RFP95500-01 - Addendum #01.pdf
PDF 798 KB Posted
- Solicitation number
- RFP95500-01
- Issued by
- Taylor County, Iowa
About this file
This document is an Addendum #01 to RFP95500-01 issued by the State of Iowa Department of Administrative Services for professional design services at the Fort Dodge Correctional Facility. The project involves roof replacement design services for two buildings: the Powerhouse Building (Building L, approximately 10,640 square feet) and the Warehouse Building (Building J, approximately 8,952 square feet), both located outside the secure perimeter at 1550 L Street, Fort Dodge, Iowa 50501. The scope includes removal of ballast, rubber membrane, rigid insulation, flashing, metal trim, gutters, and downspouts, with exclusions for existing structural elements, metal decking, wall facades, and parapet walls. A non-mandatory pre-proposal conference was held on November 10, 2026, with five total virtual meetings and seven on-site visits/meetings anticipated. Questions were due November 17, 2026 at 2:00 p.m. to construction.procurement@das.iowa.gov, and proposals are due December 7, 2026 at 2:00 p.m. via the IMPACS Electronic Procurement System. The design schedule extends through March 17, 2027 for 100 percent construction documents, with contractor bidding anticipated in April 2027 and construction execution from May through August 2027.
Proposals must include a separate Technical Proposal and Cost Proposal with lump sum pricing broken down by schedule of values and hourly rates. Required technical proposal exhibits include transmittal letter, executive summary, firm qualifications, staff experience, applicable state project experience, approach and proposed methods, and project execution documentation. The estimated construction budget is $600,000 for both roof replacements. DAS requires a project-specific Certificate of Insurance with Professional Liability coverage of $2,000,000 with a $25,000 deductible, with notification required if the deductible differs. All proposal terms must remain firm for a minimum of 120 days after submission. The contract will utilize a modified ConsensusDocs 803 Form of Agreement, and payment terms are Net 60 with 0 percent financing. Designers are not required to obtain background checks but will receive escorts for limited on-site visits. The addendum modifies the original RFP requirements, removes the 100 percent design development review meeting, and allows consideration of alternate design schedules during proposal evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP955000-01 - FDCF Powerhouse and Warehouse Roof Replacement.pdf | ||
| 1463381-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9550.00 DOC FDCF Powerhouse and Warehouse Roof Replacement
1550 L St Fort Dodge, Iowa 50501
P: 515-574-4700
RFP Pre-Proposal Minutes: Meeting #1
Meeting Date Nov 10, 2026 Meeting Time 10:00 am - 11:30 am Central Time (US & Canada)
Meeting Location Fort Dodge Correctional Facility & Virtual Video Conferencing Link
Join Meeting
Overview Meeting to allow prospective design firms to visit the project site, when possible, and learn more about the scope.
Notes
Attachments RFP 955000-01 FDCF Powerhouse and Warehouse Roof Replacement - Design Services 10.21.2026.pdf
Scheduled Attendees
Name Company Phone Number Email Attendance
Jeremiah Johnson Fort Dodge Correctional Facility P: (515) 571-4874 jeremiah.johnson@iowa.gov Present
Noah Thelen McGough Construction P: (515) 639-3853 noah.thelen@mcgough.com Present
Jennie Elliott State of Iowa - Department of Administrative Services jennie.elliott@das.iowa.gov Present
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description Attendance
Attachments FDCF Pre-Proposal Meeting - Sign In Sheet.pdf
Official Documented Meeting Minutes See attached Sign In Sheet
Project Overview
2.1 1 Scope Review Open
Description Design services to provide roof replacement of existing roofs on the Powerhouse Building and Warehouse Building. Both buildings are located outside the secure perimeter fencing. Powerhouse Building (Building L) is estimated to be 10,640 SQFT and Warehouse Roof (Building J) is estimated to be 8,952 SQFT. Scope of work could include removal of ballast, rubber membrane, ridged insulation, flashing and metal trim, gutters and downspouts. It is not expected that any existing structure, metal decking wall facade or parapet walls will be included in this scope of work.
Existing PDFs available to successful design firm Total Virtual Meetings: 5 Total On Site Visits/Meetings: 7 (3 Construction Site Observations)
State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Nov 13, 2026 11:09 AM CST https://teams.microsoft.com/meet/2435295352477820?p=JhKzI24cC6i53sQESy https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/42578-c/7697663-p/01M5GXVSJ685QY9KDTSKK8HJHW?companyId=87524&projectId=3667967&sig=68f9da2d81deb8ef718e4dce4bc4ee8b7fd624a9ae37fada269b355488b729ca https://storage.procore.com/api/v5/files/us-east-1/pro-core.com/42578-c/7697663-p/01M7AY4YNP61C4K123VFRT2YX1?companyId=87524&projectId=3667967&sig=42d70301877a2dbefb977c4fe7c981c303547f31f3256af5570b7c78dd87ca1d
Official Documented Meeting Minutes Lightning protection on the roofs and leaving in place but re-sealing penetrations with weather head. No need to re-certify the system.
Jeremiah brough up the need to include an exhaust vent in the Powerplant roof above the chillers, this might be an extra during the re-roofing process. Need to confirm if this would be handled outside of scope with DAS budget. (Main focus is re-roof for DAS).
Current building (Maintenance and Powerhouse) is metal deck. Others roof replacements on site was concrete.
Core testing will want to take place during hazardous material testing. DAS and McGough will cover cost, looking for coordination with Designers. Once floor plan is received we will engage Testing agency.
Age of the buildings estimated 28-30 years old 97-98 build.
Discussion about at extending construction due to bid for schools and availability for contractors. Should not be an issue and can discuss construction timeline as we work though design.
General Contractors will need background check and PREA. Designers will not need to do background checks since they will have limited trips and escorted if needed.
Both roofs have hatch access from inside building, Jeremiah will want contractors to use exterior access for material and general access.
2.2 1 Schedule Review Open
Description
• Questions Due to construction.procurement@iowa.gov: 11/17/2026 at 2:00pm
• Addendum Issued: Week of 11/16/26 following questions received.
• Proposals Due: 12/07/2026 at 2:00pm
• Selection of Designer/Issue NOI: Week of 12/7/26
• Execution of 803 Contract: Week of 12/7/26
• Tentative Design Kickoff Meeting: Week of 12/14/2026
• 100% DD: TBD
• 50% CD and budget: TBD
• 95% CD: TBD
• 100% CD and budget: March 17, 2027
• Contractor Bidding: April 2027
• Execution of Contractor's Contract(s): May 2027
• Submittals, Procurement and Construction: May 2027 - August 2027
• Closeout: August 2027
Official Documented Meeting Minutes Remove 100% DD Review meeting and issue in Addendum.
Extending the Construction schedule to allow additional contractor engagement with school work. Can push out to September/October but weather will still be a concern if pushed to far.
Question, What is the overall Budget? Estimated construction budget is $600,000 for both roofs.
Question, can the design documents be turned over before March 17th, 2026? Yes if designer is proposing an alternate schedule this will be considered during proposal review.
RFP Overview
Meeting #1 - RFP Pre-Proposal Project: 9550.00 DOC FDCF Powerhouse and Warehouse Roof Replacement
State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Nov 13, 2026 11:09 AM CST mailto:construction.procurement@iowa.gov
3.1 1 RFP Requirements Review Open
Description
• All questions to be directed to construction.procurement@iowa.gov
• DAS uses Procore online project management system for all projects, at no cost to the designer.
• DAS uses a modified ConsensusDocs 803 Form of Agreement
• DAS requires a project-specific Certificate of Insurance and specifies a Professional Liability policy of $2,000,000 with a deductible of $25,000 o Must note in proposal if deductible is different and provide a letter of financial stability from bank o Must provide COI prior to contract execution
• Ensure the following items are included in the proposal:
o Project-specific schedule o Resumes for all technical staff that will be assigned to the project o Anticipated hours and rates for each person on the design team o Lump sum broken down by schedule of values
• Proposals shall be uploaded through the IMPACS Electronic Procurement System (do not email to Procurement).
o Link and information is in the RFP o Designers will need to register prior to submission o Designer should complete the registration process and ensure the ability to log in as soon as possible to ensure proposals can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
Official Documented Meeting Minutes This is the old RFP Information, due to new DAS RFP process this has been modified. See new exhibits and matrix in RFP documents as well information below in meeting minutes.
Question will be sent to new procurement email : construction.procurement@das.iowa.gov
All questions to be directed to construction.procurement@das.iowa.gov
• DAS uses Procore online project management system for all projects, at no cost to the designer.
• DAS uses a modified ConsensusDocs 803 Form of Agreement
• DAS requires a project-specific Certificate of Insurance and specifies a Professional Liability policy of $2,000,000 with a deductible of $25,000 o Must note in proposal if deductible is different and provide a letter of financial stability from bank o Must provide COI prior to contract execution
• Ensure the following items are included in the proposal:
o Technical Proposal (See Section 5.2 of the RFP)
▪ Exhibit 1 - Transmittal Letter
▪ Exhibit 2 - Executive Summary
▪ Exhibit 3 - Firm Qualifications
▪ Exhibit 4 - Staff Experience
▪ Exhibit 5 - Applicable State Project Experience
▪ Exhibit 6 - Approach and Proposed Methods
▪ Exhibit 7 - Project Execution
▪ Design Services Checklist o Cost Proposal
State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Nov 13, 2026 11:09 AM CST mailto:construction.procurement@das.iowa.gov
▪ Lump sum broken down by schedule of values and rates per each person on the design team
• Proposals shall be uploaded through the IMPACS Electronic Procurement System (do not email to Procurement).
o Link and information is in the RFP o Designers will need to register prior to submission o Designer should complete the registration process and ensure the ability to log in as soon as possible to ensure proposals can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
Conclusion
4.1 1 Designer Questions Open
Description Any questions?
Official Documented Meeting Minutes Official question should be submitted to DAS Procurement, Question, What is the overall Budget? Estimated construction budget is $600,000 for both roofs.
Question, can the design documents be turned over before March 17th, 2026? Yes if designer is proposing an alternate schedule this will be considered during proposal review.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Nov 13, 2026 11:09 AM CST
| RFP Addendum #01 - FDCF Powerhouse and Maintiance Roof Replacement |
| 9550.00-DOC_FDCF_Powerhouse_and_Warehouse_Roof_Replacement-1-RFP_Pre-Proposal-2026-11-13 |
| FDCF Pre-Proposal Meeting - Sign In Sheet |
File details come from the government source that posted it. Updated .