Pre-solicitation Conference Questions_EQT Services.pdf

PDF 114 KB Posted

Attached to
SLIDES/ Q&A Pre-Solicitation Conference - NSWCPD Environmental Qualification Test Services (Related Notice N64498 -26- RFPRE Q-PD- 33-0143)
Solicitation number
RFPREQ-PD-33-0143
Issued by

About this file

This document is a Summary of Pre-Solicitation Conference Questions and Answers for a Naval Surface Warfare Center, Philadelphia Division (NSWCPD) Equipment Qualification Testing (EQT) contract opportunity.

The Government plans to procure an integrated qualification engineering service through a single-award Cost-Plus-Fixed-Fee (CPFF) Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a 60-month ordering period and 72-month period of performance, estimated at approximately $65 million. The contract will consolidate shock and vibration testing, EMI/EMC/electrical testing, Electromagnetic Environmental Effects (E3) assessments, data acquisition, instrumentation, fixture design and fabrication, finite element analysis, and post-test engineering support. Testing must comply with MIL-S-901/MIL-DTL-901, MIL-STD-167, and MIL-STD-461 standards. The winning contractor must maintain a Facility Security Clearance (FCL) and have personnel with SECRET-level security clearances in place at time of award. An adequate Government-contract accounting system is required for cost-reimbursement work. The Government will not evaluate a segmented scope or CLIN structure set aside for small business; however, small business subcontracting and participation commitments will be evaluation factors. The determination regarding whether the solicitation will be full and open or as a small business set-aside will be made after acquisition planning is completed. The Government intends to issue task orders with defined Statements of Work (SOWs) and CLINs as requirements arise, with detailed ordering procedures to be defined in the final Request for Proposal (RFP).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Pre-Solicitation Conference Questions

(Responses in BLUE)

1. Please describe the type of contract expected. FFP/CPFF/CPAF, IDIQ, /duration, etc. The Government’s current planned acquisition strategy is a CPFF, IDIQ type contract. The contract is anticipated to feature a 60-month ordering period with a 72-month period of performance. The final contract structure, CLINs and ordering terms will be defined in the issued Request for Proposal (RFP) and all of the below answers are subject to the final issued RFP.

2. Will the Government consider bidders that do not currently have a Facility Clearance but will submit the application upon contract award with the expectation to receive within 60 days and prior to any task orders? The contractor is required to maintain a Facility Security Clearance (FCL) in accordance with the DD254 to perform certain work under the contract. It shall be obtained prior to award; i.e. the clearance shall be in place at time of award. Otherwise, the Government will have no obligation to order work under the contract.

3. Will the Government consider bidders that do not currently have personnel with security clearances but will submit the SF-86 application upon contract award with the expectation to receive within 60 days and prior to any task orders ? This effort requires access to classified information up to the SECRET level; and Contractor personnel are required to have and maintain a SECRET clearance. Clearance shall be in place at time of Award, and the Government will not consider award to an offeror who does not have personnel with the required clearance.

4. Will there be segments of the scope of services that are earmarked for Small Business? No, the Government does not envision a segmented scope or CLIN structure to be set aside for Small Business performance. However, it is anticipated that Small Business subcontracting and participation commitments will be evaluated in accordance with the issued RFP instructions.

5. The October 2026 NSWCPD LRAE identified this requirement as a CPFF IDIQ but did not characterize it as single-award. Is single-award now the Government’s planned acquisition strategy? Yes, the Government's notional acquisition strategy is a Single-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract

6. What specific analysis led NSWCPD to conclude that a single-award IDIQ is preferable to a limited multiple-award pool of prequalified contractors? The Government received numerous questions regarding its acquisition strategy, which strategy is pre-decisional and subject to change. The Government’s acquisition planning evaluated multiple contracting structures in accordance with applicable FAR, DFARS and other guidance. The Government’s notional acquisition strategy is a Single Award CPFF IDIQ, which preliminarily appears to be in the best interest of the Government, the most cost-effective method to maintain technical continuity, ensure system-level accountability and avoid critical schedule delays. The final acquisition strategy and all required statutory determinations will be completed and approved in accordance with the FAR and DFARS requirements prior to the release of the formal Request for Proposal

(RFP).

7. What portions of the anticipated requirement are considered sufficiently integrated that one contractor must perform or control them across the life of the IDIQ? See response to question 6.

8. Did NSWCPD evaluate a 3-5 award MA-IDIQ structure with streamlined task-order competitions? If so, what specific deficiencies were identified? See response to question 6.

9. Did the Government evaluate functional pools, for example shock/vibration, EMI/EMC/electrical, climatic/environmental, engineering/fixtures/test equipment, and specialty testing? See response to question 6.

10. What analysis was performed comparing the administrative cost of multiple awards with the loss of recurring task-order competition under a single-award structure? See response to question 6.

11. How will the Government maintain price, fee, labor-mix, subcontract, and schedule discipline over the ordering period if there is no task-order competition among IDIQ holders? See response to question 6.

12. When NSWCPD refers to urgency as a reason for single award, is the concern primarily contract placement time, task-order competition time, laboratory availability, engineering lead time, or total requirement-to-completed-test cycle time? See response to question 6.

13. What historical cycle-time data supports the conclusion that task-order competition is a material driver of total EQT response time? See response to question 6.

14. What percentage of historical requirement-to-test-completion time is attributable to acquisition/task-order placement versus test-procedure development, engineering, test-stand or fixture development, fabrication, instrumentation, facility scheduling, testing, data reduction, corrective action, retest, and reporting? See response to question 6.

15. If an urgent requirement requires a new test stand, major fixture, special instrumentation, non-standard test method, or new facility capability that may take weeks or months to engineer and implement, how does eliminating an abbreviated task-order competition materially reduce total mission cycle time? See response to question 6.

16. Did NSWCPD model total cycle time under a single-award structure against a MA-IDIQ structure in which immediate facility availability and engineering capacity could be evaluated at the task-order level? See response to question 6.

17. Under a MA-IDIQ, FAR 16.505 permits an exception to fair opportunity where delay would be unacceptable for an urgent requirement. Why is that existing mechanism insufficient for the subset of genuinely urgent orders? See response to question 6.

18. If the single awardee’s applicable chamber, shaker, shock machine, EMI/EMC facility, test personnel, or specialty subcontract laboratory is unavailable for an urgent requirement, what contractual mechanism permits NSWCPD to access alternate qualified capacity immediately? The Government expects the Single- Award prime contractor to manage and commit adequate capacity, including utilizing multiple subcontractor laboratories. Offeror’s facilities, contingency capabilities and capacity management will be evaluated during the source selection process. See response to question 6.

19. Has NSWCPD considered whether a single-award model creates a concentration point that could increase schedule risk during equipment outages, facility congestion, staffing shortages, subcontractor delays, quality issues, or concurrent surge requirements?. See response to question 6.

20. During the conference, change orders and administrative responsiveness were discussed. What change-administration steps do NSWCPD believe are eliminated by using one IDIQ holder rather than multiple prequalified IDIQ holders? See response to question 6.

21. Once a task order is awarded, would scope changes, engineering changes, funding changes, revised test requirements, equitable adjustments, Government approvals, and technical-direction controls be materially different under SA-IDIQ versus MA-IDIQ? See response to question 6.

22. If the Government anticipates frequent requirement evolution after task-order placement, has it quantified whether the dominant administrative burden arises from source selection or from post-award technical and contractual changes? See response to question 6.

23. Does NSWCPD anticipate issuing broadly scoped task orders and modifying them as qualification requirements mature, or issuing more narrowly defined task orders after technical scope stabilizes? –The Government intends to write Task Order packages with defined SOWs and CLINs as requirements arise.

Detailed ordering procedures will be set forth in the issued RFP.

24. What is the historical average number of modifications/change actions per EQT effort, and what portion of average schedule is attributable to those actions? Historical modification frequency and associated internal operational metrics are internal Government information and pre-decisional. Specific ordering and administration terms will be defined in the formal RFP.

25. Is the Government procuring primarily laboratory access, or an integrated qualification engineering service encompassing requirements decomposition, test planning, procedure development, fixture/test-stand design, instrumentation, execution, analysis, failure investigation, corrective action, retest, and final reporting? Preliminary, the Government can state that it is procuring an integrated qualification engineering service. This is reflected in the diverse task areas. The final scope will be defined in the issued RFP.

26. Will the contractor be expected to design and fabricate non-standard fixtures, adapters, restraints, support structures, interfaces, and test stands for large or unique Navy test articles? Preliminarily, the Government’s intent is to have the Awardee perform the design and fabrication of both standard and non-standard test fixtures. The final scope will be defined in the issued RFP.

27. What level of finite-element analysis, structural dynamics analysis, DDAM, modal analysis, shock-response-spectrum analysis, fatigue analysis, or other analytical support is anticipated? Preliminarily, the Government anticipates the contractor will be required to provide shock and vibration analysis support, including Finite Element Analysis (FEA) model analysis and shock data analysis. Detail deliverables such as CDRL A008 (Shock FEA Model Analysis) confirm this requirement. Deliverables will be formally defined in the issued RFP.

28. What are the anticipated maximum test-article mass, dimensions, center-of-gravity constraints, electrical power requirements, hydraulic/pneumatic requirements, and support-equipment requirements across the IDIQ? Preliminarily, the Government anticipates establishing specific requirements for types of EQT tests, rather than specific examples of EUTs, in the issued RFP.

29. For shock and vibration, what proportion of the workload is expected to involve MIL-S-901/MIL-DTL-901, MIL-STD-167, MIL-STD-810, SSTS/FSP/SUTV/PWTV or other Navy-specific methods? Preliminarily, the requirement is to perform testing in accordance with MIL-S-901/MIL-DTL-901 and MIL-STD-167. The Government will establish specific requirements in the formal Request for Proposal.

30. For EMI/EMC/electrical testing, what proportion is expected to involve MIL-STD-461, MIL-STD-1399, RTCA/DO-160, lightning, ESD, TEMPEST, high-field susceptibility, conducted susceptibility/emissions, or other specialized standards? Preliminarily, the testing requirement is anticipated to be in accordance with

MIL-STD-461 and no other test standards are currently expected to be applicable. The final scope will be defined in the issued RFP.

31. Beyond shock, vibration, and EMI/EMC, what climatic/environmental disciplines are anticipated: altitude, temperature, humidity, salt fog, sand/dust, icing, rain, explosive atmosphere, fluid susceptibility, thermal shock, acoustic, pyroshock, or other environments? Preliminarily, the Government does not anticipate other climatic/environmental disciplines being required under this procurement. The final scope will be defined in the issued RFP.

32. What data-acquisition requirements are anticipated for high-channel-count dynamic testing, including sample rates, synchronization, signal conditioning, telemetry, video correlation, time-history retention, calibration traceability, and raw-data delivery? Preliminarily, the Government anticipates that the contractor will be responsible for test instrumentation, setup, execution, and data acquisition/analysis.

Specific data-acquisition and instrumentation standards will be defined in the issued RFP.

33. Will NSWCPD require contractor-developed instrumentation architectures, DAQ/control software, LabVIEW or equivalent automated test systems, hardware-in-the-loop capability, or custom control/safety interlocks? Preliminarily, the SOW outlines responsibilities for test instrumentation, setup, and execution.

Detailed software or custom control architecture requirements will be defined in the issued RFP.

34. To what extent will qualification failures require root-cause engineering, design-change recommendations, instrumentation changes, re-analysis, and retest support? Preliminarily, the Government anticipates that work areas shall include post-test inspections, data analysis, and support for emergent or unforeseen testing needs, which includes re-testing. The final scope of work will be defined in the issued RFP.

35. What number of concurrent EQT efforts should the prime be capable of supporting at peak demand?

Preliminarily, the Government anticipates that Section B of the solicitation will contain maximum quantities of certain CLINs. Offerors' corporate experience and facilities will be evaluated to ensure adequate peak demand support. The final scope of work will be defined in the issued RFP.

36. Will proposal evaluation credit distributed laboratory capacity and the ability to route urgent requirements among geographically separate qualified facilities? Preliminarily, the Government anticipates evaluating the offeror's capability to support the required workload, which may include distributed capacity. The final scope of work will be defined in the issued RFP.

37. How will NSWCPD evaluate actual facility availability and queue depth at proposal time versus nominal ownership of test assets? The evaluation criteria and submission requirements will be set forth in Sections L and M of the RFP.

38. Will offerors be required to identify specific chambers, shakers, shock machines, EMI/EMC facilities, instrumentation systems, and specialty laboratories that are committed to contract performance?

Preliminarily, the Government anticipates offeror’s having to demonstrate committed testing infrastructure.

Detailed instructions will be provided in the issued RFP.

39. Will the Government evaluate equipment redundancy, alternate facilities, contingency routing, and recovery plans for major test-equipment outages? Preliminarily, the Government anticipates facilities and past Performance as evaluation factors, under which risk management and contingency planning may be assessed. Specific criteria will be published in the issued RFP.

40. If the principal objective is rapid response, will proposed time-to-test and demonstrated available capacity be explicit evaluation factors? Specific criteria will be published in Section M of the RFP.

41. What portion of the required technical and laboratory capability must the prime possess organically, and what portion may be satisfied through committed subcontract laboratories? The portion is not mandated by the Government. Offerors may utilize teaming and subcontracting, and Small Business Participation Commitment will be an evaluation factor. For further guidance, the Government recommends carefully reviewing all information included in the RFP once issued.

42. If significant specialty testing may be subcontracted, how does the Government anticipate maintaining competition and cost discipline for those services under a single-award IDIQ? See response to question 6.

The Government further directs your attention to Far Part 15 and TINA.

43. Will major specialty subcontractors be permitted to participate on more than one offeror’s team? This is a decision within the purview of the offeror. For further guidance, the Government recommends carefully reviewing all information included in the RFP once issued.

44. Will affiliate capabilities, facilities, personnel, and past performance be considered where companies are under common ownership and resources are committed to performance? For further guidance, the Government recommends carefully reviewing all information included in the RFP once issued.

45. Will the Government distinguish between equipment/facilities owned by the prime, owned by an affiliate, committed through a teaming agreement, or commercially available on demand? For further guidance, the Government recommends carefully reviewing all information included in the RFP once issued.

46. Will subcontract laboratories performing cost-reimbursement work be required to maintain an adequate Government-contract accounting system, or will the requirement apply only to the prime? Under FAR guidelines, any cost reimbursement contract requires the prime contractor to have an adequate accounting system. The prime contractor is also responsible for ensuring that any subcontractor performing cost reimbursement work maintains an adequate accounting system. For further guidance, the Government recommends carefully reviewing all information included in the RFP once issued.

47. Will an adequate accounting system be required at proposal submission, prior to award, or prior to issuance of a cost-reimbursement task order? The prime contractor must have an adequate accounting system to receive a cost-reimbursement contract. The Government directs your attention to the FAR, DFAR and other applicable guidance, including the issued RFP.

48. Does NSWCPD require an existing DCAA determination, or may adequacy be established through another cognizant Federal agency or a pre-award accounting-system review? Adequacy is typically determined by DCAA or another cognizant Federal agency. Pre-award accounting system reviews may be conducted if necessary. For further guidance, the Government recommends carefully reviewing all information included in the RFP once issued.

49. If the CPFF/accounting-system requirement already limits the pool to mature Government-ready contractors, what prevents NSWCPD from using that requirement as a qualification gate for a limited MA- IDIQ pool? See response to question 6.

50. Does NSWCPD anticipate every task order being CPFF, or will repeatable/mature testing be eligible for FFP or another contract type? Preliminarily, the Government has determined that the IDIQ is estimated to be CPFF-type, utilizing a hybrid approach of Completion-type and Level-of-Effort-type CLINs. FFP will be considered if the Government feels the level of risk is manageable and not a deterrent to execution. The foregoing is subject to the issued RFP.

51. What characteristics of the expected workload make CPFF the preferred structure for mature or repeatable laboratory tests? See response to question 6.

52. The public LRAE identifies no incumbent for the new requirement. What existing contracts, task orders, Government laboratories, and external specialty laboratories currently perform the work being consolidated into this vehicle? Any existing EQT performance contracts have been awarded on an ad-hoc basis at a dollar value lower than reportable in the public LRAE.

53. What performance or cycle-time data from the current distributed model demonstrates that the principal schedule constraint is contract placement rather than laboratory capacity, engineering, fixture/test-stand development, or Government technical review? Specific internal data and cycle time metrics from previous efforts are internal Government information and pre-decisional. See response to question 6.

54. Did NSWCPD conduct a consolidation or bundling analysis addressing the effect of combining previously separate shock/vibration, EMI/EMC, environmental/electrical, engineering, and specialty-testing requirements? In accordance with FAR, DFAR and other applicable guidance, the Government performs all required statutory and regulatory analyses, including consolidation and bundling reviews during the acquisition planning process. See response to question 6.

55. What alternative acquisition structures were evaluated before deciding to place these diverse technical disciplines under one prime? A standalone FFP approach was previously considered and solicited but was subsequently cancelled. Multiple award IDIQ structures were also evaluated during the acquisition planning process. See response to question 6.

56. Did NSWCPD evaluate existing DoD contract vehicles, including vehicles supporting automatic test systems, instrumentation, test-equipment engineering, and qualification support, before establishing a separate vehicle? In accordance with FAR, DFAR and other applicable guidance, the Government performs all required statutory and regulatory analysis and available contract vehicles. See response to question 6.

57. What specific scope or execution gap could not be addressed using existing contract vehicles or a portfolio of pre-qualified specialty providers? See responses to question 6 and 56.

58. What does NSWCPD expect to be the principal technical discriminator: organic test infrastructure, engineering capability, demonstrated available capacity, breadth of standards, past performance, integrated program management, cost, or response time? The Government recommends carefully reviewing all parts of the RFP, specifically Section M, once issued.

59. Will offerors be required to demonstrate available capacity through utilization data, facility schedules, committed equipment, or other objective evidence? Preliminarily, facilities and corporate experience are evaluation factors. Detailed requirements for demonstrating capacity and committing equipment will be specified in Sections L and M of the issued RFP.

60. What is the anticipated average and maximum task-order value, duration, and annual task-order volume underlying the approximately $65 million forecast? The Government will not anticipate task order volume and value distributions. There will be a guaranteed minimum delivery requirement identified in the RFP. The foregoing is subject to the issued RFP.

61. What response period does NSWCPD believe would be required for task-order competition under a MA- IDIQ, and what analysis shows that such a response period would impair mission execution? See response to question 6.

62. Would NSWCPD consider streamlined 24–72-hour task-order responses for urgent but competitively orderable requirements, with the existing urgent-need exception used where even that period is unacceptable? See response to question 6.

63. Will the Government publish the rationale supporting the final single-award determination and the analysis comparing single-award and multiple-award approaches? The final approved acquisition strategy documentation and any required statutory determinations will be completed in accordance with FAR requirements. Relevant public notices will be posted to SAM.gov as appropriate.

64. Will NSWCPD accept additional written industry comments on the acquisition structure after the conference and before the acquisition strategy and solicitation are finalized? Questions and answers from industry are closed until a sources sought and subsequently RFP are issued, which provides offerors the opportunity for additional questions.

65. The Task areas slide indicated that shipboard survivability and operational readiness EQT will certainly include Shock, vibration and EMI/EMC, but may also include Electromagnetic Environmental Effects (E3). I would like to confirm if E3 test and assessments will also be a service requested. MIL-STD-464D defines the E3 assessment criteria at the system level (including ordnance systems and launchers). The E3 criteria vary significantly from the typical equipment level test requirements specified under MIL-STD-461H. Yes, the SOW task areas explicitly note that testing includes Electromagnetic Environmental Effects (E3) alongside EMC/EMI technical requirements. Applicable standards will be detailed in the issued RFP.

66. Will a government representative test witness role be included in the tasking of the solicitation? If test witness role is integrated, will there be a need to fire-wall the witnesses, isolating them from an EQT coordination team and or lab personnel? A government representative test witness role is not an anticipated requirement.

67. Will the winning Prime contractor be required to complete 51% of the labor? Unknown. Under FAR 52.219-14, small businesses winning set-aside contracts must perform a minimum percentage of the work themselves, so they do not act as mere pass-through entities for large businesses. The determination of whether this requirement will be solicited as full and open or as a small business set-aside will be made after the Government completes all required acquisition planning documentation and market research in accordance with the FAR.

68. Will the requirements be outlined as in a past NSWCPD contract SOW and include both Shock/Vibration and EMC/EMI, or will the scope be different? See responses to questions 29, 30, 31, 32, and 33.

69. Will the LCATs be the same as a previous NSWCPD EQT support services contract? The government presented its anticipated required LCATs in the Pre-Solicitation Conference presentation, which will be posted to the public via the SAM.gov site.

File details come from the government source that posted it. Updated .