Amendment 1.pdf

PDF 48 KB Posted

Attached to
Falls Beach Day Use Federal contract opportunity
Solicitation number
RFP-9A40-S-09-0006
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Falls Beach Day Use, newest first.
File Type Posted
Amendment 3.pdf PDF
Amendment_2.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_5_Bid Bond_SF_24.pdf PDF
Attachment_1_Project Specifications.pdf PDF
!Solicitation.pdf PDF
Attachment_3_Davis Bacon_CA20080029.pdf PDF
Attachment_4_PAL Fire Plan_jun2006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment One 6-11-09

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Southern Sierra Province 1600 Tollhouse Road Clovis, CA 93611

Southern Sierra Province Acquisitions 1600 Tollhouse Road Clovis, CA 93611

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

RFP-9A40-S-09-0006

9B. DATED (SEE ITEM 11)

June 26, 2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or © By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

14. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return Original copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Falls Beach Day Use Rehabilitation Project Sierra National Forest

The purpose of this modification is to:

1.) Extend Close date Indefinitely.

2.) To include pre-bid tour notes.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Patrick J. Gallegos

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

6-11-09

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

RFP-9A40-S-09-0006

Falls Beach Day Use Rehabilitation Pre-Bid Notes –

June 10, 2009

1.) No SHPO (State Historic Preservation Officer) Clearance for project. Project close date will be extended indefinitely. When SHPO approves, an amendment will be posted to fedbizopps with a close date of approximately 10 days after day of amendment.

2.) Archeological goal: Don’t disturb ground. Ground disturbance is defined as ground disturbance work outside contract clearing limits. Monitors will identify sensitive areas and determine if work area has undue ground disturbance. They will advise and contact CO/COR.

A plan of action will identify types of objects that are sensitive i.e. bones, burial items, etc.

3.) It’s the monitor’s job to be out at work site. Contractor does not have to quit work because they aren’t there

4.) Contractor can draft water out of lake. Water sources are identified on Page 2 of plan. If water source is not accessible, FS will find another.

5.) The Borrow site is the old firing range and is composed of DG.

6.) Restroom:

a. Demo existing restroom; use existing plumbing and electrical. Restroom has no grinder pump system.

b.) Restroom is block, grouted structure, not Pre-cast. See Denver Church CG or Pine Point Pine Slope.

c.) Sewer and Water will need to be outside of footprint. Contractor can stage blocks and material on top of soil.

7.) Picnic Tables:

a. FS suggests removing lumber and pull table straight up rather than cut off legs.

8.) When contractor brings in fill for picnic tables and area, it’s not practical to lay it on top of grass.

a.) Can you scrape grass? Yes up to 5 centimeters (approximately 2 inches.)

b. What’s it take to look at 5 centimeters? Monitors will do samples.

9.) FS has different accessibility requirements. FS can go 1- 10 which is about 10%. FS has website that addresses regulations and criteria. ABA Access is referenced on Page 3, 4, and 5 of plans.

10.) Demo Items: CLM will have opportunity to remove from site; however, if that hasn’t occurred by start of project all items i.e. fire rings, lumber from picnic tables, will become contractors.

11.) Parking areas: Typical shows as staked…no dimensions. FS will assist in layout of parking areas.

a.) Parking areas is outside arch site.

b.) Hydrant: FS assumption is water runs under parking area. It is contractors responsibility to call USA (Underground Service Alert).

c.) Two trailheads are to be maintained at park site. Culvert is not a concern of contractor.

d.) Does contractor need to import barrier rocks? Contractor can use rocks on site.

12.) Contractor is responsible for contacting Madera County regarding encroachment permits, and permits to cross bridge.

13.) No lugs or tracks in picnic area. Contractor may use smooth tires.

SOLICITATION NO:

RFP-9A40-S-09-0006

PROJECT TITLE:

Falls Beach Day Use Rehabilitation

DATE OF PRE-BID TOUR/PREWORK:

June 10, 2009

NAME (PRINT) ADDRESS: PHONE NO: E-MAIL

Robert Icenogle

301 Frankfort St.

Caly City, CA 94014

415-349-8297 www.icenogleCM.com

Paul Council

1333 E. Madison Ave., Ste 203 El Cajon, CA 92021

619-443-9730 Kcequipmentinc.com

Bob Berry R. J. Berry Jr., Inc.

P.O. Box 468 Selma, CA 93662

559-896-1680 mitchrjb@sbcglobal.net

Steve Toporcer Fortune-Ratliff General Contractors Inc.

352 W. Bedford, Suite 107 Fresno, CA 93711

559-432-1306 Mitch9@fortuneratliff.com

Hudson Fisk

42365 Hwy 49 Ahwahnee, CA 93601

559-642-3475 hfisk@sti.net

Bob Leslie Bates Construction

RT 4 Box 214 Porterville, CA 93257-9709

661-548-6561 RJL4BC@Peoplepc.com

Tim Messer Messer Logging Inc.

32111 Rockhill Lane Auberry, CA 93602

559-855-3160 timtery@netptc.net

Ben Alvarez Hobbs Construction

8850 N. Meridian Ave.

Fresno, CA 93720

559-325-3816 mikeh@hobbsci.com mailto:hfisk@sti.net