Pre-Solicitation Conference for Environmental Qualification Testing Services

This document is a pre-solicitation conference presentation for a federal contract opportunity to provide Environmental Qualification Testing (EQT) Services to the Naval Sea Systems Command (NAVSEA) Warfare Centers, specifically NSWCPD Department 30. The anticipated contract is a single-award Indefinite Quantity/Indefinite Delivery (IDIQ) Cost-Plus-Fixed-Fee (CPFF) arrangement with a 60-month ordering period and 72-month period of performance, potentially extending to a 10-year total with an option for an additional five-year period. The contract ceiling is estimated at $13.90 million for labor and $3.29 million for other direct costs, with 150,000 budgeted labor hours. The solicitation will utilize subjective tradeoff/best-value source selection with evaluation factors including facilities, corporate experience, small business participation commitment, past performance, and total evaluated price. CMMC Level 2 (Self) certification is required for contract award, and the facility clearance level is up to Secret. All responses to questions and attendee lists will be posted to SAM.gov.

The EQT services required encompass four task areas: services for environmental qualification and ship system hardening of equipment; engineering services for shock-related analyses; on-site government support to readiness reviews, testing, and shock trials; and support for creation and maintenance of Ship Change Documents. Work involves testing Hull, Mechanical, and Electrical equipment across all ship platforms (surface, submarine, carrier, and amphibious) using high-impact mechanical shock, vibration, climatic/thermal, and electromagnetic environmental effects testing. The contract will employ a hybrid approach with some requirements as completion-type CLINs (fully funded at task order award) and others on a level-of-effort basis. Specified labor categories include mechanical and electrical engineers at multiple levels, engineering technicians, EQT coordinators, and support personnel. The anticipated RFP release is end-of-March 2027, with closure in early May 2027, evaluation period May through September 2027, and contract award in October 2027. All timeframes are tentative. Pre-RFP questions should be directed to the Contract Specialist and Deputy Acquisition Manager; post-RFP questions should be directed to the Contract Specialist at the provided email addresses.

View the file

Other files

File Type Posted
Pre-solicitation Conference Questions_EQT Services.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT A: Approved for public release; distribution is unlimited.

N A V S E A W A R F A R E C E N T E R S

N A V S E A W A R F A R E C E N T E R S

N A V S E A W A R F A R E C E N T E R S

N A V S E A W A R F A R E C E N T E R S

NSWCPD Department 30 Acquisition Support, C302

Pre-Solicitation Conference

Environmental Qualification Testing Services

Presented by:

Presented to:

Industry

12 Nov 2026

N A V S E A W A R F A R E C E N T E R S

• Ground Rules

• Disclaimer Statements

• Current Environmental Testing Support contract @ NSWCPD

• Draft SOW - EQT Services Task Areas

• How will the contract work?

⁻ Notional Acquisition Strategy & Execution

• Break

• Q&A

• Anticipated Timeline

• Concluding Remarks

• Open Dialogue & Informal networking session

Agenda

N A V S E A W A R F A R E C E N T E R S

Points of Contact

N A V S E A W A R F A R E C E N T E R S

N A V S E A W A R F A R E C E N T E R S

• Contracting Dept

• Angela Cusati

Contracting Branch Head angela.f.cusati.civ@us.navy.mil

• Nicole Eckman Contracting Officer nicole.a.eckman.civ@us.navy.mil

• Kristen Cella Contract Specialist kristen.m.cella.civ@us.navy.mil

• NSWCPD Dept 30 Acquisition Support

• Brendon Clingensmith Deputy Acquisition Manager brendon.l.clingensmith.civ@us.navy.mil

• Dan Wheeler Dept 30 Lead Acquisition Manager daniel.t.wheeler.civ@us.navy.mil

• Small Business

• Christie Colaianni Deputy for Small Business Christie.l.colaianni.civ@us.navy.mil mailto:angela.f.cusati.civ@us.navy.mil mailto:nicole.a.eckman.civ@us.navy.mil mailto:kristen.m.cella.civ@us.navy.mil mailto:brendon.l.clingensmith.civ@us.navy.mil mailto:daniel.t.wheeler.civ@us.navy.mil mailto:Christie.l.colaianni.civ@us.navy.mil

N A V S E A W A R F A R E C E N T E R S

• Online participants - Please ensure mics are muted during presentation

• Please save any questions for the end of the presentation.

• Q&A will be posted to SAM.gov.

• The attendees list will be posted to SAM.gov.

• DO NOT directly contact NSWCPD C302 once an RFP is issued - all further dialogue will be accomplished via email directed to the Contracts Department.

• Technical requirements contained in this briefing are presented as a summary.

• Final Technical Requirements will be provided in the Request for Proposal (RFP).

Ground Rules

N A V S E A W A R F A R E C E N T E R S

• Remarks by Government officials involved in this presentation should not be considered a guarantee of the Government’s course of action in proceeding with an acquisition.

• The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances.

• This notice is for informational purposes only and does not constitute a Request for Proposal (RFP) or a Request for Quote (RFQ).

• Participation in this event Day is voluntary and is not a prerequisite for participation in any future contract RFP.

• The Government will not reimburse attendees for any expenses incurred in connection with this event, including travel or marketing costs.

• The formal solicitation, when issued, is the only document that should be relied upon in determining the Government’s requirements.

• Recording devices and attempts to broadcast the event are prohibited.

Cell phones are permitted, but laptops and tablets are not allowed in the building.

Disclaimer Statement

N A V S E A W A R F A R E C E N T E R S

• FAR 10 – Market Research

• All information is tentative and can change

• FAR 15.201 – Exchanges with industry before receipt of proposals

• “(b) The purpose of exchanging information is to improve the understanding of Government requirements and industry capabilities, thereby allowing potential Offerors to judge whether or how they can satisfy the Government’s requirements, and enhancing the Government’s ability to obtain quality supplies and services, including construction, at reasonable prices , and increase efficiency in proposal preparation, proposal evaluation, negotiation, and contract award.”

• “(c) …An early exchange of information…can identify and resolve concerns regarding the acquisition strategy, including proposed contract type, terms and conditions, and acquisition planning schedules; the feasibility of the requirement…”

Disclaimer Statement / FAR

N A V S E A W A R F A R E C E N T E R S

• Contract Type: Seaport Order, Cost-Plus-Fixed-Fee (CPFF); Technical Instructions issued to CTR as needed

• Award date: March 5, 2025

• Order Period of Performance End Date: March 4, 2030

• Contract Ceiling = $13.90M Labor, $3.29M ODCs

• Level of Effort = 150,000 labor hours. Four (4) Task Areas:

• Services for Environmental Qualification and Ship System Hardening of Equipment

• Engineering Services for Shock-related Analyses

• On-site (GOVT site) support to readiness reviews, witnessing tests, Shock Trials, etc

• Support creation and maintenance of SDCPs

• Classification Level = SECRET Security Level

Current NSWCPD Environmental Qualification Engineering Services

N A V S E A W A R F A R E C E N T E R S

• NSWCPD has the responsibility of providing EQT services for a wide array of Hull, Mechanical, and Electrical (HM&E) equipment that is used, modernized, upgraded, maintained, and/or sustained by any of the NSWCPD Technical Departments.

• To verify shipboard survivability and operational readiness, equipment items (Equipment Under Test (EUTs)) must undergo comprehensive EQT. These tests include, but are not limited to, high-impact mechanical shock, shipboard mechanical vibration, climatic/thermal exposure, and electromagnetic environmental effects (E3).

• NSWCPD Code 333 is the In-Service Engineering Agent (ISEA) for surface ship and submarine HI Shock, Shipboard Vibration, and Electromagnetic Compatibility (EMC)/Electromagnetic Interference (EMI) EQT, and overall ship hardening of HM&E systems.

• Work includes EQT for HME equipment located on all platforms including, but not limited to, Surface, Submarine, Carrier, and Amphibious ships.

• Work will support programs that consist of critical-path new construction events, and, critical-path Ship Change Documents (SCDs)/Alterations that are typically complex in nature and crucial to meeting key production, lights-off, and testing milestones during ship CNO availabilities.

EQT Services - Task Areas

N A V S E A W A R F A R E C E N T E R S

• EQT Coordinator Responsibilities

• EQT Test Plans and Test Procedures

• Design and Fabrication of standard and non-standard Test Fixtures

• Test Instrumentation, Setup, and Execution ⁻ High Impact Shock Testing

⁻ Vibration Testing

⁻ EMI & EMC Testing

• Data Acquisition and Data Analysis

• Post Test Inspections and Test Reporting

• Emergent / Unforeseen Testing needs

EQT Services - Task Areas

N A V S E A W A R F A R E C E N T E R S

• CDRL A001: Contract Status Report (Monthly)

• CDRL A002: Travel Report

• CDRL A003: Contractor's Personnel Roster

• CDRL A004: Electromagnetic Interference Test Procedures

• CDRL A005: High-Impact Shock Test Procedures

• CDRL A006: Test Fixture Design and Inspection Packages (Drawings, FEA, NDE)

• CDRL A007: Shock Data Analysis

• CDRL A008: Shock FEA Model Analysis

• CDRL A009: Government Property Inventory Report (Periodic)

• CDRL A010: Government Property Inventory Report (Final)

• CDRL A011: Vibration Test Plan and Report

• CDRL A012: Shock Test Report

• CDRL A013: Electromagnetic Interference Test Report

• CDRL A014: Small Business Utilization Report

• CDRL A015: System Security Plan (SSP)

EQT Services – Notional Data Deliverables

N A V S E A W A R F A R E C E N T E R S

• 5-year (60-month) Ordering Period, potentially an Option for another 5-year period.

• Expecting a Single-Award environment

• Government will utilize the subjective Tradeoff / Best-Value source selection process

• Evaluation Factors similar to those seen in cancelled solicitations N6449826R0517 and N6449826R0520

• FACILITIES

• CORPORATE EXPERIENCE

• SMALL BUSINESS PARTICIPATION COMMITMENT

• PAST PERFORMANCE

• TOTAL EVALUATED PRICE

• CMMC certification needed to be eligible for award

• FCL up to Secret

EQT Services – Notional Acquisition Strategy

N A V S E A W A R F A R E C E N T E R S

• Contract is estimated to be a Single-Award Indefinite Quantity / Indefinite Delivery (IDIQ) Cost-plus Fixed Fee (CPFF) type

• Will consist of a 60-month Ordering Period and 72-month Period of Performance.

⁻ Investigating possibility of an Option for another 5-year Ordering period after the 60-mo period

• HYBRID type approach – Some requirements to be executed via Completion-type CLINs, some to be executed on a Level-of-Effort basis

⁻ All Completion-type requirements will be fully funded at time of Task Order award

• Some overtime hours are expected to be included in the estimated LOE for technical positions.

• The work location is expected to be roughly 95% Contractor Site. Some travel to Government locations may be required for support to reviews, meetings, etc

Notional Acquisition Strategy

N A V S E A W A R F A R E C E N T E R S

Labor Categories for Level-of-Effort Work*

*SUBJECT TO CHANGE

• EQT Coordinator (MANP2)

• Acquisition Management and Support I (AMS1)

• Management Analyst I (ANM1)

• Mechanical Engineer III (EM3)

• Mechanical Engineer II (EM2)

• Mechanical Engineer I (EM1)

• Drafter / CAD Operator (14074)

• Electrical Engineer III (EE3)

• Electrical Engineer II (EE2)

• Electrical Engineer I (EE1)

• Technician, Engineering III (30083)

• Technician, Engineering II (30082)

• Technician, Engineering I (30081)

N A V S E A W A R F A R E C E N T E R S

• As NSWCPD Code 30 needs to test equipment, NSWCPD will write a Task Order package to be issued for RFQ

• Package will include Task Order SOW and CLINs required

• Completion-Type CLINs are expected to be work related to:

• Test Instrumentation, Setup, and Execution;

• the actual Conduct of a Test;

• Data Acquisition and Data Analysis; and

• Post-Test Inspections and Test Reporting

• Level-of-Effort-Type CLINs are expected to be work related to:

• EQT Coordinator Responsibilities;

• developing and revising EQT Test Plans and Test Procedures;

• designing, developing, and fabricating standard and non-standard Test

Fixtures; and

• any Emergent Testing or re-Testing work that was unforeseen at time of

Task Order issuance.

How Will It Work After Award?

N A V S E A W A R F A R E C E N T E R S

• Effective November 10, 2025, DFARS 252.204-7025 has been updated to incorporate Cybersecurity Maturity Model Certification (CMMC) requirements for contracts involving Controlled Unclassified Information (CUI) or Federal Contract Information (FCI). As your contract involves the handling of CUI or FCI, it will be subject to these new CMMC requirements.

• On 13 Jul, 26, DoW Chief Information Officer (CIO) and the Under Secretary of War for Acquisition and Sustainment (USW(A&S)) announced the immediate suspension of the Cybersecurity Maturity Model Certification (CMMC) Phase II requirements, originally scheduled for 10 Nov 26.

• New policy regulations result in CMMC certification needed for all awarded companies.

• Awarded Contractor must meet CMMC Level 2 (Self) Requirements

• Resources for additional information/understanding:

⁻ About CMMC: https://dodcio.defense.gov/cmmc/About/ ⁻ Link for CMMC resources and documentation from CIO U.S. Department of War:

• https://dodcio.defense.gov/CMMC/Resources-Documentation/

⁻ PIEE SPRS CMMC Level I Self Assessment Guide ⁻ PIEE SPRS CMMC Level II Self Assessment Guide

• https://www.sprs.csd.disa.mil/pdf/CMMCQuickEntryGuide.pdf

A Note on CMMC https://dodcio.defense.gov/cmmc/About/ https://dodcio.defense.gov/CMMC/Resources-Documentation/ https://dodcio.defense.gov/CMMC/Resources-Documentation/ https://dodcio.defense.gov/CMMC/Resources-Documentation/ https://dodcio.defense.gov/CMMC/Resources-Documentation/ https://www.sprs.csd.disa.mil/pdf/CMMCQuickEntryGuide.pdf https://www.sprs.csd.disa.mil/pdf/CMMCQuickEntryGuide.pdf

N A V S E A W A R F A R E C E N T E R S

BREAK

N A V S E A W A R F A R E C E N T E R S

• Questions submitted to NSWCPD prior to 11/12/2026

• Questions submitted during the Break

• Will answer what we can!

• ALL FINAL GOVERNMENT REPONSES WILL BE FORMALLY POSTED,

FOR ALL PARTIES TO ACCESS, VIA SAM.GOV

Q & A

N A V S E A W A R F A R E C E N T E R S

• Pre-Solicitation Conference for adjusted requirement:

11/12/2026

• Solicitation Schedule

• Contract Package updates based on Conference: Dec 2026

• RFP Release: EOM March 2027

• RFP Closes: early May 2027

• Evaluation period: May – Sept 2027

• Contract Award: Oct 2027

• All time frames listed are tentative

Anticipated Timeline

N A V S E A W A R F A R E C E N T E R S

• Comments?

• Suggestions?

• If you have any additional questions/concerns from what has been provided, prior to RFP release, please send an email to the Contract Specialist, kristen.m.cella.civ@us.navy.mil, and Deputy Acquisition Manager, brendon.l.clingensmith.civ@us.navy.mil

• If you have any additional questions/concerns after the release of the RFP, please send an email to the Contract Specialist, kristen.m.cella.civ@us.navy.mil

*Remember to keep an eye on SAM.gov!

Closing Remarks

THANK YOU

for your Interest & Participation!!

mailto:kristen.m.cella.civ@us.navy.mil mailto:brendon.l.clingensmith.civ@us.navy.mil mailto:kristen.m.cella.civ@us.navy.mil

N A V S E A W A R F A R E C E N T E R S

Open Dialogue / Informal Networking

Slide 1
Slide 2: Agenda
Slide 3: Points of Contact
Slide 4: Ground Rules
Slide 5: Disclaimer Statement
Slide 6: Disclaimer Statement / FAR
Slide 7: Current NSWCPD Environmental Qualification Engineering Services
Slide 8: EQT Services - Task Areas
Slide 9: EQT Services - Task Areas
Slide 10: EQT Services – Notional Data Deliverables
Slide 11: EQT Services – Notional Acquisition Strategy
Slide 12: EQT Services – Notional Acquisition Strategy
Slide 13: Labor Categories for Level-of-Effort Work*
Slide 14: EQT Services – How Will It Work After Award?
Slide 15: A Note on CMMC
Slide 16: BREAK
Slide 17: Q & A
Slide 18: Anticipated Timeline
Slide 19: Closing Remarks
Slide 20: Open Dialogue / Informal Networking