RFP - N400856942473 B-4495 - Repair Augmenter T-10.pdf

PDF 460 KB Posted

Attached to
B-4495 Repair Augmenter T-10 Federal contract opportunity
Solicitation number
N400856942473
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to B-4495 Repair Augmenter T-10, newest first.
File Type Posted
Amendment 0001.pdf PDF
SOW 6942473 B4495 REPAIR AUGMENTOR rev 1.pdf PDF
SOW - 6942473 - B-4495 REPAIR AUGMENTOR T-10.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-4495, Repair Augmenter T-10, MALS-14, MCAS Cherry Point, North Carolina Project No. 6942473

9 November 2020

NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC

FACILITIES ENGINEERING AND ACQUISITION DIVISION CHERRY POINT

POC: Joseph Schwarz, Contract Specialist (252) 466-4345

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A

PROPOSAL FOR THIS PROJECT:

N40085-19-D-8044

Joyce & Associates Construction, Inc.

6994 HWY 70

Newport, NC 28570 info@joyceandassoc.com

N40085-19-D-8045

Olympic Enterprises, Inc.

282 Hubert Blvd.

Hubert, NC 28539 mark.xanthos@gmail.com xanthosjohn@gmail.com

N40085-19-D-8046

Owens Construction, Inc.

828 West Beaufort Rd.

Beaufort, NC 28516 office@occ-usa.com

N40085-19-D-8047

Pyramid Contracting, LLC

1108-A Lykes Ln.

Irmo, SC 29063 lori@pyramidcontracting.com

N40085-19-D-8048 T.E. Davis Construction Company

1175 East Davis Rd.

Jacksonville, NC 28546 bhorne@tedavisconstruction.com mailto:info@joyceandassoc.com mailto:mark.xanthos@gmail.com mailto:xanthosjohn@gmail.com mailto:office@occ-usa.com mailto:lori@pyramidcontracting.com mailto:bhorne@tedavisconstruction.com

GENERAL REQUIREMENTS

Public Works Project No.: 6942473

Title: B-4495, Repair Augmenter T-10, MALS-14

NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $36.5 Million

Contract Completion Date: All work shall be completed within 90 calendar days after award.

Estimated Cost Range: Between $25,000 and $100,000.

Wage Determination: General Decision Number: NC20200038 01/03/2020

Liquidated Damages: $83.00 per Calendar Day

Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and Health Officer, if duly qualified for all three positions as defined in the project specification.

Special Scheduling: None

Basis for Award: Lowest Price

Proposal Acceptance Period: 90 days from receipt of offers

Site Visit: A site visit will be scheduled Thursday 12 November 2020 at 1300.

Contractors are to meet at the FEAD office, Building 163, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project.

Bond Requirements: Bid bonds are required in accordance with FAR 53.301-24. An electronic copy of your bid bond may be submitted with your proposal. A hard copy of your bid bond must be submitted to the FEAD office within one (1) business day after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration. Payment and/or performance bond(s) will be requested at the time of award per the current process.

• No bonds are required for proposals less than $35K.

• Proposals valued at $35K and greater will require a payment bond only.

• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.

Proposal Due Date: 1 December 2020, 1200 local time

E-Mail Address for Proposals:

1. roicc_chpt_ktr_bids@navy.mil

2. joseph.schwarz1@navy.mil

3. ericka.j.bishop@navy.mil

Requests for Information (RFIs): RFIs must be submitted to joseph.schwarz1@navy.mil as well as ericka.j.bishop@navy.mil. The cut off for RFIs is 19 November 2020 by 0900 in order to process all inquiries by the proposal due date.

The specifications and drawings are posted as attachments on https://beta.sam.gov/.

NOTE THE FOLLOWING:

The Government intends to evaluate proposals and issue a task order without discussions.

Therefore, each initial offer should contain the offeror’s best terms from a price standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary.

Any changes to the Scope of work, Technical Specifications, or Drawings will be issued on a Standard Form (SF) 30.

This request does not constitute a notice to proceed nor shall it be considered as a commitment on the part of the Government.

Any cost incurred prior to issuance of a task order cannot be reimbursed. Offerors will not be reimbursed for any effort or proposal costs resulting from this solicitation.

Offerors are advised that funding may not become available. If funds are not available, no award will be made as a result of this solicitation.

If funding becomes available, the successful offeror will be issued a task order under their contract, as set forth in DFARS 252.216-7006, Ordering (May 2011).

mailto:joseph.schwarz1@navy.mil mailto:ericka.j.bishop@navy.mil

"General Decision Number: NC20200065 01/03/2020

Superseded General Decision Number: NC20190065

State: North Carolina

Construction Type: Building

Counties: Chowan, Craven, Dare, Gates, Jones, Martin and

Washington Counties in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour

(or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020.

If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in

29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon

Act itself, but it does not apply to contracts subject only to the Davis-

Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

* PLUM0421-004 07/01/2018

Rates Fringes

PIPEFITTER (Excluding HVAC

System Installation).............$ 28.00 12.01

SUNC2011-046 08/26/2011

Rates Fringes

BRICKLAYER.......................$ 19.38 8.73

CARPENTER (Drywall Hanging

Only)............................$ 18.13 1.31

CARPENTER (Form Work Only).......$ 14.21 0.41

CARPENTER, Excludes Drywall

Hanging, and Form Work...........$ 14.64 2.39

CEMENT MASON/CONCRETE FINISHER...$ 14.02 0.00

ELECTRICIAN......................$ 17.10 1.47

HVAC MECHANIC (HVAC Duct

Installation Only)...............$ 15.58 1.53

IRONWORKER, STRUCTURAL...........$ 18.75 5.62

LABORER: Common or General......$ 10.57 0.67

LABORER: Landscape &

Irrigation.......................$ 10.29 1.82

LABORER: Mason

Tender-Brick/Cement/Concrete.....$ 10.00 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 14.71 2.33

OPERATOR: Crane.................$ 19.25 2.37

OPERATOR: Grader/Blade..........$ 15.71 1.49

PAINTER: Brush, Roller and

Spray............................$ 14.36 1.97

PLUMBER (HVAC Unit

Installation)....................$ 16.96 3.17

PLUMBER, Excludes HVAC Unit

Installation.....................$ 17.34 2.09

ROOFER...........................$ 13.55 0.80

SHEET METAL WORKER, Excludes

HVAC Duct and Unit

Installation.....................$ 13.09 1.28

TRUCK DRIVER: Dump Truck........$ 12.50 1.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal

Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to

56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate

(weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage

Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the

Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Company Name:____________________________________

Company Address: ________________________________

MACC Contract Number: ___________________________

Date: ______________

Facilities Engineering & Acquisition Division

PSC Box 8006

MCAS Cherry Point, NC 28533-0006

Proposal for Project: N400856942473 B-4495, Repair Augmenter T-10

Marine Corps Air Station Cherry Point, NC

Amendments Acknowledged: No Amendments Issued or Amendments_______

Subcontractors to be used*:

Subcontractor Discipline

*Insert additional lines as needed

Proposal amounts:

Item # Amount

Total $

Comments: