This Addendum No. 1, issued October 10, 2026, by the Iowa Department of Administrative Services-Central Procurement, provides clarifications and revisions to Design RFP955100-01 for heating unit replacements at the Iowa Correctional Institution for Women (ICIW) Iowa Prison Industries (IPI) Building located at 420 Mill Street SW, Mitchellville, Iowa. The project scope includes replacement of two existing Reznor heaters with new heating, cooling, and control systems. Key clarifications address design requirements such as field verification for development of building drawings regardless of available documentation, heating and cooling provisions for restrooms and adjacent spaces, retention of small Reznor units as backup systems if feasible, accommodation of increased building occupancy from approximately 60 to 120 persons plus staff, and inclusion of exhaust fans and intake louvers as part of the overall temperature control system to enable a "free cooling" opportunity. The addendum specifies that design costs related to added cooling for the east side of the building should be noted as a separate line item or alternate cost on design proposals.

An established project budget of $800,000 covers all costs including soft costs and construction. The existing Siemens HVAC control system will be removed and replaced with a new HVAC control system not required to connect to the campus Building Automation System (BAS) at ICIW. The design shall meet applicable code requirements for fresh air ventilation, with the State remaining open to alternative design concepts during design stages. Only one PDF building drawing has been located and will be provided to prospective offerors; however, design proposals must include field verification services. Offerors are required to acknowledge receipt of Addendum No. 1 in their proposals, with bids due November 18, 2026.

View the file

Other files

File Type Posted
RFP955100-01 - DOC ICIW IPI Bldng Heating Unit Replacements.pdf PDF
Pre-Proposal Meeting Virtual Link.html HTML file
Iowa IMPACS Procurement System.html HTML file
1463383-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To: Prospective Offerors Date: October 10th, 2026

From: Michael Bradbury, Issuing Officer

Iowa Department of Administrative Services-Central Procurement

Phone 515-823-9327: e-mail: construction.procurement@iowa.gov

RE: Addendum No. 1, to Design RFP955100-01, DOC ICIW IPI Building Heating Unit Replacements

The following additions, changes, and clarifications are hereby made by this Addendum.

Revisions to original scope:

1) Design costs related to the added cooling for the east side of the building should be noted as a separate item or alternate cost on the design proposal.

Addition to original scope:

1) No Items

Questions:

1) Is there a budget established for the project? A> Yes, $800,000 has been established for all costs to the project, including but not limited to soft costs and construction.

2) During Pre-Proposal Meeting it was noted that the IPI facility may have existing building drawings. Please provide a list of these drawings and the format these will be provided (PDF, other?). A> Only one pdf drawing has been found. See attachment. If these drawings are not available, additional design services will need to be included to field document the existing building conditions to develop drawings. A> Yes, design proposal should include field verification for development of drawings regardless of available information.

3) There are several propeller fan unit heaters existing. Please clarify which units are the temporary heaters that will be removed as part of this project, or which units will be retained in use at the conclusion of the project. A> Small Reznor units that are part of the original building shall remain. Temporary units that have been placed while the large units are down, can be removed. It would be an option for the small Reznor units to remain as backup to the new larger units if feasible, but not a requirementment.

4) It was noted the current goal is to increase inmate staff from currently ~60, back to the previous

~120 inmates, plus staff. Please clarify the maximum total building occupant load desired, it sounds like 120 – 130 people? A> Current operations have 60 +/- offenders/staff with the possibility of operations increasing to 120 +/- offenders/staff for the building as discussed.

5) Existing restrooms and adjacent spaces currently do not have exhaust ventilation to the exterior of the building. It was discussed this scope of work is currently excluded from the scope of work but may need to be considered. Please clarify if this will be excluded or needs to be included.

A> Heating/Cooling for these spaces will be part of the project. Ventilation should also be considered in these areas if it is beneficial for the overall HVAC system. The State will be looking for direction from the selected design team related to the items like this.

mailto:construction.procurement@iowa.gov

Addendum No. 1, to Design RFP955100-01, DOC ICIW IPI Building Heating Unit Replacements

6) Please clarify the Siemens HVAC control system will be removed and the desired HVAC control system will be simple stand-alone local control for units. A> Existing Siemens system will be removed and is intended to be replaced with a new HVAC control system for the building. The new system is not required to be connected to the campus BAS system at ICIW.

7) Please clarify the HVAC equipment is only to provide “minimum per code” fresh air as discussed during the meeting, or if another design concept needs to be included. It appears the units are currently using 100% outside air to serve the building. A> Project shall be designed to meet code. The State will be open to any design concepts during the design stages.

8) Building ventilation was discussed that 2 of the exhaust fans are not operational, one of the fans is objectionably loud, and one exhaust fan is functional. Additionally, it was discussed that the makeup air louvers are not operational. A> That is our understanding. The scope of work currently does not include any work associated with the exhaust fans and intake louvers. A>

Exhaust Fans and Intake Louvers are part of the overall temperature control of the building and are part of this project. Please clarify if this work needs to be excluded or included to develop a

“free cooling” opportunity for the facility. A> Included.

9)

Attachments:

1) Building PDF (1 Page)

Please acknowledge this Addendum #1 in your proposals. Thank You