This Request for Proposals (RFP953500-01) is issued by the Iowa Department of Administrative Services (DAS) seeking professional design services for exterior window replacement at the Woodward Resource Center. The project involves the design and replacement of approximately 88 operable exterior bay windows on the Linden A, B, C, and D buildings, including evaluation and design for storm windows, screens, and lintel repair or replacement. The RFP was posted on March 20, 2026, with proposals due April 15, 2026, at 2:00 pm Central Time. A non-mandatory pre-proposal conference is scheduled for April 2, 2026, at 1:00 pm at the Woodward Resource Center in Woodward, Iowa. The designer contract is expected to execute the week of April 20, 2026, with design kickoff the week of April 27, 2026. Design deliverables include 50% construction documents by May 29, 2026, 95% construction documents by June 26, 2026, and 100% construction documents by July 10, 2026. Construction bidding is anticipated in August 2026, with construction execution from September 2026 through June 2027, and project closeout in July 2027. The contract includes mandatory site visits for design kickoff, 50% and 95% document reviews, pre-bid meeting, four construction field observations, substantial completion/punch list development, final completion verification, and one-year warranty correction period visit, with additional visits at the designer's discretion.
The RFP requests lump sum pricing inclusive of all reimbursable expenses such as printing, mileage, and travel, broken down by construction documents, bidding or negotiation assistance, and construction phase services. Proposers must submit hourly rates and anticipated hours by position for all assigned staff and sub-consultants, along with an estimated fee total. A unit price per additional construction inspection visit beyond the minimum required visits is also requested. The contract will be a modified ConsensusDoc 803, with proposal terms remaining firm for 120 days. Respondents must demonstrate relevant experience on similar projects completed within the last five years, identify qualified staff with appropriate credentials and certifications, and provide organizational charts and resumes of key personnel. The designer is prohibited from submitting a bid on the resulting construction contract. The project involves coordination with the State Historic Preservation Office, the Department of Inspections, Appeals, and Licensing's Building Code Bureau, and state agencies regarding utility abandonment and shut down requirements. All design documents become copyright property of the State of Iowa and must be delivered in native computer format and PDF versions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP953500-01 - Addendum #1.pdf | ||
| 1378353-event.pdf | ||
| ConsensusDoc 803 Contract Terms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IOWA
REQUEST FOR PROPOSALS
PROFESSIONAL DESIGN SERVICES
RFP COVER SHEET
Administrative Information
RFP Number RFP953500-01 Title of RFP WRC Linden Court Bay Window Replacement
Agency Iowa Department of Administrative Services (DAS)
Project Description
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for the replacement of the exterior windows on the Linden A, B, C, and D buildings at the Woodward Resource Center.
State Issuing Officer:
Michael Bradbury Issuing Officer Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327 Email: construction.procurement@iowa.gov
PROCUREMENT TIMETABLE—Event or Action Date/Time (Central Time)
State Posts Notice of RFP on TSB website 3/20/2026
State Issues RFP 3/23/2026
Pre-Proposal Conference Location and Address:
Woodward Resource Center 1251 334th Street, Woodward, IA 50276 (Meet at Story CP2.0 Trailer) Is Pre-Proposal Conference mandatory? No If a map is needed, contact the Issuing Officer.
4/2/2026 at 1:00 pm
Questions, requests for clarification, and suggested changes from Respondents due to Construction Procurement 4/8/2026 at 2:00 pm
Proposals Due 4/15/2026 at 2:00 pm
Relevant Websites
Website where Addenda to this RFP will be posted http://bidopportunities.iowa.gov
Website where contract terms and conditions are posted https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf
Number of Copies of Proposals Required to be Submitted: 1 Digital
Firm Proposal Terms The minimum number of days following the deadline for submitting Proposals that the firm guarantees all proposal terms, including price, will remain firm is 120 Days.
mailto:construction.procurement@iowa.gov http://bidopportunities.iowa.gov/ https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf
1.1 INTRODUCTION
The Iowa Department of Administrative Services (DAS) is seeking proposals from qualified and available Design companies for services, per RFP cover page, and as outlined in the following (Sections 1.2 - 1.3). The successful proposal must:
● For the staff that will be assigned, identify and describe qualifications, experience, and expertise in providing services for similar, or relevant, projects.
● For the staff that will be assigned, provide a list of past similar or relevant projects completed in the last 5 years, and include brief descriptions of what the projects entailed and a contact name and phone number (reference). In addition provide estimated project cost, final project cost at acceptance, and whether it was completed on time.
● Describe the composition of your team. Identify staff to be assigned. Provide resumes of key individual(s) including education, relevant experience, and certifications/licensing.
NOTE: Any responding company and/or consultant that is part of the project design services cannot receive an award from the resulting request for bid of construction services.
● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.
● Describe computer program/software capabilities and expertise you utilize. Please describe your experience.
● Provide a copy of your organizational chart.
● Describe your experience, if any, on designing similar or relevant projects for the State of
Iowa.
● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.
● Identify desired reimbursable charges (the State has limitations, per State of Iowa Accounting
Policies and Procedures 210.245), and all other charges.
1.2 SCHEDULE
DAS is seeking a firm that can commence work upon execution of a contract. Time is of the essence.
Execution of Designer’s Contract Week of April 20, 2026 Tentative Design Kick-Off Meeting Week of April 27, 2026 50% Construction Documents and Cost Opinion By May 29, 2026 95% Construction Documents and Cost Opinion By June 26, 2026 100% Construction Documents and Cost Opinion By July 10, 2026 Contractor Bidding August, 2026 Execution of Contractor’s Contract(s) Late August, 2026 Submittals, Procurement and Construction September 2026 to June 2027 Close out July 2027
1.3 PROJECT DESCRIPTION
Construction Manager (Story Construction) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of replacing 88 exterior bay windows on the Linden A, B, C, and D buildings at the Woodward Resource Center.
Design services shall include:
1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract.
1.3.2 All design disciplines necessary to complete the scope of work.
1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the
Owner, Construction Manager, and Owner’s maintenance staff.
1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner.
1.3.5 At a minimum, design for construction for the following:
1.3.5.1 Removal and replacement of approximately 88 operable exterior windows, including storm windows and screens. Evaluate whether replacements need to be operable and if storm windows and screens are needed.
1.3.5.2 Window design shall include the evaluation of the lintels and design for repair or replacement.
1.3.5.3 Include water penetration testing of windows to be performed by the contractor in the specifications.
1.3.5.4 Coordination with the State Historic Preservation Office as needed.
1.3.6 Existing CAD/PDF drawings from a recent project for the Linden Court building will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm. Original window drawings and specifications are not available.
1.3.7 Field examination of the existing buildings.
1.3.8 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.
1.3.9 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal.
1.3.10 Designer shall include any and all survey work required for completion of project.
1.3.11 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required.
1.3.12 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule.
1.3.13 Designer shall assist Construction Manager in the evaluation of long lead times.
1.3.14 Quality control during Design, Preconstruction and Construction.
1.3.15 Compliance with all Federal, State, and applicable AHJ codes.
1.3.16 Completion of State building and energy code documents, as required.
1.3.17 Design review will be conducted at 50% construction documents, and 95% construction documents. Dates for design review meetings to be coordinated with the design and project team and set no later than the design kickoff meeting. Review will be conducted with DAS Owner Representative, Construction Manager, and Facility Representative, at a minimum. Drawings, specifications and cost opinions (if applicable) shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions.
1.3.18 Review with the Department of Inspections, Appeals, and Licensing’s Building Code Bureau for approval of plans or exemption from review. All fees associated with the Bureau are the responsibility of the designer.
1.3.19 Develop and distribute agendas and meeting minutes for all meetings during the design phase.
1.3.20 Designer shall provide any information necessary to obtain utility rebates where applicable.
1.3.21 Construction cost opinions provided by the Design Professional team during Design (at 50% construction documents, and 95% construction documents) with a Final Estimate for construction included with bid documents, per Iowa Code.
1.3.22 Construction drawings, specifications (the Construction Manager will produce Divisions 00 and 01), and addenda.
1.3.23 Provide bid alternates as determined during the course of design and bid package development.
1.3.24 Assist Owner and Construction Manager in obtaining bids from qualified contractors.
1.3.25 Construction administration, including creation of the submittal and closeout items log, review of and responses to submittals and closeout documentation, RFIs, proposal requests, change orders, pay applications, periodic site visits, attendance at project meetings as required, participation / development of contractor punch list, closeout documentation review and approval, certificates of substantial completion, and certificates of final completion, as well as development of Architectural Supplemental Instructions for design revisions, and punch lists within the construction management software program.
1.3.26 Participation with project team during construction progress meetings as required.
Designer shall participate in monthly conference calls during the construction period.
1.3.27 Field Observation reports, with photos, submitted for each site inspection within five (5) days of the site visit.
1.3.28 Acknowledgement that all documents are copyright to the State of Iowa and shall be turned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendums will be expected to be incorporated before final posting. Both the native computer format and PDF versions shall be uploaded to the construction management software program at the end of the project.
1.3.29 The Department requests lump sum pricing from the respondents to this RFP, with the lump sum base scope price being inclusive of all reimbursables, such as printing, mileage and travel expenses. The Department requests the fee proposal from the respondents to this RFP be broken down as follows. These breakdown prices will be used as the schedule of values for billing purposes.
1.3.29.1 Construction Documents
1.3.29.2 Bidding or Negotiation Assistance
1.3.29.3 Construction Phase
Include at minimum the following site/virtual visits:
In-Person Virtual
Design Kickoff/Building Evaluation 1 -
50% Construction Documents 1 -
95% Construction Documents - 1
100% Construction Documents - -
Pre-Bid Meeting 1 -
Construction Field Observation 4 -
Substantial Completion/Punch List Development 1 -
Final Completion/Punch List Verification 1 -
One Year Warranty Correction Period Visit 1 -
10 1
Beyond these site visits, each proposing firm shall provide additional visits as they see fit to complete the work of design. In addition to the lump sum pricing, the Department requests a unit price per construction inspection visit. This unit price will be additive or deductive based on the number of actual visits made.
1.4 ATTACHMENTS
1.4.1 Photos of Linden Bay Windows
Attachment 1.4.1
Attachment 1.4.1
File details come from the government source that posted it. Updated .