This Request for Proposal (RFP) Number 385439GMK is issued by Fermi Forward Discovery Group, LLC, the management and operations contractor for Fermi National Accelerator Laboratory (Fermilab), a Department of Energy facility located in Batavia, Illinois, covering approximately 6,800 acres in Kane and DuPage Counties. FermiForward seeks a qualified subcontractor to provide on-call, scheduled, and emergency excavation services and utility repairs across the Fermilab site, which includes approximately 375 buildings and structures situated on varied terrain with diverse soil types including clay, fill, and saturated soils in developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. The scope of work encompasses emergency and urgent repairs to water mains and sewer lines, underground piping installation and replacement, excavation and trenching, earthwork and site work, restoration services, and equipment mobilization. The subcontractor must maintain 24/7 emergency response capability with four-hour response times for emergencies, eight-hour response times for urgent requests, and the capacity to furnish up to three fully staffed and equipped crews simultaneously. Proposals are due by December 7, 2026, and no pre-proposal site visit or bidders' conference will be held. The resulting award will be an Indefinite Delivery, Indefinite Quantity (IDIQ) subcontract with a base period from January 1, 2027, through December 31, 2028, and three optional one-year periods through December 31, 2031, with an estimated annual value of $2,600,000 and a maximum subcontract value of $14,000,000.
This is a total small business set-aside for the North American Industry Classification System (NAICS) code 238910 (Site Preparation Contractors) with a small business size standard of $19.0 million. The subcontract will consist of firm fixed price task orders and, when scope cannot be reasonably defined in advance, time and materials task orders with ceiling prices. Pricing will be evaluated on a 100-point scale with technical criteria (Technical and Management Approach, Key Personnel, Current/Relevant/Past Experience, and Capacity/Equipment/Emergency Response Capability) comprising 85 points and price comprising 15 points. Offerors must submit fully burdened hourly rates for eight labor categories and daily, weekly, and monthly rates for 14 equipment types, with labor rates firm for the base period only and equipment rates firm for all periods. The minimum guaranteed subcontract value is $1,000, with an estimated 35 task orders annually and a maximum individual task order value of $300,000. Davis-Bacon Act wage rates apply, and the subcontractor must comply with certified payroll requirements through the LCPTracker system. Payment bonds are required for task orders of $35,000 or greater, and performance bonds are required for task orders of $150,000 or greater. Offerors must demonstrate acceptable safety performance with a three-year average Experience Modification Rate of 1.00 or less and Total Recordable Case and Days Away, Restricted or Transferred case rates at or below 85 percent of Bureau of Labor Statistics rates. The proposal must include comprehensive technical documentation, safety qualifications with OSHA 300A logs and workers' compensation data, collective bargaining agreements or wage rate development explanations, a corporate quality assurance plan, and insurance certificates meeting specified coverage requirements, with the University of Chicago, Universities Research Association, Inc., and the United States Government named as additional insureds.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
NUMBER 385439GMK
UTILITY EXCAVATION AND REPAIR SERVICES
INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) SUBCONTRACT
FIRM FIXED PRICE AND TIME AND MATERIALS TASK ORDERS
November 6, 2026
PROPOSALS DUE: December 7, 2026
Fermi Forward Discovery Group, LLC
Kirk Road & Wilson Street, Batavia, IL 60510-0500
TABLE OF CONTENTS
1. INVITATION TO SUBMIT PROPOSAL
2. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS
SUBCONTRACTING PLAN
3. SITE VISIT AND SITE CONDITIONS
4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS
5. AMENDMENT OF SOLICITATION
6. DESCRIPTION OF WORK AND TASK ORDER PROCEDURES
Scope of Work Response Requirements Crew Capacity and Laydown Area Type of Subcontract and Period of Performance Minimum and Maximum Quantities Task Order Procedures Task Order Schedule
7. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS
A. Part I: Technical Proposal/Evaluation Criteria
1. Criterion 1: Technical and Management Approach (20 Points)
2. Criterion 2: Key Personnel (20 Points)
3. Criterion 3: Current/Relevant/Past Experience (25 Points)
4. Criterion 4: Capacity, Equipment, and Emergency Response Capability (20 Points)
B. Part II: Business Management & Price Proposal
1. Price Proposal Form (At bottom of this document)
2. Subcontractor Annual Representations & Certifications (SARC), Form PROC-FRM-100
3. Proposal Certifications, Form PROC-FRM-466
4. Safety Qualifications and Documents
5. Corporate Quality Assurance Plan
6. Acknowledgment of Amendments
7. Collective Bargaining Agreements
8. PROPOSAL DUE DATE
9. EXCEPTIONS AND DEVIATIONS
10. LATE SUBMISSION
11. OFFEROR'S MODIFICATION AND WITHDRAWAL OF PROPOSALS
12. DAVIS-BACON ACT, CONSTRUCTION WAGES, AND CERTIFIED PAYROLL
13. ILLINOIS OCCUPATION AND USE TAXES
14. NOTICE OF BUY AMERICAN REQUIREMENT, CONSTRUCTION MATERIALS
15. PAYMENT BOND
16. PERFORMANCE BOND
17. INSURANCE
18. SUBCONTRACT AWARD
19. SUBCONTRACTING
EXHIBITS
EXHIBIT A: PRICE PROPOSAL FORM
RFP385439GMK: Excavation Services
1. INVITATION TO SUBMIT PROPOSAL
You are invited to submit a proposal for the services specified in this Request for Proposal (RFP), in accordance with the provisions contained herein and the terms and conditions of the proposed Indefinite Delivery, Indefinite Quantity
(IDIQ) subcontract entered into as a result of this solicitation. FermiForward intends to award a single IDIQ subcontract for Excavation Services. Work under the resulting subcontract will be ordered through firm fixed price task orders and, when the scope cannot be reasonably defined in advance, time and materials task orders, placed in accordance with Section 6.
This RFP is issued under Prime Contract No. 89243024CSC000002 between the United States Government, represented by the Department of Energy (DOE), and Fermi Forward Discovery Group, LLC (FermiForward) for the management and operation of the Fermi National Accelerator Laboratory (Fermilab).
All questions concerning this RFP should be submitted in writing and directed to the Procurement Specialist listed below.
Procurement Specialist: Gina M. Kern
Phone: 630-840-3955
Email: ginakern@fnal.gov
Fermi Forward Discovery Group, LLC
Procurement Department
Kirk Road & Wilson Street
Batavia, IL 60510-0500
Offerors are prohibited from contacting FermiForward officials or employees regarding this RFP, including through sales calls, other than in the manner and with the persons designated herein, until after award. FermiForward may disqualify any Offeror found to have contacted FermiForward personnel in violation of this section.
2. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE
AND SMALL BUSINESS SUBCONTRACTING PLAN
This is a total small business set-aside. The North American Industry Classification System (NAICS) code for this solicitation is 238910, Site Preparation Contractors. The small business size standard for this NAICS code is $19.0 million.
FermiForward will verify the size and socioeconomic status of each Offeror in the System for Award Management
(SAM) or the SBA certification search before award. HUBZone, veteran-owned, service-disabled veteran-owned, and women-owned small business status must be supported by SBA certification.
3. SITE VISIT AND SITE CONDITIONS
FermiForward will not hold a pre-proposal meeting or site visit for this RFP. Work under the resulting subcontract will be performed at locations across the Fermilab site that will be identified in each task order, and Exhibit O, Site Map, shows the general layout of the site. Offerors shall base their proposals on the information in this RFP and its exhibits and should account for the size of the site and the variety of soil types and terrain conditions described in Section 6.
When FermiForward determines that a site walk is needed for a specific firm fixed price task order, the site walk will be scheduled in the request for task order proposal. Questions about this RFP must be submitted in writing in accordance with Section 4.
4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS
The prospective Offeror should examine and review the solicitation with care. Any prospective Offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing by close of business (5:00 P.M. Central Time), November 18, 2026. Oral explanations or instructions given before the award of a subcontract will not be binding. Any information given to a prospective Offeror concerning a solicitation will be furnished promptly to all other prospective Offerors as an amendment to the solicitation if that information is necessary for submitting proposals or if the lack of the information would be prejudicial to other prospective Offerors.
5. AMENDMENT OF SOLICITATION
FermiForward may, by amendment, modify any provision or part of this RFP at any time before the award of any resultant subcontract. All terms and conditions that are not modified remain unchanged. An Offeror shall acknowledge receipt of any amendments to this RFP. Failure to acknowledge may result in the disqualification of an Offeror's proposal. The acknowledgment shall be provided in one of the following ways:
● Immediately upon receipt of the amendment via email to the FermiForward Procurement Specialist; or
● Return the Amendment with a signature on the acknowledgment signature line; or
● In the Offeror's Proposal Letter that accompanies an Offeror's proposal.
6. DESCRIPTION OF WORK AND TASK ORDER PROCEDURES
In summary, the work under the resulting subcontract consists of on-call, scheduled, and emergency excavation services and utility repairs, as described in Exhibit C, Statement of Work, and the requirements of each task order.
Work will be performed across the Fermilab site, which covers approximately 6,800 acres in Kane and DuPage
Counties and includes approximately 375 buildings and structures. The site contains a wide variety of soil types and terrain, such as clay soils, fill, and saturated soils, in settings that include developed areas, open prairie, woodlands, wetlands, and areas adjacent to ponds and waterways. Offerors should consider these conditions in their technical approach, equipment selection, and pricing. Fermilab operates 24 hours per day, 365 days per year, and the work must support uninterrupted laboratory operations.
Scope of Work
The Subcontractor shall furnish all qualified labor, supervision, equipment, tools, materials, traffic control, permits, notifications, and incidentals necessary to perform the work described in Exhibit C, which includes, but is not limited to, the following categories of work:
● Emergency and urgent repairs: excavation to expose, isolate, and repair failed water mains, service lines, sanitary sewers, and storm sewers, including breaks, collapses, and sinkholes, and temporary measures to make the site safe until permanent repairs are complete;
● Underground piping: installation, replacement, and repair of domestic water, raw water, sanitary sewer, storm sewer, sump discharge, and force main piping, and associated valves, valve boxes, hydrants, manholes, catch basins, culverts, and service connections;
● Excavation and trenching: trenching for new and replacement utilities; potholing and vacuum excavation to locate existing utilities; excavation and backfill for foundations, vent stacks, utility structures, and other buried components; and excavation and backfill to support repairs performed by others to electrical and gas utilities;
● Earthwork and site work: site preparation and grading, drainage ditches and swales, site stabilization, dewatering, and erosion and sediment control;
● Restoration: backfill and compaction, removal and disposal of spoils and debris, and temporary and permanent restoration of pavement, sidewalks, curbs, hardstands, and turf in accordance with the Fermilab Engineering
Standards in Exhibit T; and
● Equipment mobilization and standby services.
Repairs to electrical conduits and gas piping are excluded and will be performed by a separate licensed subcontractor.
Response Requirements
The Subcontractor shall maintain personnel, equipment, and a dedicated emergency contact number sufficient to respond to requests from FermiForward 24 hours per day, 365 days per year, including weekends and holidays, within the following times from notification:
● Emergency response: within four (4) hours;
● Urgent response: within eight (8) hours; and
● Non-emergency scheduled work: as mutually agreed by the Subcontractor and FermiForward.
Crew Capacity and Laydown Area
At times throughout the year, including during scheduled accelerator shutdown periods, FermiForward will require the
Subcontractor to furnish multiple crews at the same time. During recent shutdown periods, for example, three (3) crews were furnished concurrently for task orders lasting six (6) to eight (8) weeks, with one (1) of those crews dedicated to emergent work. The Subcontractor shall have the capacity to furnish up to three (3) fully staffed and equipped crews at the same time while continuing to meet the response times stated above.
FermiForward will designate one (1) laydown area on the Fermilab site for the Subcontractor’s equipment and materials. Space on the site is limited, and FermiForward will not provide additional laydown areas. The Subcontractor shall keep its equipment and materials within the designated area, maintain the area in a safe and orderly condition, secure its own equipment and materials, and restore the area to its original condition when the subcontract ends. Except as otherwise provided in the subcontract, FermiForward is not responsible for loss of or damage to the Subcontractor’s equipment or materials stored in the laydown area.
Type of Subcontract and Period of Performance
The award will be an IDIQ subcontract in the form of Exhibit M, Sample IDIQ Subcontract. Task orders will be firm fixed price. Time and materials task orders, each with a ceiling price, may be issued only when FermiForward determines that the scope cannot be reasonably defined in advance, such as for emergency response. Time and materials task orders are subject to Exhibit S. The base period is anticipated to be January 1, 2027 through December
31, 2028, with three (3) one-year option periods through December 31, 2031, which FermiForward may exercise unilaterally. Labor rates for each option period will be adjusted only as described in Section 7, Part II, Item 1.
Minimum and Maximum Quantities
● Minimum guaranteed value of the subcontract: $1,000.00
● Maximum value of the subcontract, including options: $14,000,000
● Estimated annual value of task orders: $2,600,000
● Maximum task order value: $300,000.00
The minimum guaranteed value is the only amount FermiForward is obligated to order under the subcontract. Based on recent historical volume, FermiForward anticipates issuing approximately thirty-five (35) task orders per year, including emergency task orders, with an estimated aggregate annual value of $2,600,000. Annual order volume may vary from year to year, provided that the cumulative value of all task orders does not exceed the maximum value of the subcontract. These estimates are provided for planning purposes only and are not a commitment by FermiForward.
Task Order Procedures
For each firm fixed price task order, FermiForward will issue a request for task order proposal to the Subcontractor stating the scope of work, schedule, applicable wage determination, bond requirements, proposal due date, and, when needed, the date and time of a task order site walk. The Subcontractor’s proposal shall include a price breakdown as required by Section B3.6 of Exhibit M, using labor and equipment rates that do not exceed the rates in the subcontract.
FermiForward will evaluate each task order proposal against its independent cost estimate and the subcontract rates and may negotiate the price, scope, and schedule before issuing the task order.
Because FermiForward intends to make a single award, task orders will be issued to the Subcontractor without further competition among IDIQ subcontract holders. FermiForward reserves the right to obtain any requirement outside of this subcontract when the Subcontractor cannot meet the required schedule or response time, when the proposed price is not fair and reasonable, or when doing so is otherwise in the best interest of FermiForward, subject to the minimum guaranteed value.
For each time and materials task order, labor and equipment will be paid at the rates in the subcontract for the hours actually worked, and materials will be paid at actual cost without profit, in accordance with Exhibit S. Each time and materials task order will state a ceiling price, and the Subcontractor exceeds that ceiling at its own risk.
Task Order Schedule
Milestones for each task order will be established in the task order, consistent with Section 010010, General
Requirements. Before work begins on each task order, the Subcontractor shall submit the preconstruction items described in Section 5 of Exhibit C, including a work plan, hazard analysis, utility coordination, environmental approach, schedule, and a quality control plan.
7. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS
This solicitation is a competitive best value trade-off procurement. FermiForward will award to the responsible Offeror whose proposal represents the best value to FermiForward, considering the technical criteria in Part I and price. This process permits trade-offs between price and non-price factors, and FermiForward may award to other than the lowest priced Offeror. The evaluation criteria and their maximum point values are: Criterion 1, Technical and Management
Approach (20 points); Criterion 2, Key Personnel (20 points); Criterion 3, Current/Relevant/Past Experience (25 points); Criterion 4, Capacity, Equipment, and Emergency Response Capability (20 points); and Price (15 points), for a total of 100 points. The point values state the relative importance of the criteria. All technical criteria, when combined, are significantly more important than price. Price will be evaluated and scored as described in Part II. Safety qualifications will be evaluated on an acceptable or unacceptable basis as described in Part II, Item 4, and will not be scored. FermiForward will use the combined technical and price scores as a guide in making its best value decision but will base the decision on the substance of the evaluation, including the strengths, weaknesses, and deficiencies identified and the reasonableness of the proposed prices. FermiForward intends to make a single award.
The proposal shall be submitted in two (2) parts: Part I, Technical Proposal, and Part II, Business/Management
Proposal. In no instance shall Part I and Part II be bound together or presented in such manner as to make them not severable. The Technical Proposal shall not contain any reference to cost other than the information required in the project experience section.
A. Part I: Technical Proposal/Evaluation Criteria
Offeror shall provide information and demonstrate how each requirement (sub-criterion below) will be met by the project team and/or has the capability(ies). FermiForward will assign points to each criterion, up to the maximum shown, based on the strengths, weaknesses, and deficiencies identified.
1. Criterion 1: Technical and Management Approach (20 Points)
The Offeror shall describe how it will execute, manage, and control task orders with respect to scope, schedule, quality, resources, communications, changes, and risk. The Offeror shall also describe how it will manage its personnel and sub-tier contractors to minimize technical, cost, and schedule risk while meeting the requirements of Exhibit C and the quality requirements of each task order. The Offeror shall include a description of the following:
(a) The Offeror's organizational approach to the management of this subcontract, including the project team, reporting relationships, and the involvement of the firm's executive management.
(b) An organization chart that shows the lines of authority and communication for the execution of this subcontract, including the Offeror's Project Manager, quality control and safety organization, and any joint venture partners, teaming partners, and key sub-tier contractors.
(c) The tools the firm uses for planning, scheduling, and cost control, such as a web-based project management system and scheduling software.
2. Criterion 2: Key Personnel (20 Points)
The Offeror shall provide a resume for each of the following Key Personnel:
● Project Manager (10 Points);
● Construction Superintendent (5 Points); and
● Project Safety Manager (5 Points).
The Offeror shall also provide a resume for its Competent Person for Excavation, who must be trained and designated as a competent person for excavation and trenching under OSHA 29 CFR 1926 Subpart P. This resume will not be scored, but a proposal that does not identify a qualified Competent Person for Excavation will not be eligible for award.
Each resume shall include the following. Resumes showing experience with emergency excavation and underground utility repair will be rated more favorably.
● Name and position;
● Years of applicable experience;
● History of applicable employment experience and the technical qualifications relevant to the requirements herein;
● Other experience and professional accomplishments that demonstrate the qualifications of the proposed candidate;
● Educational background, including academic degrees and the year conferred; and
● Technical training, including program and year of completion.
The Offeror shall demonstrate that it has the necessary structure and experienced, qualified personnel within its organization to effectively manage, control, administer, and execute construction operations and sub-tier contracts.
By identifying these individuals, the Offeror commits that, barring unforeseen circumstances, they are the persons who will be assigned to this subcontract. Key Personnel shall not be changed after award without the prior written approval of FermiForward. If the selected Offeror intends to use personnel in a Key Personnel role for whom resumes were not submitted before award, the Offeror shall submit their resumes to FermiForward for written approval before using them. The qualifications of substituted personnel must be equal to or greater than those of the personnel whose resumes were submitted. FermiForward may, at its sole discretion, reject proposed replacement personnel, in which case the
Offeror shall submit another candidate.
3. Criterion 3: Current/Relevant/Past Experience (25 Points)
Offerors will be evaluated on their relevant performance of excavation, trenching, and underground utility repair work similar in scope and complexity to the work described in Exhibit C. Offerors shall list all projects completed in the past ten (10) years that are of similar type, size, scope, and complexity, including any on-call or emergency response work and any work for FermiForward or another DOE laboratory. Projects demonstrating emergency excavation and underground utility repair experience will be rated more favorably. More recent and more comparable projects are more indicative of the Offeror's current capabilities and may have a greater impact on the evaluation than less recent, less comparable projects. Each project shall include the following:
● Customer Name, and the name, title, phone number, and email address of a customer contact;
● Project Name and Location;
● Project Description, including the Offeror's role as prime contractor or subcontractor;
● Total Contract Amount; and
● Project Start and Completion Date. If a current project, please provide the Percent (%) Complete and the projected completion date.
An Offeror without a record of relevant past performance will not be evaluated favorably or unfavorably under this criterion.
4. Criterion 4: Capacity, Equipment, and Emergency Response Capability (20 Points)
The Offeror shall demonstrate that it has the workforce, equipment, and organization to perform the full volume of work under this subcontract as a single awardee, including periods when multiple crews are required at the same time.
The Offeror shall address the following:
(a) The number of craft employees, by labor category in Table 1 of Exhibit A, that the Offeror employs and will make available for this subcontract, and how it will furnish up to three (3) fully staffed and equipped crews at the same time, as described in Section 6, without delaying emergency response.
(b) The Offeror’s current and projected workload for the next twelve (12) months, including major contracts in progress, and how this subcontract will be supported within that workload.
(c) For each equipment item in Table 2 of Exhibit A, whether the Offeror owns or rents the item, the quantity available, and, for rented items, the source and the time needed to obtain the item.
(d) The Offeror’s dedicated emergency contact number and dispatch process, the location of its nearest yard and its travel time to Fermilab, and how it will meet the response times in Section 6 on a 24 hours per day, 365 days per year basis.
(e) The portion of the work the Offeror will perform with its own forces, and the trades or services, if any, it expects to obtain from sub-tier contractors and how it will manage them.
(f) How the Offeror will prepare and submit complete task order proposals within the time stated in each request for task order proposal.
B. Part II: Business Management & Price Proposal
The Business Management proposal shall contain the following documents/items:
1. Price Proposal Form (At bottom of this document)
The Offeror shall propose fully burdened straight time, time and one-half, and double time hourly rates for each labor category, and daily, weekly, and monthly rates for each equipment item, on the Price Proposal Form (Exhibit A). The
Price Proposal Form is required to be completed in full and signed. Labor rates shall be proposed for the base period only. Equipment rates apply to the base period and all option periods. All proposed rates are ceiling rates for pricing task orders under the resulting subcontract.
FermiForward will calculate a total evaluated price for each Offeror as the sum of (1) each base period labor rate multiplied by the corresponding evaluation hours in Table 1 of Exhibit A and (2) each equipment weekly rate multiplied by the estimated weeks in Table 2 of Exhibit A. The evaluation quantities are estimates for evaluation purposes only and are not a commitment to order. FermiForward will evaluate all rates, including daily and monthly equipment rates, for reasonableness, and will evaluate the proposal for balance. A proposal that is materially unbalanced may be rejected.
Apprentice Rate Build-Up. For each apprentice labor category in Table 1 of Exhibit A, the Offeror shall submit a rate build-up showing how each proposed straight time, time and one-half, and double time rate was derived. The build-up shall identify (1) the registered apprenticeship program and its registration with the U.S. Department of Labor, Office of Apprenticeship, or a State Apprenticeship Agency recognized by that Office; (2) the apprentice period or level on which the rate is based and the percentage of the journeyman wage rate that applies to that period under the program;
(3) the resulting base wage and the fringe benefits required by the program or the applicable wage determination; (4) payroll taxes and insurance; and (5) overhead and profit, stated in dollars and as percentages. If the Offeror proposes a single rate that represents more than one apprentice period, the build-up shall show each period and the weighting used.
The overhead and profit percentages shall be consistent with those used for the corresponding journeyman labor category. FermiForward will use the build-up to evaluate the reasonableness of the apprentice rates.
Price will be scored on a maximum of fifteen (15) points. The Offeror with the lowest total evaluated price will receive fifteen (15) points. Each other Offeror will receive points equal to the lowest total evaluated price divided by that
Offeror’s total evaluated price, multiplied by fifteen (15), and rounded to two (2) decimal places. Price points will be assigned only to proposals whose rates FermiForward has determined to be fair and reasonable.
Labor Rate Adjustments for Option Periods. Labor rates for each option period will be adjusted only to reflect changes in the wage and fringe benefit rates under the Subcontractor’s collective bargaining agreements or, for any labor category not covered by a collective bargaining agreement, changes in the applicable Davis-Bacon wage determination.
No later than thirty (30) calendar days before the start of each option period, the Subcontractor shall submit to the
Procurement Specialist a copy of each current collective bargaining agreement or rate sheet and its proposed revised labor rates, with a breakdown showing the base wage, fringe benefits, payroll taxes and insurance, overhead, and profit for each labor category. The overhead and profit percentages proposed for the base period will remain fixed for all option periods, and only the increase or decrease in wages, fringe benefits, and the payroll taxes and insurance that vary directly with wages will be recognized. Offerors should account in their base period rates for any wage or fringe benefit increases scheduled to take effect during the base period. Revised labor rates will be incorporated into the subcontract by bilateral modification and will apply only to task orders issued after the effective date of that modification. In no case may the wages and fringe benefits paid to laborers and mechanics fall below those required by the applicable wage determination.
2. Subcontractor Annual Representations & Certifications (SARC), Form PROC-FRM-100
The successful Offeror's submittal of this completed form will be incorporated in the resultant subcontract. If an offering entity is a joint venture, association, consortium, or partnership, each member entity must submit an individual
Representations and Certifications Form.
3. Proposal Certifications, Form PROC-FRM-466
All appropriate sections, including the certification of compliance with FAR 52.222-90, are required to be completed and signed by a company official.
4. Safety Qualifications and Documents
The Offeror’s safety qualifications will be evaluated on an acceptable or unacceptable basis and will not be scored. A proposal that is determined to be unacceptable under this item will not be eligible for award. The Offeror shall submit the following with the proposal:
● Fermilab Subcontractor Injury & Illness Data Questionnaire (completed and signed):
○ OSHA 300A Form logs for the past three years.
○ The National Council on Compensation Insurance (NCCI) Workers Compensation Experience Rating form for the past three years.
● Corporate Safety and Health Plan (if your company's plan has not already been accepted by Fermilab in the past).
● A safety narrative that addresses (1) a self-evaluation of the Offeror’s safety program, qualifications, and approach to selecting and managing sub-tier contractors; (2) how the Offeror plans to maintain good safety performance, including trench and excavation safety; and (3) how the Offeror would implement the requirements of 10 CFR 851, Worker Safety and Health Program.
● Sample Certificate of Insurance.
Safety Performance Thresholds. The Offeror shall demonstrate a three-year average Experience Modification Rate
(EMR) of 1.00 or less, and Total Recordable Case (TRC) and Days Away, Restricted or Transferred (DART) case rates at or below 85 percent of the most recently published Bureau of Labor Statistics (BLS) TRC and DART rates for construction, as shown in the OSHA 300A logs and NCCI Workers Compensation Experience Rating forms submitted under this item. An Offeror that does not meet these thresholds may submit an explanation of the circumstances and the corrective actions it has taken, which FermiForward will consider in determining acceptability.
5. Corporate Quality Assurance Plan
Per Section 014100, Quality Requirements, the Subcontractor shall furnish with the proposal a copy of their Corporate
Quality Assurance Plan. Failure to submit such a document could constitute a non-responsive proposal. If the
Subcontractor does not have a Corporate Quality Assurance Plan developed at the time of proposal, they may elect to use the FermiForward form (Appendix C of Section 014100) to satisfy this requirement.
6. Acknowledgment of Amendments
All amendments to the solicitation must be acknowledged in accordance with Section 5 of this RFP.
7. Collective Bargaining Agreements
The Offeror shall submit a copy of each collective bargaining agreement that covers the labor categories in Table 1 of
Exhibit A, including the current wage and fringe benefit rate sheets and any scheduled rate increases. If the Offeror is not a party to a collective bargaining agreement for a labor category, the Offeror shall state so and explain how its rates for that labor category were developed.
8. PROPOSAL DUE DATE
The Offeror's proposal is to be emailed to the Procurement Specialist no later than close of business (3:00 P.M. Central
Time) on December 07, 2026. Partial or incomplete proposals may not be considered.
FermiForward requires a minimum acceptance of ninety (90) calendar days for acceptance of proposals. An Offeror allowing less than FermiForward's minimum acceptance period may be rejected.
FermiForward reserves the right to cancel this Solicitation at any time without incurring any liability or damages associated with such cancellation.
9. EXCEPTIONS AND DEVIATIONS
Offerors taking exceptions, deviations, or conditional assumptions must identify and explain each exception/deviation, or conditional assumption taken with sufficient amplification and justification to permit evaluations. Such exceptions, deviations, or conditional assumptions will not themselves automatically cause a proposal to be deemed unacceptable to FermiForward. However, a large number of exceptions or one or more significant exceptions not providing benefit to
FermiForward may result in the rejection of the Offeror's proposal as unacceptable.
By submitting a proposal without specifically identified exceptions, the Offeror stipulates its full acceptance of all terms and conditions and subcontract language as written. Any failure to identify an exception, deviation, or conditional assumption in the proposal shall be deemed a waiver of the Offeror's right to negotiate such terms.
FermiForward will not consider, and specifically rejects, any additional or modified terms and conditions proposed by the Offeror after the proposal due date.
10. LATE SUBMISSION
Proposals received by FermiForward after the Submittal Date and Time indicated may not be considered.
11. OFFEROR'S MODIFICATION AND WITHDRAWAL OF PROPOSALS
The Offeror may submit modifications to its proposals at any time before the solicitation closing date and time and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
Proposals may be withdrawn at any time before the submission deadline. Withdrawals are effective upon receipt of notice by the Procurement Specialist.
12. DAVIS-BACON ACT, CONSTRUCTION WAGES, AND CERTIFIED PAYROLL
The awarded Subcontract is subject to the wage and labor standards under the Davis-Bacon Act (40 U.S.C. chapter 31, subchapter IV) and the related labor standards FAR provisions that are incorporated by reference into FermiForward’s
General Terms and Conditions for Construction. The wage determination in Exhibit L applies to this RFP. Each task order will incorporate the wage determination in effect on the date the task order is issued, and the current wage determination will also be incorporated into the subcontract upon the exercise of each option period.
The wage rates set forth are the minimum rates that may be paid to the classification of laborers and mechanics designated therein according to the Davis-Bacon Act, as amended. FermiForward does not represent that said minimum rates do now, nor that they will at any time in the future, prevail in the locality of the work for such laborers or mechanics; nor that such laborers or mechanics are or will be obtainable at said rates for work under this subcontract, nor that said rates represent the most recent wage determination by the Secretary of Labor concerning such classifications of laborers or mechanics in the locality of work.
Apprentices may be employed and paid at apprentice rates only if they are registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Office of Apprenticeship, or with a State Apprenticeship
Agency recognized by that Office, and only within the ratio permitted by that program, in accordance with FAR
52.222-9, Apprentices and Trainees.
The Subcontractor and its Subcontractors are required to submit certified payrolls and labor compliance documentation weekly as required by Federal law.
Before work begins under any task order, the Subcontractor shall complete PROC-FRM-012, Vendor Statement and
Acknowledgment (Exhibit H), for itself and for each lower-tier subcontractor.
FermiForward currently holds a licensing agreement with LCPTracker for weekly electronic payroll submittals by the
Subcontractor and its Subcontractors. LCPTracker is a web-based system, accessed using a web browser. The
Subcontractor will be given a Log-on identification (i.e., User ID) and password to access the LCPTracker system. This requirement shall flow down to every lower-tier Subcontractor. The use of this system is free.
13. ILLINOIS OCCUPATION AND USE TAXES
Any resulting contract will be exempt from Illinois Occupation and Use Taxes.
14. NOTICE OF BUY AMERICAN REQUIREMENT, CONSTRUCTION MATERIALS
Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American, Construction Materials" (FAR clause 52.225-9), in the version in effect under the Prime
Contract.
Requests for determinations of inapplicability. An Offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Procurement Specialist in time to allow a determination before the submission of offers. The Offeror shall include the information and applicable supporting data required by the clause at FAR 52.225-9 in the request. If an Offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer or has not received a response to a previous request, the Offeror shall include the information and supporting data in the offer.
Evaluation of offers. FermiForward will evaluate an offer requesting an exception to the requirements of the Buy
American statute, based on the claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in the clause at FAR
52.225-9.
If evaluation results in a tie between an Offeror that requested the substitution of foreign construction material based on unreasonable cost and an Offeror that did not request an exception, FermiForward will award to the Offeror that did not request an exception based on unreasonable cost.
Alternate offers. When an offer includes foreign construction material not listed by FermiForward in this solicitation, the Offeror also may submit an alternate offer based on the use of equivalent domestic construction material, in accordance with FAR 52.225-9.
Trade agreements. When a task order is subject to a trade agreement, FAR 52.225-11, Buy American, Construction
Materials under Trade Agreements, will apply to that task order in place of FAR 52.225-9, and the corresponding request, evaluation, and alternate offer procedures of that clause will apply.
15. PAYMENT BOND
For each task order of $35,000.00 or greater, the Subcontractor is required to furnish FermiForward with a Payment
Bond in the amount of 100 percent of the task order price within ten (10) calendar days after the task order is issued, and before work begins, using Exhibit F, PROC-FRM-042, Payment Bond.
16. PERFORMANCE BOND
For each task order of $150,000.00 or greater, the Subcontractor is required to furnish FermiForward with a
Performance Bond in the amount of 100 percent of the task order price within ten (10) calendar days after the task order is issued, and before work begins, using Exhibit G, PROC-FRM-040, Performance Bond.
17. INSURANCE
Certificates of insurance of the types and the amounts in accordance with Clause 15 in FermiForward General Terms and Conditions and Exhibit E, Insurance Requirements for Construction, will be required of the successful Offeror before physical work at the site commences. All policies, except for Worker's Compensation and Professional Liability, shall provide by appropriate language that Fermi Forward Discovery Group, LLC, the University of Chicago, Universities Research Association, Inc., and the United States Government are additional insureds. The certificates shall state that waiver of subrogation is granted in favor of the Certificate Holder as required by written contract, that the insurance afforded by such policies is primary insurance, and that all rights of the insurer for contribution from other insurers of Fermi Forward Discovery Group, LLC, University of Chicago, Universities Research Association, and the United States Government are waived.
18. SUBCONTRACT AWARD
Issuance of the RFP does not compel FermiForward to make an award. FermiForward reserves the right to accept or reject all proposals, and to make no award, if that is determined to be in its best interest. A decision may be made without discussion; hence, an Offeror’s proposal should be submitted initially on the most favorable terms. The proposed award is based on a continuing program requirement and the issuance of obligation authority from the
Procurement Department of the Laboratory. Any subsequent award issued by FermiForward shall be constituted in writing by authorized representatives of the Procurement Department.
Registration in the System for Award Management (SAM.gov) is not required to submit a proposal. Before award, FermiForward will review SAM.gov to verify that no Offeror is excluded, debarred, suspended, or proposed for debarment.
Each resulting subcontract will consist of the documents listed in Section J of Exhibit M, with any inconsistency resolved by the order of precedence in Section A6 of Exhibit M. This RFP will not be incorporated into the subcontracts.
No other representatives of FermiForward are authorized to issue contracts or agreements or bind FermiForward to any form of agreement or understanding. The authorized Procurement Department official is the only individual who can legally commit FermiForward to the expenditure of funds in connection with this proposed procurement.
19. SUBCONTRACTING
Unless otherwise specified, the successful Offeror shall be responsible for the performance of any Subcontractors that perform work under this subcontract.
The use of Subcontractors in the performance of the contract is subject to FermiForward consent. The awarded Offeror shall ensure that any Subcontractors abide by all terms and conditions of the subcontract.
Substitution or Removal of Sub-tier Contractors. A Subcontractor that needs to remove or substitute a sub-tier contractor at the task order level on its approved utilization plan must submit a written request for the removal or substitution of the sub-tier contractor concerned. The removal or substitution may be made only after the Procurement
Department approves the request in writing. Under no circumstance shall a Subcontractor unilaterally remove or substitute a sub-tier contractor on its DOE funded subcontract without prior written approval by the Procurement
Department.
EXHIBITS
A. Price Proposal Form (attached).
B. Construction Specifications:
● 010010 General Requirements .
● 013100 ESH Construction Requirements .
● 014100 Quality Requirements .
C. Statement of Work: Excavation Services IDIQ.
D. FermiForward General Terms and Conditions for Construction.
E. Insurance Requirements for Construction (01/2025).
F. PROC-FRM-042, Payment Bond.
G. PROC-FRM-040, Performance Bond .
H. PROC-FRM-012, Vendor Statement and Acknowledgment.
I. Fermilab Subcontractor Injury & Illness Data Questionnaire, Form 7010-F1-1 (Rev. 07/2018).
J. PROC-FRM-100, Subcontractor Annual Representations & Certifications (SARC), Version 1.0 (Release Date
10/01/2026).
K. PROC-FRM-466, Proposal Certifications, Version 1.0 (Release Date 10/01/2026).
L. FSO-approved Davis-Bacon Act Wage Rates, General Decision.
M. Sample IDIQ Subcontract.
N. CESHC
O. Site Map.
P. Summary of Required RFP Submittal Documents.
Q. FermiForward General Terms and Conditions for Time and Materials or Labor-Hour Subcontracts (Non-R&D
Work) (10/2026), applicable to time and materials task orders.
EXHIBIT A: PRICE PROPOSAL FORM
RFP No. 385439GMK: Utilities Excavation and Repair Services
Offeror Name: ______________________________________ Date: ____________________
Instructions: Enter fully burdened straight time, time and one-half, and double time hourly rates for each labor category in Table 1, and daily, weekly, and monthly rates for each equipment item in Table 2. Labor rates include all wages, fringe benefits, payroll taxes, insurance, overhead, and profit and apply to the base period only. Equipment rates include fuel, maintenance, and insurance, exclude the operator, and apply to all periods. Attach the apprentice rate build-up required by Section 7, Part II, Item 1. Evaluation quantities are estimates only and are not a commitment to order.
Table 1: Labor Rates
Item Labor Category Eval. ST
Hours ST Hourly
Rate Eval. Time
& 1/2 Hours Time & 1/2
Hourly Rate Eval. Double
Time Hours Double Time
Hourly Rate Extended Price
Subtotal
1 Supervisor / Superintendent 800 $ [ ] $ [ ] $
Operating Engineer
Apprentice
3 Operating Engineer 9,000 $ [ ] $ [ ] $
4 Laborer Foreman [ ] $ [ ] $ [ ] $
5 Laborer Apprentice [ ] $ [ ] $ [ ] $
6 Laborer Journeyman 18,000 $ [ ] $ [ ] $
Mechanical Pipefitter
Foreman 800 $ [ ] $ [ ] $
Mechanical Pipefitter
Journeyman 1,500 $ [ ] $ [ ] $
TOTAL EXTENDED
LABOR
Table 2: Equipment Rates
Item Equipment Description $/Day $/Week $/Month Estimated
Weeks
Extended
Amount
($/Week x Est.
Weeks)
1 Dump Truck, 12 cubic yards $ $ $ 15
2 Dump Truck, 5 cubic yards $ $ $ 20
Vacuum Excavator (Ditch Witch FX65 equivalent or greater) $ $ $ 30
4 Wheel Tractor with 1.5 yard front end loader and
0.5 cubic yard backhoe attachment $ $ $ 15
5 Backhoe (410 Deere equivalent) with all attachments $ $ $ 20
6 Compact ("mini") Excavator (26G Deere equivalent) $ $ $ 10
7 Mid Size Excavator (210 Deere equivalent) $ $ $ 20
8 Crawler Dozer (750L Deere equivalent) $ $ $ 10
9 Skid Steer (330G Deere equivalent) $ $ $ 10
10 Plate Compactor (300 lb equivalent) $ $ $ 10
11 Light Tandem Roller (Bomag BW135 equivalent) $ $ $ 10
Item Equipment Description $/Day $/Week $/Month Estimated
Weeks
Extended
Amount
($/Week x Est.
Weeks)
Gas Powered Air Compressor (100 to 500 CFM) with
100 foot hose and air hammer with points $ $ $ 10
13 Walk Behind Trencher, 8 inch minimum depth $ $ $ 5
14 Trench Shield, Excavation Box(es) $ $ $ 30
TOTAL EXTENDED EQUIPMENT $
TOTAL EXTENDED LABOR (Table 1): $__________________
TOTAL EXTENDED EQUIPMENT (Table 2): $__________________
TOTAL EVALUATED PRICE (Table 1 + Table 2): $__________________
The undersigned certifies that this Price Proposal Form has been completed in full, that the rates offered are firm for the acceptance period stated in this RFP, that the labor rates are firm for the base period and the equipment rates are firm for the base period and all option periods, and that the labor rates include all wages, fringe benefits, payroll taxes, insurance, overhead, and profit.
Signature: ______________________________________ Title: ____________________
Company: ______________________________________ Date: ____________________
| 1. INVITATION TO SUBMIT PROPOSAL |
| 2. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SUBCONTRACTING PLAN |
| 3. SITE VISIT AND SITE CONDITIONS |
| 4. EXPLANATION OR INTERPRETATION OF RFP DOCUMENTS |
| 5. AMENDMENT OF SOLICITATION |
| 6. DESCRIPTION OF WORK AND TASK ORDER PROCEDURES |
| Scope of Work |
| Response Requirements |
| Crew Capacity and Laydown Area |
| Type of Subcontract and Period of Performance |
| Minimum and Maximum Quantities |
| Task Order Procedures |
| Task Order Schedule |
| 7. PREPARATION, SUBMISSION, AND EVALUATION OF PROPOSALS |
| A. Part I: Technical Proposal/Evaluation Criteria |
| 1. Criterion 1: Technical and Management Approach (20 Points) |
| 2. Criterion 2: Key Personnel (20 Points) |
| 3. Criterion 3: Current/Relevant/Past Experience (25 Points) |
| 4. Criterion 4: Capacity, Equipment, and Emergency Response Capability (20 Points) |
| B. Part II: Business Management & Price Proposal |
| 1. Price Proposal Form (At bottom of this document) |
| 2. Subcontractor Annual Representations & Certifications (SARC), Form PROC-FRM-100 |
| 3. Proposal Certifications, Form PROC-FRM-466 |
| 4. Safety Qualifications and Documents |
| 5. Corporate Quality Assurance Plan |
| 6. Acknowledgment of Amendments |
| 7. Collective Bargaining Agreements |
| 8. PROPOSAL DUE DATE |
| 9. EXCEPTIONS AND DEVIATIONS |
| 10. LATE SUBMISSION |
| 11. OFFEROR'S MODIFICATION AND WITHDRAWAL OF PROPOSALS |
| 12. DAVIS-BACON ACT, CONSTRUCTION WAGES, AND CERTIFIED PAYROLL |
| 13. ILLINOIS OCCUPATION AND USE TAXES |
| 14. NOTICE OF BUY AMERICAN REQUIREMENT, CONSTRUCTION MATERIALS |
| 15. PAYMENT BOND |
| 16. PERFORMANCE BOND |
| 17. INSURANCE |
| 18. SUBCONTRACT AWARD |
| 19. SUBCONTRACTING |
| EXHIBITS |
| EXHIBIT A: PRICE PROPOSAL FORM |