Solicitation Number 72030620R00009 Solicitation Title: IT Support for DABS Existing Data Center, New

Disaster Recovery Center and Load Centers Issuance Date: May 28, 2020 Site Visit Date: June 11, 2020, See Section L.2 Deadline for Questions & Comments: June 18, 2020, 17:00 Eastern Standard Time (EST) Proposal Submission Closing Date: July 9, 2020, 17:00 EST

Dear Interested Offerors:

The United States Government, represented by the U.S. Agency for International Development (USAID), Afghanistan Office of Acquisition and Assistance (OAA) in conjunction with the USAID/Afghanistan Office of Infrastructure (OI), is seeking proposals from qualified and eligible firms for the supply of IT services and equipment for De Afghanistan Breshna Sherkat (DABS). The estimated cost range for this procurement is between $2,000,000.00 to $3,300,000.00. The North American Industry classification system (NAICS) code for this acquisition is 423430 – COMPUTER AND COMPUTER PERIPHERAL

EQUIPMENT AND SOFTWARE MERCHANT WHOLESALERS.

This procurement will be conducted under full and open competition, pursuant to Part 12 Acquisition of Commercial Items and Part 15 Contracting by Negotiation, of the Federal Acquisition Regulation (FAR) (48 CFR Chapter 1). All types of firms are eligible to compete. USAID encourages the participation, to the maximum extent possible of local Afghan firms, small business concerns, veteran owned small business, service-disabled veteran small business, HUB zone small business, small disadvantaged business, and women-owned small business concerns in this activity as the prime contractor or as subcontractors.

Any questions related to this RFP and final proposal must be submitted by email to kbloaaoiteam@usaid.gov by the time and date specified above. This RFP stipulates two separately identifiable IT domains, namely Services and Equipment. Offerors can propose for either both of these domains or one of them. Proposal must address the respective domain/s in its/their entirety. Proposals that only address a portion of the respective domain/s will not be considered.

If questions are received which affect the responses to the solicitation, or if changes are made to the closing date and time, as well as any other aspects of the RFP, this solicitation will be amended. Any amendments to this solicitation will be issued and posted on beta.sam.gov. Oral instructions or explanations given before the award of the contract resulting from this solicitation will not be binding.

Offerors are encouraged to read the entire solicitation, including any amendments if issued. Special attention must be paid to Section K - Representations, Certifications and Statements of Offeror, L – Instructions, Conditions, and Notices to Offerors or Respondents, and Section M – Evaluation Criteria.

Issuance of this solicitation does not in any way obligate the U.S. Government to award a contract nor does it commit the U.S. Government to pay for costs incurred in the preparation and submission of a proposal. The Government reserves the right to reject any and all offers, if such action is considered to be in the best interest of the U.S. Government.

mailto:kbloaaoiteam@usaid.gov https://www.fbo.gov/

Thank you for your interest in USAID programs.

Sincerely

Diego Marquez Contracting Officer USAID/ Afghanistan Office of Acquisition and Assistance

STANDARD FORM 33 – SOLICITATION/OFFER/AWARD

Contents

PART I – THE SCHEDULE

SECTION B: SUPPLIES OR SERVICES AND PRICE

B.1 PURPOSE

B.2 CONTRACT TYPE

B.3 CONTRACT PRICE

B.4 BUDGET

B.5 PAYMENT

SECTION C: STATEMENT OF WORK (SOW)

SECTION E: INSPECTION AND ACCEPTANCE

52.246-2 INSPECTION OF SUPPLIES-FIXED-PRICE AUG 1996

52.246-4 INSPECTION OF SERVICES-FIXED-PRICE AUG 1996

52.246-15 CERTIFICATE OF CONFORMANCE APR 1984

52.246-16 RESPONSIBILITY FOR SUPPLIES APR 1984

E.2 INSPECTION AND ACCEPTANCE

E.3 FINAL PROJECT ACCEPTANCE

SECTION F: DELIVERIES OR PERFORMANCE

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

F.2 PERIOD OF PERFORMANCE

F.3 PLACE OF PERFORMACNE

F.4 PLANS AND REPORTS

F.5 REPORTING FORMAT

F.6 LANGUAGE OF REPORTS

F.7 KEY PERSONNEL

F.8 DELIVERABLES AND SCHEDULE

F.9 DELIVERABLE SUBMISSION

F.10 REPORTING ON THE AFGHAN-INFO SYSTEM

F.10 WARRANTY

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 ADMINISTRATIVE CONTRACTING OFFICE

G.2 CONTRACTING OFFICER’S REPRESENTATIVE (COR)

G.3 PAYING OFFICE

G.4 ACCOUNTING AND APPROPRIATION DATA:

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 AUTHORIZED GEOGRAPHIC CODE

H.2 USAID/AFGHANISTAN MAXIMIZING USE OF LOCAL ENTITIES (AUGUST 2016)

H.3 CONSENT TO SUBCONTRACTS (DECEMBER 2016)

H.4 USAID/AFGHANISTAN SUB-AWARD REQUIREMENTS (APRIL 2016)

H.5 USAID/AFGHANISTAN PUBLIC POSTING (APRIL 2016)

H.6 USAID/AFGHANISTAN VETTING REQUIREMENT (APRIL 2016)

H.7 USAID/AFGHANISTAN USE OF SYNCHRONIZED PRE-DEPLOYMENT AND

OPERATIONAL TRACKER (SPOT) FOR CONTRACTORS SUPPORTING A DIPLOMATIC OR

CONSULAR MISSION OUTSIDE THE UNITED STATES (SUPPLEMENT TO FAR 52.225-19)

(AUGUST 2016)

H.8 SERIOUS INCIDENT REPORTING (SIR) IN AFGHANISTAN (AUGUST 2016)

H.9 ADS 302.3.5.5 REPORTING OF FOREIGN TAXES (JULY 2007)

H.10 ELECTRONIC PAYMENTS SYSTEM (JULY 2014)

H.11 USAID/AFGHANISTAN PRESS RELATIONS (JANUARY 2017)

H.12 USAID/AFGHANISTAN RESTRICTIONS ON IMPLEMENTING PARTNERS EXECUTING

AGREEMENTS WITH GOVERNMENT OF AFGHANISTAN (AUGUST 2016)

H.13 USAID/AFGHANISTAN LANGUAGE REQUIREMENTS (AUGUST 2016)

H.14 ADS 302.3.5.21 SUBMISSION OF DATASETS TO THE DEVELOPMENT DATA LIBRARY

(DDL) (OCT 2014)

H.15 ADS 302.3.8.10 USAID IMPLEMENTING PARTNER NOTICES (IPN) PORTAL FOR

ACQUISITION (JUL 2014)

H.16 ENVIRONMENTAL COMPLIANCE

H.17 USAID/AFGHANISTAN IMPLEMENTATION OF EXECUTIVE ORDER 13224 ON

TERRORISM FINANCING (AUGUST 2016)

H.18 USAID/AFGHANISTAN COMPLIANCE WITH ADS 206 PROHIBITION OF ASSISTANCE

TO DRUG TRAFFICKERS (DECEMBER 2016)

H.19 ADS 302.3.4.12 LOGISTIC SUPPORT AND GOVERNMENT FURNISHED FACILITIES OR

PROPERTY (AUGUST 2016)

H.20 USAID/AFGHANISTAN COMPLIANCE WITH SECTION 508 OF THE REHABILITATION

ACT OF 1973, AS AMENDED (AUGUST 2016)

H.21 LOGISTIC SUPPORT GOVERNMENT FURNISHED FACILITIES OR PROPERTY

H.22 ADS 302.3.5.9 NON-DISCRIMINATION (JUNE 2012)

H.23 DISCLOSURE OF INFORMATION

H.24 STANDARDS OF CONDUCT -- IMPROPER BUSINESS PRACTICES

PART II – CONTRACT CLAUSES

SECTION I: CONTRACT CLAUSES

I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

52.202-1 DEFINITIONS NOV 2013

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION APR 1985

52.203-3 GRATUITIES APR 1984

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEP 2006

ALTERNATE I OCT 1995

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS OCT 2010

52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST DEC DEC 2011

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS

AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS APR

2018 61

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS-REPRESENTATION JAN 2017

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS JAN 2017

52.204-1 APPROVAL OF CONTRACT DEC 1989

52.204-7 SYSTEM FOR AWARD MANAGEMENT OCT 2018

52.204-10 REPORTING EXECUTIVE COMPENSATION AND

FIRST-TIER SUBCONTRACT AWARDS OCT 2018

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018

52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS OCT 2016

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING JUL 2016

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE JUL 2016

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS DEC 2014

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE

SOFTWARE AND SERVICES DEVELOPED OR PROVIDED

BY KASPERSKY LABN AND OTHER COVERED JUL 2018

52.204-24 REPRESENTATION REGARDING CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT DEC 2019

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE

SERVICES OR EQUIPMENT AUG 2019

52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-

REPRESENTATION DEC 2019

52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED,

SUSPENDED, OR PROPOSED FOR DEBARMENT OCT 2015

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS OCT 2018

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS OCT 2018

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS NOV 2015

52.212-1 INSTRUCTIONS TO OFFERORS-COMMERCIAL ITEMS OCT 2018

52.212-2 EVALUATION-COMMERCIAL ITEMS OCT 2014

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS COMMERCIAL ITEMS

DEC 2019 62

52.212-4 CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS OCT 2018

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO

IMPLEMENT STATUTES OR EXECUTIVE ORDERS

COMMERCIAL ITEMS JAN 2020

52.215-1 INSTRUCTIONS TO OFFERORS-COMPETITIVE

ACQUISITION JAN 2017

52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST

OR PRICING DATA AUG 2011

52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED

COST OR PRICING DATA—MODIFICATIONS AUG 2011

52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA OCT 2010

52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA

MODIFICATIONS OCT 2010

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS OCT 2010

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES OCT 1997

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN AUG 2018

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB 1997

52.222-19 CHILD LABOR-COOPERATION WITH AUTHORITIES

AND REMEDIES JAN 2020

52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015

52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS FEB 1999

52.222-26 EQUAL OPPORTUNITY SEP 2016

ALTERNATE I FEB 1999

52.222-29 NOTIFICATION OF VISA DENIAL APR 2015

52.222-44 FAIR LABOR STANDARDS ACT AND SERVICE

CONTRACT LABOR STANDARDS-PRICE ADJUSTMENT MAY 2014

52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL

EMPLOYEES FEB 1993

52.222-50 COMBATING TRAFFICKING IN PERSONS JAN 2019

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN

TEXT MESSAGING WHILE DRIVING AUG 2011

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN 2008

52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND

TRANSLATION OF CONTRACT FEB 2000

52.226-1 UTILIZATION OF INDIAN ORGANIZATIONS AND

INDIAN-OWNED ECONOMIC ENTERPRISES JUN 2000

52.227-19 COMMERCIAL COMPUTER SOFTWARE LICENSE DEC 2007

52.227-21 TECHNICAL DATA DECLARATION, REVISION,

AND WITHHOLDING OF PAYMENT-MAJOR SYSTEMS MAY 2014

52.227-22 MAJOR SYSTEM-MINIMUM RIGHTS JUN 1987

52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) JUN 1987

52.228-3 WORKERS’ COMPENSATION INSURANCE

(DEFENSE BASE ACT) JUL 2014

52.229-6 TAXES-FOREIGN FIXED-PRICE CONTRACTS FEB 2013

2.232-1 PAYMENTS APR 1984

52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB 2002

52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS APR 1984

52.232-11 EXTRAS APR 1984

52.232-13 NOTICE OF PROGRESS PAYMENTS APR 1984

52.232-17 INTEREST MAY 2014

52.232-23 ASSIGNMENT OF CLAIMS MAY 2014

52.232-29 TERMS FOR FINANCING OF PURCHASES OF

COMMERCIAL ITEMS FEB 2002

52.232-30 INSTALLMENT PAYMENTS FOR COMMERCIAL ITEMS JAN 2017

52.232-32 PERFORMANCE-BASED PAYMENTS APR 2012

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM

FOR AWARD MANAGEMENT OCT 2018

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013

52.233-1 DISPUTES MAY 2014

ALTNERATE I DEC 1991

52.233-2 SERVICE OF PROTEST SEP 2006

52.233-3 PROTEST AFTER AWARD AUG 1996

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT OCT 2004

52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS JAN 2017

52.242-13 BANKRUPTCY JUL 1995

52.242-15 STOP-WORK ORDER AUG 1989

52.242-17 GOVERNMENT DELAY OF WORK APR 1984

52.243-1 CHANGES-FIXED-PRICE AUG 1987

ALTERNATE II APR 1984

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AUG 2019

52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE JUN 2003

ALTERNATE IV APR 1984

52.246-18 WARRANTY OF SUPPLIES OF A COMPLEX NATURE MAY 2001

ALTERNATE IV APR 1984

52.246-19 WARRANTY OF SYSTEMS AND EQUIPMENT UNDER

PERFORMANCE SPECIFICATIONS OR DESIGN CRITERIA MAY 2001

ALTERNATE III APR 1984

52.246-20 WARRANTY OF SERVICES MAY 2001

52.246-23 LIMITATION OF LIABILITY FEB 1997

52.246-24 LIMITATION OF LIABILITY-HIGH-VALUE ITEMS FEB 1997

ALTERNATE I APR 1984

52.246-25 LIMITATION OF LIABILITY-SERVICES FEB 1997

52.247-34 F.O.B. DESTINATION NOV 1991

52.247-35 F.O.B. DESTINATION, WITHIN CONSIGNEE’S PREMISES APR 1984

52.248-1 VALUE ENGINEERING OCT 2010

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) APR

2012 64

52.249-4 TERMINATION FOR CONVENIENCE OF THE

GOVERNMENT (SERVICES) (SHORT FORM) APR 1984

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR 1984

52.250-2 SAFETY ACT COVERAGE NOT APPLICABLE FEB 2009

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE FEB 1998

52.253-1 COMPUTER GENERATED FORMS JAN 1991

I.2 NOTICE LISTING CONTRACT CLAUSES INCORPORATED IN FULL

52.232-32 PERFORMANCE-BASED PAYMENTS (APR 2012)

I.3 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE - AIDAR

48 CFR CHAPTER 7

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER

SECTION J - LIST OF ATTACHMENTS

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF BIDDERS 74

K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

K.2 PROVISIONS AND CLAUSES INCLUDED IN FULL TEXT

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN

INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS-REPRESENTATION

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)

52.207-4 ECONOMIC PURCHASE QUANTITY-SUPPLIES (AUG 1987)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)

K.3 SIGNATURE

SECTION L: INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FAR 52.252-1)

L.2 SITE VISIT

L.3 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)

L.4 GENERAL INSTRUCTIONS FOR SUBMISISON OF PROPOSALS

L.5 INSTRUCTION FOR PREPARATION OF TECHNICAL PROPOSALS

L.5.1 PAST PERFORMANCE (SEE M.3.A)

L.5.2 TECHNICAL APPROACH (See M.3.B)

L.5.3 MANAGEMENT APPROACH (SEE M.3.C)

L.6 INSTRUCTION FOR SUBMISSION OF PRICE/BUSINESS PROPOSAL

L.7 ALTERNATIVE LINE ITEM PROPOSAL

L.8 EVIDENCE OF RESPONSIBILITY

L.9 DISCLOSURE OF INFORMATION

L.10 AIDAR 752.204-70 PARTNER VETTING PRE-AWARD REQUIREMENTS (FEB 2012)

L.11 JOINT VENTURE INFORMATION

SECTION M: TECHNICAL EVALUATION CRITERIA

M.1 GENERAL INFORMATION

M.2 BEST VALUE CONTINUUM

M.3 TECHNICAL PROPOSAL EVALUATION CRITERIA

M.3.A CONTRACTOR PAST PERFORMANCE

M.3.B TECHNICAL APPROACH

M.3.C MANAGEMENT APPROACH

M.4 PRICE PROPOSAL EVALUATION

M.5 UNBALANCED TENDERS

PART I – THE SCHEDULE

SECTION B: SUPPLIES OR SERVICES AND PRICE

B.1 PURPOSE

The Contractor shall provide IT equipment and services to Da Afghanistan Breshna Sherkat (DABS).

B.2 CONTRACT TYPE

This is a Firm-Fixed-Price type contract on a lump-sum basis.

B.3 CONTRACT PRICE

The Firm-Fixed-Price of this contract is $ (TBD), the maximum dollar value payable to the contractor.

No additional sums shall be payable for any escalation in the price of equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the price or difficulty of achieving the results required. The Government will not adjust the contract price due to fluctuations in currency exchange rates.

B.4 BUDGET

The contractor shall not include any duty taxes in the price as USAID will facilitate the issuance of duty exemption letters.

SUMMARY OF PRICES

No. SUPPLIES/SERVICES DESCRIPTION QUANTITY UNIT

PRICE

TOTAL

TASK NO. 1 EXISTING DATA CENTER AT DABS HQ IN KABUL

1 As-is Study See Section C- Sub-Task No.1.1 N/A 2 Surveying and documentation of the existing network connectivity See Section C- Sub-Task No.1.2 N/A

3 Re-configuration of existing data center, as applicable

See Section C- Sub-Task No.1.3 N/A

4 Supply of minor equipment as needed See Section C- Sub-Task No.1.4

5 Update of all the Systems and Applications

See Section C- Sub-Task No.1.5

6 System Operation and Maintenance (O&M)

See Section C- Sub-Task No.1.6

SUB-TOTAL

TASK NO. 2 DISASTER RECOVERY DATA CENTER AT TARAKHIL POWER PLANT IN KABUL

1 Assessment, Design and Configuration of IT infrastructure and Systems

See Section C- Sub-Task No.2.1 N/A

2 Servers Production Data Center Section C.4.1 - Schedule No. 1 5 3 FC SAN Storage for Production Data

Center Section C.4.1 - Schedule No. 1 1

4 Fabric Switches for Production Data Center

Section C.4.1 - Schedule No. 1 2

5 SAN Storage for Disaster Recovery Center

Section C.4.1 - Schedule No. 1 1

6 Servers for Disaster Recovery Site Section C.4.1 - Schedule No. 1 4 7 Fabric Switches for Disaster Recovery site Section C.4.1 - Schedule No. 1 2

8 UPS System Section C.4.1 - Schedule No. 1 1 9 Core network switches for DC Section C.4.1 - Schedule No. 1 2 10 Network Switches for edge connectivity Section C.4.1 - Schedule No. 1 4

11 IP KVM Switch for remote management

Section C.4.1 - Schedule No. 1 1

12 Data Backup Software application Section C.4.1 - Schedule No. 1 1 13 LTO Tape Library Section C.4.1 - Schedule No. 1 1 14 LTO 8 Media Cartridges Section C.4.1 - Schedule No. 1 50 15 Rack Mountable Console Section C.4.1 - Schedule No. 1 1 16 Server Racks Section C.4.1 - Schedule No. 1 4 17 Red hat Enterprise Linux with 3 Years Section C.4.1 - Schedule No. 1 10

Subscription or Equivalent 18 Vmware Vsphere Enterprise 10

Processor License & Virtual center server or Equivalent

Section C.4.1 - Schedule No. 1 1

19 VMware Vcenter license supporting unlimited VMware Vsphere server

Section C.4.1 - Schedule No. 1 1

20 Veeam Backup & Replication Enterprise for VMware – for DC - DR replication with 3-year 24/7 support for unlimited Virtual Servers or Equivalent

Section C.4.1 - Schedule No. 1 1

21 Microsoft Windows 2016 Server Standard version

Section C.4.1 - Schedule No. 1 5

22 Nagios® XI Enterprise edition with 24/7 support. 100 Node support or Equivalent

Section C.4.1 - Schedule No. 1 1

23 Sophos endpoint 500 with 3 Years Full Guard Plus subscription. Or Equivalent

Section C.4.1 - Schedule No. 1 1

24 DB2 workgroup server edition license type: socket option expire date:

permanent product identifier db2wse version information: 10,5 max amount of memory 12GB enforcement policy:

soft stop

Section C.4.1 - Schedule No. 1 1

25 SQL Server 2019 Enterprise edition supporting unlimited CPU

Section C.4.1 - Schedule No. 1 2

26 Equipment Configuration and Data Migration

See Section C- Sub-Task No.2.3 N/A

27 Networking and Installation of Equipment infrastructure

See Section C- Sub-Task No.2.4 N/A

28 System Operations & Maintenance See Section C- Sub-Task No.2.5 N/A

SUB-TOTAL

TASK NO. 3 SUPPLY OF IT EQUIPMENT FOR LOAD CENTERS

MOBILE EQUIPMENT

1 Android Mobile Phone Section C.4.2 - Schedule No. 2A 366 2 Waterproof mobile case Section C.4.2 - Schedule No. 2A 366 3 Bluetooth Portable Thermal Printers 3" Section C.4.2 - Schedule No. 2A 366 4 3" Thermal Paper rolls Section C.4.2 - Schedule No. 2A 3700 5 Android Tablet with dust proof cover Section C.4.2 - Schedule No. 2A 276 6 Optical Probe for AMR Section C.4.2 - Schedule No. 2A 366 7 Micro USB to RS 485 Converter kit Section C.4.2 - Schedule No. 2A 75 8 Barcode Label Printer Section C.4.2 - Schedule No. 2A 15 9 Barcode Label Cartridges Section C.4.2 - Schedule No. 2A 100

OTHER EQUIPMENT: LAPTOPS, COMPUTERS, NETWORK, PRINTER, SCANNER, UPS, ELECTROMAGNETIC

DIGITIZER

10 Desktop System Section C.4.3 - Schedule No. 2B 409 11 Accessories and Antivirus License Section C.4.3 - Schedule No. 2B 409 12 Office Printers Section C.4.3 - Schedule No. 2B 236 13 Network equipment, Wi-Fi devices and

Cabling Section C.4.3 - Schedule No. 2B 49

14 Laser Jet heavy Printer Section C.4.3 - Schedule No. 2B 51 15 UPS System 5KVA Section C.4.3 - Schedule No. 2B 60 16 UPS System 20 KVA Section C.4.3 - Schedule No. 2B 5 17 Laptops Section C.4.3 - Schedule No. 2B 50 18 Electromagnetic digitizer Section C.4.3 - Schedule No. 2B 100 19 Optical biometric scanner Section C.4.3 - Schedule No. 2B 100

SUB-TOTAL

TASK NO. 4 TRAINING

1 Training See Section C - Task No.4 N/A

SUB-TOTAL

GRAND TOTAL

B.5 PAYMENT

Payment shall be made in accordance with 52.232-30 - Installment Payments for Commercial Items.

USAID hereby obligates the amount of $TBD for the performance and completion of the required services as described in this contract.

[END OF SECTION B]

SECTION C: STATEMENT OF WORK (SOW)

C1. ACTIVITY IDENTIFICATION

1.1. Location:

1.2.1 Existing Data Center at DABS Headquarters (HQ) in Kabul

1.2.2 New Disaster Recovery (DR) Data Center at the Tarakhil Power Plant, Kabul

1.2.3 Load Centers in Kabul, Kandahar, Balkh, Herat and Nangarhar Provinces

C2. BACKGROUND

Da Afghanistan Breshna Sherkat (DABS) is transforming and automating its business operations with the support of Information Technology (IT) to improve transparency and productivity with the goal of becoming a commercially successful and sustainable Power Utility. As part of this program, DABS has implemented the “mPower” software application suite to automate its core business processes, including metering, billing, revenue collection, customer care, mobile workforce, energy auditing, asset registration and asset management. DABS also initiated the implementation of Microsoft Great Plains (GP) for automating its internal functions, including finance, accounting, procurement, HR and Inventory Management System (IMS).

1. DABS HQ Data Center in Kabul:

The DABS HQ Data Center houses the existing IT infrastructure and is the current repository of all data collected by DABS. Currently the data gathered by DABS is not backed up. In case of any interruptions, the business operations of DABS will be adversely affected. To mitigate disruption of business operations, DABS plans to establish a Disaster Recovery Data Center at the Tarakhil Power Plant.

2. Disaster Recovery Data Center at Tarakhil Power Plant in Kabul:

All the critical business applications including mPower and Microsoft GP ERP are centralized at DABS Data Center in Chaman Hazouri Kabul without any backup data center. To address the lack of data backup, DABS intends to establish a disaster recovery data center to be housed in the National Load Control Center (NLCC) building located at the Tarakhil Power Plant, Kabul. The disaster recovery data center IT infrastructure will mirror the existing IT infrastructure at DABS HQ Data Center.

3. Load Centers:

The mPower application suite and Microsoft GP Enterprise Resource Planning (ERP) application have also been deployed in five major Load Centers in Kabul, Kandahar, Balkh, Herat and Nangarhar provinces. To support the full implementation of mPower, DABS need IT equipment and accessories (see Schedule No. 2).

C3. SCOPE OF WORK

The Contractor shall perform the following tasks:

Task No.1 Existing Data Center at DABS HQ in Kabul:

In order to facilitate the interface with the disaster recovery data center, the contractor shall perform the following:

Sub-Task No.1.1: As-is Study Sub-Task No.1.2: Surveying and documentation of the existing network connectivity Sub-Task No.1.3: Re-configuration of existing data center, as applicable Sub-Task No.1.4: Supply of minor equipment as needed Sub-Task No.1.5: Update of all the Systems and Applications Sub-Task No.1.6: System Operation and Maintenance (O&M)

Sub-Task No.1.1: As-is Study

Perform an as-is study of the existing system and conduct a detailed inventory of, but not limited to, the existing servers and other equipment along with the Bios, Firmware, Redundant Array of Independent Disk (RAID) configurations, Operating Systems (OS), partitions, network configuration, application versions and prepare an existing system As-is report.

Deliverable under Sub-Task No.1.1:

• As-is Study Report

Sub-Task No.1.2: Surveying and documentation of existing network connectivity

Survey and document the existing network connectivity for the local area network (LAN), internal and external interfaces and develop a detailed existing diagram of the network.

Deliverable under Task No.1.2:

• System Documentation

• Network Diagram1; and

• Propose list of required repairs and associated hardware and software (if needed)

Sub-Task No.1.3: Re-configuration of existing data center as applicable

The contractor shall reorganize, reconfigure and recommission the existing system. Based on review of the current system setup, the contractor shall provide clear write-up on how the system shall be built and deployed by integrating various components. A pictorial representation in AutoCAD or similar software diagram describing how the solution will be built by integrating various devices and applications and how they will work after final deployment.

Deliverables under Sub-Task No.1.3:

• Technical Solution Report: The technical report shall cover the following but not limited to:

1. Hardware and Servers Setup

1 Diagram shall include technical drawings for future reference and troubleshooting, showing connection, equipment, placement of equipment after the system is up and running.

2. Network Environment setup

3. SAN Storage and Backup environment setup

4. Vmware Virtual environment setup

5. Operating System and Application Environment setup

6. Database Environment setup

7. DC and DR Replication setup

8. Migrating the Application and Databases

The report will serve as a reference guide to DABS for operation and maintenance of the existing Data Center and help facilitate data migration between the DABS - HQ Existing data center (DC) and the New Disaster Recovery data center (DR). To achieve this, the contractor shall therefore do the following.

Sub-Task No.1.4: Supply of minor equipment

No assessment has been done on equipment that may be needed. Based on the contractor’s assessment, supply of minor equipment may be necessary in order to facilitate the transfer of data to the Disaster Recovery Data Center.

Deliverable under Sub-Task No.1.4:

• Equipment Supplied, installed, tested and commissioned

• Prepare diagram of the existing data center.

Sub-Task No.1.5: Update all the Systems and Applications

• All the software applications – including the operating system, application and database components – must be updated with the latest patches.

• SAN, networks, servers and other related hardware equipment must be updated with the latest firmware and bios components.

The contractor shall perform the above such that they sync with those at the New Disaster Recovery Center.

Deliverable under Sub- Task No.1.5:

Confirmation Letter, signed by Contractor, DABS and QA Representative, stating that all the required updates have been completed.

Sub-Task No.1.6: System Operation and Management (O&M)

• The Contractor must develop O&M manuals for existing data center system and equipment.

• The O&M manual must be practical and specific to the existing data center.

Deliverable under Sub- Task No.1.6:

O&M Manuals

Task No.2: Disaster Recovery Data Center at Tarakhil Power Plant in Kabul

The contractor shall establish a new disaster recovery data center that replicates the existing data center in its entirety. Under this task, the contractor must perform the following:

Sub-Task No.2.1: Assessment, Design and Configuration of IT infrastructure Sub-Task No.2.2: Supply of Equipment Sub-Task No.2.3: Equipment Configuration and Data Migration Sub-Task No.2.4: Networking and Installation of Equipment infrastructure Sub-Task No.2.5: System O&M

Sub-Task No.2.1: Assessment, Design and Configuration of IT infrastructure

1. The contractor must assess the site and make sure the new equipment for data recovery can be delivered, installed, tested and commissioned. The contractor shall make sure that there is proper, and enough space, easy connectivity, easy grounding and sufficient power supply exists. The Contractor shall identify if any of the mentioned conditions are not available and suggest an alternative solution.

2. The Contractor must prepare layout of the entire system. The layout must include but not limited to i) general layout/arrangement, ii) network layout, iii) grounding details, iv) equipment installation details, v) rack configuration, vi) cable trays configurations, vii) power connectivity, etc.

3. The contractor must configure all the equipment in Schedule No.1.

a. Hardware and Servers Setup

i. All the Servers, network equipment, Storage Area Network (SAN), and other devices will be commissioned in the Network and server Racks as per the approved design package. The racks shall be provisioned with dual power sources connected to UPS backup power.

ii. Provide proper grounding and bonding for all server racks and equipment.

iii. All the Servers must be commissioned in the server’s racks with ball bearing rail kits and cable guides. All of them connected and configured to a KVM switch for remote management.

iv. The network equipment must be installed in network rack per the approved design package.

v. The SAN and related equipment, including the storage processors, disk enclosures and fabric switches shall be commissioned in the rack as per the approved design package.

vi. Servers, storage and other equipment having a management console shall be configured to the management Local Area Network (LAN) along with IP and cabling.

vii. All the equipment shall be updated to the latest firmware, and bio-related firmware.

viii. All the equipment shall be equipped with redundant power connections.

b. Network Environment Setup

i. A detailed network plan must be developed with IP Planning. The plan should detail the overall network setup in the data recovery (DR) center and how it would be connected to the DABS HQ.

ii. Network security is to be configured in the Disaster recovery Center through Sophos Cyberoam, ASA or similar device provided by the DABS. The network must be segmented as LAN, WAN, DMZ and appropriate routing and policies to protect the servers and application and route the traffic based on required priorities.

iii. Virtual Private Network (VPN) service shall be implemented between the DR and DC to secure communication between both sites.

iv. The 10-Gigabit Switch is to be deployed to form a core switch. All advance features available with the devices to improve network functionality should be utilized effectively. The existing legacy network must be completely transformed from establishing the 10Gig in the core and setup trunk to remote switches through Fiber Channel (FC) links. Required VLAN routing, cabling, etc. will also be completed.

v. All servers should be connected to the core switch through a 10Gig Ethernet connection to provide adequate bandwidth for the server. There should be a separate virtual local area network (VLAN) to be configured for production servers, testing and development and traffic needs to be filtered between the VLANs.

vi. Implement a NTP (Network time protocol) service and configure all network equipment to synchronize the time with the NTP daemon (NTPD).

c. SAN Storage and Backup Environment Setup

i. SAN controllers / Processors shall be configured for the best performance, throughput and failover redundancy.

ii. Disk enclosures shall be integrated to the storage controllers through redundant high-speed back-end connectivity.

iii. Management network shall be configured, and an Active Directory-based integration shall be configured for storage access if the above feature is supported.

iv. Storage controllers shall be interconnected with the Fabric switches in a redundant path.

v. All servers shall be interconnected to the Fabric switches through redundant paths.

vi. Fabric Zones shall be created with WWN names or as per the best practice recommendation of the OEM.

vii. Separate Disk groups shall be created for VMware and Database applications as per the best practice recommendations of the above-mentioned OEMs. IO sizing shall be done to ensure that there will be no bottlenecks.

viii. RAID 5 and RAID 10 groups shall be created as per the IT Team requirements for the applications and Data.

ix. The tape library shall be integrated with the fabric interface.

x. Symantec Net-backup applications shall be implemented, and the tape library shall be configured to backup all data via the backup application.

xi. Weekly full backup and daily incremental backup shall be performed on all data.

xii. Windows and Linux net backup agents shall be installed on the database and other important servers. Agent-based backup shall be performed for the DB2 operating systems.

xiii. Database and all other data shall be backed up through an LAN-free backup method.

The required method shall be disk-to-disk and tape for optimum performance.

d. VMware Virtual Environment Setup

i. Implement the VMware Vsphere environment.

ii. Setup the VMware Vcenter server, integrate the Vcenter server with the Active

Directory-based authentication and access control.

iii. Implement DRS, Vmotion, fault tolerance on the VMware and ESXi servers and integrate them with the Vcenter for centralized management.

iv. Present RAID-10 and RAID-5 LUN’s to the VMware environment. The RAID groups and Disk spindles shall be configured as per the best practices for VMware environment.

v. Create a dedicated VMnetworks for user access and internal communication.

vi. Create a High-Availability and failover VMware DRS Cluster to ensure that the virtual machines would failover on to the other available nodes in case of failure of any node in the Cluster.

vii. Create Virtual Machine templates for Linux, Windows virtual machines based on approved drawing package.

viii. Virtual Machine Operating system partition shall be on the RAID-10 and the Swap space shall be configured in the Local Disks of the VMware Server. Additional storage shall be configured for the Virtual machine as per the approved drawing package and recommendation of the IT Team.

e. Operating System and Application Environment Setup

i. Implement Jboss/Glassfish cluster environment on 4 nodes on Red Hat Express Linux (RHEL) 6.x and updated with the latest patches and fixes. Performance tuning shall also be performed as per the best practice recommendations.

ii. Implement HAPROXY application for network load balancing on two Virtual Machines and configure the Network Load Balancing (NLB) solution. Ensure that the NLB distribute the load across the application server instances.

iii. Migrate the existing mPower CIS, CRM, Mobile app, E.A and other application modules from the physical legacy servers to the virtual servers without any impact to the production environment as per the needs of the mPower stack, including network ports.

iv. Install the Secure Sockets Layer (SSL) Certificate on the mPower servers using the appropriate name.

v. Install Microsoft GP 2015 R5 environment with 2 database nodes, two application nodes and two web service nodes clustered for high availability through network load balancing or Microsoft cluster services.

vi. Microsoft Great Plains ERP system deployment, which documents best practices, must be implemented while configuring the system for operations. Web client must be configured, and appropriate SSL must be implemented. The application must be securely published over the internet.

vii. Structured Query Language (SQL) Server data needs to be provisioned on the SAN storage on high speed LUNs. The backup for the application must be configured.

f. Database Environment Setup

i. IBM DB2 Ver 10.5 Database environment shall be implemented on the two node/high availability clustered environment to ensure that the database instance continues to function normally, even if one of the servers experiences a failure.

ii. The database environment shall be implemented on the RHEL operating system as per the best practice recommendation of the IBM storage output (IO). The performance calculation shall be carried out based on the requirements of the mPower application to ensure that there will not be a bottleneck during peak load time.

iii. Migrate the existing databases from the legacy DB2 server to the newly-built clustered environment without any impact and update with the latest patches.

iv. SAN storage shall be configured according to the database requirements of the mPower team. Dedicated Logical Unit Numbers (LUNs) shall be configured for various databases to ensure that the load impact on one of the applications shall not be placed on the other databases. IO intensive logs shall be placed on the RAID 10 LUNS and the Database files shall be configured on the RAID 5 LUNS.

g. Existing Data Center (DC) and New Disaster Recovery Center (DRC) - Replication Setup

i. Implement the storage-based replication between the DC and DRC SANs. Configure the application and policies to ensure that the replication takes place in a timely manner with less overhead.

ii. Implement data replication between the DC and DRC in a periodical manner with minimum time lag. The DR environment should have all the critical data available which would be similar to the production environment.

iii. DRC setup shall be configured in a similar way to the production environment. It shall be configured in a standby mode which would be activated in case there is a failure in the DC

iv. DR activation instruction document shall be developed with activities to be performed during failover/switchover between DC and DR environments.

Deliverables under Sub-Task No.2.1:

a) Disaster Recovery Plan

b) Documentation of the system

c) Design Drawings

d) Technical Assessment Report

e) Software and equipment installed and configured

f) Diagram of the entire IT Infrastructure and Systems

Sub-Task No.2.2: Supply of Equipment

Supply the equipment listed in Schedule No. 1 below

Deliverables under Sub-Task No.2.2:

• Equipment in Schedule No. 1 supplied

Sub-Task No.2.3: Equipment Configuration and Data Migration

a. Once the production and DRC environments are implemented, configured and tested, plans shall be made to migrate databases and applications to the new environment in a phased manner via an appropriate timeline.

b. A clear plan regarding such migration, which details the impacts and back-off options shall be submitted. The contractor shall ensure that the migration will be smooth and there will be no major issues during the migration.

c. The contractor must get a written confirmation from the USAID COR stating that the production environment is built as per the scope of work and is production ready. Without this confirmation, the environment will not be allowed to move into production

Deliverables under Sub-Task No.2.3:

• Data successfully configured and migrated to new servers

Sub-Task No.2.4: Networking and Installation of Equipment

1. Commissioning and Configuration of the Supplied System

a. A testing and development environment shall be configured on the VMware virtual

b. The test environment shall have a set of application and database nodes configured with the same versions of the software components and it shall be similar to the production

c. The test environment shall be populated with test data provided by the mPower team at

DABS.

2. Develop detailed documentation of the environment

a. Detailed documentation shall be provided by the contractor for the entire environment along the complete design package.

b. Network documents shall be submitted. Documents shall be comprised of the overall development of the network, as well as configurations made on network equipment. It should include the routing and switching details, firewall policies and other parameters which are critical to the overall environment.

c. Storage documents shall be submitted. Documents should describe the overall storage implementation, configuration and integration. It should provide clear details on the RAID groups, LUNs created, as well as zooming details of the fabric switches.

d. Backup documents, including the overall setup and configuration of the backup application, as well as policies and jobs configured. It should also detail the setup of the backup library, connectivity and operational process of the entire backup solution.

e. The application environment shall be documented along with the database and application setup and configuration. The document shall detail the overall setup for mPower application functionality.

f. A detailed document along with the position of the servers, racks and other equipment which shall clearly indicate the equipment position and overall view of the IT infrastructure built for mPower.

Deliverable under Sub-Task No.2.4:

Successful completion of networking and installation of Equipment infrastructure

Sub-Task No.2.5: System Operation and Management (O&M)

- Under this task, the Contractor shall develop O&M manuals for Disaster Recovery System.

- The O&M manual shall be practical and specific to the Disaster Recovery System.

Deliverables under Sub-Task No.2.5:

• O&M manuals for new recovery data center system and equipment.

Task No.3: Load Centers

The scope of work at the five (5) load centers involves only the supply of equipment listed in schedule No. 2 (A and B) to support and improve the current applications. The contractor shall supply the equipment at one central location and DABS will be responsible for distribution and installation at the load centers.

Deliverables under Task No.3:

• Equipment listed in Schedule No. 2 (A and B) supplied

Task No.4: Training and Knowledge Transfer for Data Centers

a. Conduct a detailed training and knowledge transfer session for the DABS IT team for a minimum 3 days, explaining the overall implementation and configuration performed. The training session shall be an interactive session with the IT Team, demonstrating the setup and configurations of various equipment applications and troubleshooting.

b. The Contractor must prepare and submit training plan and manuals for COR’s approval prior to the commencement of the training.

c. The training material shall be specific to the existing and new system.

d. Printed copies of the documentation described as above in the documentation scope shall be provided to the DABS IT team during the training and handover session.

Deliverables under Task No.4:

• Training Plan

• 3-day training completed

C.4 List of Equipment

C.4.1 Schedule No. 1: Servers and Back-End Infrastructure - Equipment for IT Disaster Recovery Data Center

No. Item Description of Goods Qty.

1 Servers

Production Data Center

2U Rack mountable server Processors Dual x Intel(r) Xeon(r) E5-2687W-V3 3.1GHz,25M Cache,9.60GT/s QPI,Turbo,HT,10C/20T (160W) Max Mem 2133MHz.

If the E5-2687W-V3 processor is discontinued, an equivalent or higher new generation v4 processor to be proposed Memory 128GB DDR4 RAM Balanced for two processors, The Server Should be populated with Identical DIMMs across all the Four (4) Memory Channels of Each Processor for Optimal Performance.

Memory Protection Should support – Advanced ECC & Online-spare Maximum Memory should be supported 256GB or More Should have front and rear USB & Display ports Integrated Graphics controller supporting 1280 x 1024 resolution PCI Expansion Slots shall be offered with Minimum Two PCI Express Gen 3.0 Slots with at least One PCIe 3.0 X16 Slot.

RAID controller with 1GB or More Read & Write Cache System should support 10 or more 2.5 Inch Hot plug SAS hard disk drives & SSD drives SAS 600GB 15K RPM Hot plug Hard Disk drives 4No’s Networking 2 x 1GbE Ethernet Ports, 2 X 10GB –T Ethernet Ports 16 GB FC HBA: Dual port Fiber Channel Host Bus Adapter The System should support Microsoft Windows 2012, Redhat enterprise Linux or equivalent The Systems Management software should provide IP based console access for

- Monitoring and management of hardware components

- Access to error logs; - Integrated Management Log (IML); - Configuration of RAID;

- Support to SNMP based alerts; - Management software should support popular monitoring applications; -Power and cooling; Redundant 750 Watt or more Hot Plug Power Supplies; -Hot plug fans; -Industry compliance; Form factor/Chassis depth Rack 2U Rack mountable; Serviceability easy install rails Standard easy install rack mountable rail kit

2 FC SAN

Storage for Production Data Center

Fiber Optic SAN Storage with below specifications Storage Type : Fiber optic SAN with two Active - Active Controllers Minimum 4GB or more Cache per controller Minimum 2 or more 16 GB FC Interface ports with Transceiver modules Protocols to be supported: FC Drives to be supported: SSD,SAS,NLSAS Support expansion up to 2 Disk enclosures or more than 50 SFF SAS Drives Hosts to be supported: 25 or more Number of Luns to be supported : 100 or more Data Protection: Snapshot, Volume Copy features should be enabled Snapshot : License shall be included for Minimum 50 or above Snapshots per system Required License shall be included for Drive Copy / Volume copy.

Thin Provisioning feature should be enabled Support for Data copy to move data across volumes to position it based on the demand, required licenses should be included Should support remote data replication to similar array.

Required licenses should be included Operating system support: Redhat Linux, Microsoft Windows 2008, 2012, Suse and Fidora Linux or equivalent Management : Unified Management through Web Browser or console Virtualization Support : Vmware vSphere Shall Support Nondisruptive software / firmware upgrades Required Disk Drives 10 No’s x 400GB 2.5” Mainstream Solid State Drives 10 No’s x 900GB SAS 10K RPM HDDs 8 No’s x 6TB NLSAS 7.2K RPM HDDs 10Meter FC Cables to establish 16Gb connectivity between the servers, FC switch and Storage- 20 NO's 16 Gb Dual Port FC HBA adapters compatible to Dell Power edge 630 Servers. 8 No's or equivalent

3 Fabric Switches for Production Data Center

16GB Fiber Optic SAN Switches for the SAN storage

- 24 Port Fiber channel switch

- 12 ports activated with required license & preinstalled with 16 Gb SFP Transceiver Modules

- Redundant Power supplies

- Port Types : D_PORT (DIAGNOSTIC PORT), E_PORT, EX_PORT, F_PORT, M_PORT (MIRROR PORT); SELF-

DISCOVERY BASED ON SWITCH TYPE (U_PORT);

OPTIONAL PORT TYPE CONTROL

- Class of Service : CLASS 2, CLASS 3, CLASS F (INTER-

SWITCH FRAMES)ISL TRUNKING

- Non disruptive firmware upgrades

- Support for web based / console based management

- Rack mountable with required rails / tools

- Software drivers power cables etc.

4 SAN

Storage for Disaster Recovery Centre

Fiber Optic SAN Storage with below specifications Storage Type : Fiber optic SAN with two Active - Active Controllers Minimum 2GB or more Cache per controller Minimum 2 or more 8 GB FC Interface ports with Transceiver modules Protocols to be supported: FC Drives to be supported: SSD,SAS,NLSAS Support expansion up to 2 Disk enclosures or more than 50 SFF SAS Drives Hosts to be supported: 25 or more Number of Luns to be supported : 100 or more Data Protection: Snapshot, Volume Copy features should be enabled Snapshot : License shall be included for Minimum 50 or above Snapshots per system Required License shall be included for Drive Copy / Volume copy.

Thin Provisioning feature should be enabled Support for Data copy to move data across volumes to position it based on the demand, required licenses should be included Should support remote data replication to similar array.

Required licenses should be included Operating system support: Redhat Linux, Microsoft Windows 2008, 2012, Suse and Fidora Linux or equivalent Management : Unified Management through Web Browser or console Virtualization Support : Vmware vSphere Shall Support Nondisruptive software / firmware upgrades Required Disk Drives 10 No’s x 900GB SAS 10K RPM HDDs 10 No’s x 6TB NLSAS 7.2K RPM HDDs 10Meter FC Cables to establish 8Gb connectivity between the servers, FC switch and Storage- 10 NO's

5 Servers for Disaster Recovery Site

2U Rack mountable server Processors Dual x Intel(r) Xeon(r) E5-2687W-V3 3.1GHz,25M Cache,9.60GT/s QPI,Turbo,HT,10C/20T (160W) Max Mem 2133MHz.

If the E5-2687W-V3 processor is discontinued, an equivalent or higher new generation v4 processor to be proposed Memory 128GB DDR4 RAM Balanced for two processors, The Server Should be populated with Identical DIMMs across all the Four (4) Memory Channels of Each Processor for Optimal Performance.

Memory Protection Should support – Advanced ECC & Online-spare Maximum Memory should be supported 256GB or More Should have front and rear USB & Display ports Integrated Graphics controller supporting 1280 x 1024 resolution PCI Expansion Slots shall be offered with Minimum Two PCI Express Gen 3.0 Slots with at least One PCIe 3.0 X16 Slot.

RAID controller with 1GB or More Read & Write Cache System should support 10 or more 2.5 Inch Hot plug SAS hard disk drives & SSD drives SAS 600GB 15K RPM Hot plug Hard Disk drives 2 No’s Networking 2 x 1GbE Ethernet Ports, 2 X 10GB –T Ethernet Ports 8 GB FC HBA: Dual port Fiber Channel Host Bus Adapter The System should support Microsoft Windows 2012, Redhat enterprise Linux or equivalent The Systems Management software should provide IP based console access for

- Monitoring and management of hardware components

- Access to error logs, - Integrated Management Log (IML), - Configuration of RAID

- Support to SNMP based alerts, - Management software should support popular monitoring applications, --Power and cooling Redundant 750 Watt or more Hot Plug Power Supplies, -Hot plug fans -Industry compliance , Form factor/Chassis depth Rack 2U Rack mountable Serviceability easy install rails Standard easy install rack mountable rail kit

6 Fabric Switches for Disaster Recovery site

24 Port 8GB Fiber Optic SAN Switch

- 8 ports activated & Licensed and Preinstalled with 8Gb SFP Modules

- Redundant Power supplies

- Port Types : D_PORT (DIAGNOSTIC PORT), E_PORT, EX_PORT, F_PORT, M_PORT (MIRROR PORT); SELF-

DISCOVERY BASED ON SWITCH TYPE (U_PORT);

OPTIONAL PORT TYPE CONTROL

- Class of Service : CLASS 2, CLASS 3, CLASS F (INTER-

SWITCH FRAMES)ISL TRUNKING

- Non disruptive firmware upgrades

- Support for web-based / console based management

- Rack mountable with required rails / tools

7 UPS System 60 KVA Smart UPS System Panasonic Maintenance free Batteries OR Equivalent Batteries to provide 60 Mins backup @ 80% Load Battery banks to be supplied based on required number of batteries Should support N+X parallel with sharing the same battery bank

INPUT

Nominal Voltage : 380 VAC (L-L)/220VAC(L-N) Voltage range : 210-475 VAC(L-L)/121-275VAC(L-N) Power factor : > 0.99

THDI : < 3%

Dual mains input Support Input Connections : Three-phase four wires + grounding

OUTPUT

Voltage :…