RFP950600-02 - DOC MPCF Perimeter Fence & Wagon Replacement.pdf

PDF 2 MB Posted

Attached to
DOC Mount Pleasant Correction Facility Perimeter Fence and Wagon Gate Replacement
Solicitation number
RFP950600-02
Issued by
Harrison County, Iowa

About this file

This is a Request for Proposals (RFP) issued by the Iowa Department of Administrative Services (DAS) seeking professional design services for the replacement of the perimeter fence and wagon gate at the Mt. Pleasant Correctional Facility in Mt. Pleasant, Iowa. The scope of work encompasses design of a new secure perimeter fence system, associated vehicle and pedestrian gates, replacement of inner fence security wire, security enhancements, site grading, utilities evaluation, structural assessment, and removal and replacement of existing rocks between inner and outer security fences with concrete. The design must maintain continuous secure perimeter operations throughout construction, with minimum requirements including one barrier (fence) at all times and two operational barriers for the wagon gate. The RFP was issued January 28, 2026, with a non-mandatory pre-proposal conference scheduled for February 4, 2026, at 9:00 AM at the facility or via Microsoft Teams. Questions and requests for clarification were due February 13, 2026, at 3:00 PM, and proposals were due February 27, 2026, at 2:00 PM via the Iowa IMPACS electronic procurement system. The selected firm must commence work the week of March 2, 2026, with design kick-off the week of March 9, 2026, and deliver 100% design development documents, 50% construction documents, 95% construction documents, and final 100% construction documents by June 1, 2026. The contract includes a minimum of ten required site visits spanning design kick-off, design review meetings at 100%, 50%, and 95% design stages, pre-bid meeting, pre-construction meeting, two construction field observations, substantial completion and punch list development, final completion approval, and one-year warranty correction period visit. Construction bidding is anticipated June to July 2026, with contractor contract execution in July 2026 and construction execution from July 2026 through August 2027, followed by closeout April to May 2027.

The State requests lump sum pricing inclusive of all reimbursables such as printing, mileage, and travel expenses, with fees broken down into four categories for schedule of values billing: Design Development Documents, Construction Documents, Bidding or Negotiation Assistance, and Construction Phase services. Additionally, proposers must provide a unit price per construction inspection visit that will be additive or deductive based on actual visits exceeding the required ten. No specific budget amount is disclosed in the RFP. The selected design firm must be registered with the Iowa Secretary of State, maintain professional liability insurance of $2 million, and employ at least one licensed engineer, architect, or landscape architect in compliance with Iowa Code Chapter 26. The design must integrate with existing security systems including SafeGuard Technologies fence and taut wire system, Genetec camera system, and Creative Technologies door control system currently operational at the facility. A critical restriction prohibits the selected design firm or any of its consultants from being eligible to receive an award for the subsequent construction services contract, ensuring separation of design and construction contracts. No set-aside designations for disadvantaged enterprises, no incumbent contractors, and no current contractors are identified. The firm must demonstrate staff qualifications and experience with similar projects completed within the last five years, organizational stability, financial strength, and proposed approach alignment with the State's schedule and budget constraints.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP COVER SHEET

Administrative Information

STATE OF IOWA

REQUEST FOR PROPOSALS

PROFESSIONAL DESIGN SERVICES

RFP Number RFP950600-02 Title of RFP DOC MPCF Perimeter Fence and Wagon Gate

Replacement

Agency Iowa Department of Administrative Services (DAS)

Project

Description

The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for the creation of construction documents for the replacement of the perimeter fence & wagon gate at the Mt. Pleasant Correctional Facility.

State Issuing Officer:

Michael Bradbury

Issuing Officer

Iowa Department of Administrative Services

Hoover State Office Building, Level 3

1305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327

Email: construction.procurement@iowa.gov

PROCUREMENT TIMETABLE—Event or Action Date/Time (Central Time)

State Posts Notice of RFP on TSB website 1/26/2026

State Issues RFP 1/28/2026

Pre-Proposal Conference Location and Address:

Is Pre-Proposal Conference mandatory? No

If a map is needed, contact the Issuing Officer.

2/4/26 @ 9:00 AM at MPCF at 1200 E Washington Street, Mt.

Pleasant, IA 52641 or on Microsoft Teams below..

MEETING LINK

Meeting ID: 268 550 901 672 20

Passcode: mL6wq7Wj

Questions, requests for clarification, and suggested changes from Respondents due to Construction Procurement

2/13/26 @ 3:00 PM

Proposals Due 2/27/26 @ 2:00 PM

Relevant Websites

Website where Addenda to this RFP will be posted http://bidopportunities.iowa.gov

Website where contract terms and conditions are posted https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf

Number of Copies of Proposals Required to be Submitted: 1 Digital

Firm Proposal Terms

The minimum number of days following the deadline for submitting Proposals that the firm guarantees all proposal terms, including price, will remain firm is 120 Days.

mailto:construction.procurement@iowa.gov https://teams.microsoft.com/l/meetup-join/19%3ameeting_MThiZDA3OTYtMDg0Ni00YWVlLWIwZjMtZDQ3MTE5M2E2NTJl%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%22f2a0c006-1634-486a-9b85-1de9fc05f08e%22%7d http://bidopportunities.iowa.gov/ https://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdf

1.1 INTRODUCTION

The Iowa Department of Administrative Services (DAS) is seeking proposals from qualified and available Design companies for services, per RFP cover page, and as outlined in the following

(Sections 1.2 - 1.3). The successful proposal must:

● For the staff that will be assigned, identify and describe qualifications, experience, and expertise in providing services for similar, or relevant, projects.

● For the staff that will be assigned, provide a list of past similar or relevant projects completed in the last 5 years, and include brief descriptions of what the projects entailed and a contact name and phone number (reference). In addition provide estimated project cost, final project cost at acceptance, and whether it was completed on time.

● Describe the composition of your team. Identify staff to be assigned. Provide resumes of key individual(s) including education, relevant experience, and certifications/licensing.

NOTE: Any responding company and/or consultant that is part of the project design services cannot receive an award from the resulting request for bid of construction services.

● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.

● Describe computer program/software capabilities and expertise you utilize. Please describe your experience.

● Provide a copy of your organizational chart.

● Describe your experience, if any, on designing similar or relevant projects for the State of

Iowa.

● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.

● Identify desired reimbursable charges (the State has limitations, per State of Iowa Accounting

Policies and Procedures 210.245), and all other charges.

1.2 SCHEDULE

DAS is seeking a firm that can commence work upon execution of a contract. Time is of the essence.

Execution of Designer’s Contract Week of March 2nd, 2026

Tentative Design Kick-Off Meeting Week of March 9th, 2026

100% Design Development Documents and Cost Opinion By Design professional to propose in RFP schedule

50% Construction Documents and Cost Opinion By Design professional to propose in RFP schedule

95% Construction Documents and Cost Opinion By Design professional to propose in RFP schedule

100% Construction Documents and Cost Opinion By June 1st, 2026

Contractor Bidding June to July 2026

Execution of Contractor’s Contract(s) July 2026

Submittals, Procurement and Construction July 2026 to August 2027

Closeout April 2027 to May 2027

1.3 PROJECT DESCRIPTION

Construction Manager (McGough Construction) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of the designing the replacement of the secure perimeter fence system, associated vehicle and pedestrian gates, any required security enhancements.

Design services shall include:

1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract.

1.3.2 All design disciplines necessary to complete the scope of work.

1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the

Owner, Construction Manager, and Owner’s maintenance staff.

1.3.4 Use of the State of Iowa‘s construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner.

1.3.5 The following design services will be needed:

1.3.5.1 This project will include the design of a new secure perimeter fence system, associated vehicle and pedestrian gates, replacement of the inner fence security wire, and any required security enhancements. The design will also address site grading, utilities, and structural needs associated with the fence replacement. The design would also include removing existing rocks in between the inner & outer security fences and replacing with concrete. Design to also include operational considerations for maintaining a continuous secure perimeter throughout construction.

1.3.5.1.1 The minimum requirements for maintaining a continuous secure perimeter include one barrier (fence) required at all times, and the wagon gate to have two operational barriers at all times. These requirements will be coordinated with the owner.

1.3.5.2 The selected design team will be responsible for evaluating existing conditions, recommending appropriate fence and security technologies, developing phased construction strategies compatible with facility operations, and preparing complete construction documents suitable for public bidding. Coordination with

Iowa DOC security and MPCF staff is a critical project component, and all design activities must comply with applicable state, departmental, and correctional security standards.

1.3.5.3 The existing security fence and taut wire was designed by SafeGuard

Technologies which integrates with the facilities camera system of Genetec. The door control system at the facility is Creative Technologies. The expectation is to have all new systems integrate with existing systems.

1.3.5.4 Existing PDF drawings will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm.

1.3.6 Field examination of the existing buildings.

1.3.7 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.

1.3.8 Designer shall include any and all survey work required for completion of project.

1.3.9 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required.

1.3.10 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule.

1.3.11 Designer shall assist Construction Manager in the evaluation of long lead times.

1.3.12 Quality control during Design, Preconstruction and Construction.

1.3.13 Compliance with all Federal, State, and applicable AHJ codes.

1.3.14 Completion of State building and energy code documents, as required.

1.3.15 Design review will be conducted at 100% design development documents, 50% construction documents, and 95% construction documents. Dates for design review meetings to be coordinated with the design and project team and set no later than the design kickoff meeting. Review will be conducted with DAS Owner Representative, Construction Manager, and Facility Representative, at a minimum. Drawings, specifications and cost opinions (if applicable) shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions.

1.3.16 Review with the Department of Inspections, Appeals, and Licensing’s Building Code

Bureau for approval of plans or exemption from review. All fees associated with the

Bureau are the responsibility of the designer.

1.3.17 Develop and distribute agendas and meeting minutes for all meetings during the design phase.

1.3.18 Construction cost opinions provided by the Design Professional team during Design (at

100% design development documents, 50% construction documents, and 95% construction documents) with a Final Estimate for construction included with bid documents, per Iowa Code.

1.3.19 Construction drawings, specifications (the Construction Manager will produce Divisions

00 and 01), and addenda.

1.3.20 Provide bid alternates as determined during the course of design and bid package development.

1.3.21 Assist Owner and Construction Manager in obtaining bids from qualified contractors.

1.3.22 Construction administration, including creation of the submittal and closeout items log, review of and responses to submittals and closeout documentation, RFIs, proposal requests, change orders, pay applications, periodic site visits, attendance at project meetings as required, participation / development of contractor punch list, closeout documentation review and approval, certificates of substantial completion, and certificates of final completion, as well as development of Architectural Supplemental

Instructions for design revisions, and punch lists within the construction management software program.

1.3.23 Participation with project team during construction progress meetings as required.

Designer shall participate in bi-weekly conference calls during the construction period.

1.3.24 Field Observation reports, with photos, submitted for each site inspection within five (5) days of the site visit.

1.3.25 Acknowledgement that all documents are copyright to the State of Iowa and shall be turned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendums will be expected to be incorporated before final posting. Both the native computer format and PDF versions shall be uploaded to the construction management software program at the end of the project.

1.3.26 The Department requests lump sum pricing from the respondents to this RFP, with the lump sum base scope price being inclusive of all reimbursables, such as printing, mileage and travel expenses. The Department requests the fee proposal from the respondents to this RFP be broken down as follows. These breakdown prices will be used as the schedule of values for billing purposes.

1.3.26.1 Design Development Documents

1.3.26.2 Construction Documents

1.3.26.3 Bidding or Negotiation Assistance

1.3.26.4 Construction Phase

Include at a minimum, ten (10) site visits. Design kick off/Building evaluation, 100% design development document review meeting, 50% document review, Pre-bid meeting, Pre-construction kickoff, Construction Field Observation (2), Substantial completion/punch list development, Punch list/Final Completion approval, and one year warranty correction period visit. Design Review at 95% construction document development will be conducted via conference call. Beyond these site visits, each proposing firm shall provide additional visits as they see fit to complete the work of design. In addition to the lump sum pricing, the Department requests a unit price per construction inspection visit. This unit price will be additive or deductive based on the number of actual visits made.

1.4 ATTACHMENTS

1.4.1 Exhibit A for photos of existing security fence.

1.4.2 Exhibit B for existing drawings of the security fence

Exhibit A

State of Iowa - Department of Administrative Services

Printed on Fri Dec 5, 2025 at 10:54 am CST

Job #: 9506.00 DOC MPCF Perimeter Fence and Wagon Gate Replacement

1200 East Washington

Mount Pleasant, Iowa 52641

Photos From Daily Log

Description

Taken Date

12/12/2024 at 11:29 am

Upload Date

12/05/2025 at 10:46 am

Uploaded By

Brandon Adams

File Name

IMG_1187.JPG

Exhibit A

Job #: 9506.00 DOC MPCF Perimeter Fence and Wagon Gate Replacement

07/10/2024 at 12:20 pm

12/05/2025 at 10:50 am

IMG_1065.JPG

Job #: 9506.00 DOC MPCF Perimeter Fence and Wagon Gate Replacement

07/10/2024 at 12:20 pm

IMG_1064.JPG

Job #: 9506.00 DOC MPCF Perimeter Fence and Wagon Gate Replacement

07/10/2024 at 12:05 pm

IMG_1058.JPG

MA[N DU[LDING

\./EST \./ING

SEE

I , 1 --------------- t--t p

Exhibit B

NE\./ 6 5/8'

END ANCHOR

POST

-----=ZON320-'17 -------------------------------------------------- ,

1- -

CABLE

(SEE DETA[L3, D\./G 02)

(SEE DETA1L3,

D\./G 02>

TEMPORARY

S\./INGING GATE

TO BE CLOSED

\./ITH TAUTE \./IRE

TEMPORARY

EXISTING

f-ENCE l -' - - --+--Z □1N5E2- ' 2 ---------------------- , (SEE DETAfL3, D\./G 02)

NOTES:

!. VER[FY MEASUREMENTS IN THE FIELD.

2. CHECK FDR EXISTING UTILIT[ES IN THE FIELD.

3. REMOVE EX[STING GATE. REPLACE \./!TH CHA[N L[NK

TD MATCH EXISTING. REPLACE AND MODIFY EXISTING END

POST TD ACCOMMODATE THE TAUT \./IRE SYSTEM.

4. PROVIDE ANCHOR POSTS TD ACCOMMODATE CHANGE OF flEIGHT

AT EXISTING CONCRETE PLATFORM.

5. INSTALL RAZOR TAPE 30' ABOVE THE TAUT \./IRE SYSTEM.

120'

SP17-2

2 3/8' OD

EXISTING

4' OD

SP! 7-3

SPIB-1

130'

Z□NE- 18

260'

SEE NOTES 6

SEE NOTE 3

140'

3DD

SP2-l

6. EXTEND FENCE TD MATCH EX[STING. INSTALL TAUT \./IRE ON NE\./

FENCE SECTION.

7. MODIFY PER D\./G 2, DETAIL !A. PROVIDE MATERIAL AS REQUIRED.

8. REMOVE THE EXISTING BOTTOM RAZOR TAPE ON THE INNER FENCE

TD THE TOP OF THE INNER FENCE. INSTALL PER INDUSTRY STANDARDS.

ADD NE\./ RAZOR TAPE IF REQUIRED.

112'

L ----- EXISTING

LONG CABLE

TO VERY CORNER

OF OUTER FENCE

<SEE DETA[L3, D\./G 02)

SP16-3

SP18-2

CONTROL

ROOM

127'

ZONE-I

26 7'

ZONE-3

168'

9. THE LASER GUARD SENSOR AT Z□NE- 19 SHALL COVER THE ENTIRE ROOF

\./ITH EMPHASIS TD\./ARDS THE MAIN/ADMINISTRATION BUILDING.

10. INTEGRATE EXISTING PTZ CCTV CAMERA \./ITH THE PSS FDR

AUTOMATIC CALL UP.

DOUBLE S\./ING GATE

NOTE 7

SEE NOTE 10

DOUBLE S\./ING GATE

SEE NOTE 7

LEGEND:

Z□NE- 2 2

48'

MAfN BU[LD[NG

EAST UNITS

CABLE <SEE DETA[L3,

- END ANCHOR POST

o- INLJNE ANCHOR POST

0 - SENSOR POST

24' D\./G 02> ◄---► _ [NF RA RED/MICRO\./ AVE SYSTEM

ZONE -16

352'

SP16-2

Z□NE- 19

<SEE NOTE 9)

"--1---ZONE-2

TRANSMITTER

AND ANTENA

\./ILL BE MOUNTED

ZONE-21

SEE D\./G 03

DETAIL 1

SP4-l 131'

ZONE-4

251'

BIi - CORNER ANCHOR POST \./ITH

OVERLAPPING OUTRIGGER

@ - □Ul R JGGER END ANCHOR POST

© - OUTRIGGER INL!NE ANCHOR POST

®) - □UT R[ GGER SENSOR POST

(@- OUl RIGGER ROLLER POST

SP16-1

SP15-2

4 FT HIGH NUISANCE FENCE/BARRIER

EXISTING LIGHT

POST \./!LL BE

REMOVED

(BY OTHER>

ON THE BLDG

ZONE -10----j,I --- I

IR/M\./

MOTORIZED

SLIDING

GATE

SENSOR COIL

SEt D\./G 2, DETAIL 2

THIS 2 3/8' POST

NEED TO BE CHANGED

FOR 4' OD POST

DOUBLE S\./ING

GATE

SP4-2

SP5-l

!2U'

Z□NE- 5

205'

<J---!l> - INFRA RED/ MJCR□'w'A VE SYSlEM

COLUMN \./ITH DOPPLER

- 4 FT HIGH NUISANCE FENCE/BARRIER

- EXISTING CHAIN LINK FENCE

- EXISTING CHAINLINK FENCE \./ITH

THE TAUT \./IRE SYSTEM.

mtttt1tt+tttt- - \./ALL MOUNTED OUTRIGGER TAUT

\./IRE FE_NCE

NVv'N./\ - SENSOR COIL 030'

EXISTING PTZ CCTV CAMERA

EXISTING STATIONARY CCTV CAMERA

- LASER GUARD SENSOR DUAL BEAM

\./ITH PTZ CCTV CAMERA

ZONE-15

190'

3" OD

3' OD

INSTALL RAZOR

MESH FENCE

MAN

GATE Z□NE- 8

34'

SPB-1

ZONE-9

IR/M\./

4 FT HIGH NUISANCE FENCE/BARRIER

4' DD

EXISTING, ------

SP5-2

SP!5-l POST

SP14-2 SP14-1

ZONE -11

80'

SP6-2 SP6-1

70' lf.-----120' -----1------ 140' --------- f--I

CD

----._1 CABLE

<SEE DETAIL3, D\./G 02)

(SEE DETAIL3, D\./G 02) , ZONE -14 -+ ----- I , ZONE-7 ZONE-6

NE\./ 6 5/8'

END ANCHOR

POST

260'

SEE NOTE

_ZONE-13

I

80'

EXISTING MAN

4, 150'

THIS POST NEED TD BE

REPLASED BY 6 5/8 POST

320'

SEE DETAIL 2 D\./G.03

-- ------------. --------------------- DE-SIG-NED-BY-•

r

-- ---- --------------------,-----------------,----------18 This ciocuMent canto.ins JOB\SQ NO :::,;::

SCALE

l--l---f--------------1-+---I inforrio.tion to So.feguo.rds Technology Inc. Any disclosures

DRA\JN BY,

MOUNT PLEASANT CORRECTIONAL

FACILITY, IOWA

PERIMETER SECURITY

DRA\JING NO O1 p orus of this inforMo. tion or o.ny f---=-f. M-Y_S_H_A_N_-l ------- , <----= ----- l U'\

O' 25' 50 75' 100' 4 8-26-02 ADDED CABLE OP. IM reproduction of this ciocur1ent CHECKED BY, f--------, -------------------- 1 3 8-10-02 CHANGED ZDNE-21, ADDED z□NE- 22 O.P. I.M. for other tho,n the specific M. FEINSTEIN _A, SYSTEM (PSS) REV SHEET NO. ::, f----+--+-------------1-----+--, purposes for which it is intended 1-------->--------<,,. . , f-2---+ 4_- _2,_-0_2+- _ c H_A_N_GE oz_□_NE_ -_2_1_,A_□DE_ □_ _z _□N_ E - 22_ -l-1-.-M-.-+- -, is expressly prohibited except os APPROVED BY•

SAFEGUARDS TECHNOLOGY, INC.

75 Atlantic Street LAYOUT f-----'--------1

I 12-24-01 CHANGED LOCATION !RIM\./ D,P. BK SoJeguo.rds Technology Inc. MOY 1-------1-----...j otherwise o.gree in writing. DATE• Tel

REV DATE DESCRIPTION BY APP. 12-02-01

Hockensock, New Jersey 07601

(201) 488-1022 Fox (201) 488-1244

SCALE, <

C

BASl<ETBALL

COURT

s

- - 105 ' ----1- ---95' ----1

VEHICLE

GATE

OPPER CONDUCTOR

#tt8-26-14C

COPP£!! CONOIJCTOR

TO POST fH8-20-14C

G!<OVNO 1100

CONNECIOR

#UB-2<H;C

GROUND RO□ &. CONtiECDON

EXISTING FfNCE POST

BONDING LUG

fH8-58XL -

COPPER

CONDUCTOR

IHB-28-14C

GRADE

SENSOR POST

2'-0" MIN

BY-PASS 1/(K'"-.J_

CONN[ClO _ 2·- • MIN fH8-206C

BONDING LUG EOR SEtlSOR F'OST

COPPER GROUND LOOP

fHB-28-14C

-3/4"d0'-Q" COPPER WELD

GROUND ROD IHB-107GR

SENSOR POST GROUNDING DETAIL

FENCE GROUNDING DETAILS

This docur1ent contains inforr10.tion to So.feguo.rds

DESIGNED BY,

JOB\SQ NO

DRA\JING NO

r n

--l 7J

Technology Inc. Any disclosures DRA'w'N BY, 1--+---j-----------------,-,--,or softhis inf'orr10.tion or ony 1-==;,I.:,-M::,Y.,..:.S_H_A.N..

reproduction of this docur1ent CHECKED BY·

+-------- FACILITY IOWA DETAILS

p"' p '"

3 08/26/02

2 08/10/02

REMOVED DETAIL 1

CHANCHED DETAIL IA

for other tho.n the specific OP, l M, purposes for which it is intended □.P. J.M. Is expressty prohibited except o.s

M. FEINSTEIN

APPROVED BY,

SAFEGUARDS TECHNOLOGY, INC.

75 Atlantic Street

SHEET 1

REV

SHEET NO ::;

l> / to l- - t- - - -t - - - - - - - - - - - - - - - - - -r- M- , - - 7 So. f' eguo.rds Technology Inc. r10. y

REV

04/24/02

DATE

CHANCHED DETAIL I AND ADDED DETAIL IA 1

DESCRI PTI□N BY

APP.

otherwise ogree in writing. DATE, 12-02-01

Hackensack, New Jersey 07601

(201) 4B8-1022 Fa, (201) 488-1244

SCALE•

NTS 0""

CD

l

CIFl'.t:11 POST

J!

[)(JSfM;

UH< POU

--f-s 314'

7FT.- RAZOR MESH

200nr1xi00MM

CHAIN LINK

c□Nl ROL FENCE

EXISTING

3' OD

----20 rv----

, n

FENCE POST

TAUT \./IRE SYSTEM

NE\./ 30' RAZOR TAPE

EXISTING

RAZOR TAP[

NfRARED

CLUS"'

D i ----------------------

'" CLUS TEe INfRA s· I"'-i_i

'"-C 1:itl

D F.=

LEAST 4 INCHES

DISTANCE BET'w'EEN TAUT \./IRES

AND THE CHAIN LJNK SHOULD BE AT

LJNK FENCE AS MUCH AS POSSIBLE

3.

0111...-.

cmrncn:

/m,"""

MAINTAIN INTEGRITY or THE CHAIN

MANUFACTURERS RECOMMENDATIONS

AND ATTACHMENT.

rtlC!I""

THE FENCE POSTS ACCORDING TD

ATTACH TAUT 'w'IRE

ON ALL DRA'w'INGS.

2 SYSTEM TO

' l ' L

<!YPIC'-.>

"' !kif"""'"'

.., UIU!ER ANCHOR P□ST

StNS!I! P□SI t STlllG

C II[ 1[

r TJ G

SENSOR COIL WALL MOUNTED BRACKET

.30" SENSOR COIL

S>----BARBED WIRE

BUILDING

NOT[,

I. INSTALL SENSOR COIL BRACKETS EVERY IO FT.

DETAIL 2 DETAIL 1A

NOTES

I. VERIFY MEASUREMENTS AND LOCATION

IN THE FIELD.

2. MODIFY EXISTING CONTROL FENCE

3. RELOCATE END CONTROL FENCE

POST SO THAT IT IS INSTALLED 4

INCHES FROM THE TAUT \./IRE SYSTEM.

4. NE\./ RAZOR TAPE (30') ON BOTH SIDES.

"ABSOLUTE"

DUAL TECHNOLOGY OUTDOOR BARRIER

(I.R./M,V.)

NOTE,

* - ZONES -9,10 - \./ITH DOPPLER,

ZONE-12 - \./IT H□UT DOPPLER

-- 10 1/4' 1---i-10 1/4'

,.DOPPLER

HICROYAV[

MI

INrRARED

CLUSTER

s·

SECTl□N A-A

D

17"f

D

D

D

[!j

L OGIC

BOARD

IMfRARED

CLUST[R

RX TX

4 THE INSTALLER IS RESPONSIBLE TO

VERIFY FOUNDATION SIZE FOR NE\J

POSTS AND INSTALL ACCDRDINGL Y.

S. THE EXISTING RAZOR TAPE IS NOT SHD\JN.

REMOVE THE EXISTING RAZOR TAP[ FROM

THE INNER FENCE AND REPLACE \JITH

NE\J 30' COIL

SENSCR POST

TAUT IRE SYSTEM DETAILS

FDR 'EXISTING FENCE' ZONES

SLIOCR POST

l

IWIOTl<>ll '1.txlkt l<CTA<.- Cll<OUIT

I. EXISTING CHAINLlNK NOT SHO'w'N l l t

[Xllf!Nj

C""l"'--H.«:t: ,l,X.,1!l,l.l_N1G,-, rrncc nmJ1tG _rtNCc ""'" tXIS11NG -r[>tC[ l'OIT

I • !ki ]OU<<H ,,u.r,c•

SCCIJ[)f C-C

1€11 .. AC[

DETAIL 3

1,t'.V '!)[AO' BIIACt

SUOCII

SLIOCII

POST 7'-6'

<21 ROPC

CLIP

THIHDL[

1,t'.V OOTIIIGGt:IIS J!

HE BIJLT

r<

FENCE GROUNDING LEGEND

COPPER GROUND LOOP CONDUCTOR

,H8-28-!4C

CORROSION RESISTANT BONDING COG

fHB- BXC

BY-PASS CQNN(CTOR )GROUND

LOOP TO GROUND ROD i!IH8-206C

::!,/-4's10'-0" COPPER WELD GROUND ROO !l'HB-107GR

NOTE

INST/I.LL COPPER GROUND LOOP CONDUCTOR

AROUND ENTIRE TAUT WIRE FENCE PERlt.AElER

'SENSOR POST TO THE ALUMINUM CHANNEL

CONUECT GROUND ROO MIO CABLE AT CH

HOUSINC

CONNECT CROUNO ROO ANO CABLE " CH

MICROWAVE POST

• CONNECT GROUND ROD ANO CABLE CH

CORNER POST OF THE TAUT WIRE FENCE "

INSTALL PER rEDERAL ANO LOCAL CODE

• CROUNOINC CABLE LOOP TO BE MlOV£ GROUtlO FOIi EmX,ISTING f[NCE SECTIONS ANO BELOW C/IOUtlO

-STANO ALONE" SECTIONS

- ,::,a -

PTZ

..j..□:::::.-:P.·+ '::·:.":·:_ -J is expressly prohibited except 05 APPROVED BYi I ' l

BUILDING

'w!ND□'w

OUTRIGGER ANCHOR POST

CLOCK LGS SYSTEM

CONTROL MON1TOR

\./ALL MOUNTED

SITE MAP

8'

ANCH□R-J

19" RACK

CCC ACCESSORIES.

TYPICAL TAUT VIRE SENSOR

VIRE ATTACHMENT DETAIL

COMPUTERIZED

CONTROL

CENTER CCCCl

ANTO,INA

120V

60 Hz

PO'w'ER

SUPPLY

TRANS-

MITTER

L-1

CCC

EYBOARD

:R[NT[:

FROM SENSORS

LASER GUARD

CAMERAS 1 " " " N s

VIOCO

MONITOR

VlllEO MOtHTOR

CCTV

NOTES,

1. THE VIDEO MONITORS ARE EXISTING.

2. THE SYSTEM SHALL HAVE A CAPABILITY TO UTILIZE EXISTING PTZ CAMERAS FOR ALARM RECALL.

PERIMETER SECURITY SYSTEM CPSS) CONNECTION DIAGRAM

N.T.S.

r-r--T----------------,--,---,-----------------..:;::::

D

E

SIG

NE

D

B Y• :;::::-:-::----,------,,--------------------------r--------------------,_JO

B\

SQ

N O -------...,:sl: This docuMent canto.ins intorMo.tion to So.teguords Technology Inc. Any disclosures

DRA'wN BY•

MOUNT PLEASANT FACILITY, CORRECTIONAL IOWA DRA \./ING NO. 03

:::C:

p"' or se tthis intor Mo. tion or ony 1---'l_. ..:M_Yc_S.:.:...HA'-N'--11 ------------ 1 DETAILS 1 ------------- 1"p' l- -'3'- IO-'B- /..2: :.:6.=:.i/-.:-.0- A.:D: ..:::ED::D..cM...:.N:...G:..:.A:.T:E:._T..:□:...D:::E.:.TAc.I::L:...:

PSS SYSTEM

KEYBOARD

ZONE 13-1 ZONE 14-1

, TYPICAL TENSIDN

BOTTOM \./IRE

120 lbs. +/- lllb. '

TELEPHONE

WINDOW

OR

I EXTENDED SENSOR COIL DD\./N TD THE TAUT \./IRE

SYSl EM □N THE FENCE AND OVERLAP.

NOTE,

TRANS-

MITTER

INTER

rACE

NOTES,

I. THE UPS \./ILL BE LOCATED IN THE CORNER UNDER

THE CLOCK, (NOT SHD\./N).

2. MOUNT THE LGS SYSl EM MONITOR TD THE CEILING

ABOVE THE CCC MONITOR.

3. LOCATE PRINTER ADJACENT TD THE UPS. (NOT SHO\./N).

CONTROL ROOM

N.T.S

DETAIL 2

NOTE,

A - TD BE VERIFY ON SITE

2 A ff ACH FENCE POSTS TD THE \./ALLS.

"G'A"lE

DETAIL 1

NE>

ANCHOR POST

(SEE NOTE 6 D\JGOI)

------- ZONE 18-2

OUTRIGGER SLIDER POST

- DUTPIGGER ROLLER POST

OUTRIGGER SENSOR POST

SP22 1

OUTRIGGER ANCHOR POST

OUTRIGGER SLIDER POST

1-2=-fO..:B..:/l::0..:/0..:2+ ..:A..:D:.:D..:E..:D.....::DE::.T..:A.::1.:.L..:2::...

I 6

SENSOR

MOUSE

□"J

□w

LGS

COHROL

l--l ---+ -----------------1-- 1- --1 l

7 ' 7 I /

I 7 I /

7 7· I /

I ' ' / 'l " .

; I

I

75 Atlantic Street /

1----' ------- lto

-l .□::.:.-P1 ..:'.:."-.:.· reproduction ot this docuMent purfporoseosthfeorr thwohnich thite isspienctiefnicded

CHECKED BY,

M. FEINSTEIN

.,A

SAFEGUARDS

TECHNOLOGY, INC.

SHEET 2

REV

SHEET NO.

12/24/02 ADDED CONTROL ROOM OP. BK. Sofeguords Technology Inc. no.y otherwise o.gree in writing

REV DATE DESCRIPTION BY APP.

1----------1-------1

DATE=

01-14-02 Tel

Hackensack, New Jersey 07601

(201) 488-1022 Fox (201) 488-1244

SCALE• cJ ru

I , I

POST

SLIDER

3.5'

T YPICAL

s PACING

---LGS KEYBOARD

L-------1 ---- KEYBOARO SHELF

LGS MOUSE

WINDOW

EXISTING CONTROL

CONSOLE

8'

'- ,I

'I

V

SUDER _/

POST

SPOSTIDE

POSTLI+A 7

TAUT

\./IRE\

OUTRIGGER

ANCHOR

POST+ A

OUTRIGGER

TAUT \.I IRE

SENSOR

TYPICAL TENSIDN

TOP \./IRE

77 lbs. +/- 11 lb.

-SENSOR LEADS

i\rrn, l-

-26

-0 c

A

D

DE

D

D

IS

T

A

NC

E

P

EIV

E

E tl

.IIR

E

S

P

M

..----1 Is expressly prohibited exc<2pt OS APPROVED BY, # ,, 75 AHonhc Slr e!

I I

GALVANIZED ANGLE IRON

l- l/2'*1-l/2':.:3/16'

\JALL

I,---

OD. SCH40 PIPE 3' OD. SCH40 PIPE

8'

END CAP

4• 5/8' HOLE

GALVANIZED PLATE

-- l/4' 5/8' HOLE

CSET 3/4' FROM

ALL EDGES)

, G ALVANIZED PLATE

12'*10':«l/4'

I I I I I I

OUTRIGGER END ANCHOR POST. CARRYING STRUCTURE

I I " I I ) " )J,, )

\JALL

1--r---, 3' OD. SCH40 PIPE

ND CAP

ROLLER OUTRIGGER 0

3'0Dx67' GALV. PIPE

\./ITH DOME CAP

'"-.L.-' -- CAAIRBCLERAFT

A 4 8'

68'

- - 1/4'

GAL VAN!ZED ANGLE IRON

1- l/2'*1-1/2':.:J/16'

4,8'

6.8' 0

4 8'

6.8'

3' OD. SCH40 PIPE

8'

4• 5/8' HOLE

0 0

BRACES NOT SHDVN

4,8'

6 8'

4.8'

LASER GUARD

10'*8'*1/4'

5/8' HOLE

(SET 3/4" FROM

ALL EDGES)

12'*10'*1/4'

OUTRIGGER ROLLER POST. CARRYING STRUCTURE

GALVANIZED ANGLE !RON

1- 1/2'*1-1/2'*3/16'

POST BRACING

I l/2'•1 1/2'•1/8'

ANGLE IRON (TYP) -

<FINISH• PRIMED

3' OD I 1/2'•1 1/2'•1/8'

@.PAINTED)

DUlRIGGER ANGLE IRON (TYP) r

-END ANCHOR (FINISH PRIMED

POST BRACING

(GALVANIZED

ANGLE IRON

I I /2'xl l/2'x3/16')

3' DD

/OUT

I R

NL

IG

IN

G E

E A R

NCHOR POST

I 1/2'•1 1/2'•1/8'

ANGLE IRON (TYPl

<r!NlSH PRJM[D

8-PA!Nl[D)

2 3/8' DD

OUTRIGGER

2 3/8' DD. SCH40 PIPE

2 3/8' DD. SCH40 PIPE

I I I I I I I I I I

I I I I

I I\ I I I

I I I I N I I

/ I I II II

8' I I I I I I \ I I I I I I I I II I I

4• I I I I I I I I YI I I

0 I I I I ' I I I I I I ; J I

1-

ND CAP

TAUT

\./IRE

I I In

I I

I I I I I I I I I

I I I I I I \ I I

I I I II I

I I V I I V I I I I

TAUT VIRE SYSTEM

®ll!

1---1·---1

I I I

I I

I I

I

I I

> f V I

-"\. ,r I

I ,,... /-

I. VELD SENSOR POST

BRACKETS TO THE

- -3/16' i.ti3/W

HOLE <TYPl (SET 3/4' FROM

I I I I I I I I I I I I I

I I I I

48'

SENSOR POST CARRYJNG

STRUCTURE

ALL EDGES) I I I I

I I I I I I I I I I I I I I I I I

2. rn SENSOR POST

BRACKET TD THE SENSOR

OUTRIGGER SENSOR POST. CARRYING STRUCTURE

1 1/2'*1 l/2'*1/B'

ANGLE IRON (TYP)

I I I I I I I I I I

I I I I I

J -1 I I I I I I I

I I I

I I I/ I I I I

<FINISH• PRIMED

8.PAINTED>

IOrT (TYP)

!OFT (TYP.)

JOrT OYP)

-4•-o

3'

38'

33•

3•[XENDER

END A CHOR POST !NL!NE ANCHOR POST SENSOR POST

N T.S.

M.T.S. M.T.S.

M.T.S.

I. EXTENDER ARE PRE

\.l[LDED TO THE ANGEL

IRON.

l'

HOLE

<SET 3/4' FROM

ALL EDGES)

OUTRIGGER TAUT w!RE SYSTEM C□N F IGUR!'\ T ION.

N.T.S.

OUTRIGGER SLIDER POST. CARRYING STRUCTURE

This docuMent contains fnforr1otlon to Sofeguords

Technology Inc Any disclosures 1-+--+-----------j----j! --- j

FILE LDC., MTPLEASANTJA/BIDl

DRAVN BY•

FACILITY IOWA

DETAILS

JOB\SO NO 1827B

DP/IVJNG NO 04

TAUT wIRE SYSTEM OUTRIGGER INFRASTRUCTURE DETAILS. or useof -this inforr,o tlon or ony i-==I "-'.c.SH_A N+ ----------- 1 reproduction of this docunent CHECKED BY, 1 ----------------------- J Foorther thon the specific _,. SHEET NO.

purposes for which It Is Intended 1--= --1------ll'...T. SAFEGUARDS TECHNOLOGY, INC.

Sl-lEET 3

I--/--'-"--"-f----'--------+-11-----1 o-tlwrwlse o.gree In writing DATE• T@I (701) 411/1-1022 fa, (201) 488-12H REV DATE DESCR1Pl l N BY APP, 04/30/02 NTS

Sofeguords lechnology Inc. Moy Hock,nsock. N w J ,, y 07601 l 00-10-02 CHNJl'.,[D DESIGN VALL ur "

O

C

V

90' a

/_J_

DTR-200O SENSOR

NTS

TOP WIRE OF THE

SENSOR

4 POINT TENSIONERS

BOTTOM WIRE OF

SENSOR

l---+-+---------18' ---------- I'--

SUBS ECTOR

ODS

ARB WIRE

TENSIONER

BREAKAWAY

STRIP

-- !orusf:' of this lnforMOtlon or ,my □. PLOTNl l<□V A reproduction of this docuMent CHECKED BY•

This docunent contains F"ILE LDC.• MTPleosontlA/:SM08 lnfornotlon to Sofeguords

Ly

TYPICAL TENSION

TOP WIRE

77 lbs. +/- 11 lb.

GROUND WIRE

CONNECTOR

NUT

WIRE

CLAMP

RUBBER

SLEEVE

SENSOR PIN

SEAL RING

PIN

CONTACT

POINT

SIGNAL

WIRE

CUP

SPECIAL

DAMPING

COMPOUND

NORMALLY OPEN

CONTACTS

E

'J

'-I--

CD

92.7'

3.4'

4.5•

3.4•

4.5'

3 4•

4.s·

3.4'

6.s· 59.0'

3.4'

3.4•

3.4'

3.4'

83.6'

75.9'

67.8'

9 57.9'

51.1'

44.3'

37.5'

SPRU

MICRO SVITCH

TYPICAL TENSION

LEXAN ENCLOSURE

EMBEDED NUT

3.4•

3.4•

3.4•

3.4'

3.4•

3.4•

30.7'

23.9'

I. SENSORS 111,2,3,4,5,6 WITH LIMITER

2. ANCHOR POST WILL ACCOMMODATE THE SAME

NUMBER OF BARBWIRES AS SENSOR POST.

NOTES•

I. ANCHOR POST WILL ACCOMMODATE THE SAME

NUMBER OF BARBWIRES AS SENSOR POST.

BOTTOM WIRE 3.4' ·-----l-- 17.L!I'QUIDTIGHT

121 lbs.+/- 111b. · j•J[[ FLEXIBLE METAL

3.4•

L --31.4Z' :.==:--rj' ·

,t--1""0. 3• CONDUIT

COVER HOLDER

3 5•--"="'

DATUM

OUTRIGGER SENSOR

Pos1· (5 SENSORS)@

-:-E_N_SO_R P_O_S_T (1_3 +5 SENSORS)@

ANCHOR POST

U-CHANNEL

THE

ANCHOR

TENSIONER

TENSIONERS ATTACHMENT TO THE ANCf-lOR POST

JOB\$0 N□, 1827 B

DRA',/ING NO

for other than 1:he spf:'clflc I. HYSHAN _J.

purposes for whfch It rs Intended f-=cc'-c...,..:...=-..-1------1;r... ,- SAf'EGUARDS TECHNOLOGY, INC.

l--l---+---------11--11---l lsexpressly prohibited except os APP□R V[ D llY• I ' 75 A\lont,c Street

Safeguards Techno!o9y Inc MOY Hoden1ack, ii ,. Jersey 07601 l-t---f---------1-11---l

MOB

$H[[l NO

SCALE• NT[

REV DATE D[ $CRI PT! □N JlY APP.

other...lse ogree In 'll'rltlng. DAT[, 08-26-02 1e1 (201) 488-1022 ro, (201) 488-1244

Techno!ogy Inc. Any disclosures A\IN BY•

,, _. Ill 6' r----1-,----, ---------- SPRU

3•

!CR□ S\JITCH

DATUM

DTR-3OOO TENSIONER INSTALLATION

NTS

RlV

-- +---------11--11 l--- 1--

DETAILS

FACILlTY IOWA

C7 4

L

+12 VDC

Technology Inc. Any cllsctosures DRAYN BY• reproduction of thls docur,ent I CH[Cl<:ED DY•

I L

J3 CONNECTOR J2 CONNECTOR

Jl

1 IN 1

3.9k/5%

2 RETURN 1

GPRU-49

ND 1

output ND 1 23

RELAYS \./ITH DPST CONTACTS

03/4" FLEX.

CONDUIT

TD PRIMARY

CDMMUN J C A Tl N

LINE

SUPPLY PO\./ER

TO 12 VDC

3 9k/5%

•-4

IN 2 RETURN 2

#8 C122

{N ND 2 21

I + + I I +

. '.,_ IN 3 output □ 2 20 -a -a Ai Al

RETURN 3

IN 4

RETURN 4

IN S

RETURN 5

IN 6

RETURN 6

IN 7

RETURN 7

tt? C2l9

ND 3 18

o ut p ut { N JI?

ll 6 CJ LT6

N04 15 output< N□414 1!5 C413

NOS ,_l_i'_ output< NDSJ.L

01" GAL V .C □N DU I T

4PR CABLE BELDEN 1049A i 7

I"'w

Ul

X X X

, D u u :0 T T

16' l,,J rul ltn

X < < c+

.,,. w Iru L.,,.

Reel

.J '.J_

IN 8

RETURN 8

+ 24 VDC

!14 cs 10 N06e-'3._ output ND 6 8

#3 C67

ND?

\JHT

PRl BLK -24V DC

\JHT -Rx PR2 BLK <Rx

PR! BLK

\JHT

PR2 BLK

Fi SYNOPTIC

MAP

C□MMUNI CATI□N

CABLE +

PD\.JER SUPPLY

._2 _l

- 24

- RX

+ RX

VDC output<

#2 f------

7 5 f------

COMMUNICATION LINE

PR3 BU<

PR4 BLK

>Tx

-24V DC

PR3 BLK

PR4 BLK

COMMUNICATION LINE \

23 - TX

24 + TX

N08 3 output< NOB2 ttl cs' 1

-J3

FAIL -NC ND9c.2

ND9 2

1--=-

FAIL -ND C9 , 1_

o u t put

#9

FROM SENSOR POST N-1

JUNCTION BOX

TYPE JR _J

SENSOR POST N+l

To LEDS

Cei,t,-ol Mop

Display

GENERAL POST REPORTING UNIT SENSOR POST JUNCTION BOX SYNOPTIC MAP WIRING DIAGRAM

NTS NTS

DETECTOR

(DTR-3000)

\./HT -RX

TD CCC

ELK +RX

PRIMARY

DLP-05

) PR2

TD SENSOR POST 1-1

+12 VDC

VOLTAGE

ADJUST

I/

MANUAL

/ TRANSMIT

/ PUSH-BOTTON

1,,,,.- VOLT AGE

ADJUST

C□MMUNI CATI DN LINE

SECONDARY

CDMMUNICA TI N LINE

\./HT -TX

ELK +TX

DLP-05

PLP-'12S

) PR3

) PR2

) PR3

TD SENSOR POST 22-1

0 Jl 1

POLARITY

NOT

I BR 11

1 2

C$ll

Tl

IC 0IJ2Q

OBSERVE

POLARITY CABLE

COMMUNICATION

CIIT • i'ZOOQ22

GROUND \.'IRE or SENSORS SHOULD BE

CONNECTED TO GROUND SCRE\.' IN POST,

SENSOR=GROUP

ALARM CONDITION AT COMPUTER

SENSOR I - SENSORS l,2

SENSOR 2 - SENSORS 3,4

SENSOR 3 - SENSORS 5,6

SENSOR 4 - SENSORS 7,8,9

SENSOR 5 - SENSORS I0,ll,12,13

SENSOR 6 - SENSORS 14,15,16,17,18

C MMUNI CA TIDN LINE <

+24V

-24V

+24V

\./HT +24V

BLK -24V

\./HT +24V

) PR1+PR4

COMMUNICATION LINE

TD SENSOR POST 1-1

IMPORTANT

BACK UP

BATTERY

12 VDC

--SHIELD NOT

CONNECTED

' --- \./HT

1---BLK------

SENSOR 7 - SP TAMPER $\.'ITCH SECONDARY C MMUNI CA TIDN LINE

-24V BLK -24V

SECONDARY ) PR1+PR4 CDMMUNICA TION LINE

TD SENSOR POST 22-1

\./ALL MOUNTED

PLUG-IN

TRANSFORMER

CABLE TD

REMOTE

ENCODER UNIT

DTR-3OOO OUTRIGGER SENSOR POST ( 13+5 SENSORS) WIRING DIAGRAM(,,\ LIGHTNING PROTECTION UNIT WIRING DIAGRAM TRANSMITTER UNIT POWER AND OUTPUT WIRING

NTS NTS NTS

This docul"lent contains FILE LDC., MTPleo.so.ntJA/SEOI lnforrio.tlon to Safeguards MOUNT PLEASANT CORRECTIONAL

1--1---1-----------1- --1orusofthis lnforr,a-Uon or any s;mi',·t,"Y S:.:HA N t-----j --F A C l:'.LI T_'.Y IO W".:A: _j for other thon tile specific M. FEINSTEJN ,)

ELEC1'RICAL

DIAGRAMS

JOD\SO NO 1827B

JIRMIJNG NO

EOl Sfl[£l NO

1--1---1-----------1- -...,1J purposes

J for which

J It Is Intended f=:;:;:" ,==+----jsr SAFEGUARDS TECHNOLOGY, JNC.

SIIEET 1

0--+---+ ---------- 1--<--J

Sexpress Y pro h lb ted except ns 75 A\lont,c Strut Sofeguo.rds Technology Inc Moy Hocken oc . New Jer.iey 07601 otherwise agree !n writing DAT[, Tel ,,001 488-1022 fox ''") ,4.88-!2H

SCAL[,

REV DATE DESCRIPTION DY APP 08-26-02

APPROV[D DY•

f--

I-

GND

'i'

Brn Blu Grn \.Jh-t Bl1-<

•-7

I-

I-f--f------f------f------

.--1.i

•-16

,1Z ru

Ul

N□

COM >

Q9 LI LI Q9

\./HT -RX

Q9 L2 L2 Q9

BLK +RX

1-- GND f---

Q9 L3 L3 Q9 "IT -TX

I- I-

® L4 L4 Q9 Pl + TX

Q9 LI

ELK +RX BLK +RX

\./HT -TX

Q9 L2 L2 Q9

. GND

Q9 L3 'j' L3 Q9 I-

Q9 L4 L4 Q9

\./HT -TX

BLK +lX

BLK +TX

12V AC

I

I I

TRANSMITTER

INTERFACE

BOARD

outpui NO

'"' m•

I

'-' ' M3 C6 ' m

7. ' \

DY•

lr r)

MOUNTED

f!ES J ill

R!T""N < !7-2l '" ' ouipu•{ ,_,. .".

• •£111RH 2 68-69 ...,,..,, IC2) ''

zoc "

O(!UON ) "

I

"•-.OCT,UON • 9-16 ""'""'{

ll ""'""'{ HIJ

6 •

--'' ." Ml ca r•IL-NCmNO, r-·

EXTERNAL MAP

24 voe

ENCODER

R

IIRN l (,€,-67 " , ""'""'{ I I) '

" R

(IU '

•s c•

Tronsriltter lJ IN 1

C5 •"

• 2< IIPC

..........{ 111·11 •

- 14· VP(

•2 C> •

Transforrier

At UPS Rec:epto.cle

F•ll-te "°'

.,.,put{ NO -

B ll co t (-) tTx (-)

T CCTV

TD CCTV/VMD

NOTE:

RELAY OUTPUT IN GPRU

il.. :

LASER GUARD

PTZ

SHOULD HAVE DPST CONTACTS ')j

• Gf'RU-◄ 9 ·1-'E'-' • ' ' 7

' '•"nu' •N, °" \ I>"

'{0 N O l J

, ., ADORES$ MS Cl

R'"C'IIIRN l 70-71 □□

°""'""' {m'

"-', R □□F R M MMP MONIT□Rt======== ::::-7 RCT,..,N ] z NO 2 {Ml zcn: 22 I _,, I/ ANTENNA ROOF ALARM I ""'-'

'"'TURN ft6 CJ I I I ENCODER Rt:11.lRN 6 MS u

I 'l>"l:'IU>H T " ""'""'{ tffl

TD CCTV l11!1s 19 20!21!22! I I "-I/ 1 ---=-- 7 ,,,

• 2< IIPC

"J C6

TO CCTV

INPUTS ZONES 17-22

ZONE

ANTENNA c , I H KE Y B□ARD co

- " .-.".' l2

C> • .., INPUTS

COAX CABLE1 RADIO

TRANSMITTER I '""'"" "" .-.". wll)UI N08

TD CCTV I I I

12VDC

GPRU

MOXA COHH BOARD RS-422 j

COH.2 T CD>ll I C ) I

MOUSE

.,._ ,J_._

R(ll-"'N I

'-•ll·NC HOS

CDH NO,

F ll--Kl C9 I

Gf'RU-<9 • ""'""'{Ml I " r

TD CCTV

I 9 I10 12l13I1411sl16l

INPUTS ZONES 9-16

ADDRESS

M8

ICJ I

---r l '4f '-- ••

ZONtS ' "'

12VDC "

'. .R'"-(l,'!PN' ""•'°s"' { HcJ•• ",. "

Z[J,C II'

10 CCTV INPUTS ZONES 1-8

UPS OPTICAL L_ \JALL "' ' ""'°"'{ = "

PD\./ER

>-- h ISOLATORS MAP ... "'

14 C5 ,'"

ZDNC II

60 Hz SUPPLY PROTECTION u,.;;- .. M3 (6 ION[ 10

CONDUJ"f -

CABLEfl2

UNIT

CABLE fl I

/ CONDUIT - "°"'

f ------ """'"

• · voc

• 2, I/PC

""M'"2"'{ "c1°' •

.,..1..,1 HD

,_, TD CCTV

T□ CCTV

- MOBILE

CON NO' 2

f IL -ICJ C1 l

INPUT

SIGNAL'

BLK

\,,/HITE

SP U SP ll8·1

ZOI< 118

SPRU SENSOR

UJIL

" ,,'=1 Gf'RU- '.l

' •• ADDRESS

i8 ICJ I " ·,-_'. TD CCTV

" " " ' " " " ' •' •• ,_, ""\nu•<00'1 ' ,-' T□ CCTV INPUT INPUT

" " '" " " ,,7 " " " ' " II II II II II I II II II II I I II II II II II II I "

l![T""1! l M7 C<

ZONES

•6 CJ

12 VAC 12 VAC

' " SENSORS " SENSORS " SENSORS

SENSORS SENSORS SENSORS SENSORS SENSORS SENSORS

RCTUOH •

1>£1<-"'" 5

• >H '

""'""'{..,·. ",. ,_. Ta CCTV I I I [ iE '--..r' To

COMMUNICATION LOOP

,_, ? To wo.ll riount

T□ CCC '

El •

""'""' H09

- ' Ml ca '

PPll

" SPPl/ n

CDH HD,

T'"''''

JR/H\J

ZONE 12

W11-1 IR/H\J

ZUNE 10

IR/H\J

ZONE 9 ,S-P

7-l

SP 6-l rAlL·Ml C9 I "

LJ "

7, ,.:='J,11 l r

SENSORS SENSORS SENSORS SENSORS SENSORS SENSORS SENSORS SENSORS SENSORS

CONNECTION OF

ENCODER ANO

FIELD

RELAY

GP R LI , MOBI LE

OUl-PUTS FOR

MAP,

CCTV

SYSTEM CONFIGURATION

COM. BUS TD MOBILE MAP AND CCTV

GPRU(S)

COMPUTERIZED

CENTER

MOXA COM.I

COMM. CDM.2

DB 9

COM.1

DB 9

COM.2

, ,-,), 4850P Tx

B (+) " B <+I

A (-'} Tx Rxt <-> B (+) D (+)

I-

PROTECT GND PROTECT GND

,- 12 V DC I- "'

RS 22/RS ◄ 85

OPTICAL ISOLATOR

, ,-,) 4850P - B <+> Rx B (+)

A (-'}lx Rxt (-) D U) D (+)

I-

I- PROTECT GND PROTECT GND

, 12 V DC I-

TO LIGHTNING PROTECTION

PRIMARY FIELD CABLE

TD LIGHTNING PROTECTION

SECONDARY FIELD CABLE

BOARD

RS-422 C□M.3

CDM.4 -

TD 12 V DC PDVER SUPPLY

VALLMOUNTED

ALARM

ANNUNCIATOR

OPTICAL JSDLATDR

This ciocunent contains

!nf'ornotlon to Sof'eguords

FILE LDC.• MTPleosontJA/SE02

MOUNT PLEASANT CORRECTIONAL ELECTRICAL

JOB\SO ND 1827B

DRI\VING ND E02

Technology Inc Any disclosures DRAVN J--+--+-------------1--+--I or useof' this inf'ornotlon or any 1,-,:D,c,:..PL"De;Te,N:.,.lK::;D'-V:CA.:_I ----- I FACILITY IOWA , DIAGRAMS reproduction of' this docur1ent CHECKED BY• 1-----,----------------f'or other thon the speclf'lc y ZHUl<OVSKIY

1!-£Ef ND purposes f'or which It Is Intended 1-,,,:,,,:::,:;:;:,::c.::::.:_:_1 ------ 1

APPROVED BY•

SIIEE'f 2 l---+--+-------------1-..J..---+ Safeguards Technology Inc. Moy 1-------1 ------ 1 Hac nsoc f.,,w J • ey 0760 I ◄ SCALE• NTC

REV DATE DESCRIPTION

other'<!lse ogree In "<¥rltlng, DAT[, 08-26-02 T.t (201) <Bll-1022 fo• {201) <88- 124

75 AUontte s1, t prohibtted except os

TABLE

NTS

OF SENSOR POST ANO MOBILE MAP GPRU ADDRESSES

LGS

CONTROL

TO CCTV

'R"(I'U,,N l .,.,1..,1{ 00 l " 22-1

- - PRlMIIRY

TD CCTV

01.0' GAL V 01.0' GAL V

•6 CJ I

E1-'S24l2

DC-DC

CONVERTER

TD CCTV - 2• IIPC ""'""'{ HOT ts- Ubj

NTS

COMMUNICATION

NTS

LINE CONNECTION DIAGRAM

24VDC

VALLMOUNTED

ALARM

ANNUNCIATOR MAP

COMPUTERIZED

CENTER

PRINTER

24V DC

Ffl'wER

SUPPLY

S-150-24

GPRU

t

J

NEAR •,' TO CCTV

TO CCTV

h---- II1

TD CCTV I I I

ll TT I 1 12 4151617181

120V AC LIGHTNING

SECONDARY

n'

ZONE 20

TD CCTV

slgnol In put

M◄ IOHC J COMfUNICAT!04

10 CCTV

BLK

,_' RED

J--+--+ ------------ 1--+-- sI expressyI

2 VEHICLE

MOUNTED

MOBILE MAPS

l2VDC 1 AMP <Plug in cor lighter)

ADDRESS LOCATION ADDRESS LOCATION ADDRESS LOCATION

1 1-1 15 13-1 29

2 1-2 16 14-1

ZONE -20,21

SENSOR

COIL

GPRU 3 2-1 17 14-2 31

4 3-1 18 15-1 32 ZONE -9,10

IR/Ml,/

GPRU 5 3-2 1CJ 15-2 33

6 4-1 20 16-1 34 ZONE -12

lR/MV

GPRU

7 4-2 21 16-2 35

8 5-1 22 16-3 36 MOB. MAP

ZUNEl-8

GPRU CJ 5-2 23 17-1 37

10 6-1 24 17-2 38 MOB. MAP

ZONE 9-16

GPRU 11 6-2 25 17-3 ]CJ

12 7-1 26 18-1 40 MOB. MAP

ZONEl?-22

GPRU 13 8-1 27 18-2 41

14 11-1 28 22-l sr)

INPUTS

Rx t

ZONE 9

7- X

INTERf ACE

Tx

I NJERf ACE

C□MMUNICAT IDN LINE

INTERfAC[

BOARD

12V DC

INTERFACE

C□MMUNICAT IDN LINE

BACKUP

BATTERY

12V DC

BATlERY

I2V DC

BATTERY I-

PD\JER

SUPPLY

PO\JER

24V

HEATER

24V

\HEAlERJ

120V AC

PD\JER

SUPPLY

24V --IHlA TE

XFRMRI

t

PO\JER

SUPPLY

24V HEAlER

IXFRMRI

XFRMRI

-t t t

IXFRMRI

I20V AC

I. 24 V AC FDR l.R. LENS HEATERS.

BOARD

ZONE 10

2. 12V DC FDR I.R./M.\J. CKT BOARD PO\JER + GPRU.

BACKUP

BATTERY

BACKUP

BATTERY I. 24V AC FDR I.R. LENS HEATERS.

2. 12V DC FOR I.R./M,\J, CKT BOARD PD\JER + GPRU.

1- I

-- -121/- U& ···· ·-

POWER AND CONTROL CONNECTIONS BETWEEN

I.R./M.W.

UNITS FOR ZONE 12 1

SEOJ

PD\JER

24V "iHEATER

XFRMR

PO\JER

24V -IHEA IEPI

IXFRMR I

I20V AC

POWER AND CONTROL CONNECTIONS BETWEEN I.R./M.W. UNITS FOR ZONES 9,10 3

NTS SEOJ

ZONE A

N/C '-

Tx TAMPER

COMMON

.9K vvv

Rx . ·'?K

ZONE A Tx TAMPER

COMMON

ZONE A Rx TAMPER

COMMON

ZONE A IR/Ml,/ ALARM

COMMON

J_ IN I

2 RETURN I

:L IN 2

4 RETURN 2

I-

5 IN 3

RETURN 3

NIC f.

3.9K

ZONE A Tx TAMPER

ZONE A Rx TAMPER

COMMON

ZONE A IR/Ml,/ ALARM l IN I

L RETURN l

- 3 IN 2

4 RETURN 2

l IN 3

DOPPLER

MASTER 'V

'V V cl_

I-

I-

I-

I-lN 4

RETURN 4

lN 5 GPRU

RETURN 5

IN 6

RETURN 6

lN 7

RETURN 7

DOPPLER

Rx

MASTER

BOARD

3.9K

-?K

J.l_

I- eli

RElURN 3

IN 4

RETURN 4

IN 5 GPRU

RETURN 5

IN 6

RETURN 6

lN 7

RETURN 7

Reel

.l'.5. lN 8

- 16 RETURN 8

- 17

.lll_

ZONE B

Tx Rx

3.9k/5%

.J2. 18

IN 8

RElURN 8

Blk

\Jht

Grn

19 12 - 24 voe 20 12 - 24 voe

- 21 - RX

22 + RX

N/C

ZONE B Tx TAMPER

Reel

Blk

\Jht Grn

19 12 - 24 voe 20 12 - 24 voe

21 - RX

I-

Blu

Brn

23 - TX

24 + TX

COM. LINE TO CCC

- COMMON

DOPPLER

MASTER

BOARD

_3.' lK

3.9K V

ZONE B Rx TAMPER

COMMON

ZONE B IR/Ml,/ ALARM

Blu

Brn

22 + RX

23 - TX

24 + TX

COMMON COMMON COM. LINE TD CCC

DUAL TECHNOLOGY I.R./M.W. WIRING WITH GPRU INTERFACE FOR ZONE 12/ '

I. ONE GPRU FOR 2 ZONES/2 SETS O, IR/Ml,/

1 DUAL TECHNOLOGY I.R./M.W. WIRING WITH GPRU INTERFACE FOR ZONES 9,1 0 /

NTS SEOJ

NTS SEOJ

This docuMent contains FILE LDC., MTPleo.sontlA/SE02

JOS\$0 NO

ORA'-'ING J-,10

l827B

Technology Inc Any disclosures DRAYN BY• ELECTRICAL E03 or use of this lnforno.tlon or o.ny for other tho.n the specific

0 PLOTNIKOVA

L MYSHAN

FACILITY IOWA DIAGRAMS

e,v

DAT£

DESCRIPTION

reproclvctlon of this docurient CfCCK[D RY• purposes for which It Is Intended

Is expressly prohibited except o.s

Sofeguords Technology Inc. MOY otherwise ogree ln writing DAU•

08-26-02

SAFEGUARDS TECHNOLOGY, INC.

7S Atlontic Slre !

Hockensock, New Jecsey 07601 r (201) 488-1022 Fo• (201) 488-1244

SIIEE'f 3 scv SH[[T NO

SCALE•

lnforMo.tlon to Sofeguords

BATTERY

R

APPROV(IJ IIY,

I-

-I

X u

----1 X

;1)

X

I Al X < <

I +

- u C

'1l

(0

":y c+

Ul

ADDRESS 0

t:J

- 3 reproduction of this docur,ent I CHE(YED BY• l-='-c':-c-"-'--1------ll.,, z ' z' z ' z y z I' Z z z z z ' z ZI' z> 21' z ZY - z ZI'- Z, z z y l'l cor1r1unicG tion t:J BoQrcl T

----1 ----1 ;1) A)

- - -'- - - - - -t - -a t - 7 - a': a re a I';: - ,: - e: z> I' Z D 0

I' Z I' Z D D D D

L E E E E E E E E E L E ' L E E C E E E

'E" E E'" "E E E E E E E E"

7 I

I t c c l'l t:J

J3 P3

SINOPTIC MAP WIRING DIAGRAM

G N D

D-TYPE

7 P I

" 9 p

-+-V y y y y y y R R

(FROM TERMINAL BLOCK IN RACK)

12VDC

L L L L E E w w w w D D

R R R R R R R R E E E E E E E E D D D D D D D D

R R R R R R E E E E E E D D D D D D +

RED J I

D-TYPE - "- t - "- "- "- le - - - - - - a - a le a a - le - -" z- , "- - ' - '

SECURE ""

37S 37P D D D D D D D D N N N N N N N N E E E E E E E E u

,s

" " " ' 2

D D D 0 D D D D D D D D D D N N N N N N N N N N N N N N E E E E E E E E E E E E E E 3 ' 5 6 7 8 9 ,0 " " " " " '"

ACCESS ,,,' '" SINDPTIC MAP

CAT. No: 10100314 {

To 9 Pin connector COMMUnicQ tion

To 9 Pin

BUZZER

BoQrcl ttJ ;1) ' -connector ttJ ;1) '

I I +

RM3

u u (0 :-; C )

":y

'1l :-; c+

COMMUNICATION

RMS

J4

J2 P2 37S 37P

R R G G G G G G G G G G G G G G G G

G G y y

--+V y y y y y y y y y y

+V RED - -

_LJ. i ' E E R R D D N N

R R R N N N

R R R R R N N N N N

R R R N N N

R R R N N N R R L L

N N w w

L L

L L L L L L

',; ',; ',; ',; w n SINOPTIC

-V RO ' 2 z y z

- y z z ' z z "- z z z ' z

- "y z

,z,' z "- "r-z z'' - z z"- "- "-z'- z

' z \ z' z z ' z z' z

N " ' N N N N N N N

0 □

D N N N N N D 0 D

0 D D D D D D N

BOARD

PD\JER

SUPPLY

12 VDC DR

24 VDC

-4

JS

I

-3 -4

J

RMB •

RMlO

" " ' 2 3 ' 5 6 7 '

,s

" " 18 ' 2 3 ' s 6 7 8 9 w " "

ZONES 1-18

-3

-4

-J7

K!/N,C.

Kl/NO

KI/COH.

K2/N.C.

RM7

p CentrQl

,JJisplQ y

Mop

I K2/NO

2 K2/CDH

VCC <5V)

37S 37P

NOTES• 1. IN EACH SYNOPTIC MAP \JIRE THE LEDS TD BE USED IN THAT PARTICULAR MAP ONLY.

2. +V - PD\JER SUPPLY VOLTAGE TD THE MAP.

This docur-.ent contolns mt LOC,MTP\eoso.nt1A/SE04

JOB\S() NU 1827B

Jnfornotlon to Sofeguords MOUNT PLEASANT CORRECTIONAL Technology Inc Any disclosures DRAVN BY• ELECTRICAL DPAVlNG J-0 E04 or use of this lnfor....otlon or o.ny "'"O P□iL'f;T';,N□"I"KV" _A1 i ----- F'._.'.:A:,'.C'..'.l'._'.L'.'.l T'.,_Y'._.'.l::O W::_A'.'.._ j DIAGRAMS

SHEET NU

l--t---+-------------1-+---t forother thon the specific y ZHUKOVSK]Y ,)

>--+--+-------------<-+----! purposes for which It Is Intended l--t---+-------------1-+---t IsPxprE.>ssly prohibited except os

APPROVED BY•

Sofeguords Technology Inc noy 1- -----l ----- l

75 Allont,c Slr et

Hoden ock, Ne" J , y 07601

SI-IEET 4

$CALE, NTC

REV DATE DESCRIPTION BY APP

otherwise agree In writing DAT[, 08-26-02 Tel (201) 488-1022 Fa, (201) 488-120

R, - \/HT

□ D N N N N

0 0

I

X

I +

- T

9 S ALARM

SINOPTIC

MAP BLOCK DIAGRAM

SHIELD

N T,- BRO

T,+ BLUE

R, + GRN

y -

RM9

' J2 P2

RM6

X X X z ' D D D D D D D D y C y y '

RS422 ""---

E

N N N N N

-----vv-

{ N {--'y "'' V

Ul t:J n

ADDRESS 1

SINOPTIC

MAP

ZONES 19-22

JJ

CONNECTOR

J2 CONNECTOR

CentrQl MQp DisplQ y

JJ CONNECTOR

J2 CONNECTOR

CentrQl MQp DisplQy

CentrQl MQ DisplQy

2 – ADMINISTRATIVE ISSUES

2.1 GENERAL INFORMATION

2.1.1 DAS will evaluate the qualifications, experience, and other relevant information from companies interested in contracting with the State of Iowa to provide the necessary services to complete the project described in this RFP.

2.1.2 Companies certified as Targeted Small Businesses are encouraged to submit Proposals. The

Iowa Department of Economic Development administer the Targeted Small Business (TSB) Program. Businesses meeting the requirements of the program are approved and registered with the Department of Economic Development and are considered Targeted Small Businesses for purposes of this RFP and most other solicitations issued by DAS. Questions concerning the TSB Program and for identification of companies certified as Targeted Small Businesses, contact the TSB Certification office in the Department of Economic Development at (515) 348- 6159.

2.2 INQUIRIES

2.2.1 All inquiries concerning this RFP shall reference the RFP number and shall be provided (via email) to the issuing officer email address identified on the cover page of this RFP. Addenda type questions must be submitted per Schedule, Section 1.2.

2.2.2 Any information provided by prospective companies orally shall not be considered part of the companies Proposal.

2.2.3 DAS assumes no responsibility for representations concerning conditions made by its officers or employees prior to the execution of a contract. Oral discussions pertaining to modifications or clarifications of this RFP shall not be considered part of this RFP and are not binding.

2.3 PREPARATION OF THE PROPOSAL

2.3.1 Proposals must be submitted on the Iowa IMPACS Electronic Procurement System.

Prospective companies are solely responsible for timely submission.

2.4 DATE, TIME AND PLACE TO SUBMIT PROPOSALS

2.4.1 As stated above the proposal must be submitted on the Iowa IMPACS Electronic

Procurement System

2.4.2 The Proposal must be submitted into IMPACS, on or before 2:00 pm, central time on the

Proposal due date.

2.5 ECONOMY OF PRESENTATION

Proposals shall address the specific RFP requirements. All questions posed by the RFP shall be answered clearly and concisely.

2.6 RFP CHANGES AND ADDENDA

Written Addenda will serve to amend the RFP documents accordingly.

2.7 CERTIFICATION OF INDEPENDENT PRICE DETERMINATION

By submission of a response to this Proposal, the Company certifies, and in the case of a joint

Proposal, each party thereto certifies as to its own organization, that in connection with this procurement:

2.7.1 Any prices or hourly rates in this Proposal have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any competitor.

2.7.2 Unless otherwise required by law, any prices or hourly rates which have been provided in this

Proposal shall not knowingly be disclosed by the Firm, directly or indirectly, to any competitor prior to the notice of intent to award a contract for services.

2.7.3 No attempt has been made or shall be made by the Company to induce any other person or

Company to submit or not to submit a Proposal for the purpose of restricting competition.

2.7.4 Each person signing this Proposal certifies that:

2.7.4.1 He/she is the person in the Firm’s organization responsible within that organization for the decision as to any prices being offered herein, or

2.7.4.2 He/she is not the person in the Firm’s organization responsible within that organization for the decision as to any prices being offered herein, but that he/she has been authorized in writing to act as agent for the persons responsible for such decision, and

2.7.4.3 Any offer made by the submitted Proposal and any clarifications to that Proposal shall be signed by an officer of the offering Company or a designated agent empowered to bind the Company in a contract.

2.8 NOTICE OF INTENT TO AWARD

After the successful Company has been selected, a copy of the Notice of Intent to Award will be issued to all Companies who submitted Proposals in response to this RFP.

2.9 WITHDRAWAL OF PROPOSALS

Prospective Companies may withdraw, modify, and/or resubmit at any time prior to the date and time set for the receipt of Proposals. Once the time set for receipt of Proposals has passed, a

Company shall not withdraw a Proposal for a period of sixty (60) days following the issuance of the

Notice of Intent to Award a contract. Proposals shall remain open and valid for consideration by DAS throughout this period of sixty days, and until such time thereafter that written request to withdraw a Proposal is received by DAS.

2.10 DISPOSITION OF PROPOSALS

All Proposals become the property of DAS and disposition of the Proposals shall be at the sole discretion of DAS.

2.11 DISCLOSURE OF PROPOSAL CONTENT

Proposals will be placed in the public domain and be available for examination by interested parties.

No Proposals shall be disclosed until after a Notice of Intent to Award has been issued. DAS reserves the right to destroy all Proposals if the RFP is withdrawn or otherwise in the normal course of business. Trade secrets or proprietary information legally recognized as such and protected by law may be withheld if they are clearly and conspicuously labeled “Proprietary” in the margin of each individual page where they appear in the Proposal. Pricing information is not normally considered proprietary.

Public Records and Requests for Confidential Treatment.

The Agency’s release of public records is governed by Iowa Code chapter 22. Contractors are encouraged to familiarize themselves with Chapter 22 before submitting a Proposal. The Agency will copy and produce public records upon request as required to comply with Chapter 22 and will treat all information submitted by a Contractor as non-confidential records unless Contractor requests specific parts of the Proposal be treated as confidential at the time of the submission as set forth herein AND the information is confidential under Iowa or other applicable law.

Failure to request information be treated as confidential as specified herein shall relieve Agency and State personnel from any responsibility for maintaining the information in confidence. Contractors may not request confidential treatment with respect to pricing information and transmittal letters. A contractor’s request for confidentiality that does not comply with this section or a contractor’s request for confidentiality on information or material that cannot be held in confidence as set forth herein are grounds for rejecting contractor’s Proposal as non-responsive. Requests to maintain an entire Proposal as confidential will be rejected as non-responsive.

If Agency receives a request for information that Contractor has marked as confidential and if a judicial or administrative proceeding is initiated to compel the release of such material, Contractor shall, at its sole expense, appear in such action and defend its request for confidentiality. If

Contractor fails to do so, Agency may release the information or material with or without providing advance notice to Contractor and with or without affording Contractor the opportunity to obtain an order restraining its release from a court possessing competent jurisdiction.

This is the start of the file's text. The full file is on GovTribe.