Addendum #1 Summary
This is Addendum #1 to a Request for Proposal issued by the Minnesota Department of Administration, Real Estate and Construction Services (RECS), for design services related to Building Automation System (BAS) upgrades at two Minnesota Department of Corrections facilities. The project involves the upgrade of Network Automation Engine (NAE) to Series Network Engine (SNE) hardware at MCF-Faribault and MCF-Red Wing. The addendum was issued on November 16, 2026, following the mandatory pre-proposal meeting held on November 10, 2026. Three firms attended the mandatory meeting: Kimley-Horn (Anthony Hughes), Ericksen Ellison & Associates (James Art), and Victus Engineering (Eric Rodriguez). The proposal deadline was November 23, 2026, with the contract term running from December 1, 2026, through November 30, 2028, with optional three-year extension increments available at the State's discretion.
The addendum addresses three key questions from prospective bidders. First, a separate professional cost consultant is not required as part of the proposal team. Second, construction progress meetings will be held twice monthly during the construction phase: one virtual meeting per month via TEAMS and one in-person meeting per month on site at the respective facilities. Third, vendor shop drawings and documentation showing the present quantities and locations of NAEs and SNEs are available from the State to the selected consultant. No pricing modifications or set-asides are addressed in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOC_Access_Procedures-RED_WING.pdf | ||
| DOC_Access_Procedures-FARIBAULT.pdf | ||
| RFP_Public_Design_18823.pdf | ||
| RECS_RFP_Design_BAS_System_Upgrades_MCF.pdf | ||
| RFP_Public_Design_18823_Exhibit_C.docx | DOCX document | |
| RFP_Public_Design_18823_Exhibit_B.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REAL ESTATE AND CONSTRUCTION SERVICES
309 Administration Building
50 Sherburne Ave St. Paul, Minnesota 55155
Voice: (651) 201.2550
TTY: (800) 627.3529
FAX: (651) 215.6245
http://mn.gov/admin/
Addendum #1
Date: November 16, 2026
Request for Proposal: RECS RFP Design for BAS System Upgrades at MCF-Faribault & MCF-Red Wing RECS Project Number: 78VA0012 Event ID: 2000018823
Subject: RFP Questions & Answers
Mandatory Meeting Attendees:
The following firms attended the mandatory meeting held on November 10, 2026:
Firm Name Attendee’s Name Kimley-Horn Anthony Hughes Ericksen Ellison & Assoc. James Art Victus Engineering Eric Rodgriguez
Questions & Answers:
Question #1: Is a separate professional cost consultant required to be part of the proposal team?
Answer #1: No
Question #2: At the information meeting on 11/10/26, we heard that construction progress meetings would mostly be virtual, but some will take place in person, onsite – typically one per month during the construction period. Is that correct?
Answer #2: Meetings will be held as follows: One meeting per month via TEAMS/Virtual. One meeting per month will be in person on site.
Question #3: Do both facilities have vendor shop drawings or other documentation which shows the present quantities and locations of NAEs and SNEs and could be made available to the selected consultant?
Answer #3: Yes
End of Addendum #1 http://mn.gov/admin/ http://mn.gov/admin/