RFP W912QR-61396929.pdf

PDF 640 KB Posted

Attached to
Cannelton Lock and Dam - culvert valve assemblies
Solicitation number
W912QR-61396929
Issued by

About this file

This is a Request for Proposal (RFP) for a task order under an existing Indefinite Delivery Indefinite Quantity (IDIQ) contract with the U.S. Army Corps of Engineers, Louisville District. The solicitation requests price proposals for fabrication, delivery, and installation of two culvert valve assemblies (one filling, one emptying valve) for the river wall of the main 1200-foot lock chamber at Cannelton Lock and Dam in Cannelton, Indiana. The base bid scope includes removal of existing valves, fabrication and delivery of replacement assemblies, installation of new assemblies, and water management (unwatering, maintenance, and rewatering of the valve chamber). The project magnitude is estimated between $5,000,000 and $10,000,000.

The RFP also includes seven optional line items for fabrication and installation of middle wall culvert valves, bulkhead J-seal replacement, hydraulic cylinder replacement, grease line replacement, and emergency rewatering/unwatering services. Award will be made on a lowest evaluated price basis. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module no later than 11:00 AM EDT on Monday, September 7, 2026. Offerors must allow for 60 calendar days of Government acceptance. The contract completion deadline is 1,500 calendar days from Notice to Proceed, with liquidated damages of $1,160 per day for delays. A mandatory site visit is scheduled for Wednesday, August 19, 2026, at 10:00 AM Central Time at Cannelton Locks and Dam. Davis-Bacon prevailing wage rates for Indiana construction workers are included with the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY CORPS OF ENGINEERS, LOUISVILLE DISTRICT

220 WEST MAIN STREET

LOUISVILLE KY 40202

Contracting Division 04 August 2026

Alltech Engineering Corp.

G & G Steel, Inc.

Hohl Industrial Services, Inc J.F Brennan Company, INC.

Marine Diving Solutions, LLC Precision Build Solutions, LLC Steward Machine Co.

Dear MATOC Contractors:

Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, Numbers W911WN23D0001 through W911WN23D0007, to provide varying types of Fabrication of parts and Refurbishment Services for the U.S. Army Corps of Engineers, Great Lakes and Ohio River Mission Boundaries primarily for Civil projects.

We request you submit a price proposal for work to be completed in the base bid that includes, but is not limited to, removal of two (2) culvert valve assemblies, fabrication and delivery of two

(2) culvert valve assemblies, and installation of two (2) culvert valve assemblies located on the river wall of the main lock chamber (1200' chamber) at Cannelton Lock and Dam, Cannelton, Indiana. A culvert valve assembly includes a strut arm, bell crank, culvert valve, pins, valve bearing block assemblies, and other ancillary items as shown on the plans. Items to be removed are highlighted in the plan set. Removal may include the disposal of the culvert valves. See spec 02 41 00 DEMOLITION AND DECONSTRUCTION for additional details. Work includes unwatering of the culvert valve chamber, maintaining the unwatered state throughout the duration of the culvert valve installation, and rewatering of the culvert valve chamber.

Disclosure of magnitude of construction projects is between $5,000,000.00 and $10,000,000.00.

The basis for award of this task order is lowest evaluated price.

Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due. Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.

Please note, as stated in the Base Contract, the following clauses have been updated to reflect the specific Task Order requirements:

FAR 52.211-10 Commencement, Prosecution, and Completion of Work.

FAR 52.211-12 Liquidated Damages-Construction.

FAR 52.211-13 Time Extensions.

FAR 52.217-5 Evaluation of Options FAR 52.217-7 Option for Increased Quantity -- Separately Priced Line Item.

FAR 52.236-1 Performance of Work by the Contractor.

FAR 52.246-21 Warranty of Construction.

FAR 52.228-5 Insurance-Work on a Government Installation.

FAR 52.236-27 Site Visit Construction Alt. I DFARS 252.236-7001 Contract Drawings and Specifications.

DFARS 252.236-7002 Obstruction of Navigable Waterways.

Site Visit – Please see the Clauses Section, for date and time.

No inquiries will be allowed during the site visit. All inquiries must be submitted via the ProjNet Bidder Inquiry site. A Bidder Key is provided with the solicitation information. Please RSVP the following information:

The documents are available for download at www.SAM.gov only. All vendors must be registered in the SAM database at www.SAM.gov. The Request For Proposal (RFP) can be found by logging into the website as a vendor and searching for the solicitation number

(W912QR-61396929).

Proposals are due no later than 11:00 AM EDT on Monday 07 September 2026. Please acknowledge receipt of this RFP by signing below in the space provided.

Proposals must be submitted using the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. *See ELECTRONIC PROPOSAL SUBMISSION for instructions.

Proposals not received by the stated date/time will not be considered.

All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is: (58UVT3-X47B9H). Please see ProjNet instructions included in this RFP.

If you have contractual questions, please contact Joel Huberman at Joel.Huberman@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.

Sincerely, Richard Van De Linde III Contracting Officer http://www.sam.gov/ http://www.sam.gov/ http://www.projnet.org/ mailto:Joel.Huberman@usace.army.mil

(Signature) (Date) (Printed Name)

(Firm Name)

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Project Number is: W912QR-61396929 The Bidder Inquiry Key is: 58UVT3-X47B9H

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret

Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your Secret

Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates http://www.projnet.org/ProjNet weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.

ELECTRONIC PROPOSAL SUBMISSION

Offerors shall submit one (1) electronic copy of their offer via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module before the time and date specified in Block 13 of this SF 1442. No paper copies, CDROMS, facsimile, DoD SAFE, or email submissions will be accepted.

A User ID and Password are required to access PIEE. Offerors are required to self-register as a Vendor or Contractor with the user's CAGE code(s) and must have an active registration in the System for Award Management (SAM) prior to the PIEE registration process.

1. Instructions for registering in PIEE:

a. Navigate to https://piee.eb.mil/

b. Select Register [top right]

c. Select Vendor

d. Create a User ID and Password and follow the prompts [next]

e. Create Security Questions [next]

f. Complete your User Profile Information [next]

g. Complete your Supervisor or Approving Official Information [next]

h. Complete Roles

i. Step 1. Select SOL-Solicitation

1. ii. Step 2. Select Proposal Manager

2. iii. Step 3. Click Add Roles

3. iv. Step 4. Fill in your Location Code (CAGE Code) [next]

j. Provide a justification for your registration [next]

k. Follow the remaining prompts to submit your registration

2. Instructions for Electronic Proposal Submission in PIEE Solicitation Module:

a. Log into PIEE and select the Solicitation Icon.

b. Enter search criteria to find the solicitation. (Search Criteria can be the complete solicitation number, Solicitation Open Date, Response Due Date, Product or Service Code, NAICS, Set Aside code, Place of Performance Zip Code, Contracting Office DODAAC, or Status)

c. The search results display. Select the Solicitation Number link to open the solicitation.

d. The solicitation displays. The information is view only.

e. Scroll down to see the Contract Information and Attachments. The Attachments can be viewed by selecting the File link. Scroll back up to the top of the screen and click the Offer tab.

f. Click the Offer tab to Add and review current offers on the Solicitation. Click the Add button to add an offer to the Solicitation.

g. Select the applicable CAGE Code for which submitting the offer for. The list is prefiltered based on the CAGEs in the Proposal Manager’s profile.

h. Upload the attachments that comprise the offer by selecting the Choose Files link.

i. After entering all necessary information enter a Signature Date and Click the Signature button.

j. The Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and

One Time Password (OTP). Click the Sign and Submit button to continue.

https://piee.eb.mil/

k. After successfully adding the Offer a success message of the submission will be displayed and the offer displayed collapsed. Users may expand and view all their offers on a Solicitation.

File Size Limitations: Offerors are advised to follow the above instructions for uploading files.

If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

W912QR-61396929_Firm Name

Please see examples above. (***NOTE: The PIEE Solicitation Module will replace special characters and spaces in the attachment filename with underscores “_”***)

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.

Upload Completion & Deadline: Offerors are highly encouraged to become familiar with the PIEE Solicitation module well in advance of the proposal due date. Interested offerors shall submit proposals no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within PIEE Solicitation module. Do not assume that electronic submission will occur instantaneously. Large files will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record.

Submissions after the deadline will be considered late and will be processed in accordance with

FAR 15.208.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the Solicitation.

The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

For training and help using the PIEE Solicitation module, reference the links below.

• New User Information and Help: https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml

• Vendor Customer Support:

https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml

RELEASE OF CLAIMS - FINAL PAYMENT FOR

Contract No.: Task Order: ________________________

Pursuant to the terms of Contract No. , dated (hereinafter called the Contract) the undersigned Contractor (hereinafter called the Contractor) hereby acknowledges that it has requested final payment in the sum certain amount of (Dollars)$ for Task Order under the Contract. The Contractor further understands and agrees that final payment of the above-stated sum to the Contractor, or its assignees, if any, constitutes compensation in full on behalf of the Contractor, and its subcontractors and suppliers, for all costs and markups directly or indirectly attributable to work performed under Task Order , including any modifications or changes thereto, except for the following claims:

If NONE, the undersigned Contractor shall initial here:

In consideration of final payment of the above-stated sum, which has been or is to be paid under the Contract for Task Order to the Contractor or its assignees, if any, the Contractor, upon payment of said sum by the UNITED STATES OF AMERICA (hereinafter called the Government) does hereby release the Government, its officers, agents, and employees from any and all liabilities, obligations, claims, and demands of any kind arising out of or under Task Order , except for those expressly reserved above.

Executed this day of

By

(Signature)

(Printed Name)

WITNESSES:

(Title)

(Signature) (Signature)

(Printed Name) (Printed Name)

00 10 00

PRICE BREAKOUT SCHEDULE

07/27

PROJECT: Cannelton Culvert Valve Replacement LOCATION: Cannelton Locks and Dam, Cannelton, IN

PROPOSER’S NAME:

CLIN DESCRIPTION QUANTITY UNIT PRICE AMOUNT

BASE PROPOSAL

Fabricate and deliver two (2) Culvert Valve Assemblies for river wall (1 filling/1 emptying)

Job

Install two (2) Culvert Valve Assemblies on river wall (1 filling/1 emptying)

Total Base $

OPTIONAL ITEM(S)

Option 1: Fabricate and deliver middle wall filling culvert valve

Option 2: Fabricate and deliver middle wall emptying culvert valve

0005 Option 3: Install middle wall filling culvert valve

0006 Option 4: Install middle wall emptying culvert valve

0007 Option 5: Bulkhead J Seal 1 Job $

0008 Option 6: Replace Hydraulic Cylinder 1 Job $

0009 Option 7: Grease Line Replacement 1 Job $

0010 Option 8: Emergency rewatering and unwatering

1 Job $

Total Options $ Total Base &

Options $

The total is the sum of all CLINs. The total of all CLINs will be evaluated at the Lowest Price to the Government for contract award.

NOTES:

1. Failure of the offeror to propose prices for all items in the Proposal Schedule may be cause for rejection of the proposal as unacceptable.

2. Any reference to “bid”, bidder, or “bidding schedule” shall be construed to mean “offeror” and “proposal.”

3. Options with unit prices listed will be exercised as a single option with quantity based on results of inspection. See line item descriptions for maximum quantities.

Description of Base Proposal Items

ITEM

NO. SUPPLIES/SERVICES

0001 Fabricate and deliver two (2) culvert valve assemblies Fabricate and deliver culvert valves (one filling valve and one emptying valve for the river wall) with their appurtenant linkages per Contract Drawings and Specifications. Base bid shall include, but is not limited to:

� Costs for payment and performance bonds � Fabrication of culvert valve assemblies.

� Deliver culvert valves to storage location specified in contract documents.

0002 Install two (2) culvert valve assemblies Install culvert valve assemblies in the river wall of the main 1200’ lock chamber (one filling valve and one emptying valve from the same culvert) per Contract Drawings and Specifications. Base bid shall include, but is not limited to:

� Costs for payment and performance bonds.

� Mobilization and demobilization.

� Lift the four (4) culvert bulkheads from their current slots.

� Wash off the four (4) culvert bulkheads.

� Remove debris from the bulkhead slots and install bulkheads.

� Pump water out of the valve pits. Maintain operation of the pumps as necessary to control water elevation in the valve pits.

� Maintain access across the lock walls for lock staff.

� Maintain functionality of main chamber. Installation limited to taking valves out of service on only one wall at a time.

� Monitor the river conditions.

� Installation of culvert valve assemblies including valve and mechanical linkages.

Description of Optional Items

0003 Option 1: Fabricate and deliver middle wall filling culvert valve assembly Fabricate and deliver middle wall filling culvert valve with the appurtenant linkages per Contract Drawings and Specifications. Shall include, but is not limited to:

� Fabrication of culvert valve assembly.

� Deliver culvert valves to Cannelton Lock and Dam to the storage location shown on plan sheet G-004 � Option 1 can be exercised within 180 days of notice to proceed

0004 Option 2: Fabricate and deliver middle wall emptying culvert valve assembly Fabricate and deliver middle wall emptying culvert valve with their appurtenant linkages per Contract Drawings and Specifications. Shall include, but is not limited to:

� Fabrication of culvert valve assembly.

� Deliver culvert valves to Cannelton Lock and Dam to the storage location shown on plan sheet G-004 � Option 2 can be exercised within 180 days of notice to proceed

0005 Option 3: Install middle wall filling culvert valve assembly Install middle wall filling culvert valve assembly per Contract Drawings and Specifications. Shall include, but is not limited to:

� Lift the two (2) culvert bulkheads from their current slots.

� Remove debris from the bulkhead slots and install bulkheads.

� Pump water out of the valve pit. Maintain operation of the pumps as necessary to control water elevation in the valve pit.

� Maintain access across the lock walls for lock staff.

� Maintain functionality of main chamber. Installation limited to taking valves out of service on only one wall at a time.

� Monitor the river conditions.

� Removal of existing culvert valve assembly as shown on the plan set � Installation of culvert valve assembly including valve and mechanical linkages.

� Rewater the valve pit after completion of all items, requiring an unwatered valve pit.

� Option 3 can be exercised within 210 days of notice to proceed

0006 Option 4: Install middle wall emptying culvert valve assembly Install middle wall emptying culvert valve assembly per Contract Drawings and Specifications.

Shall include, but is not limited to:

� Lift the two (2) culvert bulkheads from their current slots.

� Remove debris from the bulkhead slots and install bulkhead.

� Pump water out of the valve pit. Maintain operation of the pumps as necessary to control water elevation in the valve pit.

� Maintain access across the lock walls for lock staff.

� Maintain functionality of main chamber. Installation limited to taking valves out of service on only one wall at a time.

� Monitor the river conditions.

� Removal of existing culvert valve assembly as shown on the plan set � Installation of culvert valve assembly including valve and mechanical linkages.

� Rewater the valve pit after completion of all items, requiring an unwatered valve pit.

� Option 4 can be exercised within 210 days of notice to proceed

0007 Option 5: Bulkhead J-Seal Purchase and installation of culvert valve bulkhead j-seal, clamp bars, bolts, nuts, and washers for one (1) bulkhead.

� Remove existing j-seal, bolts, nuts, washers, and clamp bars � Install new j-seal, bolts, nuts, washers, and clamp bars

Option 5 can be exercised within 30 days after seals have been inspected by the contractor and government together.

Bid shall include the estimated cost for purchase of j-seal, clamp bars, bolts, nuts, and washers according to the reference drawings. Bid shall include the estimated cost for installation of the j-seal, clamp bars, bolts, nuts, and washers.

The government can exercise this option 1 time for each of the four culvert valve bulkheads (for a total of four times) and can be exercised within 30 calendar days after the bulkheads have been inspected by the government.

0008 Option 6: Replace Hydraulic Cylinder Remove existing culvert valve hydraulic cylinder and replace with refurbished hydraulic cylinder provided by the government. Option price shall include cost for offloading the cylinder from the government delivery.

The government can exercise this option up to four times that can be exercised at any time prior to planned mobilization.

The hydraulic cylinder that was removed, is to be turned over to the Government as Government property.

0009 Option 7: Replace Grease Lines Remove grease lines in valve pit and replace in kind with new stainless steel grease lines and fittings. The lengths of the grease lines are as follows:

� Upstream o Total length of grease line piping mounted on the concrete: 145 ft o 3 hoses (70 in each)

� Downstream o Total length of grease line piping mounted on the concrete: 155 ft o 3 hoses (70 in each)

The government can exercise this option 1 time for each of the four valve pits (for a total of four times) and can award within 30 calendar days after the grease lines for the given valve pit have been inspected by the contractor and government together.

0010 Option 8: Emergency Rewatering and Unwatering Monitor the river conditions and perform an emergency rewater of the culvert valve(s), if necessary.

After river levels have decreased to an acceptable level to continue work, unwater the culvert valve(s) and continue work. This option is to include all work associated with emergency rewatering and subsequent unwatering to achieve an unwatered state of the culvert valve areas in accordance with specification 35 80 01.00 06. This option is for emergency rewatering and subsequent unwatering of the work area and does not include the initial unwatering and rewatering of the culvert valves in the base bid options 3 and 4.

The government can exercise this option up to 1 time.

SECTION 00 70 00

52.211-10 - Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 1,500 calendar days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

52.211-12 - Liquidated Damages -- Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,160.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of Clause)

52.211-13 Time Extensions (Sept 2000)

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

(End of clause)

52.217-5 - Evaluation of Options (Jul 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of Provision)

52.217-7 - Option for Increased Quantity -- Separately Priced Line Item.

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option Reference Price Breakout Schedule. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of Clause)

52.228-5 Insurance-Work on a Government Installation (Jan 1997)

(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.

(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government’s interest shall not be effective-

(1) For such period as the laws of the State in which this contract is to be performed prescribe; or

(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.

(End of clause)

52.236-1 Performance of Work by the Contractor (Apr 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

52.236-14 Availability and Use of Utility Services. (Apr 1984)

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.

(b) The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.

(End of clause)

52.236-27 - Site Visit (Construction) (Feb 1995) Alternate I

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

No inquiries will be allowed during the site visit. All inquiries must be submitted via the ProjNet Bidder Inquiry site. A Bidder Key is provided with the solicitation information. Please RSVP the following information:

Cannelton Locks and Dam 5281 E. State Road 66 Cannelton, IN 47520

(812) 547-2962

Date/Time: Wednesday 19th August at 10:00 CT.

POC: Josee Scott Phone: 502-315-6725

Send RSVP to Josee.K.Scott@usace.army.mil & Joel.Huberman@usace.army.mil, USACE must receive the email by 12:00PM EDT on 17 August 2026. No additional attendees will be registered after this date or time.

1. Name of Attendee

2. Company

3. Phone Number and Email Address https://www.acquisition.gov/content/52236-2-differing-site-conditions#i1048797 https://www.acquisition.gov/content/52236-3-site-investigation-and-conditions-affecting-work#i1048811 mailto:Josee.K.Scott@usace.army.mil mailto:Joel.Huberman@usace.army.mil

(End of provision)

52.246-21 Warranty of Construction (Mar 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

252.236-7001 - Contract Drawings and Specifications (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall—

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general—

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

DRAWING NUMBER G-002

252.236-7002 Obstruction of Navigable Waterways (DEC 1991)

(a) The Contractor shall—

(1) Promptly recover and remove any material, plant, machinery, or appliance which the contractor loses, dumps, throws overboard, sinks, or misplaces, and which, in the opinion of the Contracting Officer, may be dangerous to or obstruct navigation;

(2) Give immediate notice, with description and locations of any such obstructions, to the Contracting Officer; and

(3) When required by the Contracting Officer, mark or buoy such obstructions until the same are removed.

(b) The Contracting Officer may—

(1) Remove the obstructions by contract or otherwise should the Contractor refuse, neglect, or delay compliance with paragraph (a) of this clause; and

(2) Deduct the cost of removal from any monies due or to become due to the Contractor; or

(3) Recover the cost of removal under the Contractor's bond.

(c) The Contractor's liability for the removal of a vessel wrecked or sunk without fault or negligence is limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 410 et. seq.).

WAGE DECISIONS

"General Decision Number: IN20260006 07/30/2026

State: Indiana Construction Types: Heavy and Highway

Counties: Indiana Counties of Adams, Allen, Bartholomew, Benton, Blackford, Boone, Brown, Carroll, Cass, Clark, Clay, Clinton, Crawford, Daviess, DeKalb, Dearborn, Decatur, Delaware, Dubois, Elkhart, Fayette, Floyd, Fountain, Franklin, Fulton, Gibson, Grant, Greene, Hamilton, Hancock, Harrison, Hendricks, Henry, Howard, Huntington, Jackson, Jasper, Jay, Jefferson, Jennings, Johnson, Knox, Kosciusko, Lagrange, Lawrence, Madison, Marion, Marshall, Martin, Miami, Monroe, Montgomery, Morgan, Newton, Noble, Ohio, Orange, Owen, Parke, Perry, Pike, Posey, Pulaski, Putnam, Randolph, Ripley, Rush, Scott, Shelby, Spencer, Starke, Steuben, Sullivan, Switzerland, Tippecanoe, Tipton, Union, Vanderburgh, Vermillion, Vigo, Wabash, Warren, Warrick, Washington, Wayne, Wells, White and Whitley

Heavy Construction

Highway Construction

Modification Number Publication Date 1 01/30/2026 2 05/18/2026 3 07/30/2026

ASBE0008-004 07/01/2017

Rates Fringes

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY

CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (DEARBORN, FAYETTE, FRANKLIN,

OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES)........$ 25.00 13.70

ASBE0008-004 03/01/2025

Rates Fringes

ASBESTOS WORKERS/INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS,

PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS

(DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION COUNTIES)......$

35.23 22.79

ASBE0017-008 06/01/2025

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR (NEWTON COUNTY)..$ 56.02 37.24

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY

CONTAIN ASBESTOS OR NOT, FROM MECHAINCAL SYSTEMS (NEWTON COUNTY).$ 44.82 34.00

ASBE0018-005 06/01/2017

Rates Fringes

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (BROWN, BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLAY, CLINTON, DECATUR, DELAWARE, ELKHART. FOUNTAIN, FULTON, GREENE, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JASPER, JOHNSON, KOSCIUSKO, LAGRANGE, MARSHALL, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PULASKI, .....................$ 23.00 14.40

ASBE0018-005 06/01/2025

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (BROWN, BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLAY, CLINTON, DECATUR, DELAWARE, ELKHART. FOUNTAIN, FULTON, GREENE, HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JASPER, JOHNSON, KOSCIUSKO, LAGRANGE, MARSHALL, MADISON, MARION, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PULASKI, PUTNAM, RUSH, SHELBY, STARKE, TIPPECANOE ................$ 40.20 25.68

ASBE0037-004 06/01/2023

Rates Fringes

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY

CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (DAVIESS, DUBOIS, GIBSON, KNOX,

MARTIN, PIKE, POSEY, SPENCER, SULLIVAN, VANDERBURGH AND WARRICK COUNTIES).....$ 33.44 21.84

ASBE0037-004 04/05/2025

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING

MATERIALS PROTECTIVE COVERINGS, COATINGS AN FINISHES TO ALL TYPES OF MECHANICAL

SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING, MATERIAL OPENINGS AND PENETRATIONS IN

WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT. (DAVIESS, DUBOIS,

GIBSON, KNOX, MARTIN, PIKE, POSEY, SPENCER, SULLIVAN, VANDERBURGH AND WARRICK

COUNTIES)...............................$ 38.19 23.59

ASBE0041-002 06/01/2024

Rates Fringes

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL,

SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY

COUNTIES:).......$ 35.10 19.39

ASBE0041-002 03/01/2025

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING

MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL

SYSTEMS (ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY, MIAMI, NOBLE,

STEUBEN, WABASH, WELLS AND WHITLEY COUNTIES:).......$ 37.25 19.85

ASBE0051-003 06/01/2017

Rates Fringes

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTINGS, STRIPPING, REMOVAL,

SCRAPPING, VACCUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (CLARK, CRAWFORD. FLOYD, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, ORANGE, PERRY, SCOTT, AND WASHINGTON

COUNTIES)......$ 19.80 13.30

ASBE0051-003 03/01/2025

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING

MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS (CLARK, CRAWFORD. FLOYD, HARRISON, JACKSON, JEFFERSON, JENNINGS, LAWRENCE, ORANGE, PERRY, SCOTT, AND WASHINGTON COUNTIES)......$ 30.00 20.89

ASBE0079-002 03/01/2024

HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,

SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) (RANDOLPH AND WAYNE COUNTIES)...

$ 38.56 18.70

ASBE0079-002 07/01/2024

Rates Fringes

ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES APPLICATION OF ALL INSULATING

MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF

MECHANICAL SYSTEMS (RANDOLPH AND WAYNE COUNTIES)....$ 38.56 18.70

BRIN0003-001 06/01/2023

Rates Fringes

BRICKLAYER, STONE MASON, POINTER, CAULKING (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES).$ 36.24 17.39

TERRAZZO FINISHER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION,

MONTGOMERY, MORGAN AND SHELBY COUNTIES).............$ 23.38 13.15

TERRAZZO WORKER/SETTER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION,

MONTGOMERY, MORGAN AND SHELBY COUNTIES).............$ 36.38 17.24

TILE & MARBLE FINISHER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN AND SHELBY COUNTIES).............$ 24.33 13.16

TILE, MARBLE SETTER (INDIANAPOLIS BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION,

MONTGOMERY, MORGAN AND SHELBY COUNTIES).............$ 35.63 17.23

BRIN0004-004 06/01/2024

Rates Fringes

BRICKLAYER: STONE MASON, MARBLE MASONS, POINTER, CLEANER, AND CAULKER (FORT WAYNE

ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:)

$ 35.00 21.60

TERRAZZO GRINDER FINISHER (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE,

STEUBEN, WELLS AND WHITLEY COUNTIES:)...............$ 31.00 17.89

TERRAZZO WORKER MECHANIC (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:)........................$ 36.30 22.04

TILE SETTER & MARBLE MASON MECHANIC (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:)........$ 31.55 19.08

TILE, MARBLE & TERRAZZO FINISHER (FORT WAYNE ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND WHITLEY COUNTIES:)........$ 31.55 19.08

BRIN0004-005 06/01/2024

Rates Fringes

BRICKLAYER (CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, AND WARRICK

COUNTIES).........$ 35.34 21.72

TILE FINISHER (CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, AND WARRICK

COUNTIES).........$ 29.08 17.32

TILE SETTER (CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, AND WARRICK

COUNTIES).........$ 29.08 17.32

BRIN0004-009 06/01/2024

BRICKLAYER, STONEMASON (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES).............$ 35.21 18.19

TERRAZZO FINISHER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES)..............$ 25.33 14.19

TERRAZZO WORKER/SETTER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES)...............$ 37.97 18.06

TILE & MARBLE FINISHER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES)...............$ 25.33 14.19

TILE, MARBLE SETTER (BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO, OWENS, RIPLEY AND SWITZERLAND COUNTIES)...............$ 37.22 18.05

BRIN0004-010 06/01/2024

Rates Fringes

BRICKLAYER: BRICKLAYERS, STONEMASONS AND CEMENT MASONS (CLARK, FLOYD, AND HARRISON

COUNTIES)........$ 33.70 16.57

BRIN0004-015 06/01/2024

Rates Fringes

BRICKLAYER: BRICKLAYERS, STONE MASONS AND POINTER/CLEANER/CAULKER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND

VIGO COUNTIES).............$ 38.16 18.22

BRICKLAYER: CEMENT MASON (REMAINING COUNTIES) (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES)...

$ 37.16 18.22

BRICKLAYER: TERRAZO FINISHER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES).$ 25.33 14.19

BRICKLAYER: TERRAZZO WORKER (TERRE HAUTE CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO COUNTIES).$ 37.97 18.06

BRICKLAYER: TILE LAYER, MARBLE MASON, MOSAIC WORKER (TERRE HAUTE CLAY, DAVIESS,

GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE, PUTNAM, SULLIVAN, VERMILLION AND VIGO

COUNTIES)..................................$ 38.16 18.22

BRIN0004-016 06/01/2024

Rates Fringes

BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND

WAYNE COUNTIES).............$ 35.83 20.89

TERRAZZO FINISHER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES)...$ 25.33

14.19

TERRAZZO WORKER/SETTER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON,

HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES)...$ 37.97

18.06

TILE & MARBLE FINISHER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE COUNTIES)...$ 25.33

14.19

TILE & MARBLE SETTER; MOSAIC WORKER (MUNCIE BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY, MADISON, RANDOLPH, RUSH, TIPTON, UNION AND WAYNE

COUNTIES).................................$ 35.83 20.89

BRIN0006-001 06/01/2023

Rates Fringes

BRICKLAYER: INCLUDING STONEMASON, AND POINTER, CAULKER & CLEANER (JASPER, NEWTON &

STARKE COUNTIES)...................................$ 42.05 28.22

TILE, MARBLE & TERRAZZO WORKER (JASPER, NEWTON & STARKE COUNTIES).$ 42.05 28.22

BRIN0011-001 06/01/2023

Rates Fringes

BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES).$ 33.75 20.12

TERRAZZO FINISHER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN

AND WHITE COUNTIES).................................$ 23.38 13.15

TERRAZZO WORKER/SETTER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES)..........................$ 36.38 17.24

TILE & MARBLE FINISHER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES)..........................$ 24.33 13.16

TILE & MARBLE SETTER; MOSAIC WORKER (LAFAYETTE BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN AND WHITE COUNTIES)..............$ 35.63 17.23

BRIN0018-002 06/01/2023

Rates Fringes

BRICKLAYER, CAULKER, CLEANER, POINTER (CASS, ELKHART, FULTON, GRANT, HOWARD,

KOSCUISKO, LAGRANGE, MARSHALL, MIAMI, PULASKI, WABASH)..$ 34.00 19.71

CARP0002-023 04/01/2025

Rates Fringes

CARPENTER (DEARBORN, JACKSON, JENNINGS, OHIO, RIPLEY AND SWITZERLAND COUNTIES)

$ 31.09 28.53

CARP0133-001 04/01/2025

Rates Fringes

CARPENTER (BOONE, CLAY, FOUNTAIN, MONROE, MONTGOMERY, MORGAN, OWEN, PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES)........................$ 34.69 25.59

CARP0133-003 04/01/2025

Rates Fringes

CARPENTER (HAMILTON, HANCOCK, HENDRICKS, JOHNSON (TOWNSHIPS OF CLARK, CAMP ATTERBURY

NORTH OF HOSPITAL ROAD, PLEASANT, WHITE RIVER), AND MARION COUNTIES).....$ 35.80

25.59

CARP0175-004 04/01/2025

Rates Fringes

CARPENTER (CLARK, FLOYD, HARRISON, JEFFERSON, SCOTT AND WASHINGTON COUNTIES)

$ 30.52 29.11

CARP0215-002 04/01/2025

CARPENTER (BENTON, CARROLL, CLINTON, PULASKI, TIPPECANOE, WARREN AND WHITE

COUNTIES)..............$ 35.14 25.10

CARP0224-011 04/01/2025

Rates Fringes

CARPENTER (CRAWFORD, DUBOIS, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND WARRICK

COUNTIES:).........$ 30.59 29.03

CARP0224-012 04/01/2025

Rates Fringes

CARPENTER (DAVIESS, GIBSON, GREENE, KNOX, LAWRENCE, MARTIN, ORANGE AND SULLIVAN

COUNTIES:)...$ 30.94 29.08

CARP0232-003…

This is the start of the file's text. The full file is on GovTribe.