The document is a Request for Proposals (RFP) issued by Holt Public Schools, specifically for the Midway Classroom Updates project at the Midway Early Learning Center located at 4552 Spahr Avenue in Holt, Michigan. The project involves flooring replacement for multiple classrooms (rooms 124, 126, 127, 128, 129, 130, 131) and two entrance ways, with a scope that includes removing existing flooring, preparing substrates, installing new Forbo flooring (MCT 3629 Frosty Grey) with Corkment underlayment, and installing new wall base. The project is scheduled for summer 2025, with a pre-bid meeting on April 18, 2024, bids due on May 2, 2024, and work to be completed between July 1 and August 10, 2025.
The RFP includes comprehensive requirements for contractors, including prevailing wage compliance, insurance specifications, performance and bid bonding, and detailed installation guidelines. The project also encompasses additional work such as cabinetry replacement in the specified rooms, using Wilsonart laminate, Corian countertops, and new sink and faucet installations that comply with the Filter First Law. Contractors must provide references demonstrating at least five years of successful experience, and the project includes strict material and installation specifications, including adhesive requirements, substrate preparation, and post-installation care. The total project involves multiple technical components beyond flooring, including plumbing upgrades and bottle filling station installations, with specific product requirements for materials and fixtures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOLT PUBLIC SCHOOLS
REQUEST FOR PROPOSALS (RFP)
Midway Classroom Updates
SUMMER 2025
HOLT PUBLIC SCHOOLS
DEPARTMENT OF FACILITIES MANAGEMENT
5780 WEST HOLT ROAD, DOOR #23, HOLT, Mi 48842
Purpose
Holt Public Schools is seeking bids for the replacement of flooring for the following two (2) school buildings (maps attached):
1. Midway Early Learning Center
4552 Spahr Avenue, Holt Mi 48842
Bid issued:
Pre-bid meeting: Friday, April 18 At 10:00 am, Midway Early Learning Center
Bid Due Date: Friday, May 2 at 1:00pm, Facilities Office 5780 W. Holt Rd, Door #23
Bid Opening: Friday, May 2 at 1:30pm, Facilities Office 5780 W. Holt Rd, Door #23
Commencement of Work: Work must be performed between July 1, 2025, and be completed by August 10, 2025
Submission of Proposal:
Description of the information and content required for your bid is attached. Please complete and add necessary information on additional sheets and return to:
Ryan Zoumbaris, Director of Facilities Holt Public Schools 5780 West Holt Road, Door #23 Holt, Mi 48842
Mark the return envelope: "Midway Classroom Updates" Contractor Name Contractor Address
Contractor Telephone Number
Late Proposals:
All responses must be printed and signed. The bidder assumes the risk of any delay in the mail or in the handling of the mail by employees of Holt Public Schools. Whether sent by regular mail or by means of personal delivery, the bidder assumes responsibility for having its bid deposited on time at the specified location.
Sole Bidder:
In the event that only one bid is received in response to the bid invitation, a detailed cost proposal will be requested of the single bidder. A cost/price analysis and/or audit of the proposal shall be performed by Holt Public Schools to determine if the price is fair and reasonable. Holt Public Schools reserves the right to accept or cancel the bid if only one is received. Holt Public Schools' decision will be final.
Suspended or Debarred Vendor:
Bidder must certify and affirm that it and its principals are not debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal department or agency from doing business with the Federal Government.
Returned Proposals:
All proposals received after the due date will be unopened and made available to the respective contractors to pick up at its sole cost and expense.
Signed Proposals:
Each proposal must be an original and hard copy, signed by an authorized member of the Contractor's firm. The members should be the highest-ranking officers at local level. NO ORAL, FAX or E-MAILED proposals will be accepted.
Each proposal must be submitted on the Proposal Forms attached to this RFP.
Copies of Proposal: The Contractor shall submit the original proposal and two (2) completed copies of the signed original proposal.
Opening Proposals: At the specified location and due date as stated above under "Submission of Proposal," all properly submitted proposals will be publicly opened and read aloud at 1:30 PM.
All interested parties may attend the proposal opening. No decision will be rendered at the proposal opening.
Email Clarifications: The district intends to communicate with contractors via email (example: clarifications and addendums). Except for the delivery of the proposal itself.
Additional Clarification Request: Prospective contractors may request that the district clarify information contained in this RFP. All such requests must be made by writing via email. The district will attempt to provide a written response to all written Requests for Clarification within five (5) business days after receipt of such request. The district will not respond to any Request for Clarification received after 4:00 PM on Monday, December 16, 2024. Requests for Clarification and inquiries must be made via e-mail.
All Requests for Clarification must be directed to Ryan Zoumbaris, Director of Facilities, at ryan.zoumbaris@hpsk12.net with subject line: "Flooring Replacement."
No response will be made to any oral questions. All questions and answers will be posted on the school district's website. It is each contractor's responsibility to check the website prior to the RFP due date to ensure that it has received all the information including, but not limited to, all addenda to this RFP.
Restrictions on Communication:
From the issue date of this RFP until a contractor is selected and the selection announced, a prospective contractor shall not communicate about the subject of this RFP or any contractor's proposal with the district, its Board of Education, or any individual member, administrator(s), faculty, staff, students, employees, or its construction manager, if any , except for additional Requests for Clarification in accordance with the paragraphs above, or as otherwise required by applicable law.
RFP/Proposal Information Controlling:
The district intends that all contractors shall have equal access to information relative to this RFP, and that this RFP contains adequate information. No information communicated, either verbally or in writing, to or from a contractor shall be effective unless confirmed by written communication contained in an addendum to this RFP, a Request for Clarification or other written response thereto, or in the proposal.
Reservation of Award:
mailto:ryan.zoumbaris@hpsk12.net
The contract will be awarded to the responsible bidder whose proposal is within the competitive range and determined to be the most advantageous to Holt Public Schools. Price, experience, references, and other factors are considered. Holt Public Schools reserves the right to make awards within sixty (60) days after the date of the bid opening during which period bids may not be withdrawn. The Board of Education or its designee reserves the right to reject any or all bids, in part or in total, for any objective or subjective reason whatsoever. Late bids will not be opened.
Collusive Bidding:
The contractor certifies that its proposal is made without any previous understanding, agreement, or connection with any person, firm or corporation making a proposal for the same work and is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action.
Contractor Requirements
The contractor shall be responsible for the removal of the existing exterior doors and installation of the new exterior doors at Midway Early Learning Center, Holt Transportation.
The contractor shall be responsible for obtaining waste containers for the removal of all its waste materials, rubbish and packing materials resulting from its operations. If the installer fails to clean up within seven (7) days after completion, the owner may do so, and the cost thereof shall be charged to the installer as a deduction in its contract price.
Contractor shall provide an adequate number of qualified, experienced personnel capable of performing the required work within the time frames set forth in the owner’s schedule. All workers and subcontractors performing work shall be skilled in their respective trades.
Bidders shall be reputable, recognized organizations with at least five (5) years of successful experience of work of this type. References of three (3) accounts now being serviced, for which comparable work has been performed, must be furnished. Failure to include references may be ample cause for rejection.
Upon checking in with each building's main office, bidders may view project doors at their own discretion between the weekday hours of 8:00 AM until 3:30 PM. Each bidder shall compare the premises with the specifications and be satisfied with the conditions affecting the services to be provided before submitting their proposal. No allowance or extra consideration on behalf of any bidder will subsequently be allowed by reason or error or oversight on the part of the bidder.
The bidder shall be responsible for all final measurements.
The owner shall conduct a final inspection of the project to assure that all work performed meets specifications.
The contractor must secure all equipment and materials at the site(s). Contractor shall be responsible for any and all damages to existing building(s) or grounds, sustained as a result of work under this contract, caused ty either the installation of its work or in the delivery of materials and equipment for its use. The cost of repairing or replacing such damage shall be borne by the responsible contractor. The repair of replacement work shall be done in a manner as to leave the facilities in the same condition as before the damage occurred to the complete satisfaction of the owner. The contractor is responsible for all damages and losses until the installation has been completed and accepted by the owner.
Installer shall identify one person, acceptable to the owner, who shall act as liaison with the owner. This individual should have the authority to make decisions on behalf of the installer.
Satisfactory Workmen's Compensation insurance and liabilities and property damage insurance must be always maintained and paid for by the contractor work is performed.
Commercial General Liability Insurance is required as follows: on an "occurrence basis" with limits of liability not less than 1,000,000 each occurrence, $3,000,000 aggregate, combined single limit, Personal Injury, Bodily Injury and Property Damage. Coverage shall include the following extensions: A) Contractual Liability; B) Products and Completed Operations; C) Independent Contractor’s Coverage; D) Broad Form General Liability Extensions or equivalent; E) Deletion of all Explosion, Collapses and Under group (SCU) Exclusions, if applicable.
Professional Liability Insurance (Errors & Omissions): $1,000,000 each occurrence and annual.
Workmen's Compensation including Employer's Liability Coverage: $100,000 each accident, $500,000 annual aggregate, in accordance with all applicable Michigan laws.
Specifications
See ATTACHMENT for manufacturer or product specifications for flooring, including dimensions and locations of areas to be replaced. Note: equivalents may be considered; however, proposals for equivalent materials must be disclosed as an exception to the terms and conditions of this RFP.
Contractual Information
Familial Disclosure Affidavit: All contractors must provide familial disclosure in compliance with MCL 380.1267 and attach this information to its proposal. The proposal must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner and/or any employee of the contractor and any member of the school district's board of education or the district's superintendent. The school district will not accept a proposal that does not include this sworn and notarized disclosure statement. The familiar disclosure affidavit is attached to this RFP.
Iran Economic Sanctions Act: In accordance with Michigan Public Act No. 517 of 2012, all proposals must be accompanied by a sworn and notarized statement certifying that the contractor is not an Iran Linked Business. The school district will not accept a proposal that does not include this sworn and notarized statement. The Affidavit of Compliance
— Iran Economic Sanctions Act is attached to this RFP.
Performance Bond: Successful contractors whose proposals are $50,000 or more will be required to furnish performance and payment bonds in a form satisfactory to the district, in the amount of 100% of its proposal by a treasury listed surety licensed to do business in the State of Michigan, and the attorney-in-fact who executed the performance and payment bonds on behalf of the contractor shall attach a certified, current copy of its power of attorney. The cost of the bonds shall be included in each proposal.
Bid Bond:
Bids over $30,512.00 must be accompanied by a certified check or treasury listed bid bond, as listed in the U.S.
Department of Treasury Circular 570, in minimum amount of 5% of bid amount. Bids not received without this guaranty will not be read or considered.
Governing Law: The contract shall be governed by and construed in accordance with the laws of the State of Michigan. The parties hereby agree to the exclusive jurisdiction and venue of courts sitting in Ingham County, Michigan.
General Indemnification: Contractor shall indemnify, defend and hold harmless the district, its board of education, its board members, in their official and individual capacities, its administrators, employees, agents, contractors, successors and assignees, from and against any and all claims, counterclaims, suits, debts, demands, actions, judgments, liens, costs, expenses, damages, injuries and liabilities, including actual attorney's fees and actual expert witness fees arising out of or in connection with contractor's performance of the contract and/or from contractor's violation of any of the terms of the contract, including, but not limited to: (I) the negligent acts or willful misconduct of the contractor, its officers, directors, employees, successors, assignees, contractors, and agents; (ii) any breach of the terms of the contract by the contractor, its officers, directors, employees, successors, assignees, contractors and agents; (iii) any violation or breach of any applicable Federal, State or local law, rule, regulation, ordinance, policy and/or licensing and permitting requirements applicable to the contract; or (iv) any breach of any representation or warranty the contractor, its officers, directors, employees, successors, assignees, contractors and agents under the contract. The contractor shall notify the district by certified mail, return receipt requested, immediately upon actual knowledge of any claim, suite, action, or proceeding for with Holt Public School District may be entitled to indemnification under the contract. This paragraph shall survive the expiration or earlier termination of the contract.
Compliance with Laws: Contractor shall comply with any and al' applicable federal, state, and local laws, rules, ordinances, policies, and regulations, including any licensing and permitting requirements, under the contract.
Contractor, including its personnel, employees, contractors, consultants, and agents shall be responsible for knowing the district's policies concerning appropriate behavior of persons in school district facilities and on school district properties, including for example, the prohibitions of sexual harassment and smoking, and shall comply with all such policies. Contractor represents and warrants to the school district that it shall always be in compliance with any and all applicable federal and state laws, rules, ordinances, policies and regulations and licensing and permitting requirement applicable to the contract. Contractors shall indemnify, defend, and hold the district harmless from any liability form its failure to so comply.
Pricing: Prices quoted are to be F.O.B. to Holt Public Schools. All purchase prices shall be net; including transportation, insurance, and delivery charges fully prepaid by the successful contractor to destinations indicated in the proposal.
Taxes: The Holt Public School District is exempt from taxes. However, when state and local taxes are required on construction materials installed by the contractor, such taxes must be included in the contractor's proposal price.
Proposal Withdrawal: Contractors may withdraw their proposals any time before the due date. Proposals may not be withdrawn for at least ninety (90) days after the due date.
Competition: The name of a model, manufacturer or brand in this RFP shall not be considered as exclusive to other brands. Brands and models specified in this RFP are preferred. The district expects all supplies, materials, equipment, or products bid by a contractor to meet or exceed the specifications set forth in this RFP. Further, it is the district's intent that this RFP permits competition. Accordingly, the use of any patent, proprietary name or manufacturer's name is for demonstrative purposes only and is not intended to curtail competition. Whenever any supplies, material, equipment, or products requested in this RFP are specified by patent, proprietary name or by the name of the manufacturer, unless stated differently, such specifications shall be considered as followed by the words "or comparable equivalent,' whether such words appear. The school district in its sole and absolute discretion shall have the right to determine if the proposed equivalent products/brands submitted by the contractor meet the specifications contained in this RFP and possess equivalent and/or better qualities. It is the contractors' responsibility to notify the district in writing if any specifications or suggested comparable equivalent products/brands require clarification by the district prior to the due date of the proposals. All deviations from the specification must be noted on the proposal form.
To: Holt Public Schools Date: 11/5/2024
Attention: Ryan Zoumbaris
RE: Midway Classroom Update
Scope of Work
• Work hours are expected to be between 7:00am and 7:00pm Monday – Friday.
• Work will be required to meet MCL – Act 10 of 2023 – Prevailing Wage on State funded Projects
• Dumpster for construction materials to be provided by contractor. Contractors shall place wooden blocks under wheels to protect surfaces. Location to be provided by the school district.
• Any damage done to the parking lot or sidewalk by dumpster that was not protected will be replaced at contractors expense.
• Contractor shall self-perform all trades necessary to do the work or provide licensed sub-contractors perform designated trade. Contractors shall list subcontractors that are to be used.
• Contractor required to pull any and all necessary permits for work if required.
Flooring
A. Demolition & Removal
• Removal of cove base from existing walls
• Removal of flooring from classroom Numbers 124,126,127, 128, 129, 130, 131
• Please include in base bid removal of the current floor and disposal of flooring, prep and required testing of substrate to meet manufacturers specifications listed.
• Please include protection for flooring outside of the work area and adjacent to the work area. Any damage done to areas outside of work area while performing work will be required to fixed by contractor at their expense.
• Removal of flooring in entrance way 7 and 10 and prep for new surface.
• The contractor is responsible for protecting all surrounding finishes, walls, floors, and surfaces during demolition.
• Any damage to walls, flooring, paint, tile, or other finishes caused during demolition or removal must be repaired or replaced at the contractor’s expense to restore original condition.
• Classroom furniture and items in closet’s will be removed prior to contractor’s work.
B. Installation of Flooring
• The installer must be certified in Forbo Flooring and meet the requirements of Forbo Flooring specifications.
• Floor will be prepped to meet Forbo Specifications for a Corkment Underlayment.
• Installation of underlayment prior to installation of the MCT 3629 Frosty Grey.
• Flooring to be installed to specifications requirements of Forbo flooring to allow the floor to be covered by warranty provided by Forbo.
• A complete finished safe product is to be provided.
• A new wall base to be installed after flooring is installed. 6 inch to match color of floor. Color Match
C. Transitions
• Please include protection for flooring outside of the work area and adjacent to the work area. Any damage done to areas outside of work area while performing work will be required to fixed by contractor at their expense.
• Please include transitions between different types of floors that may encounter the new flooring being installed.
D. Finishing Work
• Patch, repair, and finish any surface impacted by the scope of work, including wall touch-ups, paint, or flooring adjustments.
• Final cleaning of work area upon completion.
Floor Schedule – Size of Room’s are estimated and will need to be field verified prior to ordering
Midway -
Room Number 124 –33’ x 26’
Room Number 126 –34’ x 26
Room Number 127 –34’ x 26’
Room Number 128 –34’ x 26’
Room Number 129 –34’ x 26
Room Number 130 – 34’ x 26’
Room Number131 – 34’ 26’
*Entranceway Number 7 – 12’ x 23’
*Entranceway Number 10 – 10’ x 18
Flooring:
Midway
Classroom - Forbo Flooring – MCT 3629 Frosty Grey with Corkment underlayment
*Entranceway Walk off Carpet – Coral Brush 5730 Vulcan Black
Note: colors need to be finalized with Holt Schools prior to ordering with a review of samples color prior to order.
Cabinetry Required Cabinetry replacement will be highlighted in walkthrough. Cabinetry located in 124,125,126,127,128,129, 130, and
131. The cabinetry to be installed is to match existing that was recently installed.
A. Demolition & Removal
• Carefully remove existing wall and base cabinets in designated areas.
• Remove countertop surfaces as needed to access cabinetry and plumbing.
• Disconnect and remove existing sinks, faucets, and associated plumbing connections.
• Cap water supply and drain lines temporarily, as needed, in compliance with local plumbing codes.
• Contractor is responsible for protecting all surrounding finishes, walls, floors, and surfaces during demolition.
• Any damage to walls, flooring, paint, tile, or other finishes caused during demolition or cabinet removal must be repaired or replaced at the contractor’s expense to restore original condition.
• Proper disposal of all demolished materials offsite is required.
B. Cabinet Installation
• Install new wall and base cabinets per approved plans or specifications. Cabinets to use Wilsonart standard laminate color to be pewter mesh 4878-38 and Wilsonart premium laminate Field Elm – 7999K-12
• Cabinets must be installed level, securely anchored to wall studs, and properly aligned.
• Include installation of trim pieces, filler panels, crown molding, and toe kicks as needed.
C. Countertops
• Install new corian countertops on all applicable cabinets. Corian to from manufacturer Strata Design color to be Ash
Concrete.
• Make necessary cuts for sink, plumbing and appliance openings.
D. Plumbing Work
• Install new sinks and faucets, to be provided by the contractor.
o Please provide fixture ELKAY Model LKAV7051F o Provide an extra Water Sentry Filter Model 71300C for each faucet fixture installed o Please provide Undermount Sink Model ELKAY ELUH211510PD.
• Connect all plumbing fixtures to existing supply and drain lines.
• Install new traps, supply lines, and shut-off valves where needed.
• Plumbing installation must follow the requirements of the Filter First Law, including any point-of-use filtration devices required for drinking water fixtures in school facilities.
• All connections must be tested for leaks and proper operation.
E. Finishing Work
• Seal around sink edges and wall transitions as needed.
• Patch, repair, and finish any surface impacted by the scope of work, including wall touch-ups, paint, or flooring adjustments.
• Final cleaning of work area upon completion.
Filter First Requirements
Plumbing Work
Please provide new faucets for all sinks in the building except for the following locations: locations listed above in other scope, kitchens, and bathrooms.
• Install new faucets, to be provided by the contractor.
o Please provide fixture ELKAY Model LKAV7051F o Provide an extra Water Sentry Filter Model 71300C for each faucet fixture installed
• Connect all plumbing fixtures to existing supply and drain lines.
• Install new traps, supply lines, and shut-off valves where needed.
• Plumbing installation must follow the requirements of the Filter First Law, including any point-of-use filtration devices required for drinking water fixtures in school facilities.
• All connections must be tested for leaks and proper operation.
• Install 5 ELKAY Bottle Filling Station Model LZS8WSSP-PF o Removal existing drinking fountains and replace with ELKAY Model LZS8WSSP-PF o Provide or connect to existing water, drain, and electrical to provide an operational drinking fountain.
o If 5 existing drinking fountains are not on site new locations will be designated during walk through.
All plumbing, drains, electrical, masonry, painting (all trades necessary) to provide a new and operational water cooler station.
Payment
Payment for this work will be by itemized list of actual quantities installed at the unit prices as listed in this proposal.
Midway Childhood Learning Center
Item Quantity Unit Price Total
Flooring Removal & Prep
Forbo MCT Flooring Material
Corkwood Underlayment
Forbo Coral Brush Flooring Material
Adhesive – MCT Flooring
Adhesive - Underlayment
Adhesive - Coral
Flooring Testing
Floor Protection
Mobilization
Prevailing Wage - Installer
Prevailing Wage - Foreman
Prevailing Wage -Fringe Benefit Costs
Total
Cabinetry
Item Quantity Unit Price Total
Removal and Prep
Mobilization
General Plumbing
ELKAY Model LKAV7051F
Water Sentry Filter Model 71300C
ELKAY Undermount Sink ELUH211510PD
Corin Countertop
Cabinets
Cabinet Hardware
Prevailing Wage - Plumber
Prevailing Wage - Laborer
Prevailing Wage - Cabinetry Installer
Prevailing Wage - Carpentry
Filter First Plumbing
Item Quantity Unit Price Total
Removal and Prep
Mobilization
Misc Plumbing Supplies
ELKAY Model LKAV7051F
Water Sentry Filter Model 71300C
ELKAY Bottle Filling Station Model LZS8WSSP-PF
Installation ELKAY Bottle Filling Station
Installation ELKAY Model LKAV7051F
Misc Electrical Supplies
Prevailing Wage - Mason
Prevailing Wage - Electrician
Prevailing Wage - Plumber
Prevailing Wage - Laborer
Prevailing Wage - Painter
Prevailing Wage - Carpentry
Project Name: Holt Schools Classroom Update
Locations: Holt Midway Learning Center
Signature by: __________________________________________________________________Date: ______________
Printed Name: ______________________________________________________________Title: __________________
Contractor: _________________________________________________________________
Address: ___________________________________________________________________
City: ___________________________________State: ______________________________Zip: __________________
SPECIFICATIONS
Enhanced Bottle Filler & Single ADA Cooler Refrigerated Stainless PFOA/PFOS + Lead Drop Down Wrapper
Model LZS8WSSP-PF
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user.
When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 02252025 1-800-260-6640 | SVtechservice@Elkay.com © 2025 Page 1 LZS8WSSP-PF Patent zurn-elkay.com/patents LZS8WSSP-PF_spec.pdf
PRODUCT SPECIFICATIONS
Enhanced Bottle Filler & Single ADA Cooler Refrigerated Stainless PFOA/PFOS + Lead Drop Down Wrapper. Chilling Capacity of 8.0 GPH (gallons per hour) of 50 F drinking water, based on 80 F inlet water and 90 F ambient, per ASHRAE 18 testing. Features shall include Antimicrobial*, Automatic Filter Status Reset, Energy Savings, Filtered, Green Ticker™, Hands Free, Laminar Flow, Real Drain, Visual Filter Monitor, Quick Filter Change. Furnished with Flexi-Guard ® Safety Bubbler. Electronic Bottle Filler Sensor with Electronic Front and Side Bubbler Pushbar activation. Product shall be Wall Mount (On Wall), for Indoor applications, serving 1 station(s). Unit shall be certified to UL 399 and CAN/CSA C22.2 No. 120.
Special Features: Antimicrobial, Automatic Filter Status Reset, Energy Savings, Filtered, Green Ticker™, Hands Free, Laminar Flow, Real Drain, Visual Filter Monitor, Quick Filter Change
Finish: Stainless Steel (S) Power: 115V/60Hz Bubbler Style: Flexi-Guard ® Safety Bubbler Activation by: Electronic Bottle Filler Sensor with
Electronic Front and Side Bubbler Pushbar
Mounting Type: Wall Mount (On Wall) Chilling Capacity*: 8.0 GPH Full Load Amps 5 Rated Watts: 370 Dimensions (L x W x H): 18-3/8" x 19" x 39-7/16" Approx. Shipping Weight: 85 lbs.
Installation Location: Indoor No. of Stations Served: 1 *Based on 80° F inlet water & 90° F ambient air temp for 50° F chilled drinking water.
Special Note: One-Box Packaging.
• Visual Filter Monitor: LED filter status indicator alerts to needed filter changes.
• PFOA/PFOS Filter Included: Filter is tested and certified to NSF/ANSI 42, 53 and 401 for the reduction of PFOA and PFOS (two prevalent PFAS chemicals), lead, microplastics, Class 1 particulate, cysts, and chlorine taste and odor. 2,250 gallon capacity or 1 year after installation.
• Energy-savings mode reduces energy consumption.
• Faster Filter Changes: Quick filter change wrapper provides easy access to filter from the front and side of cooler for efficient filter changes in under a minute.
• LED lighting: Low-energy LED light encourages use, assists with
Additional Finishes: Arctic White (A)
Midnight Black (M)
Included with Product: Bottle Filler, Water Cooler, Filter
Ships in one box.
A Century of Tradition and Quality.
For more than 100 years, Elkay has been making innovative products and providing exceptional customer care. We take pride in offering plumbing products that make life easier, inspire change and leave the world a better place.
PRODUCT COMPLIANCE
ADA & ICC A117.1
ASME A112.19.3/CSA B45.4
CAN/CSA C22.2 No. 120
FCC & ISED
GreenSpec® NSF/ANSI 42, 53, 61 (Q≤1), 372 (lead free), & 401
UL 399
Complies with ADA & ICC A117.1 accessibility requirements when installed according to the requirements outlined in these standards. Installation may require additional components and/or construction features to be fully compliant. Consult the local Authority Having Jurisdiction if necessary.
Installation Instructions (PDF) - 2000001214
5 Year Limited Warranty on the refrigeration system of the unit.
Electrical components and water system are warranted for 12 months from date of installation. Warranty pertains to drinking water applications only. Non-drinking water applications are not covered under warranty.
Warranty (PDF)
PART:________________________________QTY: _____________
PROJECT:______________________________________________
CONTACT:______________________________________________
DATE:__________________________________________________
NOTES:_________________________________________________
APPROVAL:_____________________________________________
mailto:SVtechservice@Elkay.com http://www.elkay.com/products/details/lzs8wssp-pf http://www.elkay.com/products/details/lzs8wssp-pf https://www.zurn.com/patents http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/2000001214.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/96993c.pdf
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user.
When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 02252025 1-800-260-6640 | SVtechservice@Elkay.com © 2025 Page 2 LZS8WSSP-PF Patent zurn-elkay.com/patents LZS8WSSP-PF_spec.pdf filling dark bottles and illuminates in dark hallways.
• Fill rate is 1.1 GPM: Laminar flow provides clean fill with minimal splash. Real drain system eliminates standing water in basin.
*Antimicrobial claims are in refence to components manufactured antimicrobial agents, helping to provide clean, stain- and odor-free surfaces.
COOLING SYSTEM
• Compressor: Hermetically-sealed, reciprocating type, single phase. Sealed-in lifetime lubrication.
• Condenser: Fan cooled, copper tube with aluminum fins. Fan motor is permanently lubricated.
• Cooling Unit: Combination tube-tank type. Continuous copper tubing with is fully insulated with EPS foam that meets UL requirements for self-extinguishing material.
• Refrigerant Control: Refrigerant R-134a is controlled by accurately calibrated capillary tube.
• Temperature Control: Easily accessible enclosed adjustable thermostat is factory preset. Requires no adjustment other than for altitude requirements.
Optional Accessories
71300C WaterSentry® PFOA/PFOS (PFAS) + Lead + Microplastics NSF/ANSI Certified 2250 Gal 12
Month Filter
Spec Sheet (PDF)
LKAPREZL
Cane Apron for EZ Gray
MLP100
In-wall Carrier for Single-station On-wall Bottle Fillers Coolers & Fountains
1000004833 Universal Stainless Steel Back Panel for Single EZ, EMAB and VRC Bottle Filling Station mailto:SVtechservice@Elkay.com http://www.elkay.com/products/details/lzs8wssp-pf http://www.elkay.com/products/details/lzs8wssp-pf https://www.zurn.com/patents http://www.elkay.com/products/details/71300c http://www.elkay.com/products/details/71300c http://www.elkayfiles.com/spec-sheets/71300c_spec.pdf http://www.elkayfiles.com/spec-sheets/71300c_spec.pdf http://www.elkay.com/products/details/lkaprezl http://www.elkay.com/products/details/lkaprezl http://www.elkayfiles.com/spec-sheets/lkaprezl_spec.pdf http://www.elkayfiles.com/spec-sheets/lkaprezl_spec.pdf http://www.elkay.com/products/details/mlp100 http://www.elkay.com/products/details/mlp100 http://www.elkayfiles.com/spec-sheets/mlp100_spec.pdf http://www.elkayfiles.com/spec-sheets/mlp100_spec.pdf http://www.elkay.com/products/details/1000004833 http://www.elkay.com/products/details/1000004833 http://www.elkayfiles.com/spec-sheets/1000004833_spec.pdf http://www.elkayfiles.com/spec-sheets/1000004833_spec.pdf
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user.
When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 02252025 1-800-260-6640 | SVtechservice@Elkay.com © 2025 Page 3 LZS8WSSP-PF Patent zurn-elkay.com/patents LZS8WSSP-PF_spec.pdf mailto:SVtechservice@Elkay.com https://www.zurn.com/patents
Avado® Single Hole 2-in-1 Kitchen Faucet with Filtered Drinking Water
Model(s) LKAV7051F
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user. When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 12052024 1-800-476-4106 | CustCare@Elkay.com © 2024 Page 1 LKAV7051F Patent zurn-elkay.com/patents LKAV7051F_spec.pdf
PRODUCT SPECIFICATIONS
Avado® Single Hole 2-in-1 Kitchen Faucet with Filtered Drinking Water. Faucet has a flow rate of 1.5 GPM, and is made of Brass material, with a Ceramic Disc valve. Faucet requires 1 faucet holes.
Mounting Type: Deck Mount Spray Type: Pull Down Finish: Chrome (CR), Lustrous Steel (LS), Matte Black (MB) Handle Type: Lever Handle Deck Clearance: 9-13/16" Spout Reach: 8-3/4" Spout Height: 17-1/8" Hole Drillings: 1 Material: Brass Valve Type: Ceramic Disc Valve Connection: 1/2"-14 NPSM Flow Rate: 1.5 GPM Faucet Hole Size (min): 1-3/8" Countertop Thickness: 2-1/2 Spout Type: Pull-down Spray Spray Functions: Aerated
Faucet Part Number Finish 2000000331 Chrome 2000000332 Lustrous Steel 2000000346 Matte Black
Included with Product: Faucet with Filter 71300C and Deck
Plate / Escutcheon LK134 A Century of Tradition and Quality.
For more than 100 years, Elkay has been making innovative products and providing exceptional customer care. We take pride in offering plumbing products that make life easier, inspire change and leave the world a better place.
Product Compliance: ADA & ICC A117.1
ASME A112.18.1/CSA B125.1
CEC
NSF 61 (Q≤1)
NSF 372 (lead free)
Accessory: NSF 42
NSF 53
NSF 401
Complies with ADA & ICC A117.1 accessibility requirements when installed according to the requirements outlined in these standards.
Clean and Care Manual (PDF) Installation Instructions (PDF) - 2000000348 Warranty (PDF)
PART:________________________________QTY: _____________
PROJECT:______________________________________________
CONTACT:______________________________________________
DATE:__________________________________________________
NOTES:_________________________________________________
APPROVAL:_____________________________________________
mailto:CustCare@Elkay.com http://www.elkay.com/products/details/lkav7051f http://www.elkay.com/products/details/lkav7051f https://www.zurn.com/patents http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/1000005365.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/2000000348.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/1000005132.pdf
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user. When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 12052024 1-800-476-4106 | CustCare@Elkay.com © 2024 Page 2 LKAV7051F Patent zurn-elkay.com/patents LKAV7051F_spec.pdf
Included Accessories
WaterSentry® PFOA/PFOS (PFAS) + Lead + Microplastics NSF/ANSI Certified 2250 Gal 12 Month
Filter
WaterSentry® PFOA/PFOS (PFAS) + Lead + Microplastics NSF/ANSI Certified 2250 Gal 12 Month
Filter mailto:CustCare@Elkay.com http://www.elkay.com/products/details/lkav7051f http://www.elkay.com/products/details/lkav7051f https://www.zurn.com/patents http://www.elkay.com/products/details/71300c http://www.elkay.com/products/details/71300c http://www.elkayfiles.com/spec-sheets/71300c_spec.pdf http://www.elkayfiles.com/spec-sheets/71300c_spec.pdf http://www.elkay.com/products/details/71300c http://www.elkay.com/products/details/71300c http://www.elkayfiles.com/spec-sheets/71300c_spec.pdf http://www.elkayfiles.com/spec-sheets/71300c_spec.pdf
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user. When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 12052024 1-800-476-4106 | CustCare@Elkay.com © 2024 Page 3 LKAV7051F Patent zurn-elkay.com/patents LKAV7051F_spec.pdf
WaterSentry® PFOA/PFOS (PFAS) + Lead + Microplastics NSF/ANSI Certified 2250 Gal 12 Month Filter
Model(s) 71300C
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user. When making a comparison of other producers’ offerings, be certain these features are not overlooked.
Elkay REV 02272025 1-800-260-6640 | SVtechservice@Elkay.com © 2025 Page 1 71300C Patent zurn-elkay.com/patents 71300C_spec.pdf
PRODUCT SPECIFICATIONS
WaterSentry® PFOA/PFOS (PFAS) + Lead + Microplastics NSF/ANSI Certified 2250 Gal 12 Month Filter. Overall dimensions are 3-5/16" x 3-5/16" x 11-5/8".
Special Features: Filtered Dimensions: 3-5/16" x 3-5/16" x 11-5/8" Shipping Weight: 2 lbs.
Flow Rate: 1.1 GPM (4.2 L/m) Capacity: 2250 gal. (8517 L) Temperature: 40-100°F (4-38°C) Initial Pressure Drop: 2-5 PSI (14-34 kPa) Maximum Pressure: 105 PSI (724 kPa) Minimum Pressure: 20 PSI (138 kPa) Water Inlet: 3/8” (9.5mm) O.D. tube Water Outlet: 1/4” (6.4mm) O.D. tube Special Note: Replacement filter for use in Enhanced ezH2O Bottle Filling Stations.
Replacement filter for Elkay enhanced ezH20 bottle filling stations and faucets
Filter is tested and certified to NSF/ANSI 42, 53 and 401 for the reduction of PFOA and PFOS (two prevalent PFAS chemicals), lead, microplastics, Class 1 particulate, cysts, and chlorine taste and odor
Filter should be replaced every 2,250 gallons or 1 year after installation
Equipped with quick-disconnect, 1/4-turn installation, as well as automatic inlet shut-off valve that closes when filter is removed
Provides filtration at the point of use where needed Pairs with EWF3001 universal filtration kit to upgrade any beverage system or faucet to filtered
Included with Product: 2250 gallon replacement filter cartridge A Century of Tradition and Quality.
For more than 100 years, Elkay has been making innovative products and providing exceptional customer care. We take pride in offering plumbing products that make life easier, inspire change and
Product Compliance: NSF 42
NSF 53
NSF 372 (lead free)
NSF 401
CONTACT:______________________________________________
DATE:__________________________________________________
NOTES:_________________________________________________
APPROVAL:_____________________________________________
mailto:SVtechservice@Elkay.com http://www.elkay.com/products/details/71300c http://www.elkay.com/products/details/71300c
Lustertone® Classic Stainless Steel 23-1/2" x 18-1/4" x 10" Single Bowl Undermount Sink with Perfect Drain®
Model(s) ELUH211510PD
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user. When making a comparison of other producers’ offerings, be certain these features are not overlooked. Latest version of the spec sheet available:
https://www.elkayfiles.com/spec-sheets/ELUH211510PD_spec.pdf
Elkay REV 09012024 1-800-476-4106 | CustCare@Elkay.com © 2024 Page 1 ELUH211510PD Patent zurn-elkay.com/patents ELUH211510PD_spec.pdf
PRODUCT SPECIFICATIONS
Lustertone® Classic Stainless Steel 23-1/2" x 18-1/4" x 10" Single Bowl Undermount Sink with Perfect Drain®. Sink is manufactured from 18 gauge 304 Stainless Steel with a Lustrous Satin finish, Rear Center drain placement, and Sides and Bottom pads.
Installation Type: Undermount Material: 304 Stainless Steel Special Features: Perfect Drain Finish: Lustrous Satin Gauge: 18 Sound Deadening: Sides and Bottom pads Number of Bowls: 1 Sink Dimensions: 23-1/2" x 18-1/4" x 11-1/2" Bowl 1 Dimensions: 21" x 15-3/4" x 10" Drain Size: 3-3/8" (86mm) Drain Location: Rear Center Minimum Cabinet Size: 27" Mounting Hardware: Undermount brackets sold separately Template Included: Yes Cutout Template #: 1000001400 Template is available for download at elkay.com. CAD software will be required to open the template.
Perfect Drain: Seamlessly welded stainless steel collar eliminates the gap between a traditional drain and the sink for a more sanitary and gap free installation. Select garbage disposers can be installed on either sink bowl for user convenience. Please see our Garbage Disposer Compatibility Guide.
Installation Profile:
Included with Product: One LKPD1 Perfect Drain and strainer.
A Century of Tradition and Quality.
For more than 100 years, Elkay has been making innovative products and providing exceptional customer care. We take pride in offering plumbing products that make life easier, inspire change and
Product Compliance: ASME A112.19.3/CSA B45.4 Accessory: ASME A112.18.2/CSA B125.2
Sinks are listed by IAPMO® as meeting the applicable requirements of the Uniform Plumbing Code®, International Plumbing Code®, and National Plumbing Code of Canada.
Clean and Care Manual (PDF) Installation Instructions (PDF) - 1000005239 Installation Instructions (PDF) - 74180289_Disposer Installation Instructions (PDF) - 74180340-USA_Drain Installation Instructions (PDF) - Garbage_Disposer_Compatibility_Guide Warranty (PDF)
CONTACT:______________________________________________
DATE:__________________________________________________
NOTES:_________________________________________________
APPROVAL:_____________________________________________
http://dummy_url/ mailto:CustCare@Elkay.com http://www.elkay.com/products/details/eluh211510pd http://www.elkay.com/products/details/eluh211510pd https://www.zurn.com/patents http://dummy_url/ http://www.elkayfiles.com/templates/1000001400.dxf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/1000005386.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/1000005239.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/74180289_disposer.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/74180340-usa_drain.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/garbage_disposer_compatibility_guide.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/garbage_disposer_compatibility_guide.pdf http://www.elkayfiles.com/care-cleaning-install-warranty-sheets/1000005125.pdf
Lustertone® Classic Stainless Steel 23-1/2" x 18-1/4" x 10" Single Bowl Undermount Sink with Perfect Drain®
Model(s) ELUH211510PD
In keeping with our policy of continuing product improvement, Elkay reserves the right to change product specifications without notice. Please visit elkay.com for the most current version of Elkay product specification sheets. This specification describes an Elkay product with design, quality, and functional benefits to the user. When making a comparison of other producers’ offerings, be certain these features are not overlooked. Latest version of the spec sheet available:
https://www.elkayfiles.com/spec-sheets/ELUH211510PD_spec.pdf
Elkay REV 09012024 1-800-476-4106 | CustCare@Elkay.com © 2024 Page 2 ELUH211510PD Patent zurn-elkay.com/patents ELUH211510PD_spec.pdf
Included Accessories
LKPD1
Perfect Drain® Fitting Type 304 Stainless Steel Body and Strainer
LKWOBG2115SS
Elkay Stainless Steel 20" x 14-3/4" x 1" Bottom Grid
CB1516
Elkay Hardwood 15" x 16-3/4" x 3/4" Cutting Board
LKDS35
3-1/2" Garbage Disposal Stopper / Strainer for use with Perfect Drain®-Satin Finish
LKDS99
3-1/2" Garbage Disposal Stopper / Strainer for use with Perfect Drain®-Chrome Polished
Stainless Steel
LKPDVR18B
Perfect Drain® Chrome Plated Brass Body Vandal-resistant Strainer
LKGT1041
Elkay Gourmet Single Hole Kitchen Faucet Pull-out Spray and Lever Handle with Hi and Mid-rise
Base Options
Spec_Sheet (PDF) http://dummy_url/ http://www.elkay.com/products/details/eluh211510pd http://www.elkay.com/products/details/eluh211510pd https://www.zurn.com/patents http://dummy_url/ http://www.elkay.com/products/details/lkpd1 http://www.elkay.com/products/details/lkpd1 http://www.elkayfiles.com/spec-sheets/lkpd1_spec.pdf http://www.elkayfiles.com/spec-sheets/lkpd1_spec.pdf http://www.elkay.com/products/details/lkwobg2115ss http://www.elkay.com/products/details/lkwobg2115ss http://www.elkayfiles.com/spec-sheets/lkwobg2115ss_spec.pdf http://www.elkayfiles.com/spec-sheets/lkwobg2115ss_spec.pdf http://www.elkay.com/products/details/cb1516 http://www.elkay.com/products/details/cb1516 http://www.elkayfiles.com/spec-sheets/cb1516_spec.pdf http://www.elkayfiles.com/spec-sheets/cb1516_spec.pdf http://www.elkay.com/products/details/lkds35 http://www.elkay.com/products/details/lkds35 http://www.elkayfiles.com/spec-sheets/lkds35_spec.pdf http://www.elkayfiles.com/spec-sheets/lkds35_spec.pdf http://www.elkay.com/products/details/lkds99 http://www.elkay.com/products/details/lkds99 http://www.elkayfiles.com/spec-sheets/lkds99_spec.pdf http://www.elkayfiles.com/spec-sheets/lkds99_spec.pdf http://www.elkay.com/products/details/lkpdvr18b http://www.elkay.com/products/details/lkpdvr18b http://www.elkayfiles.com/spec-sheets/lkpdvr18b_spec.pdf http://www.elkayfiles.com/spec-sheets/lkpdvr18b_spec.pdf http://www.elkay.com/products/details/lkgt1041 http://www.elkay.com/products/details/lkgt1041 http://www.elkayfiles.com/spec-sheets/lkgt1041_spec.pdf http://www.elkayfiles.com/spec-sheets/lkgt1041_spec.pdf creating better environments
General Installation Guidelines
General Installation Guidelines v2.00 02/17 Page 1 of 4
Jobsite Conditions
• Areas to receive material should be clean, fully enclosed and weather tight. The permanent HVAC should be fully operational and controlled and set at a minimum temperature 65° F (18.3° C). If this is not possible, the areas should be acclimated and controlled by means of temporary HVAC to the service level conditions expected during occupancy. The temperature and humidity should range from 75° F ± 10°F (23.9° C ± 5.5° C) with a 50% ± 10% ambient relative humidity. These conditions MUST be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation.
• Substrate evaluation and preparation should not begin until a stable, conditioned environment has been established as described in this section.
NOTE: Site conditions can dramatically affect the performance of the adhesive. Temperature, ambient relative humidity, substrate porosity and air circulation will determine the open, working and curing time of the adhesive. Not respecting these limits can result in an installation failure.
• Areas to receive flooring must have adequate lighting to allow for proper inspection and preparation of the substrate, installation of the flooring and final inspection.
• Installation should not begin until the work of all other trades has been completed, especially overhead trades.
• Substrates to receive Forbo flooring products must be structurally sound, rigid, smooth, flat, clean, and permanently dry. The substrate must be free of all foreign materials including, but not limited to, dust, solvent, paint, wax, oils, grease, residual adhesive, adhesive removers, film-forming curing compounds, silicate penetrating curing compounds, sealing,…