RFP_PR8409_GIS_Utility_Network_Migration_Project_and_Support_Services.pdf
PDF 1 MB Posted
- Solicitation number
- PR8409
- Issued by
- Florida
About this file
This document is a Request for Proposal (RFP) issued by the Orlando Utilities Commission (OUC) for a GIS Utility Network Migration Project and Support Services. The project aims to transform OUC's legacy Esri Geographic Information System (GIS) from a geometric network-based platform to Esri's modern ArcGIS Utility Network (UN) utility-based solution. The UN Migration Project will be divided into three integrated phases, with OUC seeking a single System Integrator to implement phases for water (starting in 2025), electric, and fiber networks. The project is set to begin in October 2023, with key dates including a proposal due date of August 28, 2025, by 2:00 PM EST. The contract term is initially three years with a potential single two-year renewal option at OUC's discretion.
Bidder qualifications include being an Esri Gold Partner with at least ten years of experience providing Esri GIS services, having successfully completed at least two Utility Network implementations (with preference given to vendors with both electric and water experience), and being licensed to do business in Florida. The project requires the vendor to provide a first draft Scope of Work, project implementation plan, milestones, deliverables, and a project schedule. No bid bond or payment and performance bond is required. The project's objective is to optimize core GIS-based engineering, operations, inspections, maintenance, production, and construction processes while modernizing OUC's existing geospatial infrastructure and data models.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective 10/2023
PR8409
For
GIS Utility Network Migration Project and Support Services
Issue Date: July 31, 2025
Pre-response Conference: None Scheduled At This Time
Pre-response Conference Date: N/A
Questions/Comments Due Date: August 8, 2025 by 12:00 PM EST
Addendum Due Date:
Proposal Due Date:
Bid Bond:
August 15, 2025
August 28, 2025 by 2:00
PM EST
Not Required Payment & Performance Bond: Not Required
Direct all inquiries to Buyer of Record:
Al Segura
407-434-2974 asegura@ouc.com mailto:asegura@ouc.com
Orlando Utilities Commission PR8409 – GIS Utility Network Migration Project and Support Services
SCM-RFP-T-01 – Request for Proposal Template v4.2 – 10/21/19
Orlando Utilities Commission Orlando, Florida
PR8409 for GIS Utility Network Migration Project and Support Services
Table of Contents 1 Introduction
1.1 Scope of Work Summary
1.2 Pre-Response Conference
1.3 Term of Contract
1.4 Minimum Bidder Qualifications
1.5 Price and Costs
1.6 Terms and Conditions
1.7 Contract Sample
1.8 Proposal Evaluation Criteria
2 Bidder Requirements and Qualifications
2.1 Detailed Scope, Requirements, & Drawings
2.2 Bidder Information & Required Bidder Qualifications
2.2.1 Bidder Information
2.2.2 Required Bidder Qualifications
3 Instructions to Bidders
3.1 Legal and Public Record Statement
3.2 Confidentiality Notice to Bidders
3.2.1 Exemptions
3.3 Acknowledgement
3.3.1 Statement of No Bid
3.4 General Information
3.4.1 Common Terms
3.4.2 Submittal
3.4.2.1 Alternate Proposals
3.4.3 Signatures
3.4.4 Withdrawal
3.5 Electronic Submittal of the Proposal
3.6 Compliance Forms
SCM-RFP-T-01 – Request for Proposal Template v4.2 – 10/21/19
3.6.1 Public Entity Crimes
3.6.2 Dispute Disclosure
3.7 Supplier Diversity
3.7.1 Reserved
3.8 Proposal Preparation Costs
3.9 Exceptions
3.10 Clarifications
3.11 Local Conditions
3.12 Opening
3.13 Solicitation Selection Schedule
3.14 Proposal Acceptance and Rejection
3.15 Proposal Evaluation Criteria
3.16 Cancelation
3.17 Freight (If Applicable)
3.18 Bid Bond (If Applicable)
3.19 Payment and Performance Bond (If Applicable)
3.20 Contract Execution
3.21 Award
3.22 Taxes, Permits, and Licenses
3.23 Error and Omissions
3.24 Proposal Submittal Format
3.24.1 OUC Policies and Procedures for Bidders
3.25 Signatures
4 Proposal Submittal Format & Checklist
5 Attachments
SCM-RFP-T-01 – Request for Proposal Template v4.2– 10/21/19
Orlando Utilities Commission Orlando, Florida
PR8409 for GIS Utility Network Migration Project and Support Services
Direct all inquiries to the Buyer of Record: Al Segura 407-434-2974 asegura@ouc.com
Proposal Opening Location: Orlando Utilities Commission Reliable Plaza 100 West Anderson Street Orlando, Florida 32801
1. Instructions are located in the Instruction to Bidders section of this document; or, may be provided during a Pre-Conference Meeting.
2. Electronic proposal submittals, described in the Electronic Submittal of the Proposal section of this document, will be accepted and are highly encouraged. Hard copy proposal submittals may be used when necessary and must adhere to the hardcopy proposal submission instructions. Do not submit both electronic and hard copies unless otherwise instructed. Email or other means will not be accepted.
3. VendorLink help can be accessed by calling 407-222-1885, or by emailing support@evendorlink.com. Re qu es t f or
P ro po sa l (
RF
P) mailto:asegura@ouc.com http://www.ouc.com/docs/procurement/hard-copy-proposal-submission-instructions.pdf?sfvrsn=0 mailto:support@evendorlink.com
1 INTRODUCTION
The Orlando Utilities Commission (OUC) is an electric and water municipal utility serving Orlando, Florida and portions of surrounding Orange County. OUC also has an Inter-local agreement with the City of St.
Cloud, Florida for the management of its electric utility. Currently, OUC serves more than 380,000 customers. To obtain general information about OUC, access www.ouc.com.
1.1 SCOPE OF WORK SUMMARY
OUC seeks to address technology obsolescence and establish standardized utility focused data models by transforming OUC’ legacy Esri Geographic Information System (GIS) geometric network based platform to Esri’s modern ArcGIS Utility Network (UN) utility-based solution.Refer to Section 2.1, Detailed Scope, Requirements, & Drawings for more information.
1.2 PRE-RESPONSE CONFERENCE
To comply with security requirements, email names of attendees and company affiliations to the Buyer of Record at least 48 hours in advance of the meeting. Please bring government issued photo identification the day of the Pre-Response Conference.
If applicable, refer to Attachment C: Invitation to Pre-Response Conference
1.3 TERM OF CONTRACT
An initial period of three (3) years with a single two (2) year renewal at the option of OUC.
1.4 BIDDER QUALIFICATIONS
• Provide a first SOW draft for the project implementation plan including milestones/deliverables.
• A list of project assumptions as pertinent (hardware requirements, if applicable).
• Include a Project Schedule (GANTT Chart)
• A cover letter signed by an officer of the company attesting to the information provided within the proposal.
• Must be at least an Esri Gold Partner
• Vendor must be in business a minimum of ten (10) years providing Esri GIS services
• Vendor must have successfully completed at least two (2) Utility Network implementations o Vendor will need to provide references and contact information for these implementations o Preference will be given to Vendors that have completed both electric and water Utility Network implementations
• Work requested in this RFP must only be performed within the United States. No “off-shoring” or use of foreign companies will be permitted.
• Website URL:
• Is the firm licensed to conduct business in the State of Florida?
o If Yes, provide proof of registration with the Florida Department of State – Division of Corporations.
http://www.ouc.com/ o If not, OUC requires that the Bidder be registered to do business in the State of Florida by the time Notice of Intent to Award is sent. The link to the site is:
http://www.sunbiz.org.
• Is your firm currently involved in any unsettled litigation?
o If yes, please explain:
• Has your firm ever been issued a warning or violation by a regulatory agency for noncompliance with Federal or State regulations?
o If yes, provide dates and explain.
• Does your firm have employee incentive programs to reward safety, productivity, quality, performance, and/or longevity?
o If so, describe.
• Have you ever had a contract terminated?
o If yes, provide the name of the company, when the event happened, and reasons.
• Has the firm ever been in a lawsuit where the company or one of its employees was accused of a wrongdoing?
o If yes, provide name of plaintiff, when the event occurred and reasons.
• Do you have a Training Program for your employees?
o If yes, please provide an outline or attach a copy of program.
• Does your firm have an affirmative action plan in utilizing small business / minority / disadvantaged entrepreneur and local participation in pre-qualifying suppliers and subcontractors?
o If yes, describe the plan and provide possible recommendations to promote the hiring and training of minority/disadvantage workers.
• Does your firm have a Drug Free Workplace Policy?
o If yes, provide a summary and/or copy of your Policy.
• Does your Firm meet any or all the following employee pre-screening requirements:
o Drug Screening Tests: Yes ( ); No ( ) o Workers’ Compensation History Review: Yes ( ); No ( ) o Driver’s License Verification: Yes ( ); No ( ) o Pre-employment Physical Exam: Yes ( ); No ( ) o Criminal History Review: Yes ( ); No ( )
1.5 PRICE AND COSTS
Prices documented in the submitted Proposal must remain firm throughout the contract period (including additional extensions, if applicable). Refer to Attachment B: Price Schedule.
http://www.sunbiz.org/
1.6 TERMS AND CONDITIONS
EXHIBIT A – OUC GENERAL TERMS AND CONDITIONS
EXHIBIT B - OUC INFORMATION TECHNOLOGY FOR PROFESSIONAL SERVICES
1.7 CONTRACT SAMPLE
Click here to view an OUC contract sample.
1.8 PROPOSAL EVALUATION CRITERIA
Refer to the Instructions to Bidders section of this document.
http://www.ouc.com/docs/procurement/proc_contract_agreement.pdf?sfvrsn=2
2 BIDDER REQUIREMENTS AND QUALIFICATIONS
2.1 DETAILED SCOPE, REQUIREMENTS, & DRAWINGS
For detailed scope, please refer to Attachment A.
2.2 BIDDER INFORMATION & REQUIRED BIDDER QUALIFICATIONS
2.2.1 Bidder Information
On company letterhead Bidder to provide a response cover page with the following information:
1. Firm Name
2. Name of Parent Company if applicable
3. Complete Business Address
4. State of Incorporation
5. Number of years in business
6. Name(s) and contact information of key personnel
7. Women or Minority owned business status
8. Dun & Bradstreet number
9. Licenses obtained to conduct business with OUC
2.2.2 Required Bidder Qualifications
Refer to Section 1.4 Minimum Bidder Qualifications for more information.
1. List the number of projects (with similar scope and size) that the bidding organization has completed and are in progress.
2. Provide at least three (3) references with contact information related to completed projects with the similar scope and size project.
a. If deemed pertinent, OUC will request to do site visits to customers provided as references by selected Bidder or Bidder’s affiliates.
3. Provide a complete list of all the subcontractors that may be part of the project, with the following information:
a. Company name
b. MWBE Status
c. Contact information
d. Number of years in business
e. Proof of the necessary licenses for the job (if applicable)
f. List of project that they had participated with similar scope and size to this RFP
4. Should bidder be awarded the work in this RFP, please provide information on any Economic Development Opportunities that Bidder may bring, such as the creation of new jobs or purchasing or leasing of new building space, which could benefit the local Orlando Area or the State of Florida.
3 INSTRUCTIONS TO BIDDERS
3.1 LEGAL AND PUBLIC RECORD STATEMENT
As required by Florida’s Public Records Law, information provided to OUC in the course of business will be made available for public inspection and copying unless a specific statutory exemption applies.
3.2 CONFIDENTIALITY NOTICE TO BIDDERS
By submitting a proposal to OUC, each Bidder acknowledges and understands that OUC is a public agency subject to Chapter 119 Florida Statutes (“Public Records Law”). Any Proposal document the Bidder submits will become a public record when OUC provides notice of an intended decision or 30 days after opening the bids, proposals, or final replies, whichever is earlier. Trade Secrets, certain background financial information, and other items, may constitute exemptions to disclosure under the Public Records law.
3.2.1 Exemptions
If during the Proposal or Negotiation Phase a Bidder wishes to claim an exemption on any portion of its Proposal to OUC, the Bidder must identify the specific statutory exemption and do the following:
1. Submit a redacted version. Redact (black out) only those portions of the Proposal put forward for exemption.
2. Submit an un-redacted version of the same documents marked, “Confidential –Trade Secret/ Proprietary Information”. Both versions are to be submitted at the same time.
3.3 ACKNOWLEDGEMENT
1. From the issue date of this solicitation packet until a selection decision is made, no unauthorized contact related to this solicitation will be allowed between a Bidder, their employees or subcontractors and any OUC commissioner, officer, director, or staff, with the exception of the Buyer of Record. Any unauthorized contact will disqualify the Bidder from further consideration
2. The selected Bidder agrees to obtain, prior to award, Worker's Compensation, General Liability, Automotive, and other insurance requirements in accordance to the requirements in the terms and conditions specified in section 1.7.
3. All policies shall be subject to approval by OUC, and issued by companies authorized by the State of Florida’s Department of Insurance to conduct business in the State of Florida.
4. The selected Bidder agrees that it and its subcontractors have a Drug-Free Workplace Program that complies with Florida Statute §§ 287.087 and 440.101 et. seq., the Omnibus Employee Testing Act of 1991, 49 Code of Federal Regulation § 391 and 40 (operation of commercial motor vehicles).
a. In addition, all subcontractors must implement a controlled substance and alcohol testing policy for safety sensitive positions as defined by the Commission’s Alcohol and Controlled Substance Testing Policy for Safety Sensitive Positions.
5. The selected Bidder’s employees and its subcontractors’ employees are further prohibited from being under the influence or impairment of alcohol on OUC property or work sites or at any time or place while conducting business with or on behalf of OUC.
6. The selected Bidder shall submit only one proposal/bid in response to this solicitation packet, and shall have no financial interest in other entities submitting proposals/bid responses for the same solicitation packet.
7. Neither the selected Bidder, nor its affiliates, nor anyone associated with them shall have any potential conflict of interest due to any other clients, contracts, business relationships or property interests for this solicitation packet’s scope of work.
8. The selected Bidder shall disclose to OUC the name(s) of any OUC employee, contractor, or OUC Board Member who has a direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction. A direct or indirect financial interest in the selected Bidder’s organization, or in the proposed transaction exists if the OUC employee, contractor, or Board Member:
a. Presently, or in the preceding twelve (12) months, has an ownership interest in the selected Bidder’s organization (other than as owner of less than 1% of the stock of a publicly traded corporation).
b. Works for, is a partner, officer, director, trustee, or consultant to the selected Bidder.
c. Has received grant, travel, honoraria, or other similar support from the selected Bidder
d. Has a right to receive royalties from the selected Bidder.
9. No member of the selected Bidder’s ownership, management, or staff shall have a vested interest in any aspect of OUC, nor any business or other relationship with any of OUC’s employees, officers, directors, or Board Members that creates a conflict of interest or the appearance of a conflict of interest.
10. No member of the selected Bidder’s ownership or management is presently applying for an employee position or actively seeking an appointment within OUC.
11. The selected Bidder, or authorized signatory, shall provide written notice to OUC in the event that a conflict of interest is identified at any time.
3.3.1 Statement of No Bid
The OUC Procurement Department is committed to continuously improving its processes to receive maximum participation from the industry/market. OUC is requesting that organizations, who do not wish to bid on this RFP, send the Buyer of Record an email briefly explaining their “no bid” decision. This response will help to improve the solicitation process and any future communications.
3.4 GENERAL INFORMATION
Bidders shall prepare Proposals in accordance with the requirements of these Instructions to Bidders. Not preparing a Proposal, in accordance with such instructions, implies that the Bidder does not intend to comply with all of the proposed contract conditions. Such proposals will be considered irregular and may be rejected.
OUC will receive Proposals through the VendorLink system for goods, equipment, materials, and related services set forth in the included specifications and documents.
http://www.myvendorlink.com/
3.4.1 Common Terms
OUC and Bidders (the parties) agree that the following phrases each shall have the meaning provided here and may be used interchangeably:
1. “Bidder(s)”, “Supplier(s)”, and “Proposer(s)” shall mean the organization, party, person, firm, company, corporation, partnership, joint venture, or other type of entity responding to this solicitation.
2. “Solicitation” shall mean , “Request for Proposal(s)”, “RFP”, “Request for Quote”, “RFQ”, “Invitation to Bid”, “ITB”, “Solicitation Package” or, “Solicitation Packet”, to which the Bidder is responding.
3. “Bid(s)”, “Proposal(s)”, or “Quote(s)” shall mean the documents formally submitted to OUC by each of the Bidders responding to this solicitation packet.
3.4.2 Submittal
Bidders shall submit Proposals in accordance with the instructions and schedule included in the solicitation containing these specifications and documents. Refer to Section 4: Proposal Submittal Format & Checklist and submit Proposal with all applicable content.
3.4.2.1 Alternate Proposals
If the Bidder submits an alternate proposal, they shall identify clearly the proposal as an “Alternate Proposal”. OUC may consider alternate proposals a blanket exception to the solicitation and reject the Proposal.
3.4.3 Signatures
An authorized representative of each Bidder shall:
1. Sign or e-sign the Proposal, give their full name and title, and provide the Bidder’s business name and address.
2. Enter the organization’s exact legal name on the Proposal.
3. Sign or e-sign compliance forms, if applicable.
3.4.4 Withdrawal
Bidders may withdraw, alter, and resubmit their Proposals through VendorLink at any time prior to the Proposal due date and time. Proposals may not be withdrawn, altered, or resubmitted after the Proposal due date and time. OUC may request clarifications and additional information after proposal submission.
3.5 ELECTRONIC SUBMITTAL OF THE PROPOSAL
To ensure correct Proposal formatting, Bidders shall:
1. Submit Proposals electronically through VendorLink.
2. Upload files only in MS Word (.doc or .docx), Excel (.xls or .xlsx), and PowerPoint (.ppt or .pptx); Adobe Portable Document Format (.pdf); Compressed File (ZIP) formats.
3. Enable printing on files submitted.
4. Clearly identify the RFP Number, Name, Submission Date, and Bidder Name on the Response Cover Page on Bidder’s letterhead.
5. Separate and identify each part of the submission (i.e. document type, form type, content type) with a divider/separation page.
6. Contact VendorLink technical support at support@evendorlink.com, if technical difficulties arise during proposal submission.
7. Follow all instructions outlined in this RFP and provide all requested information.
OUC may ask the selected Bidder to supply one hard copy set with original, written signatures and original compliance forms, prior to the contract execution. Do not submit following both methods unless otherwise instructed.
3.6 COMPLIANCE FORMS
3.6.1 Public Entity Crimes
Each Bidder shall submit copies of an executed and notarized Sworn Statement under Section
287.133 (3)(a) and 287.135, Florida Statutes, on Public Entity Crimes and Scrutinized Companies.
3.6.2 Dispute Disclosure
Each Bidder shall submit copies of an executed Dispute Disclosure form.
3.7 SUPPLIER DIVERSITY
OUC has adopted a policy to encourage broad-based participation in all contracts with OUC. A copy of the policy can be found clicking on this link.
3.7.1 Reserved
3.8 PROPOSAL PREPARATION COSTS
OUC shall provide, without charge, one set of the specifications and documents to prospective Bidders for preparation of proposals. Addenda documents will be issued only to prospective Bidders registered in VendorLink.
This solicitation does not commit OUC to pay any costs incurred in the preparation and submission of the Proposal or to pay any other costs incurred prior to award.
3.9 EXCEPTIONS
OUC is seeking proposals that meet all technical and commercial requirements as outlined in this solicitation. If a Bidder takes exception to any solicitation requirement or condition, the exception must be specifically stated on the Exception Form provided within the solicitation document. OUC shall consider only those exceptions written on the form at the time the Proposal is submitted. The Bidder acknowledges that any exception taken to the solicitation criteria (including submitting an alternate proposal) may result in OUC determining the Proposal to be nonresponsive.
mailto:support@evendorlink.com http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.ouc.com/doing-business-with-ouc/procurement/supplier-diversity http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2
3.10 CLARIFICATIONS
If a prospective Bidder has doubt as to the true meaning of any part of the solicitation, they may submit a written request for clarification through email to the Buyer of Record; verbal requests will not be accepted. The Bidder must reference the Solicitation Package page number and section heading on any clarification requests
Failure of the Bidder to request information or make inquiries will not relieve them of any responsibility to perform under the terms of any contract awarded for the work in accordance with subsequent clarifications.
OUC shall issue an addendum to all Bidders, via VendorLink, once an inquiry is clarified and/or answered. Verbal responses will not be provided and are not binding on OUC.
3.11 LOCAL CONDITIONS
Each Bidder shall have thorough knowledge of conditions, factors, and scope of work, which would affect the execution and completion of the requested work. If required, site visits will be held the day of the Pre-Response Conference unless otherwise arranged.
Bidders shall investigate properly and consider all such factors in the preparation of every Proposal submitted. OUC shall not permit claims for financial adjustment based on the lack of prior information or its effect on the cost of the work.
3.12 OPENING
OUC shall open Proposals on the RFP Due Date at 2:30 p.m. EST at 100 West Anderson Street, Orlando, Florida. If required, at a public opening, OUC shall read only the Bidder name and if they have provided all the required information. OUC shall not share any other information at this time, with the exception of solicitations for construction or repairs on public works projects in which the price is submitted. Proposals not meeting the requirements may be rejected.
All questions concerning this solicitation must reference the document page number, and section heading. OUC shall answer questions and post them to VendorLink as an addenda to the solicitation.
3.13 SOLICITATION SELECTION SCHEDULE
OUC shall adhere to the stated schedule during the solicitation process, unless a change notice is issued to the Bidders via a written addendum. OUC reserves the right to postpone the date and time announced for the opening of proposals at any time.
OUC expects Proposals to address all of the information requested in the solicitation and subsequent clarifications, and to reflect the capabilities of the Bidder.
Bidders shall submit any supplemental information, and list any variations on the Exceptions form, in accordance with Section 4, Proposal Submittal Format & Checklist.
3.14 PROPOSAL ACCEPTANCE AND REJECTION
OUC reserves the right to accept the Proposal which, in its judgment, is the most responsive and responsible Proposal and to reject any and all proposals; as well as waive irregularities and formalities in any proposal that is submitted.
Without limiting the generality of the foregoing, OUC may reject any proposals which are incomplete or irregular; Proposals which omit any one or more items for which the solicitation requires, any Proposals which omit unit prices if unit prices are required, any Proposals from Bidders who have previously failed to satisfactorily complete contractual obligations.
1. The following shall cause an automatic rejection of the proposal:
a. Proposals delivered/submitted after the 2:00 p.m. due date
b. Failure to submit a Bid Bond (if required)
c. Failure to attend a mandatory Pre-Response Conference and/or any mandatory presentation (if required)
d. Failure to submit a signed Payment and Performance Bond Compliance Form when (a) a Payment and Performance Bond is required or (b) alternate payment and performance security permissible under Section 255.05, Florida Statutes is required
2. The following items may cause a rejection of the proposal:
a. Failure to submit copies of any of the signed & notarized (where required) forms:
i. Statement on Public Entity Crimes form
ii. Dispute Disclosure
3.15 PROPOSAL EVALUATION CRITERIA
OUC shall evaluate the Proposals based on the information provided by each of the Bidders. OUC’s review may include, but may not be limited to the following categories:
1. Qualifications and Experience, including past performance for OUC
2. Responsiveness to Requirements
3. Safety and Quality Programs
4. Financial Soundness of Organization
5. Price
OUC reserves the right to negotiate with Bidders who submitted responsive and responsible Proposals in the best interest of the OUC Commission. This negotiation process may occur prior to OUC Commission approval. Each Bidder acknowledges that OUC shall evaluate all Proposals and may initiate clarification discussions or seek additional information from all or some of the Bidders to fully understand any unclear elements of their proposals. Following clarification, OUC may initiate negotiations with the Bidder considered to be the most responsive and responsible. If no agreement is reached with the highest ranked Bidder, OUC may reject all Proposals or continue negotiations with each subsequently ranked Bidder until an acceptable deal is reached. A final contract award may be contingent upon OUC Commission and legal approval.
OUC reserves the right to consider historic information and facts, whether gained from the Bidder’s Proposal, question and answer conferences, references, and/or other sources during the evaluation process. OUC may conduct such investigations to assist with the evaluation of any Proposal. The investigation also serves to establish the Bidders’, subcontractors’, and other related entities’ responsibility, qualifications, and financial ability to fulfill the Proposal requirements to the Commission’s satisfaction, within the prescribed time.
http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2
The Bidder solely is responsible to submit information related to the evaluation categories. OUC is under no obligation to solicit such information. Failure of the Bidder to submit information may cause an adverse impact on the Proposal’s evaluation.
3.16 CANCELATION
Prior to the final execution of a Contract or full Notice to Proceed, OUC reserves the right to rescind said award without prior notice to Bidders. In addition, OUC may reject all Proposals, reissue the solicitation packet, or re-award the contract.
3.17 FREIGHT (IF APPLICABLE)
The selected Bidder shall coordinate with OUC’s freight contractor for shipping unless OUC determines that the selected Bidder can obtain freight/shipping rates or methods that are more advantageous to OUC. The selected Bidder shall submit an alternate shipping proposal based on delivery to OUC’s Free On Board (FOB) carrier at the designated OUC facility or location. The alternate proposal must include the:
1. Carrier name
2. Insurance coverage
3. Firm price freight quote
The Bidder must include any alternate proposal in the bid response to this solicitation. OUC may accept or reject the proposed alternate shipping arrangement.
OUC’s freight/shipping supplier and contact information is:
Nexterus
1-888-867-5952 (Monday – Friday, 8:00 a.m. – 7:00 p.m. EST) dcs@nexterus.com
3.18 BID BOND (IF APPLICABLE)
Bidder may be required to submit a certified check or cashier’s check drawn on an acceptable bank, or an acceptable Bidder’s bond executed by the Bidder and a surety company authorized to do business in the State of Florida. The value of the bid bond shall be five percent (5%) of the proposal price schedule. When submitting a Proposal through VendorLink, the Bidder shall provide a copy of the check and express mail the original check to the delivery location provided on the first page of the Solicitation Packet Form.
The bid bond guarantee shall be made payable without condition to OUC. The amount of the check or bond may be retained by and forfeited to OUC as liquidated damages if the Proposal results in a contract award and the Bidder fails to honor the accepted terms.
OUC shall return the selected Bidder’s bid bond when that Bidder executes the contract and files a satisfactory payment and/or performance bond, if required. OUC may retain the bid bond of the second highest ranked Bidder for a period not to exceed thirty (30) days, pending the execution of the contract by the selected Bidder. OUC shall return the bid bond of each unsuccessful Bidder upon request, after the contract is awarded or when the Proposal is rejected.
mailto:dcs@nexterus.com
3.19 PAYMENT AND PERFORMANCE BOND (IF APPLICABLE)
The selected Bidder may be required to furnish a Payment and Performance Bond to OUC per Florida Statutes; Section 255.05 equal to 100 percent of the contract price. The cost of such bonds shall be stated as a separate line item in the Proposal.
A surety company, authorized to do business in the State of Florida and acceptable to OUC, shall sign the bond. The Performance Bond and Payment Bond shall be dated with the actual execution date. With these bonds, the responsible party shall file certified copies of the power of attorney of such attorney-in-fact signing the bond on behalf of the surety, and such certificates shall be certified to show that such power of attorney was in effect to and including the date of the actual execution of the bonds. Any bonds submitted by a surety or its agent shall be conclusively presumed to have been authorized by and binding upon the surety company irrespective of the date shown on the power of attorney.
If bonds are required, they shall remain in full force and effect until satisfactory completion of any specified performance guarantee tests, or satisfactory completion of all other contractual requirements, whichever shall occur last. Upon recording of the performance and payment bond (if applicable) Bidder shall provide OUC three (3) copies.
OUC shall furnish a copy of the selected Bidder’s bond to any lienor demanding that bond under the provisions of Florida Statute 713.23.
3.20 CONTRACT EXECUTION
The selected Bidder shall execute the necessary contractual forms, and return the executed forms within ten (10) business days of receipt of forms for execution.
3.21 AWARD
OUC reserves the right to award a single or multiple contracts for all proposal items, or to award separate contracts for single proposal items or any combination of such items; or to make no contract award.
OUC shall be the sole judge of its own best interests, the proposals, and the resulting contract. An award may be made to the most responsive and responsible organization whose proposal is determined to be the most advantageous to OUC. The Commission’s decision shall be final and OUC’s rights include the ability to:
1. Reject any or all proposals or parts thereof
2. Issue subsequent solicitations
3. Cancel the entire solicitation
4. Remedy technical errors on the solicitation
5. Negotiate with any, all or none of the Bidders
6. Award a contract to one or more Bidders or none at all
7. Accept other than the lowest price
8. Waive informalities and irregularities in proposals http://www.ouc.com/docs/procurement/proc_paymt_perform_bond_form.pdf?sfvrsn=2
3.22 TAXES, PERMITS, AND LICENSES
The Bidder's attention is directed to the General Terms and Conditions and the Florida Statutes regarding taxes, permits, and licenses. It shall be the Bidder's responsibility to determine the applicable taxes, permits, and licenses. If the Bidder has doubt as to whether or not a tax, permit, or license is applicable, they shall state in their proposal whether this item has been included in their proposal price and the amount of the applicable tax, permit, or license in question.
3.23 ERROR AND OMISSIONS
Bidders or their authorized representatives are expected to be fully informed as to the conditions, requirements and specifications before submitting proposals; failure to do so will be at the Bidder’s own risk. Neither law nor regulations make allowance for errors either of omission or commission on the part of Bidders. In case of error of extension of prices in the proposal, the unit price shall govern.
3.24 PROPOSAL SUBMITTAL FORMAT
Bidders shall complete all required forms, and include them in the proposal submittal package with any other required information. Refer to Section 4, Proposal Submittal Format & Checklist for more information.
3.24.1 OUC Policies and Procedures for Bidders
The Bidder shall read and comply with OUC’s policies and procedures before submitting this Proposal:
1. Contractor Security Policy
2. Bid Protest Guidance
3. Generic Contractor Orientation
4. Drug and Alcohol Free Workplace and Testing Policy
5. OUC Travel and Expense Guidelines
6. All policies – OUC Procurement Services Department website
These policies and any supplemental policies provided at contractor orientation are hereby fully incorporated into this contract by reference and to the extent applicable to the supplier in the performance of their work. Supplier and its subcontractors, suppliers, agents, and employees shall fully comply with all such policies as amended from time to time.
3.25 SIGNATURES
By submitting this proposal with the authorized electronic signature, the Bidder hereby declares that, in all respects for and in good faith, without collusion or fraud:
1. Only the individuals or organizations interested in this proposal/bid response as principal or principals are named in this Proposal.
2. No other individuals or organizations than mentioned in this Proposal have any interest in this Proposal/Bid Response or in the subsequent contract.
3. This Proposal/Bid Response is made without connection with any other person, company, or parties likewise submitting a Proposal/Bid Response.
http://www.ouc.com/docs/procurement/procure_contractor_sec_pol.pdf?sfvrsn=2 http://shareouc/procuretopay/Shared%20Documents/Linked%20Procedures%20and%20Artifacts/SCM-BID-G-01%20Bid%20Protest.pdf http://www.ouc.com/docs/procurement/procure_contractor_orientation_stanton.pdf?sfvrsn=4 http://www.ouc.com/docs/procurement/proc_alc_cont_subs_abuse_policy.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_travel_expense_guidelines.pdf?sfvrsn=2 http://www.ouc.com/doing-business-with-ouc/procurement
Bidders shall prepare Proposals in accordance with the Instructions to Bidder’s document. Failure to submit the necessary forms may cause a rejection of the proposal. The Bidder hereby agrees to provide the services and/or items specified in the solicitation packet at the prices quoted pursuant to the requirements of this document.
Orlando Utilities Commission RFP PR8409 – GIS Utility Network Migration Project and Support Services
4 PROPOSAL SUBMITTAL FORMAT & CHECKLIST
A checkmark (✓) on the items below indicates these are applicable items and the terms and conditions stated in earlier sections are applicable. Bidders shall complete all the forms checked (✓) below, and include them in the proposal submittal package in order with any other information.
Provide a written signature on all original forms and, when required, a notary stamp. Scan & upload these forms with the Proposal.
Technical Response File (checked if applicable)
Tab 1 – Cover Page
Proposal Cover Page on Bidders Letterhead
Bidder Information as listed in Section 2.2.1
Tab 2 – Bidder Background and Qualifications
References and Qualifications as listed in Section 2.2
Tab 3 – Response to Requirements
Response to all Requirements as listed in Section 2 and any applicable Attachments
Tab 4 – Compliance Forms
Submit at time of proposal
Exceptions
Sworn Statement on Public Entity Crimes and Scrutinized Companies Under Florida Statutes, Section 287.133 (3) (a) and 287.135
Dispute Disclosure
Addenda (If Applicable)
Provided at time of award
Copy of Company’s Business License
Copy of Insurance Certificate
W-9 Form http://www.ouc.com/docs/procurement/proc_exceptions_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_public_entity_crimes_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_dispute_disclosure_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_addenda_form.pdf?sfvrsn=2 http://www.ouc.com/docs/procurement/proc_w9_form.pdf?sfvrsn=2
SCM-RFP-T-01 – Request for Proposal Template v4.2 - 10/21/19
5 ATTACHMENTS
Attachment A: Detailed Scope of Work & Requirements
Attachment B: Price Schedule
DETAILED SCOPE OF WORK & REQUIREMENTS
1. PROJECT INTRODUCTION
OUC is responsible for a portfolio of utility services and solutions including the electric generation, water production, transmission and distribution of electric and water services to its customers within its service area as well as chilled water, lighting, back-up generation, electric vehicle charging and solar services and solutions.
OUC seeks to address technology obsolescence and establish standardized utility focused data models by transforming OUC’ legacy Esri Geographic Information System (GIS) geometric network based platform to Esri’s modern ArcGIS Utility Network (UN) utility-based solution.
The UN Migration project is being divided into three (3) separate, but integrated phases, with separate start/end dates. OUC is looking for a single bid for all three phases, with the intent to select a single Vendor to take on the role of the System Integrator to implement all three (3) phases, beginning with Water in 2025.
The purpose of this ArcGIS Utility Network Migration, is to request Proposals from qualified Vendors to oversee, coordinate and execute the modernization of the OUC’s existing GIS to Esri’s ArcGIS UN to support the optimization of core GIS based engineering, operations, inspections, maintenance, production, and construction related processes, technologies and data. OUC will achieve these goals through contracting with a selected Vendor(s) for measurable results that maximize program efficiency, effectiveness and responsiveness, and reduce operational costs.
2. PROJECT BACKGROUND
OUC has a well-established GIS for electric, fiber, and water records, which is continuing to expand as an authoritative content for the location and information of OUC’s assets. The growing business requirements for advanced analytics and business challenges presented from operational demands, system reliability, regulatory mandates, and growing customer requirements necessitate geospatial insight on a more granular asset level than is currently available. Managing the electric, fiber, and water system networks in different models continues to be a challenge, particularly with meeting the requirements associated with its distribution assets. OUC’s implementation of Esri current ArcMap software and Geometric Network data model is as follows:
• Electric Distribution, version 10.8.1,
• Fiber, version 10.8.1
• Water Distribution, version 10.8.1.
In addition to the core GIS infrastructure nearing the end of support, several of the critical third-party solutions supporting key editing and business functionality are also ending support without an option to upgrade. Going unsupported puts OUC at risk for inability to perform critical security updates in an increasingly challenging cyber environment.
This RFP outlines OUC’s requirements for engaging a System Integrator (SI) to migrate, convert and/or transform from the current Esri Geometric Network data models and obsolete 32-bit GIS technology to the new Esri UN ArcGIS and the latest cutting-edge GIS technology. This transformation will be inclusive of reconfiguring, replacing, retiring or reimagining existing integrations with other OUC systems.
Any proprietary third-party product configuration will be completed by the product vendor, but it is expected that any technical changes and/or coordination will be done with direct oversight provided by the selected UN Migration Vendor.
2.1. STAKEHOLDER ENGAGEMENT
The UN Migration aligns with OUC’s long-term strategy for improvement. As a result:
• The UN Migration Project is an OUC strategic initiative and is sponsored by the highest levels of OUC line-of-business and Information Technology management and supports OUC’s long-term vision for geoenabling the electric, fiber, and water related processes and data.
• OUC recognizes that migration to the ArcGIS UN will fundamentally change how the utility operates and requires System Integrator expertise to implement and train OUC personnel to realize the benefits of the technology.
• The System Integrator will work with the OUC team to develop a teaming strategy that supports program governance, change management, project management and technical solution factors for a successful UN Migration project.
• OUC is committed to working with a Vendor and to providing a cross-functional team to successfully implement the UN across electric, fiber, and water network.
• OUC is the primary stakeholder for the UN Migration Project. OUC requires that the Vendor leverage their experience and proven methodologies for a successful implementation from both a business and technical perspective.
2.2. IMPROVEMENTS AND FUNCTIONAL NEEDS
To continue to meet the needs of our customers and the requirements of both our municipal partners and our regulators, OUC has identified the need to move from Esri’s Geometric Network data models and obsolete 32-bit technology to the new Esri Utility Network data models, along with their ArcGIS Pro GIS software, and the latest cutting-edge technology. It is extremely important for OUC to modernize our geospatial platform before the upcoming retirement (February 2028) of the Esri Geometric Network and ArcMap editing environment to avoid maintaining critical operations on an unsupported platform.
While this modernization is heavily driven by technology obsolescence, OUC is seeking to take advantage of the new functionality the Utility Network will enable throughout the ArcGIS Enterprise platform to aid in meeting the ever-changing business needs of OUC.
Being that this will be a transformational project, we will be doing a re-evaluation of every integration to our existing GIS platform, to determine whether existing solutions and integrations should be replaced, reconfigured, or retired as part of the transformation to take advantage of new core Esri functionality.
As part of this, OUC also expects to identify possible process changes that may be needed or desired to take advantage of the latest technology.
2.3. OTHER STRATEGIC INITIATIVES RUNNING SIMULTANEOUSLY TO THE UN
MIGRATION PROJECT
Current projects, and others planned over the next five years, will operate independently yet in parallel with the UN Migration Project. This section provides a high-level overview of known programs that will be in operation during the UN deployment effort. It will be incumbent upon the System Integrator to take these ongoing dependencies and their sequencing into account when planning and implementing the ArcGIS UN solution. OUC will provide the System Integrator with detailed information on each of these efforts at the appropriate time.
Electric ADMS
Estimated Start Date: 2027
Estimated End Date: 2027
The Advanced Distribution Management System (ADMS) software solution project will replace the current Electric DMS Software with a more advanced software package enabling OUC to more efficiently and effectively manage the electric system network.
2.4. CURRENT STATE OVERVIEW
The following includes a summary of OUC’s current state.
Category Comments
Enterprise GIS Platform and Mobile
• GIS is currently v10.8.1, ArcGIS Enterprise (Portal) has been implemented.
• ArcFM / Fiber Manager 10.8.1 /ArcFM viewer for Engine and is reaching end of life.
• Water Engine (Custombuilt on ArcEngine – EngineObjects)
• ArcFM Viewer for Engine - use replication program in FM to create stand-alone DB every night to update field application.
• InfraMap
• ArcReader – most widely used mobile product for our field users
System Performance There are numerous Data Automations that run at regular intervals, moving data to and from the GIS. Some of these take a significant time to run (hours) and are a drain on system resources.
GIS Graphic Work Design AutoCAD is used by design staff; Stakeholders noted the need for improvements to the design application, including both system performance concerns and functionality enhancements.
GIS Customizations/ Interfaces
• GIS to CGI OMS
• Geocoding Web Service to CGI web (used for dispatch routing)
• CCB to/from GIS
• GIS to/from ARM360 and custom OMS storm response integration tool
• GIS to AutoCAD (FME)
• GIS to SynerGi
• ArcFM
• InfraMap to GIS
GIS System of Record for
ADMS
CC&B is currently the System of Record for customer connectivity;
Substation one-lines do not exist in GIS today – would support ADMS functionality; Some non-GIS data sources will need to be converted to GIS or loaded directly to the ADMS.
GIS and Business Alignment Solid awareness of GIS tools around the organization; Many stakeholders are aware of how GIS can help them and expressed need for GIS tools and apps.
Analysis & Decision-Making Tools
Stakeholders expressed the need for access to various geospatial datasets; Need for greater visibility into planned daily work and locations (crews & contractors); Many internal customer-facing GIS applications were identified (outage map, streetlight reporting, planned outages, planned work locations, etc.).
Data Quality Some focused data clean-up and augmentation will be necessary for the GIS migration to UN and the ADMS implementation to ensure the transition to the new GIS data model.
Data Standards It will be crucial to enforcing data governance with the GIS migration to UN and the ADMS implementation; Standard operating procedures, work order posting/as-built or electronic data submittal standards, and redline procedures need to be enforced to ensure data quality.
Land Base Related Data Ensure right’s-of-way, easement, and property data are migrated with the existing County landbase to the new GIS environment.
Substation & Transmission Data
Substation one-lines do not exist in GIS today; A decision will need to be made as to when this data (Substation data/one-lines) should be transitioned to GIS for maintenance; This would offer advanced functionality for ADMS and some non-GIS data. Transmission characteristics/Line ratings, etc.) are not maintained in GIS.
No substations are modeled in GIS, they are currently maintained in AutoCAD.
3. PROJECT GOALS AND OBJECTIVES
The following section provides a summary of the UN Migration Project goals and objectives.
3.1. PROJECT GOALS
The following includes a summary of the project goals.
1. Establish GIS as “System of Record” for location of network system assets along with how they are connected.
2. Define and address data gaps between the existing GIS data model and the Utility Network GIS data model.
3. Consolidate and improve data accuracy and content.
4. Enhanced data modeling to reflect real-world representation of the electric and water system networks, including such things as Distributed Energy Resources (DERs).
5. Leverage Web-centric technology (e.g., Portal) to allow greater access to data in disparate systems and across the utility.
6. Increase consistency of GIS standards and processes.
7. Increase efficiencies with improved business processes.
8. Modernize current GIS tools, addressing performance issues with legacy Esri and SE technologies.
9. Reduce or eliminate overlapping GIS/Design/CAD software functionality and processes.
10. Ensure the Utility Network GIS data model is designed for grid modernization and support the future ADMS with a connected network model.
11. Ensure proper planning and analysis is performed relating to required infrastructure and architecture.
12. Organize the electric, fiber, and water migrations into phases to reduce risk and resource impacts.
13. Address change management as part of each phase.
14. Leverage the suite of network management capabilities in ArcGIS Pro for creating, editing, managing, analyzing, visualizing, and sharing network data when based on the UN data model.
15. Align with other major initiatives at OUC, including planned ADMS, mobility, etc.
3.2. PROJECT OBJECTIVES
Upon successful completion of this RFP process, a vendor will be selected to take on the role of the System Integrator to implement OUC’s GIS platform modernization by providing implementation, change management, project management, security, acceptance testing, quality assurance, project management (time management, budget compliance, etc.), and other requirements outlined within this RFP to accomplish the UN Migration Project. The UN Migration Project is being divided into three (3) separate, but integrated phases, with separate start/end dates. OUC is looking for detailed, firm estimates for all three phases.
“Phase 1” Water: This phase will consist of, but is not limited to, the following which must be done in each environment (development, test, UAT and production):
• Conversion of the existing water and chilled water geodatabase based on the Geometric data models into a single Water Combined geodatabase based on the Utility Network data model.
• Building of a scalable ArcGIS Pro editing environment, utilizing the latest version.
• Updating of all ArcGIS services to read from and write to the new water database.
• Remediation (upgrade/reconfigure, replace, retire) of all the integrations to the Water geospatial platform. This will include all the required integrations as well as any new integrations that may be implemented prior to the geospatial platform modernization.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .