rfp-f-g-2026-03.pdf

PDF 406 KB Posted

Attached to
PREDATOR CONTROL STRUCTURE AND COVERS FOR THE CONCRETE RACEWAYS LOCATED AT THE BERLIN STATE FISH HATCHERY.
Solicitation number
RFP F&G 2026-03
Issued by
Coos County, New Hampshire

About this file

This is a Request for Proposal issued by the New Hampshire Fish and Game Department seeking bids for predator control structures and covers for concrete raceways at the Berlin State Fish Hatchery. The project requires four fabric buildings, each measuring 18 feet wide by 150 feet long with a 9 feet 7 inches peak height and 6-foot eave height. Sealed bids must be submitted to the NH Fish and Game Department, Attn: Inland Fisheries, 11 Hazen Drive, Concord, New Hampshire by 2:00 p.m. on Friday, April 17, 2026. Specifications and additional information are available from Alexander Sitek at 603-271-1745 or alexander.j.sitek@wildlife.nh.gov. The bid submission should include pricing breakdowns for equipment, shipping, installation, and all related structural reports.

The specifications require galvanized primer and powder-coated steel framing manufactured in the United States with a minimum 50 kilopsi yield strength, minimum 18-ounce PVC cover material certified to NFPA 701, CPAI-84, and ULC 109 standards, and structural engineering based on the 2024 International Building Code and ASCE 7-16 standards. The structures must withstand 90 miles per hour wind loads and 88 pounds per square foot ground snow loads, and include six heavy-duty double zipper side entries, personnel doors with ramps and windows on both end walls, fabric windows with screens, a three-piece vinyl cover system, and stainless steel cables and hardware. All proprietary installation tools must be included by the supplier, and a minimum five-year non-prorated warranty on the entire building is required.

View the file

Other files

File Type Posted
rfp-f-g-2026-03-award.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGAL NOTICE

STATE OF NEW HAMPSHIRE FISH AND GAME DEPARTMENT

REQUEST FOR PREDATOR CONTROL STRUCTURE AND COVERS FOR THE CONCRETE

RACEWAYS LOCATED AT THE BERLIN STATE FISH HATCHERY.

You are invited to submit bid proposals for predator control structures and covers to protect the concrete raceways located at the Berlin State Fish Hatchery. Sealed bids can be received at the NH Fish & Game Dept.

Attn: Inland Fisheries, 11 Hazen Drive, Concord, NH until 2:00 p.m. on Friday April 17, 2026. Specifications are attached or can be requested through Alexander Sitek 603-271-1745, alexander.j.sitek@wildlife.nh.gov.

Companies, corporations or trade names, except sole proprietorships must be registered with the Secretary of State (Corporate Division, 603-271-3244) to conduct business with the State of New Hampshire.

mailto:alexander.j.sitek@wildlife.nh.gov

DETAILED SPECIFICATIONS

FOR

PREFERRED PREDATOR STRUCTURES AND COVERS

Four 18’ x 150’ Fabric Building with 9’7” Peak Height, 6’ Eave Bids should include pricing breakdown for equipment, shipping, installation, and any/all related structural reports.

Minimum Salient Characteristics Minimum requirements

1. Dimensions:

a. 18’ wide (outside dimension)

b. 150’ long (outside dimension)

c. 9’7” peak height (outside dimension)

d. 6’ eave (wall) height

2. Frame system:

a. Inline galvanized primer and powder coated steel framing system.

i. Aluminum frames are not acceptable.

ii. Steel must be sourced and manufactured within the United States.

iii. Steel tubing must be minimum 50ksi yield material.

iv. Arch chords must be made from a minimum of 2.5” x 2.5” square steel tubing.

v. Arches must be maximum 2.5’ on center.

b. Frame system must have a minimum of 2 rows of purlins in between each arch.

i. All purlins must be made from a minimum of 1.510” round tubing.

c. Perimeter Base Frame System:

i. Frame system must include full perimeter base except across end openings.

ii. Base frame must be made from minimum 2.0” square tubing.

d. End uprights

i. The frame system must have a minimum of (4) 2.5” x 2.5” square vertical uprights on the end.

3. Cover material

a. All cover and end walls must be made with minimum 18oz PVC material.

b. Vinyl material must be certified to meet NFPA 701 large-scale test, CPAI-84 and ULC 109.

c. Vinyl material must be certified as no growth mildew resistance to ASTM G21.

d. No rope, ratchet strap, cinch strap, or double d-ring tensioning systems allowed in cover panels or end panels.

e. Supplier must include a price for any proprietary tools necessary for tensioning the fabric to the frame.

4. Environmental and engineering requirements

a. Wind load: 90 mph 3-second gusts per risk Category II

b. Ground Snow load: 88 pounds per square foot

c. Engineering calculations:

i. Climatic and geographic conditions must be based on Allied Environmental Conditions and Test Publications (AECTP) – 230 (Edition 1).

ii. The engineering must be based on the following methodologies and technical input references must be used in the certified engineering process for the building to be considered:

1. 2024 International Building Code (IBC).

2. AISC Manual of Steel Construction, 15th edition.

3. ASCE Standard, Minimum Design Loads for Building and Other Structures, ANSI/ASCE 7-16.

4. AISC Design Guide 24: Hollow Structural Sections Connection Manual

iii. A RISA-3D program must be used to solve member forces and reactions at support points. An Allowable Stress Design (ASD) approach must be used to analyze the structural members.

iv. Foundation anchors must be assumed to be pinned with rotational support about the axis parallel to the arch. Translational lateral degrees of freedom must be unyielding.

v. The structural steel tubing shall be manufactured in accordance with ASTM-A-500, ASTM-B-117, ASTM-B6 and ASTM-G-23. All welding shall be performed prior to shipment using MIG welding.

vi. Coefficient of friction as it relates to snow shedding shall not be used when calculating snow capacity.

5. Building features

a. Front End wall must include the following features:

i. (1) 36”x80” Personnel Door with window and a Door Ramp

ii. (2) Fabric windows with Screen

b. Back End walls must include the following features:

i. (1) 36”x80” Personnel Door with window and a Door Ramp

ii. (2) Fabric windows with Screen

c. The building must include (6) 2.5’ Wide x 6’ High Heave Duty Double Zipper Side Entries

d. The building must include a 3-Piece Vinyl Cover System

e. The building must include Stainless Steel Cables and Hardware

6. Tools

a. Supplier must include any proprietary tools required for installation of the building.

7. Warranty

a. Minimum 5-year non-prorated warranty on the entire building.

STATE OF NEW HAMPSHIRE FISH AND GAME DEPARTMENT

File details come from the government source that posted it. Updated .