RFP Tax Advisory Services for ITC Elective Pay Filing 5.8.26.pdf
PDF 392 KB Posted
- Solicitation number
- BD-26-1344-00126-00126-128896
- Issued by
- Norfolk County, Massachusetts
About this file
Summary
This Request for Proposals (RFP) is issued by the Town of Wellesley, Massachusetts, through its Select Board Office, Finance Department, and Climate Action Department, seeking qualified firms or individuals to provide professional Tax Advisory services related to the federal Investment Tax Credit (ITC) elective pay mechanism under Section 6417 of the Internal Revenue Code, as enacted by the Inflation Reduction Act of 2022. The project involves successfully pre-filing for, filing for, and receiving elective pay for Clean Electricity (Section 48E) ITCs for three solar photovoltaic systems: a 430 kW DC system at Hardy Elementary School (estimated cost $2,456,608.75), a 374 kW DC system at Hunnewell Elementary School (estimated cost $2,182,629.75), and a 46 kW DC system at the Recycling and Disposal Facility administrative building (estimated cost $40,000). The Tax Advisor will be responsible for establishing eligibility, determining start-of-construction dates, demonstrating continuous progress compliance, pursuing domestic content bonuses, managing Foreign Entity of Concern and Prohibited Foreign Entity risks, analyzing cost eligibility, preparing IRS filings, and providing audit support. Proposals are due by noon Eastern Daylight Time on Thursday, May 28, 2026, with award anticipated in June 2026 and a Notice to Proceed to be issued in June 2026. The selected Tax Advisor should commence work within one week of receiving the Notice to Proceed. The anticipated contract term extends from June 2026 through April 2028 with no obligation for renewal unless authorized by the Town.
Pricing shall be structured as a percentage of elective pay received by the client, with separate price proposals required for each of the three solar projects (Hardy School, Hunnewell School, and RDF). Billing commences only when the Town receives direct pay funds from elective pay. The Town is seeking external funding for the school systems through a Climate Leader Communities Decarbonization Accelerator Grant of up to $1 million from the Massachusetts Department of Energy Resources and ITC funding via elective pay; for the RDF system, only ITC funding via elective pay is being pursued. The selected firm must maintain Professional Liability (Errors & Omissions) coverage of at least $2,000,000 per claim/$4,000,000 aggregate, General Liability coverage, and appropriate Cyber/Privacy coverage. The Proposer must demonstrate extensive expertise in advising tax-exempt governmental entities on claiming ITCs through elective pay for rooftop solar installations on public buildings, with strong accounting, engineering, and legal expertise. Proposals must be submitted in both paper and electronic formats, with non-pricing technical information in one sealed envelope and pricing information in a separate sealed envelope. The evaluation criteria include overall responsiveness and technical understanding, quality and range of expertise available, depth of relevant experience with elective pay mechanisms for municipal solar projects, capacity to meet project deadlines, and quality of references.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals (RFP) Tax Advisory Services for Infla�on Reduc�on Act (IRA) Investment Tax Credits (Elec�ve Pay) for the
Town of Wellesley, Massachusets
Issue Date: Friday, May 8, 2026 Proposals Due: Thursday, May 28, 2026, at Noon Eastern Daylight Time
Issuing Authority: Town of Wellesley, Massachusets Procurement statute: MGL 30B
CONTRACT No. CAC-2026-1
Introduc�on
The Town of Wellesley, Massachusets (the “Town”) ac�ng through its Select Board Office, Finance Department, and Climate Ac�on Department is solici�ng sealed proposals from qualified firms or individuals to provide professional Tax Advisory services related to the federal Investment Tax Credit (ITC) elec�ve pay mechanism (elec�ve pay) under Sec�on 6417 of the Internal Revenue Code, as enacted by the Infla�on Reduc�on Act of 2022. The purpose of this project is to successfully pre-file for, file for, and receive elec�ve pay for a Clean Electricity (Sec�on 48E) ITC for three (3) solar photovoltaic (PV) systems on Town of Wellesley property.
An Award, if any, will be made to the responsible and responsive proposer determined to be the most advantageous to the Town, taking into considera�on non-price and price criteria as set forth herein.
Project Goals
The Tax Advisor will work with Town staff and the Town’s design and construc�on contractor(s) to pre-file for, file for, and receive elec�ve pay for three (3) roo�op solar photovoltaic (PV) systems on Hardy Elementary School (Hardy School), Hunnewell Elementary School (Hunnewell School), and the Recycling and Disposal Facility administra�ve building (RDF), respec�vely. In pursuing these outcomes the Tax Advisor will:
A. Successfully pre-file and file for elec�ve pay. In filing the Tax Advisor will:
a. Ensure that each of the solar PV systems is eligible for elec�ve pay and iden�fy eligibility risks associated with design, procurement, and construc�on. Recommend and implement �mely mi�ga�on strategies to avoid these risks.
b. Iden�fy start-of-construc�on dates for each of the three (3) solar PV systems. Evaluate and, if possible, establish a start-of-construc�on date prior to December 31, 2025, for the Hardy and Hunnewell school solar PV systems.
c. Demonstrate compliance with the elec�ve pay con�nuous progress requirement for all three (3) solar PV systems.
d. Seek a domes�c content bonus for each solar PV system, as appropriate.
e. Avoid, minimize, and mi�gate foreign en�ty of concern (FEOC) and prohibited foreign en�ty (PFE) risks to the maximum extent permited by law
f. Perform a final cost analysis to determine and maximize all costs for the school and RDF systems eligible for the elec�ve pay amount to be included in the final elec�ve pay filings.
B. Assist the Town in preparing for a poten�al elec�ve-pay-related audit.
Project Background and Status
The Town plans to construct three (3) roo�op solar PV systems on Town-owned municipal buildings. As of the issuance of this RFP:
1) One (1) roo�op solar PV system is planned for Hardy School. Building construc�on took place from 2023 to 2024, without installa�on of solar PV.
a. Solar capacity: 430 kW DC
b. Es�mated total project cost: $2,456,608.75
2) One (1) roo�op solar PV system is planned for the Hunnewell School. Building construc�on took place from 2022 to 2024 without installa�on of solar PV.
a. Solar capacity: 374 kW DC
b. Estimated total project cost: $2,182,629.75
3) One (1) roo�op solar PV system is planned for the RDF building. Building construc�on is underway and solar PV construc�on is planned for mid-summer 2026 with opera�on commencing in December.
a. Solar capacity: 46 kW DC
b. Es�mated construc�on cost: $40,000
During planning for the two new elementary schools, there was a decision to postpone the solar installa�ons un�l a�er school building construc�on was complete. System costs were high and elec�ve pay and grant opportuni�es were not available. The Wellesley Municipal Light Plant (WMLP) offered to coordinate solar installa�on with a Power Purchase Agreement (PPA) for solar PV on the roof of each school. The WMLP’s atempt to establish a PPA failed due to unfavorable contract terms. The Town seeks the following external funding for the two school solar PV systems:
1) A Climate Leader Communi�es Decarboniza�on Accelerator Grant for up to $1 million from the
Massachusets Department of Energy Resources; and
2) ITC funding via elec�ve pay.
The Town seeks the following external funding for the RDF solar PV system:
• ITC funding via elec�ve pay.
The Hardy, Hunnewell, and RDF solar PV system projects will proceed according to the schedule below.
However, the Permanent Building Commitee and School Commitee are considering moving the Hardy and Hunnewell School solar installa�ons from summer 2027 to fall 2026. This schedule change would move procurement and construc�on earlier by several months. In an�cipa�on of this poten�al schedule change, the Town of Wellesley is working with temporary legal advisors to ini�ate document collec�on and to navigate ques�ons around, for example, start-of-construc�on dates and con�nuous progress.
• Hunnewell School and Hardy School solar PV o Feb.–Aug. 2026: Planning/Design o Aug.–Dec. 2026: Documents issued to the Hardy and Hunnewell construc�on managers, respec�vely, for pricing as a change order o Dec. 2026 – May 2027: Submitals and material procurement o May 2027: Construc�on start o Oct. 2027: Construc�on end o Nov. 2027: Commissioning o Dec. 2027: Interconnec�on
• RDF solar PV o Jun.–Aug. 2026: Construc�on o Sept.–Oct. 2026: Commissioning o Nov. 2026: Interconnec�on
The Town will own all three solar PV systems and expects to be eligible to seek elec�ve pay as a tax-exempt government en�ty.
The Town intends to engage a Tax Advisor early in the project schedule for the two schools to inform design, procurement, contrac�ng, and construc�on decisions that may affect eligibility, credit amount, and compliance with IRA requirements.
Available Informa�on
The Town will make available informa�on regarding the school and RDF solar PV systems, including feasibility, design, budget, procurement, and construc�on studies, reports, and correspondence as may be necessary for the Tax Advisor’s successful comple�on of this project.
Project Expecta�ons
The Proposer is encouraged to suggest revisions to Project Expecta�ons in their proposal if they have sugges�ons that could improve the poten�al for mee�ng project objec�ves.
The selected Tax Advisor shall perform professional advisory tasks for the three abovemen�oned solar PV systems. Task A and B begin with mee�ng logis�cs, project review, and eligibility determina�ons.
Tasks C through E are relevant only to solar PV systems deemed eligible under Task B.
Task A. Mee�ngs
1. Meet with the Town’s Project Team to officially ini�ate the Project. This will be an opportunity to share updates on the Project status.
2. Meet with the Town Representa�ve every two weeks un�l finaliza�on of procurement plans for the two school projects. Meet as needed a�er procurement plans are complete.
3. Provide mee�ng minutes, ac�on items, and decision memoranda within 2 days a�er each mee�ng.
Task B. Ini�al Project Review
1. Through document review and interviews with Town staff, establish a thorough understanding of the Hardy School, Hunnewell School, and RDF solar PV system histories and plans, including procurement approaches and an�cipated contracts.
2. Establish eligibility of each project for the investment tax credit.
3. Through Tasks C-G, iden�fy eligibility risks associated with system design, procurement, and/or contrac�ng and recommend �mely mi�ga�on strategies for avoiding these risks.
Task C. Start-of-Construc�on Analysis
1. Advise the Town regarding elec�ve pay “beginning-of-construc�on” or “start-of-construc�on” rules applicable to solar PV systems.
2. For the Hardy School and Hunnewell School solar PV systems, present specific, legally defensible pathways for establishing a start-of-construc�on date prior to December 31, 2025, consistent with IRS guidance.
3. Determine the RDF solar PV system’s start-of-construc�on date.
4. Iden�fy documenta�on necessary to substan�ate start-of-construc�on dates for school and
RDF elec�ve pay filings.
5. Produce a memorandum for the Town detailing the start-of-construc�on and con�nuous progress strategies (see Task D5) and for the school and RDF systems. The memorandum shall include the documenta�on plans and templates from Tasks C4 and D4.
Task D. Con�nuous Progress Analysis
1. Advise the Town regarding con�nuous progress requirements applicable to the planned solar
PV systems.
2. For the Hardy School and Hunnewell School solar PV systems, evaluate poten�al pathways for establishing con�nuous progress consistent with IRS guidance.
3. Determine a strategy for establishing con�nuous progress of the RDF solar PV.
4. Provide a detailed documenta�on plan and monthly evidence collec�on schedule along with documenta�on templates, contractor repor�ng forms, and/or checklists to ensure that contractors and subcontractors supply evidence necessary to demonstrate con�nuous progress.
5. Produce a memorandum for the Town detailing the start-of-construc�on (see Task C5 above) and con�nuous progress strategies for the school and RDF systems. The memorandum shall include the documenta�on plans and templates from Tasks C4 and D4.
Task E. Foreign En�ty of Concern (FEOC)/ Prohibited Foreign En�ty (PFE) Compliance
1. Assess the applicability of FEOC/PFE restric�ons to the planned school and RDF systems, including en�ty-level, payment, and material-sourcing rules.
2. Advise the Town on procurement, contrac�ng, and documenta�on prac�ces to avoid, minimize, or mi�gate FEOC/PFE risks to the maximum extent permited by law.
3. Provide a detailed documenta�on plan and monthly evidence collec�on schedule along with documenta�on templates, contractor repor�ng forms, and/or checklists to ensure that contractors and subcontractors supply evidence necessary to demonstrate compliance with FEOC/PFE restric�ons.
4. Produce a memorandum to the Town detailing the strategies to comply with FEOC/PFE restric�ons and to qualify for the domes�c content bonus (see Task F6) as applicable for each planned solar PV system. The memorandum shall include the documenta�on plans and templates from Tasks E3 and F5.
Task F. Domes�c Content Bonus Analysis
1. Assess the possibility, costs, and benefits to the Town of qualifying for the elec�ve pay domes�c content bonus.
2. Advise the Town on whether it should pursue the domes�c content bonus for the school and
RDF systems.
3. Dra� language on domes�c content requirements to be included in the construc�on contract documents.
4. Review related documents to ensure that the Town is in the best posi�on to qualify for the domes�c content bonus. Ac�vi�es may include reviewing equipment proposals to iden�fy how equipment packages should be subdivided into components or subcomponents, commen�ng on domes�c content language, and suppor�ng the Town in answering domes�c content ques�ons during bidding and construc�on phases.
5. Provide a detailed documenta�on plan and monthly evidence collec�on schedule along with documenta�on templates, contractor repor�ng forms, and/or checklists to ensure that contractors and subcontractors supply evidence necessary to demonstrate eligibility for the domes�c content bonus.
6. Produce a memorandum to the Town detailing the strategies to qualify for the domes�c content bonus and to comply with FEOC/PFE restric�ons (see Task E4) as applicable for each planned solar PV system. The memorandum shall include the documenta�on plans and templates from Tasks E3 and F5.
Task G. Cost Eligibility Analysis
1. Provide an es�mate of the approximate elec�ve pay amount the Town is expected to receive for each project.
2. Provide a detailed documenta�on plan and monthly evidence collec�on schedule along with documenta�on templates, contractor repor�ng forms, and/or checklists to ensure that contractors and subcontractors supply sufficient informa�on for the Tax Advisor to complete the analysis. Clarity on the cost informa�on is necessary so that the Town can include this as a requirement in the contract documents. The Town will work with the Tax Advisor to clarify technical ques�ons about the eligible property and relay cost documenta�on from the Contractor.
3. Produce a memorandum to the Town detailing cost eligibility informa�on the Town needs to request from contractors and subcontractors. The memorandum shall include documenta�on from Task G2.
4. Provide a final cost eligibility analysis to determine and maximize all costs for the school and RDF systems eligible for elec�ve pay and the tax credit amount to be included in the final elec�ve pay filings.
Task H. IRS Pre-Filing Registra�on and Filing
1. Develop a pre-filing and filing plan and �meline aligned with system comple�on and Town fiscal processes.
2. Prepare all required federal forms, elec�ons, statements, and suppor�ng documenta�on for the elec�ve payment claim.
3. Carry out required IRS pre-filing registra�on for elec�ve payment on behalf of the Town.
4. Complete filing forms.
5. Complete filing for elec�ve payment on behalf of the Town.
Task I. Post-Filing and Audit Support
1. Advise the Town on record reten�on and other prac�ces to support compliance with a poten�al future audit, inquiry, or informa�on request related to the elec�ve pay filing or payment.
2. Advise the Town in the event of an IRS audit, inquiry, or informa�on request related to the elec�ve pay filing or payment. Assist the Town with responses and documenta�on.
Deliverables Summary At a minimum, the Tax Advisor will provide the following.
1. Mee�ng minutes, ac�on items, and decision memoranda within 2 days a�er each mee�ng
2. Writen memoranda addressing:
a. Start-of-construc�on and con�nuous progress strategies including documenta�on (Tasks C4-5 and D4-5)
b. FEOC/PFE restric�ons and domes�c content bonus analyses including documenta�on (Tasks E3-4 and F5-6), as applicable to each planned solar PV system
c. Cost eligibility informa�on the Town should request from contractors and subcontractors including documenta�on (Tasks G1-3)
d. Pre-filing/filing plan and �meline (Task H1)
e. Audit readiness and recordkeeping guidance (Task I1)
3. Review and/or prepara�on of elec�ve pay filing materials for each eligible solar PV system
4. Final cost eligibility analyses for each planned solar PV system (Task G4)
5. IRS pre-filing registra�on for elec�ve payment on behalf of the Town for each eligible solar PV system
6. Complete forms and file for elec�ve payment on behalf of the Town
7. Elec�ve pay filing(s)
8. Provide an organized digital file repository for all documenta�on needed to support the elec�ve pay filing(s)
9. Advise and assist the Town in the event of an IRS audit, inquiry, or informa�on request related to the elec�ve pay filing(s)
Town Representa�ve
The Town Representa�ve for this engagement will be Marybeth Martello, Ph.D., Sustainability Director, 525 Washington Street, Wellesley, MA 02482. Ques�ons or comments regarding this RFP may be directed to her by telephone: (781) 431-1019, ext. 2229 or via E-mail mmartello@wellesleyma.gov.
Selec�on Schedule
Ques�ons should be submited to Marybeth Martello at mmartello@wellesleyma.gov. Answers to ques�ons received will be posted by 3:00 p.m. on Thursday, May 21, 2026.
The Town an�cipates reviewing submissions and making an award in June 2026. A Contract for the Project will follow soon a�er and a No�ce to Proceed should be issued to the selected Tax Advisor in June 2026.
The selected Tax Advisor should commence work within one week of receipt of a No�ce to Proceed.
mailto:mmartello@wellesleyma.gov
Project Schedule
This project will need to commence as soon as possible and be completed at the end of the tax filing period in 2028. Sub tasks should be completed by the dates listed below.
• Early June 2026 (one week a�er receipt of a No�ce to Proceed): Project kick-off mee�ng
• Mid-June 2026: Ini�al Project Review
• End of June 2026: Start-of-construc�on and Con�nuous Progress Analyses and Memorandum
• End of June 2026: FEOC/PFE and Domes�c Content Analyses and Memorandum
• July 2026: Cost eligibility analysis Task G1-G3
• August/September 2026: Pre-filing and filing plan
• May 2026-May 2028: Ongoing collec�on and organiza�on of documenta�on to support pre-filing and filing for tax credit
• January-February 2027: Final Cost Eligibility Analysis (Task G4) for RDF system
• January-February 2027: Prepare and submit all required forms to pre-register the RDF system for elec�ve payment on behalf of the Town
• February-May 2027: Prepare and submit all required forms to file for elec�ve payment for the
RDF system on behalf of the Town
• May 2027: Provide a complete and organized digital file system with all suppor�ng documents and submited forms for the pre-registra�on and tax filing for the RDF system
• May 2027 onward, as needed: Provide audit support if necessary for the RDF system (Task I)
• January-February 2028: Final Cost Eligibility Analyses (Task G4)
• January-February 2028: Prepare and submit all required forms to pre-register qualified proper�es for elec�ve payment on behalf of the Town
• February-May 2028: Prepare and submit all required forms to file for elec�ve payment for qualified proper�es on behalf of the Town
• May 2028: Provide a complete and organized digital file system with all suppor�ng documents and submited forms for the pre-registra�on and tax filing
• May 2028 onward, as needed: Provide audit support if necessary (Task I)
Contract Terms
• The an�cipated contract term is June 2026 through April 2028 with no obliga�on for renewal unless authorized by the Town.
• The contract shall include a not-to-exceed amount.
• Payment shall be subject to appropria�on.
• The Proposer shall comply with all applicable federal, state, and local laws.
• The selected firm shall maintain, at minimum, Professional Liability (Errors & Omissions) coverage of $2,000,000 per claim / $4,000,000 aggregate, General Liability coverage, and Cyber/Privacy coverage appropriate to the handling of confiden�al data. Evidence of insurance shall be provided upon contract execu�on.
Technical Proposal - Contents, Requirements and Order of Presenta�on of Proposal Submission
Proposals must include a cover leter, including an introduc�on to the firm, as well as the name, telephone numbers, and email address of the primary contact for the project.
Proposals must also include writen responses to all requirements of this RFP in the order of the items listed below. Any addi�onal informa�on deemed relevant by the Proposer but not applicable to the categories listed below should be added a�er the items listed below.
A. STATEMENT OF PROJECT REQUIREMENTS
State in succinct terms the Proposer’s understanding of what is required by this Request for Proposals.
B. SCOPE OF SERVICES
Describe in narra�ve form the Proposer’s approach and plan for accomplishing the work listed herein.
Provide an outline of the tenta�ve schedule for comple�on of tasks (�meline) as presented in the firm/team's approach to the scope of services.
C. PROPOSED COMMUNICATION PLAN
Provide a descrip�on and �meline of mee�ngs.
D. PROJECT TEAM
Include resumes for all professional members of the Proposer's and subcontractor's (if any) team and iden�fy the person(s) who will be the Project Manager with ul�mate responsibility for the work. Team members must be available throughout the dura�on of the project or task. The proposal should specify the company’s specific office from which the work will be performed. No change in personnel shall be affected by the Proposer without the express writen consent of the Town.
E. SIMILAR EXPERIENCE
Provide details of experience and past performance of the Proposer and members of its team on comparable work for municipal or government en��es. This sec�on should cover, at a minimum, the substan�ve nature of comparable engagements, the experience of team members in working successfully in maters of similar complexity, and the record of the members of the Proposer's team for �mely performance. Proposers are requested to give sufficient informa�on about their experience to permit the Town to understand and verify the exact nature of the Proposer’s contribu�on to other projects and en��es.
F. COMPETING COMMITMENTS
Discuss how adequate and �mely aten�on to this engagement will be assured. The Proposer should describe its overall capability and provide assurances that it can meet its commitment to successfully complete any and all aspects of the project. Assume the project will begin in June of 2026.
G. FINANCIAL CAPACITY
Provide the firm's latest financial statement, including its opera�ng statement and balance sheet. They will be helpful in assessing the ability of the firm to meet the contract requirements.
H. REFERENCES
Provide a minimum of three references of people who can substan�ate the Proposer’s summary of qualifica�ons and experience relevant to this project. Include the name, �tle and telephone number, project name and project descrip�on that are generally similar to this project.
I. PRICE PROPOSAL
The Proposer shall complete, sign, and date the Price Proposal Form and enclose it in a separate, sealed Price Proposal envelope. The Price Proposal Form shall include costs of work iden�fied and shall report costs for the Hardy, Hunnewell, and RDF solar PV systems separately.
The Price Proposal form should indicate that the price proposal will be valid for 90 days.
Rule for Award
Any agreement that results from this Request for Proposals shall be awarded to the responsive and responsible Proposer submi�ng the proposal considered most advantageous, taking into considera�on all evalua�on criteria set forth in this RFP. The Town reserves the exclusive right to select or reject the individual(s) or firm(s) that it deems to be in its best interest to do so. The Town reserves the right to request addi�onal informa�on, conduct interviews, and seek clarifica�on from any proposer as part of the evalua�on process.
The selec�on of Tax Advisor(s) to accomplish this Project will be based on the following criteria:
1) Overall responsiveness of the proposal including understanding of the technical and managerial requirements (e.g., goals, analysis, deliverables, �meline).
Highly Advantageous: A proposal will be considered highly advantageous if it demonstrates an excellent understanding of the Project requirements; clearly defines the technical and management approach;
and demonstrates an excellent ability to carry the Project to successful comple�on, on �me and while controlling costs.
Advantageous: A proposal will be considered advantageous if the Proposer demonstrates a good understanding of the Project requirements; defines the technical and management approach; and demonstrates a good ability to carry the Project to successful comple�on, on �me and while controlling costs.
Unsatisfactory: A proposal will be considered non-advantageous if the Proposer does not clearly demonstrate an understanding of the Project requirements; does not clearly define the technical and management approach; and minimally demonstrates an ability to carry the Project to successful comple�on, on �me and while controlling costs.
2) The quality and range of exper�se available to the Project team, with a par�cular focus on accoun�ng, engineering, and legal exper�se.
Highly Advantageous: A proposal will be considered highly advantageous if the key persons for this Project have (or have access to sub-contractors with) extensive direct relevant educa�on, knowledge, and qualifica�ons in areas of accoun�ng and engineering and/or law for this type of project and projects requiring analysis and strategic ac�on to achieve the most favorable, legal outcomes regarding project eligibility, credit atainment, and compliance obliga�ons.
Advantageous: A proposal will be considered advantageous if the key persons for this Project have (or have access to sub-contractors with) significant direct relevant educa�on, knowledge, and qualifica�ons in areas of accoun�ng and engineering, and/or law for this type of project and projects requiring analysis and strategic ac�on to achieve the most favorable, legal outcomes regarding project eligibility, credit atainment, and compliance obliga�ons.
Unsatisfactory: A proposal will be considered highly advantageous if the key persons for this Project have some or no direct or sub-contractor access to relevant educa�on, knowledge, and qualifica�ons in areas of accoun�ng and engineering and/or law for this type of project and projects requiring analysis and strategic ac�on to achieve the most favorable, legal outcomes regarding project eligibility, credit atainment, and compliance obliga�ons.
3) The quality and depth of the experience of the individual(s) who will do this work in providing similar successful assistance in other projects of this nature; Note: depth can refer to experience dura�on (in years) or experience with relevant projects (in number of projects).
a. Advising tax-exempt or governmental en��es on claiming the ITC through elec�ve pay pursuant to IRC §6417.
b. Advising municipal governmental en��es on claiming elec�ve pay for roo�op solar installa�ons on public buildings.
Highly Advantageous: A proposal will be considered highly advantageous if the individual(s) who will do this work has an excep�onal track record in providing tax advisory services related to federal renewable energy tax credits and has advised municipal governmental en��es on claiming the ITC through elec�ve pay pursuant to IRC §6417 for roo�op solar PV systems on public buildings.
Advantageous: A proposal will be considered advantageous if the individual(s) who will do this work has a strong track record of relevant experience in providing tax advisory services related to federal renewable energy tax credits and has advised tax-exempt or governmental en��es on claiming the ITC through elec�ve pay pursuant to IRC §6417.
Unsatisfactory: A proposal will be considered not advantageous if the individual(s) who will do this work has litle relevant experience in providing tax advisory services related to federal renewable energy tax credits and has limited experience advising tax-exempt or governmental en��es on claiming the ITC through elec�ve pay pursuant to IRC §6417.
4) Capacity to commit to the Project’s development and to complete the required services to meet Town’s deadlines.
Highly Advantageous: The Proposer demonstrates an excellent understanding of the Project schedule and has ample staffing available to meet the Project schedule.
Advantageous: The Proposer demonstrates a good understanding of the Project schedule and has adequate staffing available to meet the Project schedule.
Unsatisfactory: The Proposer does not demonstrate understanding of the Project schedule or adequate staffing available to meet the Project schedule
5) Relevance and quality of reference checks.
Highly Advantageous: A reference will be considered highly advantageous if the reference’s experience with the Proposer is highly relevant to the Project and the reference provides excellent reviews of the Proposer and their work.
Advantageous: A reference will be considered advantageous if the reference’s experience with the Proposer is relevant to the Project and the reference provides good reviews of the Proposer and their work.
Unsatisfactory: A reference will be considered unsa�sfactory if the reference’s experience with the Proposer is not relevant to the Project and/or the reference provides inadequate reviews of the Proposer and their work.
Ownership of Informa�on Provided
All informa�on provided by the Town and all material developed for this assignment shall be returned to and become the property of the Town before final payment is made to the Proposer and will not be used by the Proposer for other purposes, or released to others, without writen permission of the Town.
Other Requirements
The Town reserves the right to reject any and all proposals, to waive any requirements of this Request for Proposals, request addi�onal or clarifying informa�on to modify or amend with the consent of the Proposer any proposal including but not limited to team members, and to nego�ate the costs, fees, and/or terms of any agreement (contract) deemed by the Town to be in its best interest. In addi�on:
• This RFP does not obligate the Town to award a contract or to pay costs incurred in proposal prepara�on.
• The selected Proposer will be required to submit a Cer�ficate of Non-Collusion, W-9, and any other documents required by the Town.
• The Town reserves the right to request interviews and presenta�ons for some or all of the Tax Advisors submi�ng proposals.
• The Town is not and will not be liable for any cost(s) incurred by RFP candidates in the prepara�on of responses to this RFP.
Proposal Submission
Paper Submissions One (1) paper copy of the non-pricing technical informa�on (including forms) and pricing informa�on shall be provided separately in two (2) sealed envelopes, marked:
Envelope 1: “Non-Pricing Technical Informa�on” (please include all forms in this envelope) and
Envelope 2: “Pricing Informa�on”
Electronic Submissions Two (2) electronic copies of the non-pricing technical informa�on (with forms) shall be submited on two
(2) thumb drives.
Deadline The proposal must be received no later than noon on Thursday, May 28, 2026, and shall be submited to:
Marybeth Martello, Ph.D.
Sustainability Director Wellesley Town Hall 525 Washington Street 3rd Floor, Select Board Office Suite Wellesley, MA 02482
Delivery of proposals to any other office or loca�on, other than the address indicated, will not cons�tute receipt.
The submital package should be marked “Tax Advisory Services for Infla�on Reduc�on Act (IRA) Investment Tax Credits (Elec�ve Pay) for the Town of Wellesley, MA, CONTRACT No. CAC-2026-1” and shall include separate por�ons:
1. The “Non-Pricing Technical” por�on of the proposal, including any leter of transmital, required forms, and resumes
2. The “Pricing Informa�on” por�on of the proposal, enclosed in a sealed envelope
Please be brief and concise. All leters of transmital shall be just that and do not contain the specific content of the proposal.
Failure to comply with these addi�onal guidelines may cause the proposal to be eliminated from considera�on by the Town of Wellesley.
Selec�on Process
The Selec�on Commitee shall include senior management staff from the following departments:
Climate Ac�on, Finance, and Facili�es Management.
Ownership of Informa�on Provided
All proposals become the property of the Town of Wellesley and are subject to disclosures as required by Massachusets General Laws and the regula�ons of the Town of Wellesley.
Forms
The following forms shall be submited as part of the Non-Pricing Technical por�on of the proposal.
• Cer�ficate of non-collusion
• Tax Cer�fica�on
• Cer�ficate of Authority
PRICE PROPOSAL FORM
Tax Advisory Services for Infla�on Reduc�on Act (IRA) Investment Tax Credits (Elec�ve Pay)
Town of Wellesley, Massachusets
Name of Firm:
NOTE: The Town of Wellesley can pay for tax advisory services only if and when the Town receives direct pay funds.
Please complete a total of three price proposals, one each for Hardy School, Hunnewell School, and the
RDF.
Billing commences if and when the client receives elec�ve pay.
Total cost = ____ percentage of elec�ve pay received by client
Price for Hardy School project $ Price for Hunnewell School project $ Price for RDF project $
Please atach es�mated budget and breakdown of costs indica�ng approximate �meline and services provided.
Print Name
Title
Signed
Date
CERTIFICATE OF NON-COLLUSION
By submission of this bid or proposal, the undersigned cer�fies that:
1. This bid or proposal has been independently arrived at without collusion with any other bidder, compe�tor, or poten�al compe�tor; and
2. This bid or proposal has not been knowingly disclosed prior to the opening of bids or proposals for this project, or any other bidder, compe�tor, or poten�al compe�tor; and
3. No atempt has been or will be made to induce any other person, business, partnership, corpora�on, union, commitee, club, or other organiza�on, en�ty, or group of individuals to submit or not submit a bid or proposal; and
4. The person signing this bid or proposal cer�fies that he has fully informed himself regarding the accuracy of the statements contained in this cer�fica�on, under penal�es of perjury, affirms the truth thereof, such penal�es being applicable to the bidder, as well as to the person(s) signing in its behalf.
(Signature of Person(s) Submi�ng Bid or Proposal)
(Name of Person(s) Submi�ng Bid or Proposal) Title
(Name of Business)
(Date)
COMMONWEALTH OF MASSACHUSETTS
TAX CERTIFICATION
I cer�fy, under penal�es of perjury, that the below men�oned firm or person, to the best of my knowledge and belief, has complied with all the laws of the Commonwealth rela�ng to taxes, repor�ng of employees and contractors, and withholding and remi�ng of child support.
NAME/FIRM: _________________________________________________________
ADDRESS: _______________________________________________
TELEPHONE: ____________________ DATE: __________________
SIGNATURE OF AUTHORIZED OFFICIAL:___________________________
TITLE: _________________________________________________
SOCIAL SECURITY # OR FEDERAL IDENTIFICATION #:______________
Approval of a contract, or other agreement, will not be granted unless this cer�fica�on form is signed by the applicant.
Your Social Security number or Federal Iden�fica�on number will be furnished to the Massachusets Department of Revenue (DOR) to determine whether you have met tax filing or tax payment obliga�ons.
The Town is required to furnish a list to the DOR at the end of its fiscal year, showing the vendors to whom more than $5,000 is paid during the 12 months ending June 30th. Providers who fail to correct their non-filing or delinquency will not have a contract or other agreement issued, renewed, or extended. This request is made under the authority of Massachusets General Laws, Chapter 62C, Sec�on 49A.
CERTIFICATE OF AUTHORITY
MEETING OF BOARD OF DIRECTORS
At a mee�ng of the Directors of the Duly called and held at On the day of 2021, at which a quorum was present and ac�ng, it was:
Voted, that the of this Corpora�on is hereby authorized and empowered to make, enter into, sign, seal and deliver, in behalf of this Corpora�on a Contract for with the Town of Wellesley, and performance and payment bonds (each in the full amount of the Contract) in connec�on with such Contract.
I do hereby cer�fy that the above is a true and correct copy of the record, that said vote has not been amended or repealed and is in full force and effect as of this date, and that is duly elected of this Corpora�on.
(Clerk or Secretary of the Corpora�on)
(Affix Corporate Seal)
THIS FORM IS VOID AND WITHOUT LEGAL EFFECT IF ALTERED IN ANY WAY.
File details come from the government source that posted it. Updated .