RFP Sole Source FlexFile Part 2 - Actual Cost-Hour Data_02 June 2021.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
F/A-18 Depot Option Support Federal contract opportunity
Solicitation number
SPRPA1-21-R-006U
Issued by
Defense Logistics Agency Aviation

About this file

This document contains a request for proposal for depot option support services for the F/A-18 aircraft. The Defense Logistics Agency Aviation is seeking a proposal to add F/A-18 PMI High Flight Hour Depot Support Option to an existing Boeing corporate contract over a five year period of performance. Offerors are instructed to provide pricing and delivery in accordance with the terms of the base contract, and the attached statement of work and its enclosures. Pricing must be provided as requested without alternate options. The proposal must include a signed DFARS checklist for both the prime contractor and any subcontractors. The point of contact for questions is listed.

View the file

Other files for this federal contract opportunity

Other files attached to F/A-18 Depot Option Support, newest first.
File Type Posted
Proposal Request Letter RFP (SPRPA1-21-R-006U).pdf PDF
RFP Sole Source FlexFile Part 3 - Supplemental Data_02 June 2021.xlsx XLSX spreadsheet
F18 Depot SOW OPTION _26 July 21 DRAFT CAP Add.doc DOC document
Enclosure 3 Metrics Plan 7.29.21 Base Plan for Option DRAFT 2.docx DOCX document
F18 Depot Option Draft BOM_7-16-21 DRAFT.xlsx XLSX spreadsheet
RFP Sole Source FlexFile Part 1 - Metadata and Structures_02 June 2021.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template Info

CSDR Cost and Hour Report (Flex File) Alternative Submission Template
Part 2 - Actual Cost-Hour Data
Version 1.0
March 5, 2019
**FOR THE PURPOSE OF THIS SOLE SOURCE RFP, THE OFFEROR SHALL COMPLETE ALL WORKSHEETS HIGHLIGHTED IN GREEN ALONG WITH ITS CORRESPONDING COLUMNS ALSO HIGHLIGHTED IN GREEN. ALL TABS HIGHLIGHTED IN RED ARE NOT REQUIRED FOR THIS SOLE SOURCE RFP.
**THE CONTRACTOR IS STILL REQUIRED TO COMPLETE THE FLEXFILE REQUIREMENT IN ITS ENTIRETY ACCORDING TO THE COST AND HOUR DID, DD FORM 2794 (CSDR PLAN), AND OTHER FORMS AND GUIDANCE.
Part 2 – Actual Cost-Hour Data contains data generated through automated export from the cost accounting system or other applicable data source. Data must be properly linked to the structures defined in Part 1.

For information about what data fields each table contains, and how to use them, refer to the Data Exchange Instructions (DEI).

Data for this part can be submitted using either the “Part 2 - Actual Cost-Hour Data” XLSX template or a CSV file. Data submitted using a CSV file must include a header with field names matching those found in the Data Exchange Instructions (DEI).

Worksheets:
Actual Cost-Hour Data

Actual Cost-Hour Data

Actual Cost-Hour Data
Order or Lot IDCLIN IDEnd Item IDWBS Element IDAccount IDNonrecurring or Recurring ID

Author: Supported values:

NONRECURRING

RECURRINGFunctional Category IDFunctional
Overhead Category IDStandard Category ID

Author: Supported values:

DIRECT_ENGINEERING_LABOR

ENGINEERING_LABOR_OVERHEAD

DIRECT_MANUFACTURING_TOUCH_LABOR

DIRECT_MANUFACTURING_OTHER_LABOR

MANUFACTURING_OPERATIONS_LABOR_OVERHEAD

DIRECT_MAINTENANCE_TOUCH_LABOR

DIRECT_MAINTENANCE_OTHER_LABOR

MAINTENANCE_OPERATIONS_LABOR_OVERHEAD

OTHER_DIRECT_COSTS

OTHER_OVERHEAD

DIRECT_MATERIALS

MATERIAL_OVERHEAD

GENERAL_AND_ADMINISTRATIVE

FACILITIES_CAPITAL_COST_OF_MONEY Detailed Standard Category ID Author: Supported values:

DIRECT_ENGINEERING_LABOR

ENGINEERING_LABOR_OVERHEAD

DIRECT_MANUFACTURING_TOUCH_LABOR

DIRECT_MANUFACTURING_SUPPORT_LABOR

DIRECT_MANUFACTURING_TOOLING_LABOR

DIRECT_MANUFACTURING_OTHER_LABOR

MANUFACTURING_OPERATIONS_LABOR_OVERHEAD

DIRECT_MAINTENANCE_TOUCH_LABOR

DIRECT_MAINTENANCE_SUPPORT_LABOR

DIRECT_MAINTENANCE_OTHER_LABOR

MAINTENANCE_OPERATIONS_LABOR_OVERHEAD

DIRECT_PROGRAM_MANAGEMENT_LABOR

DIRECT_OTHER_LABOR

DIRECT_SERVICES

OTHER_DIRECT_NON_LABOR

OTHER_OVERHEAD

DIRECT_REPORTING_SUBCONTRACTOR

INTERCOMPANY_WORK_ORDERS

PURCHASED_PARTS

PURCHASED_EQUIPMENT

RAW_MATERIALS

DIRECT_TOOLING_AND_EQUIPMENT

OTHER_MATERIAL

MATERIAL_OVERHEAD

GENERAL_AND_ADMINISTRATIVE

FACILITIES_CAPITAL_COST_OF_MONEY Unit or Sublot ID Allocation Method ID Reporting Period ID Tag1 Tag2 Tag3 Tag4 Tag5 Tag6 Tag7 Tag8 Tag9 Tag10 Tag11 Tag12 Tag13 Tag14 Tag15 Tag16 Tag17 Tag18 Tag19 Tag20 Tag21 Tag22 Tag23 Tag24 Tag25 Value (Dollars) Value (Hours)

File details come from the government source that posted it. Updated .