RFP Sole Source FlexFile Part 2 - Actual Cost-Hour Data_02 June 2021.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- F/A-18 Depot Option Support Federal contract opportunity
- Solicitation number
- SPRPA1-21-R-006U
- Issued by
- Defense Logistics Agency Aviation
About this file
This document contains a request for proposal for depot option support services for the F/A-18 aircraft. The Defense Logistics Agency Aviation is seeking a proposal to add F/A-18 PMI High Flight Hour Depot Support Option to an existing Boeing corporate contract over a five year period of performance. Offerors are instructed to provide pricing and delivery in accordance with the terms of the base contract, and the attached statement of work and its enclosures. Pricing must be provided as requested without alternate options. The proposal must include a signed DFARS checklist for both the prime contractor and any subcontractors. The point of contact for questions is listed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Proposal Request Letter RFP (SPRPA1-21-R-006U).pdf | ||
| RFP Sole Source FlexFile Part 3 - Supplemental Data_02 June 2021.xlsx | XLSX spreadsheet | |
| F18 Depot SOW OPTION _26 July 21 DRAFT CAP Add.doc | DOC document | |
| Enclosure 3 Metrics Plan 7.29.21 Base Plan for Option DRAFT 2.docx | DOCX document | |
| F18 Depot Option Draft BOM_7-16-21 DRAFT.xlsx | XLSX spreadsheet | |
| RFP Sole Source FlexFile Part 1 - Metadata and Structures_02 June 2021.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Template Info
| CSDR Cost and Hour Report (Flex File) Alternative Submission Template |
| Part 2 - Actual Cost-Hour Data |
| Version 1.0 |
| March 5, 2019 |
| **FOR THE PURPOSE OF THIS SOLE SOURCE RFP, THE OFFEROR SHALL COMPLETE ALL WORKSHEETS HIGHLIGHTED IN GREEN ALONG WITH ITS CORRESPONDING COLUMNS ALSO HIGHLIGHTED IN GREEN. ALL TABS HIGHLIGHTED IN RED ARE NOT REQUIRED FOR THIS SOLE SOURCE RFP. |
| **THE CONTRACTOR IS STILL REQUIRED TO COMPLETE THE FLEXFILE REQUIREMENT IN ITS ENTIRETY ACCORDING TO THE COST AND HOUR DID, DD FORM 2794 (CSDR PLAN), AND OTHER FORMS AND GUIDANCE. |
| Part 2 – Actual Cost-Hour Data contains data generated through automated export from the cost accounting system or other applicable data source. Data must be properly linked to the structures defined in Part 1. |
For information about what data fields each table contains, and how to use them, refer to the Data Exchange Instructions (DEI).
Data for this part can be submitted using either the “Part 2 - Actual Cost-Hour Data” XLSX template or a CSV file. Data submitted using a CSV file must include a header with field names matching those found in the Data Exchange Instructions (DEI).
| Worksheets: |
| Actual Cost-Hour Data |
Actual Cost-Hour Data
| Actual Cost-Hour Data | |||||
| Order or Lot ID | CLIN ID | End Item ID | WBS Element ID | Account ID | Nonrecurring or Recurring ID |
Author: Supported values:
NONRECURRING
| RECURRING | Functional Category ID | Functional |
| Overhead Category ID | Standard Category ID |
Author: Supported values:
DIRECT_ENGINEERING_LABOR
ENGINEERING_LABOR_OVERHEAD
DIRECT_MANUFACTURING_TOUCH_LABOR
DIRECT_MANUFACTURING_OTHER_LABOR
MANUFACTURING_OPERATIONS_LABOR_OVERHEAD
DIRECT_MAINTENANCE_TOUCH_LABOR
DIRECT_MAINTENANCE_OTHER_LABOR
MAINTENANCE_OPERATIONS_LABOR_OVERHEAD
OTHER_DIRECT_COSTS
OTHER_OVERHEAD
DIRECT_MATERIALS
MATERIAL_OVERHEAD
GENERAL_AND_ADMINISTRATIVE
FACILITIES_CAPITAL_COST_OF_MONEY Detailed Standard Category ID Author: Supported values:
DIRECT_ENGINEERING_LABOR
ENGINEERING_LABOR_OVERHEAD
DIRECT_MANUFACTURING_TOUCH_LABOR
DIRECT_MANUFACTURING_SUPPORT_LABOR
DIRECT_MANUFACTURING_TOOLING_LABOR
DIRECT_MANUFACTURING_OTHER_LABOR
MANUFACTURING_OPERATIONS_LABOR_OVERHEAD
DIRECT_MAINTENANCE_TOUCH_LABOR
DIRECT_MAINTENANCE_SUPPORT_LABOR
DIRECT_MAINTENANCE_OTHER_LABOR
MAINTENANCE_OPERATIONS_LABOR_OVERHEAD
DIRECT_PROGRAM_MANAGEMENT_LABOR
DIRECT_OTHER_LABOR
DIRECT_SERVICES
OTHER_DIRECT_NON_LABOR
OTHER_OVERHEAD
DIRECT_REPORTING_SUBCONTRACTOR
INTERCOMPANY_WORK_ORDERS
PURCHASED_PARTS
PURCHASED_EQUIPMENT
RAW_MATERIALS
DIRECT_TOOLING_AND_EQUIPMENT
OTHER_MATERIAL
MATERIAL_OVERHEAD
GENERAL_AND_ADMINISTRATIVE
FACILITIES_CAPITAL_COST_OF_MONEY Unit or Sublot ID Allocation Method ID Reporting Period ID Tag1 Tag2 Tag3 Tag4 Tag5 Tag6 Tag7 Tag8 Tag9 Tag10 Tag11 Tag12 Tag13 Tag14 Tag15 Tag16 Tag17 Tag18 Tag19 Tag20 Tag21 Tag22 Tag23 Tag24 Tag25 Value (Dollars) Value (Hours)
File details come from the government source that posted it. Updated .