Exhibit B_As-Built Drawings.pdf
PDF 544 KB Posted
- Solicitation number
- RFP_2025_02_21
- Issued by
- Teller County, Colorado
About this file
The documents are As-Built Drawings for the Town of Frisco's Water System Improvements project, specifically for an 870,000-gallon East Side Reservoir and associated infrastructure. The drawings, prepared by Robellard & Associates Consulting Engineers in June 1980, detail the site plan and topographical layout for a water tank site, including a 500,000-gallon tank, a diversion structure, a pond, an infiltration gallery, and a grit chamber. The drawings provide technical site specifications with a scale of 1" = 10' and a contour interval of 2', showing the precise location and elevation details of water system components near Dillon Dam Road in Frisco, Colorado.
The project drawings reveal the complex topographical challenges of the water system installation, with detailed side views and cross-sections illustrating the site's terrain and the strategic placement of water infrastructure. The documents are part of a broader water system improvement initiative, suggesting municipal investment in water storage and distribution infrastructure. The drawings include technical annotations about elevation, tank positioning, and surrounding landscape features, indicating a comprehensive engineering approach to water system design and implementation in a mountainous region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I
OD
own
P%) j fjp con n0 Z OX Ul rTl
EXHIBIT B - AS-BUILT DRAWINGS
c
I
N s w m
O p m to
Am r2 o v
Z
W pA -rn
C
A =., E j + aF o„ a
F -r tn k t
U
Or r o
N m \
N
U0 r
A \
T ? / w • '`• ' °'
Q) n rn
Q) m o c o t
9/ a -ra e rvl m w \ e
M` a
Fpm _ ` n
A a \
T m z \/ y i
R l / tri m < \ `` w o \ w rt am d
Zt F / i w z n -- -- - -- \ m n nar
Z m
D T rn i
O y b
O arm
Oo a.
Fw
C
3w
O rim \ + a
Zm o2r \ \
Z n' m o z x
O \ ] p os mA
3 >°
CO y a
Q
CONTRACT
x r-
Revision
Dare
By
Description
SITE
PLAN
TOWN
OF
FRISCO
Design
N
R -
RlB
Checked
NLR
Date
June
Robe llafd &
Associates
Drawn
RLB
Scale
I" " ^
870,, 000' f
GALLON
EAST
SIDE
RESERVOIR
WATER
DEPARTMENT
F ` '
Consulting
Engineers
WATER
SYSTEM
IMPROVEMENTS
FRISCO
COLORADO
X `
Project
No
Sheet of
P.
O.
Box
2117, Won, Cokwodo
80435 a
468 -s w wu
M
A as c r c c y -a
Q
CONTRACT
x r-
Revision
Dare
By
Description
SITE
PLAN
TOWN
OF
FRISCO
Design
N
R -
RlB
Checked
NLR
Date
June
Robe llafd &
Associates
Drawn
RLB
Scale
I" " ^
870,, 000' f
GALLON
EAST
SIDE
RESERVOIR
WATER
DEPARTMENT
F ` '
Consulting
Engineers
WATER
SYSTEM
IMPROVEMENTS
FRISCO
COLORADO
X `
Project
No
Sheet of
P.
O.
Box
2117, Won, Cokwodo
80435 a
468 -s w wu
M
File details come from the government source that posted it. Updated .