About this file

This document is a Request for Proposal (RFP) issued by Dalton Utilities for a 2024 Leak Detection Survey of their water distribution system. The scope of work requires the contractor to perform a leak detection survey and pinpointing project covering approximately 125 miles of water distribution lines and all connected valves, hydrants, and services. The contractor will be required to provide a detailed report identifying the location, size, and type of each leak, as well as the estimated leak rate. The project must be completed within 60 calendar days of the notice to proceed, and progress billing will be allowed. Bids are due by 10:00 AM on November 15th, 2024.

The RFP outlines the bid requirements, including the need to complete the provided bid sheet, provide a total bid price, and submit a proposal detailing the methodology, equipment, and personnel planned for the project. It also specifies the insurance and E-Verify requirements for the contractor and any subcontractors. Dalton Utilities will provide a field technician to assist with locating the distribution system components, and the contractor will be responsible for any necessary pot holing to access the water mains.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL FOR

2024 LEAK DETECTION SURVEY FOR

DALTON UTILITIES WATER DISTRIBUTION SYSTEM

SCOPE OF WORK

Perform a leak detection survey and pinpointing project to cover approximately 125 miles of water distribution lines and all connected valves, hydrants, services, etc. At a minimum, the final report shall include the following items for each leak: location, size/type of facility, description, equipment used to find leak, estimated leak rate in gallons per minute (gpm), and a picture of the leak location. Each leak is to be clearly marked in the field, as well as documented in the report. It will not be necessary to pinpoint leaks on private lines; however, all leaks discovered on private service lines are to be reported to Dalton Utilities. Dalton Utilities will supply a field technician at all times to assist with locating mains, valves, services, and hydrants. Any pot holing required to gain access to the mains for the purpose of testing is the responsibility of the contractor.

PROJECT REQUIREMENTS

A breakdown of the size and material of the water mains within the area of study and additional system information pertinent to the project are included as

Attachment B.

Equipment to be used should be included in the bid, as well as, names and qualifications of laborers to perform work.

A detailed report of leak locations, estimated GPM loss, and street address.

A weekly progress report is to be supplied to the field technician that includes the area covered, the location of any potential leaks, and the area expected to be covered the following day.

A Final Report shall include: a summary of the project, survey review, with observations noted, sheets with data on each individual leak with a drawing of its location, picture, and a prioritization schedule of all leaks graded on a 1 to 5 scale.

Pre-project meeting will be held at Dalton Utilities prior to beginning any fieldwork.

Project must be completed within 60 calendar days of notice to proceed and issuance of a purchase order.

Project will be constructed under a Purchase Order from Dalton Utilities.

Progress billing will be allowed. Contractor should submit a schedule to determine monthly progress billing.

RFP for 2024 Leak Detection Survey

BID REQUIREMENTS

Complete the bid sheet (Attachment C) and provide a total bid price for the project based on the assumed units. This bid is for all labor and equipment necessary to complete the project. A proposal detailing the methodology, equipment, and personnel planned for this project must be submitted with the bid.

Bids are due back to Charlie Morrow via email:

Email: cmorrow@dutil.com

Bids are due by 10:00 AM on November 15th, 2024.

INSURANCE REQUIREMENTS

In accordance with Dalton Utilities’ policy requiring General Liability Insurance, and

Workman’s Compensation Insurance for all entities performing projects for Dalton

Utilities, we are requesting that all contractors submit to Dalton Utilities an active

Certificate of Insurance showing General Liability and Workmen’s Compensation

Insurance. General Liability and Workmen’s Compensation insurance requirements shall meet or exceed the minimum requirements of Dalton Utilities’ standards as shown on Attachment D.

E-VERIFY REQUIREMENTS

All contractors and subcontractors performing work for Dalton Utilities must participate in the E-Verify Program pursuant to the Georgia Security and Immigration

Compliance Act (SB 529). See Attachment E.

Attachment B

CLEVELAND HWY

WARING RD

REED RD

CR

OW

VA

LL

EY

R

D

NORTH BY-PASS

DAWNVILLE RD

BE

AV

ER

DA

LE

RD

GA HWY 2

PRATERS MILL RD

HIGHWAY 2

LA

KE

KA

TH

Y R D

LA

KE

FR

AN

CI

S R

D

CR

OW

R D

WILLIAMS RD

HA

IG

M

ILL

LA

KE

R D

REN

FR

OE R

D

PLEASANT GROVE DR

REED POND RD

GOOD HOPE RD

OLA DR

ME

ER

S R D

FREEPORT RD

UNDERWOOD RD

FRONTIER TRL

TUNNEL HILL-VARNELL RD

VIC

K D

R

LA

UR

A D R

WHEAT DR

CHEROKEE TRL

VISTA DR

W BROADACRE RD

3RD ST

MAPLE GROVE RD

KITTLE RD

SO

NY

A D R

WESTBROOK RD

CHEROKEE ESTATES RD

RA

US

CH

EN

BE

RG

R D

DOVER ST

CO

UN

TR

Y W

AY

HAIG MILL

RD

E BROADACRE RD

VIL

LA

GE

D

R

POPLAR SPRINGS RD

OLD PRATER MILL RD

BRYLOW DR

ST

AN

DI

NG

R D

THOMAS RD

Mc

GA

UG

HE

Y C

HA

PE

L R

D

WILLOWDALE RD

VA

RN

EL

L R

AIL

RO

AD

ST

CHATTANOOGA RD

CLIFFS ST

OLD PRATER MILL RD NE

TIMBERGHOST RD

97 SPRINGS RD

NEELY RD

MA

PL

E G

RO

VE

D

R

UPPER VARNELL RD

S BROOKER DR

QUILLIAN RD

RICKY DR

BEULAH DR

BA

Y D

R

BRADY DR

BROOKER RD

ANNIE LN

IZLAR WAY

NELSON KILE RD

ORCHARD WAY

LAKEWOOD DR

OLD CADY RD

PE

RC

HE

RO

N

DR

JUSTIN LN

GO

LF

VI

EW

DR

COHUTTA-VARNELL RD

EDWARDS PARK

CHAROLAIS TRL

KE

RR

R D

STINSON DR

NEW HOPE CHURCH RD

RU

BY

D R

PA

LM

S

WA

Y

N OAKS DR

LEE BRYANT RD

SILHOUETTE WAY

SC

AR

LE

T D

R

DA

NT

ZL

ER

C

IR

FL

EM

IN

G

ST

SA

TC

HE

R

DR

PIO

NE

ER

D

R

McCAMISH RD

HALEY DR

AB

BE

Y L N

1S T S

T

CAPRICE RD

N PARK DR

MANIS RD

I-75 NORTHBOUND

RAISIN WAY

ESTATE DR

HA

ZE

L D R

JOHNNY DR

2N D

ST

WE

XF

OR

D P

L

HAIG MILL DAM RD

I-75 SOUTHBOUND

RU

FU

S D R

COCHRAN DR

AV

IS

DR

LE

LIA

D R

GILLUM DR

OLD BEAVERDALE RD

N

SU

MM

IT

DR

TE

A R

OL

L D

R

W

PA

RL

IAM

EN

T D

R

SE

WA

RD

W

AY

CO

AS

T D R

HAVEN DR

GIDDENS RD

PALIMINO DR

TE

E T

OP

D

R

NE

W

HO

PE

R D

MERCER DR

KID

S D

R

HAZEL LN

YORK ST

HEATHER WAY

GROOMS DR

E H

ILL

VIE

W

DR

ANDY LN

VANN WAY

CHATHAM DR

HO

PE

W

AY

TIL

LM

AN

D

R

PEGGY LN

CA

YL

OR

D

R

WILLIAMS DR

W

HI

LL

VIE

W

DR

McFALLS ST

PACER LN

LY

NN

D R

RA

Y D

R

SAGAMORE DR

DUSTIN DR

DURGAN PL

KIM

BE

RL

Y P

AR

K D

R

N WHITFIELD DR

OA

KV

IEW

D

R

NADINE WAY

WILDWOOD RD

KIN

NA

MO

N

DR

DEER TRL

LO

FT

WO

OD

DR

FA

IR

WA

Y D

R

DIETZEN WAY

JO

HN

SO

N

RD

SU

SA

N

LN

PATRICIA LN

LEE JOAN DR

E R

IN

DA

D

R

KAY DR

ROYAL OAK DR

RO

BE

RT

S D

R

DO

G

LE

GG

D R

N T

HO

RN

TO

N A

VE

DAVIDWOOD DR

DA

RIS

DR

TO

M

MA

NI

S R D

TANGLEWOOD DR

E VARNELL MAIN ST

CHADWICK DR

CO

US

IN

D

R

CA

SE

Y L N

BIR

DI

E L N

EMMETT DR

SH

AR

ON

DA

LE

D

R

E LANGSTON WAY

WE

LS

H

DR

PIEDMONT DR

TR

AN

QU

IL

WA

Y

LY

NN

WO

OD

D R

ROSEN DR

GARDEN LN

TIM

BE

RL

AN

D

DR

FA

LC

ON

DR

BE

LG

IAN

D

R

SH

AD

OW

R

OC

K L

N

HOLLYWOOD DR

STRIPLIN TRL

FORREST PARK RD

KEMPTON LN

DE

SO

TO

TR

L

RENFROE CUT-OFF

BATTLE RIDGE DR

BOYD RD

BROCK DR

DIS

CO

VE

RY

LN

TH

RA

SH

ER

H

ILL

S R D

SA

RA

TO

GA

DR

LA

TO

NI

A D

R

GOOD OLE BOYS DR

HIDDEN LAKE RD

RAPALA DR

GA

IL

DR

SHADY ACRES RD

EDWARDS DR

NIX RD

MEADOWDALE DR

ARABIAN DR

BLACKBERRY WAY

VA

RN

EL

L C

ED

AR

ST

AR

BO

R T

RL

RIDGEHAVEN WAY

VINE DR

BULL RUN DR

CO

RO

NE

T D

R

CO

UN

TR

Y C

LU

B W

AY

STA

LLI

ON WAY

TONYA DR

AL

PH

AR

ET

TA

D

R

VICTORY PKWY

SALLY DR

SH

AL

LO

WF

OR

D

RD

SOSEBEE DR

WADE DR

PHILLIP DR

SU

TT

ON

D

R

CANTERBURY

MARESCA DR

RIDERWOOD DR

BL

OO

MI

NG

TO

N

DR

DR

IVE

R L N

ROWLAND WAY

BR

ID

LE

LN

NORTHGATE DR

BE

TH

AN

Y D

R

LINDA SUE DR

BE

DF

OR

D

DR

MARLOW WAY

MI

ST

Y M

EA

DO

WS

D R

MARSHALL DR

SK

YV

IEW

D

R

TA

BB

Y W

AY

SA

NT

A F E T

RL

WILLOW OAK LN

ROSEWOOD DR

RIDGEFIELD WAY

JA

ME

S C T

WI

GG

S D R

GL

EN

DA

LE

D R

GL

ISS

ON

D

R

NELMS LN

CENTENNIAL PKWY

DI

AN

E D R

SANDY DUNES

BENT TREE RD

SIMPLE WAY

AL

MA

D R

SHAMROCK DR

BA

TTL

E WAY

JEANETTE DR

AMAZING WAY

ALBERTSON DR

ABILENE TRL

APPALOOSA DR

WHISTLE WAY

OAKLAKE DR

ALLISON DR

DIXON DR

SP

RI

NG

ST

BROOKER FARM RDFREEDOM LN

VE

TE

RA

NS

D R

SHELIA CT

CA

YL

OR

R

ID

GE

R D

PIN

EW

OO

D

RD

SUSAN DR

LINGERFELT WAY

PADDLE WHEEL CT

FELKER CIR

VINYARD DR

BROTHERS LN

HARPER LN

SIE

NN

A D R

TR

AIL

BL

AZ

ER

LN

THISTLE DR

CONCORD DR

LA

GE

NI

A C

T

DELBERT WAY

REMINGTON WAY

WESTWOOD CIR

PLAINVIEW DR

YARDLEY LN

HIGHLAND POINTE DR

PIE

RC

E R D

OH

AN

A W

AY

BRENT LN

CHURCHILL WAY

JEFFERSON TR

SMITH INDUSTRIAL BLVD

C & L DR

KIK

ER

LN

N SUMMITT DR

BLUE HERON WAY

KIN

GS

RD

WATT DR

HO

NE

YS

UC

KL

E L

N

MALLARD RD TOWNSHIP DR

CREEKWOOD LN

SUSSEX WAY

MEGAN DR

FONDEL LN

HASKELL WAY

CLEAR OAKS DR

BAIRD WAY

RAINDANCE RD

DUKES WAY

ST

IN

NE

TT

D R

CRABTREE DR

DU

RH

AM

ST

AU

TU

MN

C

T

MI

LL

ER

G

RO

VE

D R

RU

RI

TA

N

DR

ELMWOOD DR

CHATT

AN

OOGA A

VE

STIRRUP LN

RIVERBURCH PKWY

SWANSON DR

CO

NN

IE

DR

GLAZE DR

SOMERSET PL

WYNFIELD DR

CH

ES

TN

UT

TR

L

NATURE WAY

UPTON DR

ROY WAY

PRINCE WAY

AS

HL

EY

LN

GOLDEN ROD LN

RACKLEY DR

ADAIR WAY

CORSON WAY

MILLICAN LN

MA

LL

OR

Y D

R

ATHENS WAY

OSPREY DR

MIA WAY

PERIWINKLE WAY

CLASSIC LN

SADDLE WAY

MILL TRACE RD

GR

AY

FO

X W

AY

MCGILL WAY

MALVIN WAY

HI

CK

OR

Y S

T

DI

NN

ER

BE

LL

LN

JANINE WAY

SIR JON DR

SYDNEY CIR

STACKSTONE DR

PECAN WAY

BOMBAY WAY

TODD AVE

ANN DR

LUKE POWELL RD

CL

AS

SIC

C

HA

SE

D R

MIMOSA ST

OLD WARING RD

HO

RS

ES

HO

E W

AY

HIAWASSEE WAY

CA

LL

IE

CI

R

RICHMOND DR

SOUTH RIDGE DR

CHESTNUT OAK DR

OS

TE

R

DR

N B

RO

AD

RIC

K D R

YU

MA

W

AY

CA

TT

LE

MA

N D R

ROSLYN CT

BROWN BEAR PATH

RED OAK DR

ANDROS DR

GR

OV

E L

EV

EL

D

R

OLD McGAUGHEY CHAPEL RD

BROOKLAND DR

SU

NR

AY

D

R

SAINT IVES WAY

KENNEDY WAY

BRIGHTON WAY

TURRENTINE DR

OV

ER

LA

ND

TR

L

CA

ME

RO

N

DR SU

MM

IT

VIE

W

DR

JULIE KAY DR

CA

MD

EN

W

AY

MONTICELLO WAY

SCOTT LANCE WAY

CLIFFS DR

SYCAMORE DR

JA

RR

ET

T W

AY

OLD

HAIG

MILL

RD

GR

OV

E P

AR

KW

AY

PU

RY

EA

R

DR

SILAS WAY

SW

INN

EY

DR

WO

OD

LIN

E D

R

REVERE RUN

BR

OA

DA

CR

E D R

EDELWEISS WAY

SCHOFIELD WAY

RE

NO

W

AY

GROVES RD

ED

INBU

RGH PL

THORNTREE WAY

ROCHESTER PL

MI

DD

LE

SU

MM

IT

DR

MOORE DR

W LANGSTON WAY

ROLAND HILLS DR

EN

ZIA

N

DR

RO

LL

IN

G

ME

AD

OW

S R

D

HIGHGATE CT

BREWER WAY

TRINITY WAY

CLIFTON HEIGHTS

PA

DG

ET

T W

AY

DOT CRESCENT DR

SNEED WAY

LOWELL DR

W ENVIRONS LN

ENVIRONS LN

BR

IAR

WO

OD

DR

ASBURY WAY

HA

WK

SN

ES

T W

AY

ASHTON WOODS WAY

CRICKET WAY

TERRAPIN WAY

TOMAHAWK TR

N TINKER WAY

CALLOWAY DR

SPRING VALLEY DR

BU

RK

ET

T D

R

HU

NT

ER

WO

OD

LN

VICKSBURG WAY

ABBOTT WAY

TOWNSHIP PLACE

BARBARA RUTH DR

KELLER WAY

WO

OD

RI

DG

E L N

HO

RN

BE

AM

W

AY

HARDY WAY

TOOMBS WAY

ME

MO

RIA

L G

AR

DE

NS

SHIRE CT

RO

SS

W

AY

WA

YN

E W

AY

RO

SS

C T

FLEMING PL

AP

PL

E T

RE

E W

AY

SAMUEL WAY

RO

CK

RI

DG

E

DR

DIAMONDBACK WAY

HA

TH

AW

AY

WO

OD

BU

RY

TR

DA

LT

ON

C

T

OTWAY DR

DRUCILLA WAY

RIDERWOOD DR

NO

RT

H B Y-P

AS

S

AUTUMN CT

TUNNEL HILL-VARNELL RD

RE

ED

R D

CO

UN

TR

Y W

AY

CHATTANOOGA RD

CR

OW

VA

LL

EY

R

D

HAIG MILL RD

OLD HAIG MILL RD

Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community

2024 Leak Detection Survey

Dalton Utilities Whitfield Co, Ga October 23, 2024

LDS Water Mains 2024 Main Material

Cast Iron Copper Galvinized

HDPE SDR 11

HDPE SDR 9

PEX

PVC

Centerlines County Road Interstate Primary Secondary

Main Material Length in Ft Length in Miles Cast Iron 117594 22.27 Copper 914 0.17 Galvanized 61 0.005

HDPE11 476438 90.23

HDP11 57433 10.87

PVC 7211 1.36

PEX 408 0.07

Main Diameter Length in Ft Length in Miles 2" 4334 0.82 2.25" 14287 2.71 4" 14436 2.73 6" 424101 80.32 8" 145634 27.58 10" 3467 0.65 12" 53800 10.19

Attachment C

DALTON UTILITIES

Bid Tab

2024 Water Leak Detection Survey

004113-3

Bid

Unit Total

Item

No.

Approx.

Quantity Unit Description Price Price

1.) 125.00 Miles Survey of Cast Iron Water Mains $ $

125.00 Miles Total Miles

SUBTOTAL

$TOTAL BID FOR 2024 LEAK DETECTION SURVEY

Attachment D

Attachment D to RFP for 2024 Leak Detection Survey

Insurance Requirements

I. Insurance:

The Contractor shall provide to the Owner proof and scope of insurance coverage in the form of a Certificate of Insurance currently in force. The Certificate of Insurance must list Dalton Utilities and the City of Dalton as additional named insured and will not be cancelled or materially altered unless at least 30 days prior written notice has been given to Dalton Utilities. This coverage must include but is not limited to:

A. Compensation Insurance:

1. Workman's Compensation for any employee engaged in any work on project

2. Other Workman's Compensation for any employee engaged in any work on project not covered by Workman's Compensation

B. General Liability:

Comprehensive General Liability for products and completed operations shall be XC, U, and the ISO Broadform General Liability endorsement or its equivalent. This coverage shall include:

1. Bodily Injury Insurance in an amount not less than $1,000,000 for bodily injury, including accidental death, to any one person, and subject to the same limit for each person, in an amount not less than $2,000,000 on ac-count of one accident.

2. Property Damage Insurance in an amount not less than $1,000,000 for any one damage claim, and in an aggregate amount up to $2,000,000 dur-ing a period of 12 months.

3. Automobile Liability including bodily injury and property damage of aforesaid amounts.

4. Owner's Protective Liability Insurance to be issued in the name of Dalton

Utilities for liability and property damage in the same amounts as stipu-lated for the contractor

5. Umbrella Policy to provide for increase in coverage of basic policies to an amount not less than $5,000,000.

6. Builder's Risk or Installation Floater Insurance for fire and increase of coverage in the amount at all times at least equal to the amount paid on account of work and materials to be set up in the name of Dalton Utilities or Contractor as their interest

Attachment E

004549-1

E-Verify Affidavit

Contractor Affidavit under O.C.G.A. §13-10-91(b)(1)

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. §13-10-

91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of the Water, Light and Sinking Fund Commission of the City of Dalton, Georgia d/b/a

Dalton Utilities has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. §13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.C.A. §13-10-

91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number

Date of Authorization

Name of Contractor

Name of Project

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on ______________, ___, 202___ in ________________ (city), ___________ (state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE ____ DAY OF____________, 202___.

NOTARY PUBLIC

My Commission Expires: _____________

004549-2

Subcontractor Affidavit under O.C.G.A. §13-10-91(b)(3)

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. §13-

10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with ______________________________ (name of contractor) on behalf of the Water, Light and Sinking Fund Commission of the City of Dalton, Georgia d/b/a Dalton Utilities has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in OC.G.A. §13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. §13-

10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice of receipt of an affidavit from any sub-subcontractor that has contracted with a sub-subcontractor to forward, within five business days of receipt, a copy of such notice to the contractor.

Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Name of Subcontractor

Executed on ___________, ___ 202___ in __________________ (city), ________ (state).

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE ___ DAY OF__________, 20___.

My Commission Expires: _______________

004549-3

Sub-subcontractor Affidavit under O.C.GA. §13-l0-91(b)(4)

By executing this affidavit, the undersigned sub-subcontractor verifies its compliance with O.C.G.A.

§13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract for ___________________________________ (name of subcontractor or sub-subcontractor with whom such. sub-subcontractor has privity of contract) and

__________________________________________ (name of contractor) on behalf of the Water, Light and

Sinking Fund Commission of the City of Dalton, Georgia d/b/a Dalton Utilities has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in

O.C.G.A. §13-10-91. Furthermore, the undersigned sub-subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub-subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the sub-subcontractor with the information required by O.C.G.A. §13-10-91(b). The undersigned sub-subcontractor shall submit, at the time of such contract, this affidavit to

_________________________________________ (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract). Additionally, the undersigned sub-subcontractor will forward notice of the receipt of any affidavit from a sub-subcontractor to

_________________________________________ (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract). Sub-subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Name of Sub-subcontractor

Executed on ___________, _____, 202___ in __________________ (city), ______(state).

SUBSCRIBED AND SWORN BEFORE ME ON THIS THE __ DAY OF___________,202___.

My Commission Expires: _____________

File details come from the government source that posted it. Updated .