This is a Request for Proposals (RFP) issued by the City of Dallas Park and Recreation Department's Facility Development Division for architecture and engineering services for two (2) aquatic centers: Singing Hills Aquatic Center and Jaycee Zaragoza Aquatic Center. The RFP solicits qualified architectural and engineering firms to provide comprehensive professional services including finalized scope development, scope-to-budget assessment, schematic design, design development, construction documents, bidding, permitting, and construction administration. The services encompass architecture, landscape architecture, mechanical and electrical engineering, plumbing engineering, surveying, civil engineering, accessibility consulting, geotechnical engineering, structural engineering, and cost estimation, along with community engagement meetings and compliance with applicable codes and the City's Green Building Policy. Singing Hills Aquatic Center (6805 Patrol Way, Dallas, TX 75241) has an estimated construction budget of $3,300,000 with design completion by August 1, 2027, construction beginning January 15, 2028, and completion by March 1, 2029. Jaycee Zaragoza Aquatic Center (3125 Tumalo Trail, Dallas, TX 75212) has an estimated construction budget of $3,000,000 with design completion by May 1, 2027, construction beginning September 1, 2027, and completion by April 1, 2028. Each project will be awarded under a separate contract, with the highest-ranking firm selecting their preferred project and the second-ranking firm receiving the remaining project. Proposals are due by 1:00 PM on Friday, August 7, 2026, with questions due by 5:00 PM on Friday, July 31, 2026. Design work is scheduled to begin October 28, 2026.
The total estimated construction budget for both projects is $6,300,000. Selection will be based on a 100-point evaluation rubric weighted as follows: Capabilities, Experience, and Resources (25 points); Capacity and Current Contracts (10 points); Approach to the Project (20 points); Ability to Achieve Sustainable Development Goals (10 points); Work Plan (10 points); Prior and Current Litigation and Claims History (5 points); and DRIVE Requirements (20 points). The City of Dallas requires compliance with its Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy with a Small Business Enterprise participation goal of 14.84%. Proposers must document good faith efforts to meet the participation goal and include specific forms (Form 604, Form 605, and Form 606) evaluating local economic impact, SBE utilization, and engagement scores. Proposals are limited to 40 pages in PDF format and must be submitted electronically through the Bonfire platform. The City will use its standard Architect Contract with no modifications entertained, and all submitted information is subject to public disclosure under the Texas Public Information Act upon contract execution. The RFP was issued July 17, 2026.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS (RFP)
FOR
ARCHITECTURE AND ENGINEERING SERVICES
FOR
TWO (2) AQUATIC CENTERS
SINGING HILLS AQUATIC CENTER
JAYCEE ZARAGOZA AQUATIC CENTER
CITY OF DALLAS
PARK AND RECREATION DEPARTMENT
ISSUED: JULY 17, 2026
DUE: AUGUST 7, 2026 AT 1:00 PM
PKR-2026-00030846 (Singing Hills Aquatic Center)
PKR-2026-00030847 (Jaycee Zaragoza Aquatic Center)
Park and Recreation Department Facility Development Division
Professional Services for Two (2) Aquatic Centers Singing Hills and Jaycee Zaragoza Aquatic Centers
Request for Proposals
TABLE OF CONTENTS
SECTION 1 – GENERAL INFORMATION
SECTION 2 – SCOPE OF SERVICES
SECTION 3 – SELECTION PROCESS
SECTION 4 – DRIVE REQUIREMENTS
SECTION 5 – SUBMITTAL REQUIREMENTS
SECTION 6 – SELECTION CRITERIA WEIGHTING
SECTION 7 – PROPOSED SCHEDULE
SECTION 1 – GENERAL INFORMATION
The City of Dallas, represented by the Park and Recreation Department (PARD) – Facility Development Division, is soliciting proposals from qualified architectural and engineering firms (A/E) to provide professional services for two (2) aquatic center facilities: Singing Hills Aquatic Center and Jaycee Zaragoza Aquatic Center. Each project will be awarded under a separate contract. The highest-ranking firm will start negotiations for their choice of project. The second-highest ranking firm will start negotiations for the remaining project. The anticipated funding schedules for each project are provided below.
Estimated Construction Budget: $6,300,000.00
City of Dallas Contact Information: Any inquiries or concerns regarding the RFP procedures or processes shall be directed to the PARD Project Manager mentioned below.
Submittal Due Date: Proposals are due on Friday, August 7, 2026, by 1:00 PM. Proposals need to be addressed to Project Manager Kamil Miskowiec, City of Dallas Park and Recreation Department, Room 6FN, City Hall, 1500 Marilla, Dallas, Texas 75201. Submit proposals to http://dallascityhall.Bonfirehub.com. Questions must be submitted no later than Friday, July 31, 2026, at 5:00 PM.
SECTION 2 – SCOPE OF SERVICES
The Scope of work includes Finalizing Scope Development, Scope-to-Budget Assessment, Schematic Design, Design Development, Construction Documents, Bidding, Permitting and Construction Administration Services for two (2) Aquatic Centers. The professional services required for the project include, but are not limited to architecture, landscape architecture, mechanical engineering, electrical engineering, plumbing engineering, surveying, civil engineering, accessibility consulting, geotechnical engineering, structural engineering and cost estimation. A sample of the Architect’s Contract is attached to this RFP. The final scope of design services will be determined during fee negotiations between the City and the selected firms and will be reflected in the final fee proposal.
Other services shall include, but are not limited to:
1. Community Engagement Meetings
2. Meeting all applicable codes and regulations including the City’s Green Building Policy
3. Permitting Application
Professional Services for Two (2) Aquatic Centers
AQUATIC CENTER #1
Singing Hills Aquatic Center – 6805 Patrol Way, Dallas, TX 75241 Estimated Construction Budget: $3,300,000.00 Complete Design of Singing Hills – August 1, 2027 Begin Construction of Singing Hills – January 15, 2028 Complete Construction of Singing Hills – March 1, 2029 A conceptual plan, phasing plan and cost estimate will be required for determination of scope.
Preliminary project scope may include:
Six (6) lane lap pool, 25 yards long, maximum depth 9’-0”, shallow end 3’-6”; includes lane stripes, end-of-lane “Ts”, backstroke flags, and lane lines
Sprayground Waterslide Bathhouse Administration office Filtration equipment structure Sunshade pavilion Pool deck Substantial earthwork and grading Access drive Extension of existing park trail Landscaping
AQUATIC CENTER #2
Jaycee Zaragoza Aquatic Center – 3125 Tumalo Trail, Dallas, TX 75212 Estimated Construction Budget: $3,000,000.00 Complete Design of Jaycee Zaragoza – May 1, 2027 Begin Construction of Jaycee Zaragoza – September 1, 2027 Complete Construction of Jaycee Zaragoza – April 1, 2028 A conceptual plan, phasing plan and cost estimate will be required for determination of scope.
Preliminary project scope may include:
Six (6) lane lap pool, 25 yards long, maximum depth 9’-0”, shallow end 3’-6”; includes lane stripes, end-of-lane “Ts”, backstroke flags, and lane lines
Bathhouse Administration office Filtration equipment structure Pool deck Landscaping Perimeter fence and gate enclosing new pool and existing sprayground
For all projects, the following deliverables will be required:
Professional Services for Two (2) Aquatic Centers
Preparation of planning-level construction estimates for each aquatic center, including construction costs, site development and utilities, FF&E, contingencies, and anticipated cost escalation based on projected construction schedule.
Development of conceptual site plans and supporting scope narratives aligned with proposed budgets.
Identification of phasing strategies, if applicable, to align scope with available funding.
Participation in two public input meetings will be required.
SECTION 3 – SELECTION PROCESS
The City’s selection committee will rank the firms to seek the most qualified firm for the project based on the evaluation criteria established in this RFP and answers provided at the interview, if an interview is conducted.
Acceptance of evaluation methodology: By submitting a proposal in response to this RFP, the respondent accepts the evaluation process and acknowledges and accepts that determination of the most qualified firm may require subjective judgments by the selection committee.
Public information: All information, documentation, and other materials submitted in response to this solicitation are considered non-confidential and/or non-proprietary and are subject to public disclosure under the Texas Public Information Act after the solicitation is completed and contract executed with selected firm.
Firms associating with other firms to bring specific expertise and experience to the project are encouraged.
Subsequent to the issuance of this RFP, PARD reserves the right to amend it, waive any requirement or irregularity, request modifications to submittals, provided all firms are treated equally and reject any and all proposal statements for any reason. PARD further reserves the right to award the contract for this project as deemed in its best interest, and to request changes in the composition of any team.
The form of contract to be used for this project shall be the standard City of Dallas Architect Contract.
The City will not entertain modifications to the contract. Questions about this project must be made through the Bonfire website, http://dallascityhall.Bonfirehub.com.
The City of Dallas is not responsible for the non-receipt of submittals. Respondents are cautioned to submit a complete response to all requirements.
Professional Services for Two (2) Aquatic Centers
SECTION 4 – DRIVE REQUIREMENTS
Respondents are required to comply with the City of Dallas Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy. The full policy, including Small Business Enterprise (SBE) participation goals, evaluation criteria, and required forms, is included in this RFP.
Respondents should review the policy carefully and include all required documentation with their proposal.
Failure to comply with DRIVE requirements may affect proposal evaluation and scoring.
SECTION 5 – SUBMITTAL REQUIREMENTS
Submittals should be prepared simply and economically, providing a straightforward, concise description of the Respondent’s ability to meet the requirements for the project. Elaborate formats, colored displays, promotional materials and so forth are not desired. The submittal is limited to 40 pages. Emphasis should be on completeness and clarity of content. Submittals should be a convincing body of evidence to sell themselves to the Evaluation Team.
Respondents are requested to provide their submittals in vertical 8.5” x 11” format in a PDF file with the name of the project, Two (2) Aquatic Centers, and the prime firm’s name in the file name.
Submittals shall be organized using the following “sections”. Respondents shall respond to each of the items below. Do not answer multiple items with one answer. Every item shall be addressed separately.
Proposals must be submitted electronically by 1:00 PM on Friday, August 7, 2026, to http://dallascityhall.Bonfirehub.com
Submittals should be organized with sections by the following:
1. Contact Sheet:
a. Legal name of firm
b. Date of firm formation
c. Date of opening primary home office, and, if applicable, any branch and local offices
d. Contact person with phone number, fax number, and email address
e. Alternate contact person with phone number, fax number, and email address
f. Current address of office(s)
g. Identify office that will be providing services
h. Legal Business Description (Individual, Partnership, Corporation, Joint Venture, etc.)
i. If firm is not located in Dallas, describe means to achieve a Dallas presence
2. Capabilities, Experiences, Resources:
a. Staff’s areas of expertise
b. Experience with other similar projects
c. History of meeting deadlines
d. History of staying within budget
Professional Services for Two (2) Aquatic Centers
e. Expertise of project manager and project team
f. Past performance on City and other contracts (References required)
g. Current financial capability and business practices
3. Capacity and Current Contracts:
a. Staffing size. Key personnel for this project
b. Current workload for key personnel who will be assigned to this project
What are the key personnel’s current projects in the next 12 months? What is the term for those projects?
4. Approach to the Project:
a. What are the critical issues that typically surround these project types and how do you typically address these issues?
b. How well are you familiar with the circumstances surrounding project?
5. Ability to Achieve Sustainable Development Goals:
a. Provide up to three (3) examples of projects in which your firm incorporated green building strategies or sustainability measures. Describe the specific approaches used and their impact on the project.
b. Based on your experience with sustainable development practices, explain how you would apply these practices in your approach to the proposed project.
6. Work Plan:
a. Provide a proposed work plan describing the firm’s approach to completing the conceptual design for the three (3) aquatic center projects. The work plan should demonstrate the firm’s understanding of the project objectives and outline the process for evaluating each site and developing conceptual scope recommendations aligned with available or anticipated project funding.
b. Do you use any special techniques and processes such as Quality Assurance/Quality Control procedures?
7. Prior and current litigation and claims history, including claims history with the City.
8. Business Enterprise Hub - DRIVE Policy Requirements:
1. It is the policy of the City of Dallas to involve certified small business enterprises (SBEs) to the greatest extent feasible in the City’s contracting opportunities. The City further seeks to encourage the growth and development of SBEs, promoting local economic growth and increased competition. In alignment with this commitment the City has adopted the
Professional Services for Two (2) Aquatic Centers
Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy for City of Dallas contracts.
a. The SBE participation goal for this contract is 14.84%
b. As a prerequisite for City Council award, the consultant must demonstrate and document its good faith effort (GFE) to meet the established participation goal. If the highest-ranking proposer fails to adequately document GFE or meet the participation goal, may be denied award of the contract.
c. Assistance in preparing the DRIVE forms may be obtained by sending an email to businessenterprisehub@dallas.gov
2. Equal Employment Opportunity/Nondiscrimination
The selected proposer shall not discriminate against any employee or applicant for employment because of race, age, color, national origin, religion, marital status, sex, sexual orientation, military or veteran status, political opinions or affiliations, genetic characteristics, or disability, consistent with applicable laws. The selected proposer shall prohibit discrimination regarding, but not limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection of training, including apprenticeship. The selected proposer shall also comply with all applicable requirements of the Americans with Disabilities Act, 42 U.S.C.A. §§12301-12233, as amended. The selected proposer agrees to post in conspicuous places, available to employees and applicants, notices setting forth the provisions of this nondiscrimination clause.
3. Developing Regional & Inclusive Vendor Enterprises (DRIVE) Plan – 20 Points Possible
• It is the policy of the City of Dallas to involve certified small business enterprises (SBEs) to the greatest extent feasible in the City’s contracting opportunities. The City further seeks to encourage the growth and development of SBEs, promoting local economic growth and increased competition. In alignment with this commitment the City has adopted the Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy for City of Dallas contracts.
• Evaluation points shall be awarded as follows:
SBE Utilization – up to 8 points [FORM 605] o Proposed SBE Commitment o First-time Contracting
Local Economic Impact – up to 6 points [FORM 604]
Professional Services for Two (2) Aquatic Centers o Local Workforce o Local Supply Chain Usage o Local Community Investment
Engagement Score – up to 6 points [FORM 606] o Past Subcontractor Utilization o Documented Engagement Efforts
9. Attachments:
a. Sample City of Dallas Architect Contract
b. Insurance Requirements
c. Certifications Form
d. Certification to Enter Contract
e. Conflict of Interest Questionnaire
f. Acknowledgement of House Bill 89
g. Acknowledgement of Senate Bill 252
h. Business Enterprise Hub Forms
SECTION 6 – SELECTION CRITERIA WEIGHTING
2. Capabilities, Experience, Resources 25 points
3. Capacity and Current Contracts 10 points
4. Approach to the Project 20 points
5. Ability to Achieve Sustainable Development Goals 10 points
6. Work Plan 10 points
7. Litigation and Claims History 5 points
8. Drive Requirements 20 points TOTAL POINTS 100 points
SECTION 7 – PROPOSED SCHEDULE
Issue Request for Proposals July 17, 2026 Proposals Due August 7, 2026 Begin Design October 28, 2026