RFP953500-01 - Addendum #1.pdf
PDF 355 KB Posted
- Attached to
- WRC Linden Court Bay Window Replacement
- Solicitation number
- RFP953500-01
- Issued by
- Clinton County, Iowa
About this file
This is an Addendum No. 1 to Request for Proposals 953500-01 issued by the Iowa Department of Administrative Services for professional design services related to the WRC Linden Court Bay Window Replacement project at the Woodward Resource Center in Woodward, Iowa. The addendum modifies the designer's scope to include participation in bi-weekly conference calls during the active construction period, rather than monthly calls throughout construction. The original RFP sought design services for the replacement of approximately 88 operable exterior bay windows across four buildings (Linden A, B, C, and D), with evaluation and design for storm windows, screens, and lintel repair or replacement. Key deadlines include proposal submission on April 15, 2026, at 2:00 pm Central Time; 50% construction documents due May 29, 2026; 95% construction documents due June 26, 2026; and 100% construction documents due July 10, 2026. A non-mandatory pre-proposal conference was held on April 2, 2026, at the Woodward Resource Center. The designer contract was expected to execute the week of April 20, 2026, with design kickoff the week of April 27, 2026. Mandatory site visits are required for design kickoff, document reviews, pre-bid meeting, four construction field observations, substantial completion assessment, final completion verification, and a one-year warranty correction period visit.
The approximate construction budget is $603,900. Proposers must submit lump sum pricing inclusive of all reimbursable expenses, hourly rates with anticipated hours by position for all staff and sub-consultants, and unit pricing for additional construction inspection visits beyond the minimum required. Respondents must demonstrate relevant experience on similar projects completed within the last five years, identify qualified staff with appropriate credentials and certifications, and provide organizational charts and resumes of key personnel. The RFP specifies that hazardous materials abatement, including asbestos window glazing removal and temporary enclosures, will be handled by a separate abatement contractor bid package managed by the Owner. Spray testing will be required for completely installed window assemblies, and the water testing standard will be determined by the design professional. All design documents become copyright property of the State of Iowa and must be delivered in native computer format and PDF versions. Construction bidding is anticipated in August 2026, with construction execution from September 2026 through June 2027, and project closeout in July 2027.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP953500-01 - WRC Linden Court Window Replacement.pdf | ||
| 1378353-event.pdf | ||
| ConsensusDoc 803 Contract Terms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO.1
WRC Linden Court Bay Window Replacement
Woodward, Iowa
Date: April 9th, 2026
RFP: 953500-01
Project: 9535.00 WRC Linden Court Bay Window Replacement
CHANGES TO RFP:
• Change note 1.3.26 to read as the following: “Participation with project team during construction progress meetings as required. Designer shall participate in bi-weekly conference calls during the active construction period.”
QUESTIONS AND ANSWERS FROM THE PRE-PROPOSAL MEETING:
Q1) What is the approximate construction budget
A1) $603,900
Q2) Are ceilings included in designers’ scope?
A2) Ceiling demolition and replacement is not expected to be needed with this project.
Q3) What electronic files are available?
A3) CAD files from a previous tuckpointing project that show the elevations and approximate window openings will be made available to the successful designer, but the designer is responsible for field verification of any and all documents they choose to use.
Q4) How many windows are operable?
A4) Portions of all of the windows are currently operable.
Q5) When were the new double-hung windows installed?
A5) Unknown. Those windows are not a part of this project scope.
Q6) Will coordination with State Historic Preservation Office be minimal with more guidance on overall design intent?
A6) SHPO does not consider these buildings to be historic, so there will not be any guidelines to follow.
Q7) Is abatement window removal being done by Owner abatement contractor? Will window installer be responsible for providing water tight temporary enclosure?
A7) A previous hazardous materials survey found that the window glazing contains asbestos, so all window demolition will be in a separate bid package to be completed by an abatement contractor. The abatement contractor will also be responsible for supplying and installing water tight temporary enclosures.
Q8) Will spray testing be required for window components or assembly?
A8) Spray testing will be required for a completely installed window assembly.
Q9) Will the buildings be occupied during construction?
A9) Possibly, this will be determined during design.
Q10) Please confirm that installed windows to be inoperable.
A10) This will be evaluated by the architect during design and the owner will make a final decision if allowable by the applicable building codes.
Q11) Has the water test for installed window assembly been identified yet or is this to be determined?
A11) This will need to be determined by the design professional.
Q12) Modification as to scheduled site visits was discussed at the April 2 meeting. Can this be addressed with addendum?
A12) This discussion revolved around the frequency of progress meetings which is clarified above;
there will be bi-weekly calls during active construction instead of monthly calls throughout the construction period.
ATTACHMENTS:
1. Attendees to pre-proposal meeting on 4/2/2026 at the Woodward Resource Center.
END OF ADDENDUM