This is a Request for Proposals (RFP27007132) issued by the Community College of Rhode Island for architectural and engineering services for the Workforce Innovation Center Addition at the Knight Campus in Warwick, Rhode Island. The project encompasses design services, construction documents, construction administration, and construction management services for a multi-story, approximately 43,000-square-foot workforce training facility to be constructed on an existing island in the student parking lot. A non-mandatory pre-bid conference is scheduled for November 18, 2026 at 8:30 a.m. at CCRI Warwick, Knight Campus, Room 4090, 400 East Avenue, Warwick, RI 02886. The initial contract period will begin approximately March 2027 and continue for 40 months until all construction activities are completed and staff relocated. The project is divided into two phases: Phase 1 (Foundations and Sitework/Utilities with Construction Documents due within 3 months) and Phase 2 (structural completion and landscaping due within 8 months), with Phase 1 construction anticipated August 2027 through December 1, 2027, and Phase 2 construction March 2028 through April 1, 2030.
The State of Rhode Island has established no small business set-aside for this solicitation; however, ISBE Minority, Women, and Disability Business Enterprise participation is evaluated alongside technical and cost proposals, with up to 6 bonus points awarded for documented ISBE participation. The project operates under a Not to Exceed construction budget of $54,329,000, which includes all architectural and engineering fees, construction management consultant costs, and consultant fees, with a separate Not to Exceed budget of $5,000,000 for furniture, equipment, and IT assets. Proposals will be evaluated on a 100-point scale (70 technical points, 30 cost points) plus 6 potential ISBE bonus points, with technical proposals requiring a minimum score of 55 points to advance to cost evaluation. Required insurance includes professional liability of $2,000,000 per occurrence and $2,000,000 annual aggregate. The selected vendor must utilize Rhode Island custom AIA Documents (G701-2017, G714-2017, G802-2017) and submit AIA B101 and AIA 201 contracts, and proposals must be submitted electronically through Ocean State Procures by December 15, 2026 at 1:30 p.m. EST. The State retains a 0.33 percent contract administrative fee from annual invoice payments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 1 of 8 Revised 4/22/2024
RFP - AGENCY SOLICITATION SPECIFICATIONS
HEADER:
TITLE: RFP27007132 CCCRI A&E Services for The Workforce Innovation Center Addition Knight Campus
DESCRIPTION: Community College of Rhode Island is seeking a vendor for Architectural Services for the Workforce Innovation Center Addition at the Knight Campus, Warwick
PRE-BID/ PROPOSAL CONFERENCE: YES
MANDATORY: NO
Wednesday November 18, 2026 at 8:30am CCRI Warwick, Knight Campus Room 4090 400 East Avenue, Warwick, RI 02886
CONTRACT TERMS
The initial contract period will begin approximately March 2027 for 40 months. Contracts may be renewed based upon project requirements and the availability of funds
Insurance Requirements In accordance with this solicitation, or as outlined in Section 13.19 of the General Conditions of Purchase, found at https://rules.sos.ri.gov/regulations/part/220-30-00-13 and General Conditions - Addendum A found at https://ridop.ri.gov/about-us/procurement-statutes-and-regulations, the following insurance coverage shall be required of the awarded vendor(s):
General Requirements:
13a) ☒ Liability - combined single limit of $1,000,000 per occurrence, $1,000,000 general aggregate and $1,000,000 products/completed operations aggregate.
https://rules.sos.ri.gov/regulations/part/220-30-00-13 https://ridop.ri.gov/about-us/procurement-statutes-and-regulations https://ridop.ri.gov/about-us/procurement-statutes-and-regulations
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 2 of 8 Revised 4/22/2024
13b) ☒ Workers compensation - $100,000 each accident, $100,000 disease or policy limit and $100,000 each employee.
13c) ☒ Automobile liability - $1,000,000 each occurrence combined single limit.
13d) ☐ Crime - $500,000 per occurrence or 50% of contract amount, whichever is greater.
Professional Services:
13e) ☒ Professional liability (“errors and omissions”) - $2,000,000 per occurrence, $2,000,000 annual aggregate.
13f) ☐ Environmental/Pollution Liability when past, present or future hazard is possible - $1,000,000 per occurrence and $2,000,000 aggregate.
13g) ☐ Working with Children, Elderly or Disabled Persons – Physical Abuse and Molestation Liability Insurance - $1 Million per occurrence.
Information Technology and/or Cyber/Privacy:
13h) ☒ Technology Errors and Omissions - Combined single limit per occurrence shall not be less than $5,000,000. Annual aggregate limit shall not be less than $5,000,000.
AIA Contract:
☒ AIA Contract - For public works projects, the selected Vendor must submit a fully executed Rhode Island custom AIA contract. If awarded the contract, Vendor shall be required to obtain the specified AIA Documents from https://documentsondemand.aia.org/?filter=Rhode. Design Agents must obtain and utilize the Custom Rhode Island AIA Documents G701-2017, AIA G714-2017, AIA G802-2017, which can also be located at https://documentsondemand.aia.org/?filter=Rhode. Full instructions will be included in the Tentative Selection Letter.
Required documents AIA B101 and AIA 201
SECTION A. BACKGROUND
https://documentsondemand.aia.org/?filter=Rhode https://documentsondemand.aia.org/?filter=Rhode
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 3 of 8 Revised 4/22/2024
The Community College of Rhode Island, Knight Campus is soliciting proposals from qualified firms to provide Design Services including Construction Documents, Construction Administration and Construction Management Services to build a Workforce Innovation Center Addition at the Knight Campus, in accordance with the terms of this Request for Proposals (“RFP”) and the State’s General Conditions of Purchase, which may be obtained at the Division of Purchases’ website at www.purchasing.ri.gov.
The initial contract period will begin approximately March ,2027 for approximately 40 months until all construction activities have been completed, and staff has been relocated into their new quarters.
SECTION B: SCOPE OF WORK AND REQUIREMENTS
General Scope of Work
An Architectural Firm, along with their Consultants (See item 10 below), will provide a complete design for the Workforce Innovation Center addition at the Knight Campus per attached feasibility study completed on July 30,2025. This new building will be located on an existing island located in the lower portion of the student parking lot. It will be a multi-story Workforce training facility of approximately 43,000sf. This Architectural Firm along with consultants shall submit a detailed narrative upon being awarded the project identifying how they intend to meet the specific timeline tasks as identified below for the design along with a potential construction schedule. The challenges of this location include an approximate 14-foot slope front to back. The location of the Mega structure is a critical factor where the primary utilities lines will be run from.
1. Architectural Firm, along with their consultants, will review the existing site conditions and present schemes in their proposal as to how the operations of the College will be maintained during the construction of the building and subsequent phasing of the underground utility work.
2. Architectural Firm, along with their consultants, will work with Correctional Industries to identify new furnishings required for the area and come up with a detailed listing to be purchased directly by the College.
3. Architectural Firm, along with their consultants will identify Workforce Lab and Shop Equipment for the fit out to be purchased directly by the College or included in the General contractor’s scope of work.
4. Architectural Firm, along with their consultants, will include non-blasting methods in their proposal for the removal of all ledge.
5. Architectural Firm, along with their consultants, will include in their design compliance with RIDEM requirements.
6. Architectural Firm, along with their consultants, will include in their design the requirements of the States new green initiative.
7. Architectural Firm, along with their consultants, will provide new cameras to tie into the existing College Police Security System for the addition.
http://www.purchasing.ri.gov/
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 4 of 8 Revised 4/22/2024
8. Architectural Firm will be required to hire a consultant to test any questionable existing materials to determine if they contain ACM’s or contaminated materials and prepare a plan in the Construction Bid Documents.
9. Architectural Firm will be required to hire an AV Consultant who will work with the College’s IT Department designing the space.
10. The Architect will be required to include in their Bid Proposal Rimkus Consulting Group Inc, 12140 Wick Chester Ln Ste 300, Houston TX 77079 as a Construction Management Consultant to assist in the Architects Project Management responsibilities. Alternate Construction Management Consultant substitutions are permitted per the State Of Rhode Island Purchasing guidelines during the bidding period. The Substitutions are subject to the approval of the College which will be clarified in the Addendum.
Specific Activities / Tasks
1. The Architect shall submit construction cost estimates at 25%, 50% and 100% Construction Documents deadlines for Phases 1 and 2 as stated in line 2 below. Submit to all State agencies as required for their review and approvals. Within 1 week of receiving approval submit Bid Documents (per Phase) to CCRI for submission to State Purchasing.
2. The Project will be broken down into two Phases with different timelines: Phase 1 will include Foundations, Sitework/Utilities with the Construction Documents due within 3 months from the date of CCRI Purchase Order. Phase 2 will be the balance of the structure and all landscaping improvements due within 8 months from the date of CCRI Purchase Order. The intent is to bid Phase 1 while Phase 2 is in design and have the building pad ready during the Bidding period for Phase 2. Phase 1 Construction onsite tentative start date August 2027, complete December 1, 2027. Phase 2 Construction onsite tentative start date March 2028, complete April 1, 2030.
3. The Construction Management Consultants’ responsibility will be to assist in the design of the project to confirm availability of materials, keep track of the cost exposure to meet the Colleges Not to Exceed budget and to track/meet the project time frame as specified in item 2 above. Perform weekly project inspections during the onsite construction work to verify that the work is going in as designed, in an acceptable quality, workmanship and identifying any deficiencies that need to be addressed. A written report will be required within 2 days after the inspections to forward to all parties. Keep track of the Contractors schedules to ensure that the completion dates will be met.
4. The Architect shall lead weekly meetings with the College Team during the design phases. Provide the minutes within 2 days of the meeting assigning action items by responsible parties.
5. The Architect shall lead weekly meetings with the College Team and General Contractor during the Construction Phases. Provide the minutes within 2 days of the meeting assigning action items by responsible parties.
6. The Architect will be responsible for providing and producing existing condition drawings as part of the design documents.
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 5 of 8 Revised 4/22/2024
7. The Architect will be responsible for submitting the Documents to all applicable State Agencies such as State Fire Marshall, Building Commissioner’s Office, Governor’s Commissions on Green Initiative and Disability and any other State Agencies for approval including paying the submission fee. This Fee will be included in the reimbursable line item for the Lump Sum Fee Proposal.
8. The Architect shall prepare all modifications to the construction documents as required based on comments from the State Agencies. All CCRI approved comments to be incorporated into the final Construction Bid Documents.
9. The Architect shall attend all pre-bid conferences and prepare meeting minutes and or as addendums as required.
10. The Architect will review and approve contractor submittal packages, as-builts, shop drawings, etc.
11. The Architect will review the contractor pre-installation submittal packages for conformity to the engineering drawings and code requirements.
12. Respond to any requests for information from the contractors.
13. Prepare and maintain a log in electronic format (Procore) identifying items requiring Contractor corrective action.
14. Compile from weekly progress site visits (items not corrected) for a final punch list 2 weeks before substantial completion per Phase and verify that all punch list items have been completed within 4 weeks after the Substantial Completion Date per Phase. Prepare necessary Certification/Affidavit forms, 128’s etc. as required.
15. The Architect shall provide all front-end documents. This will include all Division 0 through Division 1 Documents.
16. The Architect shall provide electronic as-built drawings, approved submittals and specifications at the completion of each Phase when completed.
17. Prepare Change Orders with written consent of CCRI.
18. Determine the amount owed to the contractor and review and approve Application and Certification for Payments per the Contract Documents throughout the construction period.
19. All travel, incidentals, printing costs, etc. are to be included in the reimbursable line item included in the Lump Sum Fee Proposal.
20. Review as-built drawings and Operation and Maintenance (O & M) manual developed by the contractor. Provide a review letter, written and stamped by the engineer of record, attesting to the completeness and accuracy of the installation record (as-built) drawings.
21. The Architect is to provide construction administration services including but not limited to site visits, field reports, sketches, punch list documents and request for information responses as necessary.
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 6 of 8 Revised 4/22/2024
22. The College has a NOT TO EXCEED Construction Budget of $54,329,000 which includes Architectural and Engineering Fees, including the Construction Management Consultant and all Consultants. Separate from the Construction Budget is a NOT TO EXCEED Budget of $5,000,000 for Furniture and Equipment including IT equipment and Workforce Lab Shop Equipment.
23. As part of the RFP a breakout of the following hours is required:
a. Hours carried in the Design Phase
b. Hours carried for the Design consultant
c. Hours carried for Construction Administration Services
SECTION C: PROPOSAL
1. Technical Proposal Narrative and format: Vendors must submit a technical proposal which addresses each of the following elements and is limited to six (6) pages (this excludes any appendices and as appropriate, resumes of key staff that will provide services covered by this request) *Technical proposals must be uploaded to the “Vendor Attachment” Technical Evaluation Section in OSP as a separate document:
A. Staff Qualifications – Provide staff resumes/CV and describe qualifications and experience of key staff who will be involved in this project, including their experience in projects of this magnitude, size of the projects they handled (construction Costs) and years with this firm.
B. Capability, Capacity, and Qualifications of the Vendor - Please provide a detailed description of the Vendor’s experience as a related to a project of this size and scope. Identify all consultants, including how long they have worked for the Prime Architect. List a minimum of three (3) relevant client references, to include client names, addresses, contact names with emails and phone numbers, dates of service and type(s) of service(s) provided.
C. Work Plan - Please describe in detail, the framework within which requested services will be performed. The following elements should be included: Provide a phasing plan with your proposal as to the anticipated time frames/durations for meeting each phase of the design schedule along with projected construction periods.
D. Approach/Methodology – Define the methodology to be used providing a phasing plan with your proposal as to the anticipated time frames/durations for meeting each phase of the design schedule along with projected construction periods.
2. Cost Proposal
Detailed Budget and Budget Narrative:
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 7 of 8 Revised 4/22/2024
Provide a cost proposal for the required services which includes the following information:
Phase 1: Design Costs Non- ADA Design Costs Associated ADA Design Construction Administration Costs Non-ADA Construction Administration ADA
Phase 2: Design Costs Non- ADA Design Costs Associated ADA Design Construction Administration Costs Non-ADA Construction Administration ADA
Total Proposal: Including Reimbursables
**Cost proposals must be uploaded to the “Supplier Attachment” Cost Evaluation Section in OSP as a separate document. Do not include with your technical proposal as your proposal may be disqualified
3. Supplemental Bidder Attestation Form
See Appendix A on the “Overview” tab in Ocean State Procures™ for information. Vendors are required to complete, sign and submit this form with their overall proposal.
**Upload your Supplemental Bidder Attestation Form to the “Supplier Attachment” Technical Evaluation Section in OSP as a separate document. Do not include with your Technical Proposal.
4. ISBE Proposal
See Appendix B on the “Overview” tab in Ocean State Procures™ for information and the MBE, WBE and/or Disability Business Enterprise Participation Plan form(s). Vendors are required to complete, sign and submit these forms with their overall proposal. Please complete separate forms for each MBE, WBE, and/or Disability Business Enterprise subcontractor to be utilized on the solicitation.
**Upload your ISBE Form(s) to the “Supplier Attachment” Cost Evaluation Section in OSP as a separate document. Do not include with your cost Proposal.
SECTION D: EVALUATION AND SELECTION
Technical proposals must receive a minimum of 55 (78.5%) out of a maximum of 70 points to advance to the cost evaluation phase.
Technical proposals scoring less than 55 points shall not have the accompanying cost or ISBE participation proposals opened or evaluated; such proposals shall not receive further consideration.
2023-1.v2.04222024 RFP – Agency Solicitation Specifications Page 8 of 8 Revised 4/22/2024
Technical proposals scoring 55 points or higher shall have the cost proposals evaluated and assigned up to a maximum of 30 points, bringing the total potential evaluation score to 100 points. As total possible evaluation points are determined, vendor ISBE proposals shall be evaluated and assigned up to 6 bonus points for ISBE participation.
Proposals shall be reviewed and scored based upon the following criteria:
Criteria
Possible Points
Staff Qualifications 10 Points
Capability, Capacity, and Qualifications of the Vendor
10 Points
Work Plan 30 Points
Approach/Methodology 20 Points
Total Possible Technical Points
70 Points
Cost proposal
30 Points
Total Possible Evaluation Points 100 Points ISBE Participation 6 Bonus
Points
Total Possible Points
106 Points
Additional evaluation criteria can be found at:
• For those with an OSP account, see the “Requirements” tab of this solicitation in OSP for additional information on the evaluation and selection process in the “RFP Standard Specification” section.
• For those without an OSP account, public access to the full bid can be found at https://ridop.ri.gov/vendors/bidding-opportunities.
Search for this solicitation, open the record, click on the “Print/Download Solicitation Summary” button in the upper right corner for all the solicitation requirements and supporting documents are found at the bottom of the page in the “Solicitation Attachments” section.
https://ridop.ri.gov/vendors/bidding-opportunities
| SECTION A. BACKGROUND |
| SECTION B: SCOPE OF WORK AND REQUIREMENTS |
| General Scope of Work |
| Specific Activities / Tasks |
| 21. The Architect is to provide construction administration services including but not limited to site visits, field reports, sketches, punch list documents and request for information responses as necessary. |
| 22. The College has a NOT TO EXCEED Construction Budget of $54,329,000 which includes Architectural and Engineering Fees, including the Construction Management Consultant and all Consultants. Separate from the Construction Budget is a NOT TO EXCEED Bu... |
| 23. As part of the RFP a breakout of the following hours is required: |
| a. Hours carried in the Design Phase |
| b. Hours carried for the Design consultant |
| c. Hours carried for Construction Administration Services |
| SECTION C: PROPOSAL |
| 1. Technical Proposal |
| 2. Cost Proposal |
| 3. Supplemental Bidder Attestation Form |
| 4. ISBE Proposal |
SECTION D: EVALUATION AND SELECTION