box & Cable furnished by others.
FOR REFERENCE ONLY
THIS EQUIPMENT WILL BE PURCHASED BY THE
OWNER UNDER A SEPERATE CONTRACT. THIS
CONTRACT SHALL INCLUDE TAKING DELIVERY,
INSTALLATION, AND STARTUP OF THE EQUIPMENT
DESCRIBED BELOW.
Internal
6) Proposing standard 18-month warranty from date of shipment unless noted otherwise.
Complementary 12-months additional warranty for a total of 30-months from date of shipment is available for products that include Square D on-site Services.
7) All paint is standard ANSI 49 or ANSI 61 gray as indicated in this proposal unless noted otherwise.
8) Factory witness testing is not included unless noted otherwise. Add $9,000.00 net per device per day if required. Travel & Lodging expenses are not included.
9) Schneider Electric does not guarantee compliance with the 2020 NEC 240.87 Arc Energy requirements unless specifically noted in our Bill-of-Material.
Please reference the detailed Schneider Electric 2020 NEC 240.87 Arc Energy Reduction disclaimer that is available upon request for more information and contact your local Schneider team for assistance.
FOR REFERENCE ONLY
Proposal Name: AMES LAB - Metals
Development Room 150 Substation Prepurchase
Quote Name: 1-AMES Substation Dwg R02-14-
Quote Date: 06/18/2025
PRINTED : 6/18/2025 1:01 PM
Substation
Seq # Qty Product Description 1 1 Designation:HVS #3
Item No : 176872232 Product Details:
1-Metal Enclosed Switchgear-METAL ENCLOSED SWITCHGEAR > 1000 VOLTS
GENERAL PRODUCT INFORMATION
THIS METAL-ENCLOSED SWITCHGEAR SHALL BE
DEPICTED IN THE ATTACHED DRAWINGS AND SHALL
INCLUDE THE FOLLOWING:
PRODUCT TYPE: HVLcc
1 SECTION LINE-UP
Enclosure Type: Type 1
1 - SET OF CERTIFIED TEST REPORTS INCLUDED
WITH FINAL DRAWINGS.
OVERALL DIMENSIONS: 29.50 IN 749.30 mm WIDE See Attached Drawings for Lineup Height
37.25 IN 946mm DEEP
APPROXIMATE WEIGHT: 760.00 LBS. 344.74 kg.
SWITCHGEAR RATINGS
NOMINAL SYSTEM VOLTAGE: 4160V
SWITCHGEAR MAXIMUM VOLTAGE RATING: 5kV
MAIN BUS: 600A TIN-PLATED COPPER
GROUND BUS: BARE COPPER
BIL : 60 KV
SWITCHGEAR MAXIMUM AVAIL FAULT CURRENT: 38kA HVLcc does not support relay protection for fault currents
INTEGRATED SHORT CIRCUIT CURRENT
RATINGS FOR SWITCHES WITH FUSES:
THE INTEGRATED SHORT CIRCUIT CURRENT
RATINGS FOR SWITCHES WITH FUSES
CAN BE FOUND IN THE INTEGRATED
RATINGS TABLES. REFER TO THE CATALOG
SECTIONS FOR EACH PRODUCT LINE.
SPECIFIC APPLICATION INFORMATION
SYSTEM GROUNDING: 4 Wire 3 Phase Wye Solidly Grounded FREQUENCY: 60Hz MAX AVAILABLE SHORT CKT CURRENT: 38kA (RMS)
FRONT AND REAR ACCESS
REAR ACCESS IS REQUIRED FOR THIS EQUIPMENT!
AMBIENT AIR TEMP: > -30C, <40 DEG C
STANDARD & OPTIONAL ITEMS COMMON TO LINEUP
Customer Requirements: Eng Review With Order Conversion
EXTERIOR PAINT COLOR:
ANSI 61 LIGHT GREY
INSULATORS: EPOXY
HOT STICK WITH FUSE HANDLING TOOL
Lineup Plastic Nameplate Black Surface/White Letters
STANDARD ENCLOSURE HARDWARE
APPLIES TO CATEGORY B APPLICATIONS
WHERE THE GENERAL PUBLIC WILL NOT
HAVE ACCESS TO THE SWITCHGEAR
Infrared Viewing Windows Up to 3 per Section
PADLOCK PROVISIONS FOR UP TO 3 LOCKS
LABEL REQUIREMENTS : UL
STANDARDS: ANSI
4.0 IN PAINTED BASE CHANNEL
LUGS ARE BURNDY COMPRESSION TYPE YA
ONE HOLE ANTI-ROTATION (COPPER ONLY)
SPECIAL FEATURES OR TAG ITEMS (PER LINE-UP)
IF SPECIAL FEATURES ARE LISTED BELOW IN THIS
BILL OF MATERIAL, THEY WILL NOT APPEAR ON THE
FRONT ELEV OR ONE-LINE DRAWING AND MAY ALTER
THE FINAL LAYOUT AND DIMENSIONS.
Section 1 INV Main 29.5W, Unit 1, -
1 - LIVE LINE INDICATOR FOR LINE SIDE AND
LOADSIDE
1 - 3 PHASE SET OF 4/0 AWG COPPER
COMPRESSION LUGS PER PHASE
LINESIDE (UL LISTED)
1 - Mimic Bus Plastic Device Symbols (Not a Sheet)
1 - PRIMARY CABLE CONNECTION TO CONVENTIONAL
POWER-DRY TRANSFORMER ON RIGHT
3 - SQUARE D CURRENT LIMITING 5.5 KV 300E
FUSES
1 - FUSELOGIC BLOWN FUSE FLAG ON THE FRONT OF
MECHANISM COVER
1 - LEXAN VIEWING WINDOW FOR FUSE COMPARTMENT
(3 IN X 5 IN)
1 - 600A SQUARE D TYPE HVLCC OVER TOGGLE
MECHANISM (OTM) SWITCH, MANUALLY OPERATED,
APPLICATION B
600A CONTINUOUS & INTERRUPTING CURRENT
1 - INTERNAL GROUND SWITCH TO GROUND LOADSIDE
2 - Infrared Viewing Windows per Section
1 - KEY INTERLOCK SWITCH TO SECONDARY MAIN
BREAKER
Special: Key interlock to xfmr tap chan, , TAG# TR-147983-1
2 1 Designation:T-3
Item No : 176877543 Product Details:
1-CLASS 7420 POWER-DRY TRANSFORMER-SQUARE D SECONDARY UNIT SUBSTATION
POWER-DRY (VPI) TRANSFORMER
1500 kva rated
PRIMARY VOLT: 4160 DELTA
30 KV BIL
SECONDARY VOLT: 480Y/277
10 KV BIL
STANDARD 60 HERTZ
IMPEDANCE: 5.75%
+/- 7.5% TOLERANCE
CONDUCTOR: ALUMINUM WINDINGS
TEMP: 220 DEG. VPI POLY RESIN INS. CLASS
150 RISE OVER 30 AVG - 40 MAX AMB
TAPS: 2-2.5% FCAN, 2-2.5% FCBN
ALTITUDE: STD. 3300 FEET MAXIMUM
65 DB SOUND LEVEL
MODIFICATIONS:
AA RATING ONLY
KEY INTERLOCKED TAP ACCESS
ALUMINUM TRANSFORMER NAMEPLATE
TAMPER PROOF HARDWARE
UL LISTING
INDOOR CABINET
WRAPPED FOR SHIPPING
PAINT COLOR ANSI 61
ENERGY EFFICIENT PER DOE 2016
MIN EFFICIENCY (50% LOAD) = 99.37%
PLASTIC MIMIC BUS
HIGH VOLTAGE TERMINATIONS:
PRIMARY CABLE (STANDARD)
SIDEWALL MOUNTED ON LEFT (SEGMENT-2)
CONNECTION TO HVLCC
FUSED (APPLICATION B)
NO SURGE ARRESTERS
LOW VOLTAGE TERMINATIONS:
SIDEWALL MOUNTED ON RIGHT (SEGMENT-4)
PZ4/QED6 - <4000A - INDOOR ENCL
4000 AMP & BELOW CONNECTION DETAILS
TRANSFORMER TESTS:
RATIO TEST
POLARITY TEST
PHASE RELATION TEST
NO-LOAD LOSS TEST
EXCITATION CURRENT TEST
IMPEDANCE VOLTAGE TEST
LOAD LOSS TEST
APPLIED POTENTIAL TEST
INDUCED POTENTIAL TEST
RESISTANCE MEASUREMENT TEST
INSULATION RESISTANCE TEST
TEST REPORT REQUIRED (STD FORMAT)
FACTORY QC IMPULSE TST HV ONLY
NOTES:
SPECIFICATION ON RECORD
STANDARDS: IEEE C57.SERIES
SECONDARY FLEX CONNECTORS TO BE SHIPPED
WITH THE LOW VOLTAGE SWITCHGEAR.
Revision (***09-16-2024 = H rev 53 / SQD rev 15***)
T/GI 20180716
3 1 Designation:Main Breaker
Item No : 176880885 Product Details:
1-POWER-ZONE 4 SWITCHGEAR COMMS-LOW VOLTAGE SWITCHGEAR
Lineup with MTZ Micrologic X Breakers with Smart System Communications Network 2.0 Single Main With Feeders
480/277V,3PH-4W,60HZ
2000A Copper Main Bus Solidly Grounded Neutral 100% Neutral 1KVA Control Power Transformer 65kA Maximum Available Fault Current 72" Deep Enclosure Indoor NEMA 1 Style Enclosure ANSI 49 Exterior Color Paint Network Communications with Device Web Pages (IFE/Meter) Ethernet Modbus TCP Customer RJ45 Connection Direct Ethernet Modbus TCP to Breakers (Masterpact) All devices pre-wired and pre-tested to the customer connection White Back Pans EcoStruxure Service Ready - Continuous Thermal Monitoring Universal Panel Server Special Records:
TAG TR-148109-1 - 01 - Bus connect to 2000A busduct -
ENCLOSURE OPTIONS
1 - 22" Wide section(s) with 2000A, Thermal Rated, Silver Plated Horizontal Bus, 4W, 100%N 1 - Bus Compartment Side Barriers 1 - Plastic Mimic Bus - Black
INCOMING ONE: CONNECTIONS & METERING OPTIONS
Connected to Dry Type Transformer Dry Transformer is Located on the Left Side Transformer Connection Type - Close Coupled (No Throat) 2000A 4W Connection to Square D Dry Transformer 2000A UL Service Entrance Label
MAIN ONE: CIRCUIT BREAKER
2000A, MTZ2-20H1, Manually Operated Main Breaker
DESCRIPTION:
Micrologic X Unit (6.0X), LSIG Communications Module & Wiring - Main/Tie Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - ERMS Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 2000A Trip Setting (Amps) - 2000 Energy Reduction Maintenance Switch - Locally Mounted Power Meter - PM5563RD in line up with communications 4A Form C Contacts Auxiliary Switch Operations Counter
Breaker Padlock Attachment on Circuit Breaker Breaker ID Nameplate - Main 1 Kirk Key Interlock on Main Breaker Metering CTs Cell - 1 B Special Records:
TAG SP-6252 - 01 - Upgrade 2-h compression lugs -
LINEUP WATT LOSSES
Estimated Equipment Watts Loss (Fully Loaded) for AC Calculation is 817 Watts.
Note: For Watts Loss values on equipment with breakers or sections loaded at less than full load, consult product catalog for derating watts loss or further analysis options.
1-SRVRECSRVREADYLABR-Service Ready Onsite Labor
4 1 Designation:PD-LAB
Item No : 176882021 Product Details:
1-POWER-ZONE 4 SWITCHGEAR COMMS-LOW VOLTAGE SWITCHGEAR
Lineup with MTZ Micrologic X Breakers with Smart System Communications Network 2.0 Feeder Section(s) - (Main is Remote)
480/277V,3PH-4W,60HZ
2000A Copper Main Bus Solidly Grounded Neutral 100% Neutral 1KVA Control Power Transformer 65kA Maximum Available Fault Current 72" Deep Enclosure Indoor NEMA 1 Style Enclosure ANSI 49 Exterior Color Paint Network Communications with Device Web Pages (IFE/Meter) Ethernet Modbus TCP Customer RJ45 Connection Direct Ethernet Modbus TCP to Breakers (Masterpact) All devices pre-wired and pre-tested to the customer connection White Back Pans
ENCLOSURE OPTIONS
3 - 22" Wide section(s) with 2000A, Thermal Rated, Silver Plated Horizontal Bus, 4W, 100%N 2 - Bus Compartment Side Barriers 3 - Plastic Mimic Bus - Black
INCOMING ONE: CONNECTIONS & METERING OPTIONS
2000A 4W Connection to Square D Busway, NCBA L-R, Qwik Flange Copper Non-Service Entrance
INCOMING 1 FEEDER BREAKERS & INSTRUMENTATION
1600A, MTZ2-16H1, Manually Operated Feeder Breaker
DESCRIPTION: EQ#L2C
Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to
Breaker/Cradle Micrologic X Digital Module - ERMS Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 1000A Trip Setting (Amps) - 900 Energy Reduction Maintenance Switch - Locally Mounted Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch 1600A, 4W, Mechanical 1-Hole Lugs Breaker Padlock Attachment on Circuit Breaker Operations Counter Cell - 1 C Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker DESCRIPTION: Spare Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 400A Trip Setting (Amps) - 400 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 1 D Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker
DESCRIPTION: EQ#L2A
Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 400A Trip Setting (Amps) - 300 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 2 A Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker DESCRIPTION: Spare Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 800A Trip Setting (Amps) - 800 Breaker ID Nameplate - Feeder
4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 2 B Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker DESCRIPTION: Spare Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 800A Trip Setting (Amps) - 800 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 2 C Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker DESCRIPTION: Spare Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 800A Trip Setting (Amps) - 800 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 2 D Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker DESCRIPTION: EQ#l2B Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 800A Trip Setting (Amps) - 700 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 3 A Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder
Breaker
DESCRIPTION: EQ#L1B
Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 400A Trip Setting (Amps) - 250 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 3 B Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker
DESCRIPTION: DP150
Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 800A Trip Setting (Amps) - 800 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 3 C Load Side Power Direction - Cable (Bottom)
800A, MTZ2-08H1, Manually Operated Feeder Breaker
DESCRIPTION: EQ#L1A
Micrologic X Unit (5.0X), LSI Communications Module & Wiring - Feeder Ethernet Modbus TCP Communication to Breaker/Cradle Micrologic X Digital Module - Energy per phase Sensor Plug Rating - 400A Trip Setting (Amps) - 350 Breaker ID Nameplate - Feeder 4A Form C Contacts Auxiliary Switch Breaker Padlock Attachment on Circuit Breaker 800A, 4W, Mechanical 1-Hole Lugs Operations Counter Cell - 3 D Load Side Power Direction - Cable (Bottom)
LINEUP WATT LOSSES
Estimated Equipment Watts Loss (Fully Loaded) for AC Calculation is 3051 Watts.
Note: For Watts Loss values on equipment with breakers or sections loaded at less than full load, consult product catalog for derating watts loss or further analysis options.
5 1 Designation:2000A BUSWAY
Item No : 176895128 Product Details:
1-I-LINE BUSWAY-I-LINE BUSWAY
CONSISTING OF
2000A Copper/Silver Busway 480Y/277V 3Ph 4W 60Hz Ground Bus Reqmt: Aluminum Integral Ground (Std) 100kA RMS Symmetrical Short Circuit Rating Date Configured: 6/16/2025 1:55:11 PM
Indoor Segment Run Consisting of:
24 Feet of Feeder Busway 3 90 Degree Elbows 4 Indoor Fixed Hangers 1 Assembly Tools
Ungrouped
6 3 Designation:Spare MV Fuses
Item No : 183960753 Product Details:
55GFMSJD300E-FUSE DIN/E 5.5KV 300E
7 1 Designation:Optional Start Up Service
Item No : 183961418 Product Details:
1-SRVSQDSER-Startup Services - Straight Time The following startup scope of work is Schneider Electric's manufacturer recommended scope…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .