RFP955000-01 - FDCF Powerhouse and Warehouse Roof Replacement.pdf

PDF 2 MB Posted

Attached to
DOC FDCF Powerhouse and Warehouse Roof Replacement
Solicitation number
RFP95500-01
Issued by
Taylor County, Iowa

About this file

This is a Design Services Scope Checklist for RFP 955000-01, issued by the Iowa Department of Administrative Services for professional design services related to roof replacement at the Fort Dodge Correctional Facility (FDCF). The project encompasses design services for roof replacement on two buildings—the Powerhouse and Warehouse—located at 1550 L Street, Fort Dodge, Iowa 50501. The non-mandatory pre-proposal conference is scheduled for November 10, 2026, with a proposal submission deadline of December 7, 2026 at 2:00 p.m. Central Standard Time. The scope checklist identifies required design development and construction document services, including project administration, code authority consulting, schedule development, field examination of existing buildings, materials research and specifications, and coordination of multiple design disciplines (architectural, structural, mechanical, electrical, fire systems, access control, civil, telecommunications, building automation controls, landscape, interior, acoustical, and graphics/signage). Proposing firms must include design documentation as part of their RFP proposals. Construction administration services are required during the bidding and construction phases, including participation in a construction kick-off meeting, bi-weekly conference calls, three minimum site observation visits with reports, and a warranty review visit. Questions and requests for clarification are due November 17, 2026 at 2:00 p.m. to construction.procurement@das.iowa.gov or Michael Bradbury at 515-823-9327, with addenda posted at bidopportunities.iowa.gov.

Respondents must submit separate Technical Proposals and Cost Proposals, with pricing and exceptions to contract terms prohibited in the Technical Proposal. All proposal terms, including price, must remain firm for a minimum of 120 days following the submission deadline. Payment terms are Net 60 with zero percent financing. Contract terms follow ConsensusDoc 803, available at das.iowa.gov. Respondents seeking confidential treatment must complete Form 22 Part 2, mark confidential pages, and submit a public copy with confidential information excised. The checklist indicates that certain services are marked as "Included" (required), while others are marked as "Excluded" or "TBD" (to be determined), allowing for some flexibility in scope definition. Virtual and on-site meetings are specified throughout the project phases, with a total of five virtual meetings and seven on-site meetings anticipated. No specific set-asides, incumbents, funding sources, or contract renewal options are identified in this document.

View the file

Other files

File Type Posted
RFP95500-01 - Addendum #01.pdf PDF
1463381-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B - DESIGN SERVICES SCOPE CHECKLIST

( * ) required by DAS

Included Excluded TBD

Virtual

Meeting

On Site

Meeting

Remarks / Responsible Party if Not performed by

Arch/Engineer

PROJECT ADMINISTRATION AND MANAGEMENT SERVICES

* Project Administration X ----- -----

* Disciplines Coordination / Document Checking X ----- -----

* Code Authority Consulting / Review / Approval X ----- ----- Exemption or Approval Review Uploaded to Procore

* Schedule Development Assistance X ----- ----- Schedule/Coordinate all Pre-design, Design Development, Bidding/Letting, Construction, and Closeout Meetings X ----- -----

Typically completed by CM

* Document Review (All Phases) X ----- -----

Submittal - Written Monthly Progress Reports X ----- -----

Submittal - Monthly Progress Contract Documents X ----- -----

Marketing Presentations X ----- -----

LEED Certification / Rebate Assistance / Etc X ----- -----

DESIGN DEVELOPMENT - CONSTRUCTION DOCUMENTS

* Designer Kick Off Meeting X 1 -----

Field Examination of existing buildings (on site)

X ----- ----- Each proposing firm shall provide visits as they see fit to complete the work of design

* Meeting(s) with Owner Including minutes (includes consultants) X ----- ----- Uploaded to Procore

* Materials Research/Specifications X ----- -----

Design / Documentation - Architectural

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Structural

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Mechanical

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Electrical

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Fire Systems

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Access Control

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Civil

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Telecommunications

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Building Automation Controls

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Landscape

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Interior (Furniture)

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Special

To be completed by Designer and Included with their RFP proposal

Design / Documentation - Acoustical

To be completed by Designer and Included with their RFP proposal

Design - Graphics and Signage

To be completed by Designer and Included with their RFP proposal

Coordination of Owner Supplied Equipment/Materials X ----- -----

Should be Included if there are Owner supplied equipment or materials (including furniture)

* Coordination with Owner/CM for Scope of Hazardous Materials Testing X ----- -----

Energy Report X ----- -----

Progress Contract Documents for Review - SD X ----- ----- Uploaded to Procore & Bluebeam Studio Session

Progress Contract Documents for Review - DD X 1 ----- Uploaded to Procore & Bluebeam Studio Session

EXHIBIT B - DESIGN SERVICES SCOPE CHECKLIST

( * ) required by DAS

Included Excluded TBD

Virtual

Meeting

On Site

Meeting

Remarks / Responsible Party if Not performed by

Arch/Engineer

Progress Contract Documents for Review - 50% CD X ----- 1 Uploaded to Procore & Bluebeam Studio Session

* Progress Contract Documents for Review - 95% CD X 1 ----- Uploaded to Procore & Bluebeam Studio Session

* Prepare Bidding Contract Documents X ----- ----- Uploaded to Procore

Prepare Front End for Bidding Contract Documents X ----- ----- Typically completed by CM

Statement of Probable Construction Cost - SD X ----- -----

Statement of Probable Construction Cost - DD X ----- -----

Statement of Probable Construction Cost - 50% CD X ----- -----

Statement of Probable Construction Cost - 95% CD X ----- -----

* Statement of Probable Construction Cost - 100% CD X ----- ----- Uploaded to Procore

* Submit to Department of Inspections and Appeals for Preliminary Review X ----- ----- Upload to Procore

Submit to Department of Inspections and Appeals for Exemption or Full Plan

Review X ----- -----

Upload to Procore

* Review/Approve 95% Submittal Log, Attic Stock Log, Closeout Log X ----- -----

Tabulation of Areas and Program Comparison - DD X ----- -----

Tabulation of Areas and Program Comparison - CD X ----- -----

Presentation Model / Renderings X ----- -----

BIDDING / LETTING

* Identify Bid Strategies X ----- -----

* Attend Pre-Bid Meeting(s) / Tour(s) X ----- 1

Lead Pre-Bid Meeting (s) / Tour (s). Including Meeting Minutes. X ----- ----- Typically completed by CM

* Prepare Addenda X ----- -----

Statement of Probable Construction Cost - All Addenda X ----- -----

Attend Bid Opening X ----- ----- Typically attended by CM/OR

* Bid Evaluation X ----- -----

Review Construction Contract Agreements X ----- ----- Typically completed by CM/OR

CONSTRUCTION ADMINISTRATION SERVICES

* Participate in Construction Kick-Off Meeting X 1 -----

* Submittal Service (Shop Drawings, etc.) X ----- -----

* Participation in Bi-weekly conference calls during the construction period X ----- -----

Site Observation with Reports

X ----- 3

Upload to Procore. At minimum include site observations as indicated. Beyond these site visits, each proposing firm shall provide a unit cost per construction inspection visit.

* Approval of Constructor Pay Applications X ----- -----

* Testing and Inspection Report Review X ----- -----

* Supplemental Documentation (ASIs) X ----- -----

* Change Requests / Change Order Review/Approval X ----- -----

* Interpretations and Decisions of Contract Documents X ----- -----

* Creation of Punch List X ----- 1

Punch List Management X ----- ----- Typically managed by CM

* Punch List Completion Verification X 1 -----

* Project Closeout Review/Approval (O&Ms, As-builts, COSC, COFC, etc) X ----- ----- Upload to Procore

Contract Cost Accounting X ----- ----- Typically managed by CM/OR

POST CONSTRUCTION SERVICES

Post Project Review Meeting Participation X ----- -----

* Update of CAD Files (Change Orders, RFIs, ASIs) X ----- -----

Update of CAD Files (Record Documents) X ----- -----

* Warranty Review X ----- 1

Expert Witness X ----- -----

Total Virtual/On Site Meetings 5 7

Exhibit - C

Fort Dodge Correctional Facility Roofing Site Map

Powerhouse Building

Warehouse Building

!RFP 955000-01 FDCF Powerhouse and Warehouse Roof Replacement - Final 10.21.2026
2.1 MINIMUM FIRM QUALIFICATIONS
2.2 SCOPE OF WORK
SECTION 3 – ADMINISTRATIVE INFORMATION
SECTION 5 – PROPOSAL CONTENT
SECTION 6 – PROPOSAL EVALUATION, SELECTION, AND AWARD
EXHIBIT A – SAMPLE INSURANCE CERTIFICATE
Exibhit B - Design Services Checklist - FDCF Roof Replacement Final
Exhibit C - Site Map