RFP Note to Include_EMG Demo (20).docx
DOCX document 27 KB Posted
- Attached to
- Emergency Residential Demolition: 20137 Omira
- Solicitation number
- 300000142476578
- Issued by
- Michigan
About this file
This is a Request for Proposal note prepared by the BSEED (Building, Safety, Engineering & Environmental Department) Inspector for an emergency residential demolition project in Michigan, specifically for the property located at 20137 Omira. The project involves the demolition of a 1.5-story brick single-family dwelling that has been extensively fire-damaged and deemed unsafe. The structure contains compromised framing members that are extensively charred, with the majority of the roof collapsed into the interior. The property is vacant and open to trespass, with unmaintained yards containing excessive rubbish and debris. Two additional vacant dwellings are located immediately adjacent to the subject property, both to the north and south. The RFP notes specify that emergency demolition is recommended and that emergency timelines must be strictly adhered to regardless of whether frost laws are in effect.
The demolition project is categorized as an emergency residential demolition requiring expedited procurement and execution procedures. No specific pricing information, bidder set-asides, incumbent contractors, response dates, or contract term details are provided in the notes. The emphasis on emergency timelines indicates that weather conditions, including potential frost law restrictions, should not delay project initiation or completion, suggesting this work may be winter-critical or require immediate action to secure the property and protect adjacent structures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 186505_SUPPLIER.pdf | ||
| 20137 Omira emg letter signed, parcel, photos.pdf | ||
| Price Sheet EMG Demo (15).xlsx | XLSX spreadsheet | |
| Emergency RFQ Notice - 5.24.22 template.dotx | DOTX file | |
| EMG Professional Rate Schedule Demo 02192021.xlsx | XLSX spreadsheet | |
| EMG Professional Rate Schedule Instructions 02192021.docx | DOCX document | |
| OCP, Demolition_Signature_Page 2 25 2020.doc | DOC document | |
| Scope of Services_EMG Demo (Residential) 8.4.23 (48) (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notes to Include in the RFP:
BSEED Inspector Description: DB Fire Run Inspection, found:
1.5 story, brick, 1 family dwelling
Vacant & open trespass/elements (thru-out) Extensively fire damaged (i.e.: thru-out) Yards not maintained (excessive rubbish & debris in rear yard) Dwelling not maintained (majority of interior framing members extensively charred & compromised structurally; majority of roof has collapsed inside the dwelling) 2 Vacant dwellings are located just north & south of dwelling
Recommend: Emergency Demo
DFD Fire Occurrence Date:
*Emergency timelines must be met regardless of if Frost Laws are in effect.
File details come from the government source that posted it. Updated .