This is a Design Services Scope Checklist for RFP 955000-01, issued by the Iowa Department of Administrative Services for professional design services related to roof replacement at the Fort Dodge Correctional Facility (FDCF). The project encompasses design services for roof replacement on two buildings—the Powerhouse and Warehouse—located at 1550 L Street, Fort Dodge, Iowa 50501. The non-mandatory pre-proposal conference is scheduled for November 10, 2026, with a proposal submission deadline of December 7, 2026 at 2:00 p.m. Central Standard Time. The scope checklist identifies required design development and construction document services, including project administration, code authority consulting, schedule development, field examination of existing buildings, materials research and specifications, and coordination of multiple design disciplines (architectural, structural, mechanical, electrical, fire systems, access control, civil, telecommunications, building automation controls, landscape, interior, acoustical, and graphics/signage). Proposing firms must include design documentation as part of their RFP proposals. Construction administration services are required during the bidding and construction phases, including participation in a construction kick-off meeting, bi-weekly conference calls, three minimum site observation visits with reports, and a warranty review visit. Questions and requests for clarification are due November 17, 2026 at 2:00 p.m. to construction.procurement@das.iowa.gov or Michael Bradbury at 515-823-9327, with addenda posted at bidopportunities.iowa.gov.
Respondents must submit separate Technical Proposals and Cost Proposals, with pricing and exceptions to contract terms prohibited in the Technical Proposal. All proposal terms, including price, must remain firm for a minimum of 120 days following the submission deadline. Payment terms are Net 60 with zero percent financing. Contract terms follow ConsensusDoc 803, available at das.iowa.gov. Respondents seeking confidential treatment must complete Form 22 Part 2, mark confidential pages, and submit a public copy with confidential information excised. The checklist indicates that certain services are marked as "Included" (required), while others are marked as "Excluded" or "TBD" (to be determined), allowing for some flexibility in scope definition. Virtual and on-site meetings are specified throughout the project phases, with a total of five virtual meetings and seven on-site meetings anticipated. No specific set-asides, incumbents, funding sources, or contract renewal options are identified in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP95500-01 - Addendum #01.pdf | ||
| 1463381-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B - DESIGN SERVICES SCOPE CHECKLIST
( * ) required by DAS
Included Excluded TBD
Virtual
Meeting
On Site
Meeting
Remarks / Responsible Party if Not performed by
Arch/Engineer
PROJECT ADMINISTRATION AND MANAGEMENT SERVICES
* Project Administration X ----- -----
* Disciplines Coordination / Document Checking X ----- -----
* Code Authority Consulting / Review / Approval X ----- ----- Exemption or Approval Review Uploaded to Procore
* Schedule Development Assistance X ----- ----- Schedule/Coordinate all Pre-design, Design Development, Bidding/Letting, Construction, and Closeout Meetings X ----- -----
Typically completed by CM
* Document Review (All Phases) X ----- -----
Submittal - Written Monthly Progress Reports X ----- -----
Submittal - Monthly Progress Contract Documents X ----- -----
Marketing Presentations X ----- -----
LEED Certification / Rebate Assistance / Etc X ----- -----
DESIGN DEVELOPMENT - CONSTRUCTION DOCUMENTS
* Designer Kick Off Meeting X 1 -----
Field Examination of existing buildings (on site)
X ----- ----- Each proposing firm shall provide visits as they see fit to complete the work of design
* Meeting(s) with Owner Including minutes (includes consultants) X ----- ----- Uploaded to Procore
* Materials Research/Specifications X ----- -----
Design / Documentation - Architectural
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Structural
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Mechanical
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Electrical
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Fire Systems
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Access Control
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Civil
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Telecommunications
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Building Automation Controls
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Landscape
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Interior (Furniture)
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Special
To be completed by Designer and Included with their RFP proposal
Design / Documentation - Acoustical
To be completed by Designer and Included with their RFP proposal
Design - Graphics and Signage
To be completed by Designer and Included with their RFP proposal
Coordination of Owner Supplied Equipment/Materials X ----- -----
Should be Included if there are Owner supplied equipment or materials (including furniture)
* Coordination with Owner/CM for Scope of Hazardous Materials Testing X ----- -----
Energy Report X ----- -----
Progress Contract Documents for Review - SD X ----- ----- Uploaded to Procore & Bluebeam Studio Session
Progress Contract Documents for Review - DD X 1 ----- Uploaded to Procore & Bluebeam Studio Session
EXHIBIT B - DESIGN SERVICES SCOPE CHECKLIST
( * ) required by DAS
Included Excluded TBD
Virtual
Meeting
On Site
Meeting
Remarks / Responsible Party if Not performed by
Arch/Engineer
Progress Contract Documents for Review - 50% CD X ----- 1 Uploaded to Procore & Bluebeam Studio Session
* Progress Contract Documents for Review - 95% CD X 1 ----- Uploaded to Procore & Bluebeam Studio Session
* Prepare Bidding Contract Documents X ----- ----- Uploaded to Procore
Prepare Front End for Bidding Contract Documents X ----- ----- Typically completed by CM
Statement of Probable Construction Cost - SD X ----- -----
Statement of Probable Construction Cost - DD X ----- -----
Statement of Probable Construction Cost - 50% CD X ----- -----
Statement of Probable Construction Cost - 95% CD X ----- -----
* Statement of Probable Construction Cost - 100% CD X ----- ----- Uploaded to Procore
* Submit to Department of Inspections and Appeals for Preliminary Review X ----- ----- Upload to Procore
Submit to Department of Inspections and Appeals for Exemption or Full Plan
Review X ----- -----
Upload to Procore
* Review/Approve 95% Submittal Log, Attic Stock Log, Closeout Log X ----- -----
Tabulation of Areas and Program Comparison - DD X ----- -----
Tabulation of Areas and Program Comparison - CD X ----- -----
Presentation Model / Renderings X ----- -----
BIDDING / LETTING
* Identify Bid Strategies X ----- -----
* Attend Pre-Bid Meeting(s) / Tour(s) X ----- 1
Lead Pre-Bid Meeting (s) / Tour (s). Including Meeting Minutes. X ----- ----- Typically completed by CM
* Prepare Addenda X ----- -----
Statement of Probable Construction Cost - All Addenda X ----- -----
Attend Bid Opening X ----- ----- Typically attended by CM/OR
* Bid Evaluation X ----- -----
Review Construction Contract Agreements X ----- ----- Typically completed by CM/OR
CONSTRUCTION ADMINISTRATION SERVICES
* Participate in Construction Kick-Off Meeting X 1 -----
* Submittal Service (Shop Drawings, etc.) X ----- -----
* Participation in Bi-weekly conference calls during the construction period X ----- -----
Site Observation with Reports
X ----- 3
Upload to Procore. At minimum include site observations as indicated. Beyond these site visits, each proposing firm shall provide a unit cost per construction inspection visit.
* Approval of Constructor Pay Applications X ----- -----
* Testing and Inspection Report Review X ----- -----
* Supplemental Documentation (ASIs) X ----- -----
* Change Requests / Change Order Review/Approval X ----- -----
* Interpretations and Decisions of Contract Documents X ----- -----
* Creation of Punch List X ----- 1
Punch List Management X ----- ----- Typically managed by CM
* Punch List Completion Verification X 1 -----
* Project Closeout Review/Approval (O&Ms, As-builts, COSC, COFC, etc) X ----- ----- Upload to Procore
Contract Cost Accounting X ----- ----- Typically managed by CM/OR
POST CONSTRUCTION SERVICES
Post Project Review Meeting Participation X ----- -----
* Update of CAD Files (Change Orders, RFIs, ASIs) X ----- -----
Update of CAD Files (Record Documents) X ----- -----
* Warranty Review X ----- 1
Expert Witness X ----- -----
Total Virtual/On Site Meetings 5 7
Exhibit - C
Fort Dodge Correctional Facility Roofing Site Map
Powerhouse Building
Warehouse Building
| !RFP 955000-01 FDCF Powerhouse and Warehouse Roof Replacement - Final 10.21.2026 |
| 2.1 MINIMUM FIRM QUALIFICATIONS |
| 2.2 SCOPE OF WORK |
| SECTION 3 – ADMINISTRATIVE INFORMATION |
| SECTION 5 – PROPOSAL CONTENT |
| SECTION 6 – PROPOSAL EVALUATION, SELECTION, AND AWARD |
| EXHIBIT A – SAMPLE INSURANCE CERTIFICATE |
| Exibhit B - Design Services Checklist - FDCF Roof Replacement Final |
| Exhibit C - Site Map |
File details come from the government source that posted it. Updated .