rfp2026-02cm.pdf

PDF 475 KB Posted

Attached to
Cabinet Unit Heaters Replacement - Belknap County Nursing Home
Solicitation number
RFP2026-02CM
Issued by
Belknap County, New Hampshire

About this file

This is a Request for Proposal (RFP) issued by Belknap County Commissioners' Office in New Hampshire for cabinet unit heater replacement services at the Belknap County Nursing Home located at 30 County Drive, Laconia, NH. The project requires removal and replacement of twenty-two (22) existing hydronic cabinet-style unit heaters with new, energy-efficient models that integrate with the facility's existing hot water heating system. The scope includes furnishing new cabinet unit heaters with factory-mounted fans and hydronic heating coils, demolition and removal of existing units, complete installation with all necessary piping modifications, installation of new commercial-grade wall-mounted thermostats, system commissioning, and air purging of hydronic lines. Proposals must be submitted to the Board of Commissioners at 34 County Drive, Laconia, NH 03246 or via email to Jon T. Bossey, Facilities Director at jbossey@belknapcounty.gov by 12:00 p.m. on Wednesday, March 4, 2026. The contractor shall be responsible for all methods, means, safety, and coordination to complete the project successfully while minimizing disruption to the occupied 24-hour healthcare facility.

The contractor must furnish new units sized to match or exceed existing heating capacities, provide all necessary hydronic piping including supply and return lines, isolation valves, and balancing valves, and restore all disturbed finishes to match existing conditions. Work must comply with nursing home infection control requirements and maintain heating service to occupied areas whenever possible, with work hours coordinated in advance. The contractor shall provide a minimum one-year warranty on labor and equipment, submit operation and maintenance manuals, provide as-built documentation, and conduct a final walkthrough with Belknap County Facilities staff. The RFP does not specify pricing terms, funding amounts, or award dates. Belknap County reserves the right to accept or reject any and/or all proposals and to cancel the request at any time for any reason.

View the file

Other files

File Type Posted
rfp2026-02cm.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal

RFP2026-02CM

Cabinet Unit Heaters Replacement Belknap County Nursing Home

Belknap County Commissioners’ Office Jon T. Bossey, Facilities Director

34 County Drive, Laconia, NH 03246

(603) 737-2391

BELKNAP COUNTY

REQUEST FOR BID

RFP 2026-02CM

Introduction:

Belknap County is seeking a qualified contractor to perform cabinet unit heater replacements. Proposals shall be submitted to the Board of Commissioners, 34 County Drive, Laconia, New Hampshire 03246 by 12:00pm, Wednesday, March 4, 2026. Outside envelopes must be labeled “Cabinet Unit Heater Replacement”.

Alternatively, proposals may be submitted via email to:

Jon Bossey, Facilities Director, Belknap County jbossey@belknapcounty.gov

The County reserves the right to accept or reject any and/or all proposals. The County reserves the right to cancel this request at any time for any reason.

Work Areas:

Belknap County Nursing Home 30 County Drive Laconia, NH 03245

Replacement of Cabinet Unit Heaters

Belknap County Nursing Home

1. General Description

This Scope of Work defines all labor, materials, equipment, methods, and means required to remove and replace twenty-two (22) existing cabinet-style unit heaters at the Belknap County Nursing Home. The intent of this project is to provide new, reliable, energy-efficient heating equipment that integrates with existing building systems and meets all applicable codes and facility operational requirements.

The Contractor shall provide a complete, turnkey installation. All work shall be performed in an occupied healthcare facility and must be carefully coordinated to minimize disruption to residents, staff, and ongoing operations.

2. Existing Conditions

The Belknap County Nursing Home is an occupied facility operating 24 hours per day.

All existing cabinet unit heaters are hydronic (hot water) units served by the facility heating system.

Contractor shall field-verify:

o Quantity and locations of all existing unit heaters o Existing capacities (BTUH), voltages, control types, and piping configurations o Available clearances and wall/alcove conditions o Condition of existing isolation valves, piping, and electrical feeds

3. Scope of Work Requirements

3.1 Equipment

Furnish twenty-two (22) new cabinet unit heaters sized to match or exceed the heating capacity of existing units.

Units shall be designed specifically for hydronic (hot water) heating systems and fully compatible with the existing nursing home hydronic distribution system.

Units shall include:

o Factory-mounted fans o Hydronic heating coils o Cabinet enclosures suitable for healthcare environments o New control valves as required

Units shall be new, current-production models from a recognized manufacturer.

3.2 Demolition and Removal

Safely isolate hydronic piping serving each existing unit heater.

Drain and cap piping as required to prevent leaks or system contamination.

Disconnect and remove existing cabinet unit heaters.

Remove and properly dispose of all removed equipment and associated debris off-site.

Protect adjacent finishes, walls, floors, and furnishings throughout demolition.

3.3 Installation

Install new cabinet unit heaters at existing locations unless otherwise directed.

Provide all hydronic piping modifications necessary to connect new units, including:

o Supply and return piping o Isolation valves o Balancing valves (if required) o New unions and fittings

All piping shall be properly supported, insulated where applicable, and installed neatly.

Modify wall openings, cabinets, or enclosures as required to accommodate new units.

Restore all disturbed finishes to match existing conditions.

3.4 Controls, Electrical, and Thermostats

Furnish and install new wall-mounted thermostats for each cabinet unit heater unless otherwise directed by the County.

Thermostats shall be commercial-grade, tamper-resistant, and suitable for healthcare environments.

Coordinate thermostat locations with Belknap County Facilities staff to avoid resident tampering and ensure accessibility for staff.

Connect new unit heaters to existing electrical circuits where feasible.

Provide new electrical connections, disconnects, or wiring as required to meet code.

Integrate new thermostats with unit-mounted controls and hydronic control valves.

Verify proper operation of fans, valves, thermostats, and control sequences.

3.5 System Commissioning

Purge air from all hydronic piping serving new unit heaters.

Refill and pressurize the heating system as required.

Balance flow to ensure proper heating output at each unit.

Test each unit heater for:

o Proper fan operation o Heating performance o Control response

4. Phasing and Coordination

Contractor shall coordinate work with Belknap County Facilities staff.

Work shall be phased to maintain heating service to occupied areas whenever possible.

Work hours shall be coordinated in advance and may be restricted in resident care areas.

5. Infection Control and Safety

Contractor shall comply with all nursing home infection control requirements.

Dust, debris, and noise shall be controlled at all times.

Work areas shall be cleaned daily and left safe for occupants.

All personnel shall follow facility safety and access protocols.

6. Testing, Training, and Closeout

Provide a minimum one-year warranty on labor and equipment.

Submit operation and maintenance manuals for installed unit heaters.

Provide as-built documentation noting any deviations from existing conditions.

Conduct a final walkthrough with Belknap County Facilities staff.

8. Responsibility

The Contractor shall be fully responsible for all methods and means of construction, safety, coordination, and successful completion of this project in accordance with this Scope of Work.