This is a Request for Proposal (RFP) issued by the Town of Frisco Public Works Department in Colorado, seeking a qualified firm to provide comprehensive water tank rehabilitation and maintenance services for two municipal water storage tanks. The project involves design-build services for the 870,000-gallon Dillon Dam Road water tank and the 500,000-gallon North Tenmile Creek water tank, with work scheduled for May through October 2025. The RFP was released on February 21, 2025, with proposal submissions due by March 14, 2025 at 5:00 pm. The scope includes detailed tank inspections, engineering evaluations, design services, construction activities such as coating removal and reapplication, installation of new tank components, and optional five-year maintenance services from 2025-2030.
The Town will evaluate proposals based on a weighted criteria system: Fee Schedule (35%), Project Approach (25%), Qualifications and References (20%), and Project Manager and Personnel (20%). Proposers are encouraged to visit the site prior to submission and should provide comprehensive documentation including organizational information, project references, personnel qualifications, project methodology, and a detailed fee schedule. The contract is structured to allow the Town flexibility in awarding portions of the scope, with the potential to proceed only with the 2025 construction work and potentially opt out of the five-year maintenance period. The Town's standard construction contract includes a two-year general warranty for materials and work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
Frisco Water Tank Rehabilitation and Maintenance Services
Release Date: February 21, 2025 Submittal Deadline: March 14, 2025 at 5:00pm
Public Works Town of Frisco
102 School Road Frisco, CO 80443
Request for Proposals – Frisco Water Tank Rehabilitation and Maintenance Services
TABLE OF CONTENTS
1. Invitation
2. Background
3. Scope of Work
4. Schedule
5. Instructions
6. Proposal Requirements
6.1 Cover Letter
6.2 Organizational Information
6.3 Qualifications and References
6.4 Project Manager and Personnel
6.5 Project Approach
6.6 Fee Schedule
6.7 Project Schedule
8. Questions and Answers
9. Evaluation Criteria
10. Selection Process
11. Attachments
1. Invitation
The Town of Frisco (hereinafter referred to as “Town”) is seeking proposals from firms (hereinafter referred to as “Proposer” or “Consultant”) to provide rehabilitation and maintenance services as outlined in this document for the Town of Frisco’s 870,000 gallon Dillon Dam Road water storage tank and the 500,000 gallon Ten-Mile Creek water storage tank.
2. Background
The Town of Frisco is located in Summit County near Interstate 70 and Highway 9. The Town has approximately 3,000 year-round residents and approximately four million visitors per year.
Currently the Town of Frisco Water Division serves an estimated 4,500 individuals through 2,200 water service taps in a distribution system with over 35 miles of pipeline. The Water Division is part of the Town of Frisco Public Works Department and operates as an Enterprise Fund for the Town of Frisco. The Town’s water supply is provided through four different water sources; one surface water treatment plant and three groundwater wells which produce roughly 740 acre-feet of water, annually. The storage capacity of the Town’s water system includes three storage tanks which hold 2.5 mil gallons of finished water combined. Two of the storage tanks are above ground, welded steel storage tanks which hold 500k and 870K gallons individually, while the other tank is a buried concrete tank with a 1.2 mil gallon capacity.
The Dillon Dam Road water tank is located between Dillon Dam Road and I-70 and is located on forest service property. The tank was constructed in 1980 and is an at-grade steel tank with an 870,000 gallon capacity. Interior inspections have been completed at five year intervals and minor maintenance has been completed, but there is no documentation of major maintenance completed on the tank since its construction. Inspections have documented tank corrosion and degradation of exterior insulation on the tank. Access to the tank is from Dillon Dam Road. The current access road contains very steep grades and difficult access. A separate construction project is scheduled for April/May 2025 to realign the access road to improve access for this project.
The North Tenmile Creek water tank is located northwest of I-70 near Exit 201. The tank was constructed in 1970 and is an at-grade steel tank with a 500,000 gallon capacity. Interior inspections have been completed at five-year intervals and minor maintenance has been completed, but there is no documentation of major maintenance completed on the tank since its construction. Inspections have documented tank corrosion and degradation of exterior insulation on the tank. The Tenmile Creek tank is located on property owned by Denver Water and operated by the Town of Frisco through existing agreements.
3. Scope of Work
The Town is seeking a qualified and experienced firm to provide inspection, design, rehabilitation, and maintenance services for the Dillon Dam Road and Tenmile Creek water tanks. The Town desires to enter into a design-build contract for professional turn-key services. Proposals and subsequent contracts shall include both design and construction services (Town does not intend to contract the construction separately).
The following scope items shall be included in project proposals:
1. Inspection: Conduct a detailed inspection of the tank interior and exterior including the tank foundation, steel structure exterior, steel structure interior, coatings, insulation, hatches, access ladders, overflow pipes and screens, vent pipes and screens, railings, gaskets, valves, security fences, and all other structures and equipment associated with the water tanks.
2. Design Services: Complete an engineering evaluation which includes the following minimum items:
a. Engineering report detailing inspections and recommendations for rehabilitation/maintenance work required to mitigate existing corrosion/issues, extend tank service life, improve functionality, and comply with Town/CDPHE/AWWA and other relevant codes.
b. Construction documents (drawings/details) which include all information needed to construct recommended improvements from item (a) above.
c. Specifications for coatings and other recommended work.
d. Hydraulic analysis to determine any requirements for taking tanks offline while still providing minimum flow requirements to system. Options may include schedule requirements to bring tanks offline during low use season (see above), specifications for temporary water tanks, or other temporary modifications to the water system. Plan shall also include tank shutdown protocols including valve and pump operations.
3. Construction Services – Dillon Dam Road Tank (2025): Contractor shall either complete or subcontract the following construction services. The following list includes the services anticipated by the Town of Frisco. Proposers are encouraged to visit the site prior to submitting a proposal and include any additional items recommended. Work shall be completed in accordance with project specifications, CDPHE standards, and AWWA standards.
a. Erosion control and containment around the structure of debris, dust, and hazardous materials.
b. Remove existing two-inch insulative foam covering on the tank exterior.
c. Complete removal of exterior coating system through abrasive blasing.
d. Apply exterior coating application (including primer, final coating, and color as approved by Town).
e. Complete removal of interior coating system on the wet interior surfaces, including abrasive blasting, grinding, and removal of irregularities.
f. Seal all roof openings and roof penetrations.
g. Apply interior coating application (including primer and coating).
h. Install wet interior ladder with a fall prevention device.
i. Install tank mixing device.
j. Remove and install new tank level indicator.
k. Remove and install new aluminum frost-free vent.
l. Install a new 24-inch roof access manway with protective handrail.
m. Install a new 24-inch shell access pressure manway.
n. Remove safety cage and install new ladder, ladder shield, and ladder cage.
o. Clean existing overflow pipe and install a replacement screen.
p. Install new locks for roof hatches.
q. Replace shell manway bolts and gaskets.
r. Replace missing/loose grout.
s. Install new locking ladder shield.
t. Replace or bolster existing chain-link fence to increase security of water tank.
u. Tank disinfection in accordance with AWWA.
v. Mobilization, performance/payment bonds, and insurance required.
w. Two-year general warranty of all work.
4. Construction Services – North Tenmile Creek Tank (2025): Contractor shall either complete or subcontract the following construction services. The following list includes the services anticipated by the Town of Frisco. Proposers are encouraged to visit the site prior to submitting a proposal and include any additional items recommended. Work shall be completed in accordance with project specifications, CDPHE standards, and AWWA standards.
a. Erosion control and containment around the structure of debris, dust, and hazardous materials.
b. Remove existing two-inch insulative foam covering on the tank exterior.
c. Complete removal of exterior coating system through abrasive blasing.
d. Apply exterior coating application (including primer, final coating, and color as approved by Town).
e. Complete removal of interior coating system on the wet interior surfaces, including abrasive blasting, grinding, and removal of irregularities.
f. Seal all roof openings and roof penetrations.
g. Apply interior coating application (including primer and coating).
h. Install wet interior ladder with a fall prevention device.
i. Install tank mixing device.
j. Remove and install new tank level indicator.
k. Remove and install new aluminum frost-free vent.
l. Install a new 24-inch roof access manway with protective handrail.
m. Install a new 24-inch shell access pressure manway.
n. Remove safety cage and install new ladder, ladder shield, and ladder cage.
o. Replace existing overflow pipe (approximately 75 feet).
p. Install new locks for roof hatches.
q. Replace shell manway bolts and gaskets.
r. Replace missing/loose grout.
s. Install new locking ladder shield.
t. Replace or bolster existing chain-link fence to increase security of water tank and prevent unauthorized access/graffiti at water tank.
u. Tank disinfection in accordance with AWWA.
v. Mobilization, performance/payment bonds, and insurance required.
w. Two-year general warranty of all work.
5. Maintenance Services (2026-2030): Complete additional inspection, maintenance, and warranty services for a five-year period. The Town may elect to not award the maintenance services phase. Therefore, proposers shall separate costs of maintenance services from design and construction services. Fee schedule shall include an annual cost for the maintenance and warranty services. All work in this period to be completed under the annual cost (no-cost to Town beyond the annual fee).
a. Complete annual inspections of water tanks and associated improvements. Submit inspection reports.
b. Periodic tank wash-out and exterior wash (proposer to submit scope and schedule of washing).
c. Inspection and repair of tank accessories.
d. Other coating or maintenance services recommended.
e. Warranty of all material and work completed in 2025.
Note: Item 5 services shall be separated from all other items, as Town may choose not to proceed with an extended warranty/maintenance period.
6. Meetings: Bi-weekly meetings during the design phase with Town Staff and weekly meetings during construction shall be included in proposal.
7. Project Base Mapping: The Town will provide as-builts, aerial imagery, lidar data, and GIS data. Additional base mapping required shall be included by Contractor.
8. As-Built Drawings: Contractor shall provide as-built drawings at completion of construction.
9. Construction Administration: Contractor shall include costs of engineering staff to provide construction administration and inspection services. Contractor shall submit final documentation, stamped by a professional engineer, confirming compliance with project documents and regulatory compliance.
4. Schedule
Below is an outline of milestone dates for the project. Proposers shall submit a more detailed schedule of proposed dates for inspections, design phase, and construction. The schedule shall contemplate Town water needs and minimize impacts to the system and maintain minimum water delivery requirements. The high water use season is considered June – August. It is anticipated that the Dillon Dam Road tank work would occur after high water use season to minimize system impacts.
• Advertisement of RFP February 21, 2025
• Questions Due March 7, 2025
• Proposal Deadline March 14, 2025, 5:00 pm
• Contract Award April 1, 2025
• Construction May – October 2025
• Maintenance/Warranty Period 2025 – 2030
Note: No mandatory pre-proposal meeting will be held for the project. However, proposers are encouraged to visit the site and complete preliminary tank inspections prior to submitting a proposal. Contact chrism@townoffrisco.com to schedule a site visit.
5. Instructions
One digital copy of the proposal shall be submitted via email to the address below. There is no limit on the number of pages or proposal size, but concise proposals are encouraged. Please note that files over 20 MB cannot be accepted via email and must be delivered through a file share service. Submittals must be received no later than 5:00 pm on Friday, March 14, 2025.
Contact: Chris McGinnis, PE, Public Works Director/Town Engineer Email: chrism@townoffrisco.com
The Town will not accept late proposals. The Town reserves the right to reject any or all proposals or accept what is, in its judgment, the proposal which is in the Town's best interest. The Town further reserves the right, in the best interests of the Town, to waive any technical defects or mailto:chrism@townoffrisco.com irregularities in any and all proposals submitted.
During the Request for Proposal selection process, all proposals shall remain confidential. The entire selection process (procurement) file shall be opened to the public (which includes all proposers) after an agreement is approved by the Town, except those items for which confidentiality has been requested in writing by the Proposer, and providing that the Town Attorney has reviewed and determined this to be properly confidential under the State Open Records Act and other relevant statutes and regulations.
This solicitation does not commit the Town of Frisco to award a contract, to pay any costs incurred with the preparation of a proposal, or to procure or contract for services or supplies. The Town of Frisco reserves the right to accept or reject any or all proposals received in response to this request, to negotiate with any qualified source, or cancel in whole or part this proposal process if it is in the best interest of the Town to do so. After contract negotiations, prospective consultants may be required to submit revisions to their proposals.
6. Proposal Requirements
6.1 Cover Letter
This letter should identify the proposer’s name, mailing address email address telephone number, and contact person. The letter should also identify key staff who will be working on the project, and commit them for the duration of the project, if selected. The letter should also state that the firm has read and understands the requirements of the RFP. This letter must be signed by a duly authorized official of the appropriate firm.
6.2 Organizational Information
Provide a statement of the proposer’s corporate status and background, organization structure, list of owners and principals, history, type of business conducted, and business locations.
6.3 Qualifications and References
List qualifications and ability of the proposer to meet the terms of the RFP. Include at least three examples of projects completed within the past five years that will confirm the proposer’s expertise in providing services listed in this RFP. Any experience with similar mountain towns should be included. Examples must be specific to the key staff identified in section 6.4. Examples shall also include any systems that are currently being maintained by the proposer. Each project shall include the following:
• Client Name
• Address
• Contact Person, Phone Number, and Email
• Project Dates
• Project Description
• Project Budget
6.4 Project Manager and Personnel
List the project manager and other key personnel who will contribute to the project. Describe the qualifications, experience, job title, years of experience, expertise, and availability of the manager and personnel.
Include a list of any subcontractors or subconsultants contributing to the project and include their qualifications, experience, superintendent, and personnel. The coatings/painting contractor shall be specifically identified and a narrative of their work experience shall be provided.
6.5 Project Approach
Provide a comprehensive description of the methodology and approach for completing the project scope described above. List milestones, steps, philosophical approach, and innovative ideas for the project approach.
The work and renovation plan for the tanks should include an assessment of their condition and expected improvements. This evaluation must cover, but is not limited to, an analysis of the internal and external structural integrity of the tanks and their appurtenances, the need for painting, and the condition of the foundation. Additionally, the plan shalloutline methods for managing and disposing of hazardous waste.
6.6 Fee Schedule
Proposer shall submit a schedule of rates and total costs applicable to each phase of the work as outlined in the project scope. Fees shall include all items to complete the scope of work from project kick-off to final completion. Rates shall reflect the allocation of key staff personnel and subcontractors to the project. This schedule of rates should include all information regarding reimbursable, ancillary services, payment schedules to subcontractors, add-ons, etc.
The fee schedule shall separate each item shown in scope of services to provide the ability to award only portions of the scope of work. Particularly, the Town may elect to proceed only with the 2025 scope of work only and exclude the five-year maintenance/warranty. The Town’s standard construction contract includes a two-year general warranty for all material and work provided on the project.
6.7 Project Schedule
Proposer shall submit a preliminary timeline of dates and schedule for scope of work from beginning to final completion. This schedule should generally follow the milestone dates in Section 4 of this RFP.
8. Questions and Answers
All questions concerning this RFP must be submitted by email to Chris McGinnis, Town Engineer of Town of Frisco, at chrism@townoffrisco.com by 5:00 pm on March 7, 2025. Addenda, reports, and responses to questions will be distributed by Tuesday, March 11, 2025. Any written question of a proposer regarding the meaning or interpretation of the RFP, work scope, specifications, etc., must be submitted to the TOWN prior to the above-specified date. All clarifications given to any prospective proposer shall be similarly furnished to all prospective proposers in summary form as an addendum to this RFP if the lack of such information could reasonably be considered prejudicial towards uninformed proposers.
9. Evaluation Criteria
The successful firm or team will be motivated to work with Town staff and will have expertise in the following areas:
• Inspection and design of water tank rehabilitation projects
• Water tank painting/coating expertise
• Design-build approach experience
• Strong safety record and approach to safety
• Ability to ensure state/regulatory compliance
The following is a list of weighted criteria that will be used to evaluate proposals:
Qualifications and References 20% Project Manager and Personnel 20% Project Approach 25% Fee Schedule 35%
10. Selection Process
The Town will select the Proposer it deems best for this project with consideration to price, experience, proposed project methodology, proposed timeline, references, and other materials presented by the firm.
The Town may invite Proposers to participate in interviews with the evaluation committee for the purpose of clarifying, confirming, or obtaining additional information on proposals. If interviews are held, they will be scheduled after the proposal deadline.
11. Attachments
Exhibit A Water System Map Exhibit B Water Tank As-Built Drawings Exhibit C Sample Contract
| 1. Invitation |
| 2. Background |
| 3. Scope of Work |
| 4. Schedule |
| 5. Instructions |
| 6. Proposal Requirements |
| 6.1 Cover Letter |
| 6.2 Organizational Information |
| 6.3 Qualifications and References |
| 6.4 Project Manager and Personnel |
| 6.5 Project Approach |
| 6.6 Fee Schedule |
| 6.7 Project Schedule |
| 8. Questions and Answers |
| 9. Evaluation Criteria |
| 10. Selection Process |
| 11. Attachments |