RFP - Host Server Replacement FY24.docx
DOCX document 31 KB Posted
- Attached to
- HOST SERVER REPLACEMENT RFP - FY24
- Solicitation number
- RFP - ADVA - 240000000963
- Issued by
- Wayne County, Dearborn City, Michigan
About this file
This document is a Request for Proposal (RFP) issued by the Advanced Technology Academy in Dearborn, Michigan for the HOST SERVER REPLACEMENT project in fiscal year 2023-2024. The Academy is seeking bids for the replacement of their host server hardware, including licensing and installation services to upgrade the current operating systems to the latest supported versions of Windows Server. The RFP provides details on the current server environment and specifications for the proposed replacement hardware, which should be a HPE ProLiant DL360 Gen10+ or equivalent. Vendors are required to submit their bids by February 2, 2024 at 1:00 PM, and the Academy reserves the right to make modifications to the RFP timeline. The contract work is anticipated to be carried out during the Academy's spring break from March 23-31, 2024.
The RFP outlines the pricing and warranty requirements, including the need for vendors to provide costs for one and three-year support. Vendors are also asked to provide solutions for repurposing the outgoing hardware as a backup or redundant host. The Academy is exempt from federal excise and sales taxes, and all proposals must comply with applicable federal, state, and local codes and regulations. The RFP is open to all qualified vendors, and the Academy reserves the right to reject any and all bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Host Server Replacement - Q | — | |
| Host Server Replacement - Addendum 2.pdf | ||
| Host Server Replacement RFP - Pricing Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVANCED TECHNOLOGY ACADEMY
HOST SERVER REPLACEMENT RFP
FY 2023-24
SECTION 1
REQUEST FOR PROPOSAL
Reference: HOST SERVER REPLACEMENT RFP – FY24
| Bid Due: | February 2, 2024 at 1:00 p.m. | |
| Advanced Technology Academy | ||
| 4801 Oakman Boulevard | ||
| Dearborn, MI 48126 |
Introduction:
You are invited to submit your proposal and bid response on the enclosed forms in accordance with the Request for Proposal, Instructions to Bidders, and General Requirements contained within this bidding package entitled: HOST SERVER REPLACEMENT RFP – FY24
Instructions to Bidders:
Bids must be submitted on attached forms.
Bids must be labeled “HOST SERVER REPLACEMENT RFP – FY24”
| Advanced Technology Academy |
| Attn: Danielle Corbeil |
| 4801 Oakman Boulevard |
| Dearborn, MI 48126 |
Bids must be received by February 2, 2024 at 1:00 p.m. Bids received after February 2, 2024 at 1:00 p.m. will be not be evaluated.
No oral, telephonic, telegraphic, e-mail or facsimile proposals will be considered.
SECTION 2
GENERAL REQUIREMENTS
2.1 Proposals shall be submitted only on the forms provided within this RFP. All designations and prices shall be fully and clearly set forth on the forms provided.
2.2 Advanced Technology Academy’s Representatives reserve the right to reject any and all bids either in whole (or in part) to reject a Bid which is in any way incomplete or irregular, and to waive informality or wave any part thereof.
2.3 THE BIDS SHALL BE ON THE BASIS OF A GUARANTEED SUM. BIDDERS SHALL NOT ADD ANY CONDITIONS OR QUALIFYING STATEMENTS, NOR SALL THE PROPOSAL CONTAIN ANY ADDED RECAPITULATION OF THE WORK TO BE DONE, OR THE PROPOSALS MAY BE DECLARED IRRECULAR. Oral, telegraphic, or telephonic modification of the work will not be considered.
2.4. Advanced Technology Academy will clarify or correct any questions by issuance of an Addendum to all Bidders.
2.4.1 Addenda are written graphic instruments issued prior to the contract, which modify or interpret the bidding documents, drawings, and/or specification, by additions, deletions, clarifications, or corrections. The Request for Proposal and all Addenda will become part of the contract documents when the installation contract is executed.
2.4.2 Any explanations for the RPF shall be issued in the form of an addendum.
2.4.3 All addenda issued during the bidding time shall become part of the specifications. A copy of each addendum shall be sent to all Bidders. No verbal statement by Advanced Technology Academy or the Bidder shall be considered authoritative.
2.4.4 Each Bidder shall ascertain, prior to submitting a bid that he/she has received all addenda issued and acknowledges receipt on the Proposal Form.
| 2.5 | Questions are to be submitted in writing no later than January 26, 2024 to: |
| Danielle Corbeil | |
| Veritas Accounting, LLC | |
| daniellec@veritasacctg.com |
2.6 Respondents may inspect the project site prior to submitting a proposal to determine all requirements associated with this Request for Proposal. Failure to do so shall not relieve the successful vendor from the necessity of furnishing and installing, without additional costs to the Academy, any material and equipment or performing any labor that may be required to carry out the intent of the resulting contract.
2.7 NO PLEA OF INGNORANCE OF CONDITIONS THAT EXIST, TIME, FACILITES THAT ARE AVAILABLE OR ANY OTHER RELEVANT MATTER CONCERNING THE WORK TO BE PERFORMED WILL BE ACCEPTED AS AN EXUSE FOR FAILURE TO FULFILL EVERY DETAIL OF ALL THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2.8 VARIANCE & PRICES
Any variance from the specifications shall be fully explained in writing by the bidder and all prices quoted shall be on the unit price basis.
2.9 WITHDRAWAL OF BIDS
Any bidder may withdraw his/her bid at any time prior to the scheduled time of opening the bids, upon presentation of proper identification. After the opening of bids, no proposal shall be withdrawn for a period of 60 days.
2.10 SIGNATURES
The signatures required on this form shall be in longhand, in ink, by an authorized representative and submitted with the bid. Bids in non-compliance with this request will be subject to rejection.
2.11 PRODUCTS/SERVICES SPECIFICATIONS
It is the intent of the specifications to define the minimum quality of equipment and services acceptable. The product line or service must be of a known quality from a nationally recognized manufacturer(s) who regularly advertises, promotes, and distributes catalog products to the school market.
2.12 MANUFACTURER SUBSTITUTIONS
Any substitutions from the specified products, equipment or services by the manufacturer is acceptable at no additional cost to Advanced Technology Academy. Advanced Technology Academy reserves the right to refuse any and all manufacturer substituted products, equipment or services.
2.13 CLEAN UP
The vendor shall, at all times, keep the premises free from accumulations of waste materials, or same, caused by the work; and upon completing the work, shall remove all work-related rubbish from and about the building and shall leave the work area broom clean, or its equivalent. In the case of dispute, the Academy may remove the rubbish and charge the cost to the vendor, as the Academy shall determine.
2.14 FEDERAL, STATE AND MUNICIPAL TAXES
Each proposal submitted shall include, and the vendor shall pay, all taxes, which are levied by the Federal, State, and Municipal Governments, on labor and for materials entering the work. The owner reserves the right to require evidence of such taxes prior to final payment. In compliance with the regulations of the Michigan Sales Tax Commission, no sales tax is to be included in the proposal. The Academy is exempt from Federal Excise and Sales taxes. All property or services furnished must comply with all applicable federal, state, and local codes and regulations.
2.15 RFP TIMELINE
The Academy’s anticipated timeline for this RFP is as follows:
| Issuance of the RFP | January 19, 2024 | |||
| Deadline for written questions | January 26, 2024 | |||
| Due date for Proposals | February 2, 2024 (1:00pm) | |||
| Bid Opening | February 2, 2024 (1:05pm) | |||
| Academy’s Consideration of Proposals | February 2024 | |||
| Commencement of Work | March 23-31, 2024 (Spring Break) |
Please note: This is an anticipated timeline based on when the school will have available time for installation of the new hardware. The Academy reserves the right, in its sole and absolute discretion, to make modifications to the RFP timeline.
SECTION 3
QUALIFICATIONS OF BIDDERS
3.1 The respondent to this RFP must include:
· Company Name
· Representative’s Name and Title
· Office Address
· Telephone Number
· Fax Number
· E-Mail Address
| 3.2 | The respondent will provide the location of Corporate Headquarters |
| 3.3 | The respondent will provide the location of sales, installation, and support office(s) |
| 3.4 | The bidder will provide a brief, but complete history of the company: |
| 3.5 | All respondents to this Request for Proposal must submit with their proposal a list of current and past clients where similar services have been performed. References should include name, address, telephone number and contact information. |
SECTION 4
SPECIFICATIONS AND PRICING
4.1 CURRENT ENVIRONMENT
Currently, all services are designed as a SAN to migrate services across available resources; three (3) ESXi hosts, in addition to standalone physical servers.
Below is a current snapshot of the Academy’s environment:
| Server |
| Processor |
| Memory Capacity GiB |
| OS Name |
| Device Make |
| Device Model |
| MEALMAGIC12 |
| Intel(R) Core (TM) i5-3570 CPU |
@ 3.40GHz @ 3.4 GHz
| 15.8 |
| Windows Server 2012 R2 Standard Edition |
| Lenovo |
| 2992E4U |
| ATA-HP7 |
| Intel(R) Xeon(R) CPU |
E5-2643 v3 @ 3.40GHz @ 3.4 GHz
| 31.87 |
| Windows Server 2012 R2 Standard Edition |
| HP |
| ProLiant DL360 Gen9 |
| ATA-GRE |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 32 |
| Windows Server 2012 R2 Standard Edition |
| VMWare, Inc |
| VMware Virtual Platform |
| ATA-HP13 |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 16 |
| Windows Server 2016 Standard Edition |
| VMWare, Inc |
| VMware Virtual Platform |
| ATA-VDC1 |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 16 |
| Windows Server 2012 R2 Standard Edition |
| VMWare, Inc |
| VMware Virtual Platform |
| ATA-HP10 |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 8 |
| Windows Server 2012 R2 Standard Edition |
| VMWare, Inc |
| VMware Virtual Platform |
| VCENTER |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz
| 16 |
| Windows Server 2012 R2 Standard Edition |
| VMWare, Inc |
| VMware Virtual Platform |
| ATA-LAN |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 7.99 |
| Microsoft Windows Server 2008 R2 Standard Edition |
| HP |
| ProLiant DL380 G6 |
| ATA-HP1 |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 7.99 |
| Microsoft Windows Server 2008 Standard Edition |
| VMWare, Inc |
| VMware Virtual Platform |
| ATA-COS1 |
| Intel(R) Xeon(R) CPU |
E5540 @ 2.53GHz @ 2.53 GHz
| 16 |
| Windows 10 |
| VMWare, Inc |
| VMware Virtual Platform |
4.2 SPECIFICATIONS:
Hardware: HPE ProLiant DL360 Gen10+, or equivalent. The vendor can use best judgment on manufacturer.
Licensing/Installation: Vendors should proposal all licensing and labor services to upgrade the current Oss to the latest supported Windows Server operating system. The Academy also requests the vendor provide a project plan/timeline.
The Academy welcomes solutions vendors propose to achieve modernizing the current server structure environment. However, it is requested that the vendor demonstrate how its proposal will be effectively supported and be the most cost-effective solution. Additionally, the Academy welcomes solutions to repurpose the outgoing hardware as a back-up/redundant host.
4.4 PRICING
Complete and attach the excel form in Section 4. The spreadsheet must be completed entirely for all components that are bid by the vendor:
a) Part Number
b) Hardware description – if the hardware description differs from the proposed hardware description, the vendor should change and highlight the new description.
c) Quantity – if there is any change in quantity from the requested quantity, the field must be highlighted.
d) Unit Price
e) Extended Price
f) Installation costs – provide all install costs for the proposed product(s), if requested in the hardware description field
g) Include the costs for one (1) and three (3) -year support for all products
Total Base Bid: (Total must match the total from the spreadsheet)
Section 4.2 Base Bid Total: $ __________________
I have examined the specifications and instructions included herein and agree, provided I am awarded a contract within 60 days of the bid due date, to provide the specified items form the sum shown in accordance with the terms stated herein. All deviations from specifications and terms are in writing and attached hereto.
Company Name:
Address:
Name/Title
Authorized Signature:
Email Address:
Phone Number:
Cellular Number:
Date:
File details come from the government source that posted it. Updated .