RFP.Perry.Walton.Woodward Curb.Gutter.docx

DOCX document 308 KB Posted

Attached to
Road Repair - Concrete Curb and Gutter
Solicitation number
RFP - 591 - 220000001493
Issued by
Macomb County, Pentwater Village, Michigan

About this file

This document is a Request for Proposal (RFP) issued by the Michigan Department of Transportation (MDOT) for concrete curb and gutter repair work along Perry Street between Walton Road and Woodward Loop. The scope of work includes removing and disposing of existing concrete curb and gutter, installing new concrete curb and gutter, providing traffic control, and other related work. The RFP has a proposal deadline of March 14, 2022, and the anticipated contract start date is May 1, 2022. The contract term is until September 30, 2022.

The RFP requires bidders to be prequalified by MDOT in the category of "Concrete, C, C&G". Pricing must be provided for items such as hand patching, curb removal, new concrete curb and gutter, and traffic control. The State reserves the right to consider factors such as the bidder's Michigan economic impact, compliance with labor and environmental laws, and status as a qualified disabled veteran-owned business when evaluating proposals. Liquidated damages may be assessed for failure to complete the work within the specified 30-calendar day timeframe.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement proposal instructions Department of Transportation Curb and Gutter Repair Perry Street between Walton Rd and Woodward Loop Request for Proposal No. 220000001493 Solicitation Manager Name: ReChelle I. Benson Direct Phone: 517-335-5905 Email: BensonR4@michigan.gov Main Phone: 1-855-MI-PURCH 1-855-647-8724 This is a Request for Proposal (RFP) for:

Curb and gutter repairs along Perry St between Walton Rd and Woodward Loop RFP Timeline

Event
Time
Date
RFP issue date
N/A
Thursday, March 3, 2022
Deadline for bidders to submit questions about this RFP
3:00 p.m. Eastern
Wednesday, March 9, 2022
Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS
3:00 p.m. Eastern
Thursday, March 10, 2022
Proposal deadline*
3:00 p.m. Eastern
Monday, March 14, 2022
Anticipated contract begin date
N/A
Sunday, May 1, 2022

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State’s publicly available website after bidders are notified of the award recommendation.

RFP Structure and Documentation

Document
Description
Bidder Response Instructions
Cover Page
Provides RFP title and number, important dates, and contact information for Solicitation Manager
Informational
Proposal Instructions
Provides RFP instructions to bidders
Informational
Confidential Treatment Form
Required verification on whether bidder’s proposal contains confidential information
Bidder to complete and submit by proposal deadline
Vendor Questions Worksheet
Questions to bidders on background and experience
Bidder to complete and submit by proposal deadline
Schedule A Statement of Work
Statement of work
Bidder to complete and submit by proposal deadline
Schedule B Pricing
Pricing for goods and services sought by the State through this RFP
Bidder to complete and submit by proposal deadline
Exhibit A
Temporary Traffic Control Typical (Numbering Key)
Informational
Exhibit B
Driveway Openings and Approaches; Concrete Sidewalk
Informational
Exhibit C
Concrete Curb and Concrete Curb & Gutter
Informational
Exhibit D
SOA_2016-002

Fluorescent_Sheeting_Implementation Informational

Exhibit E
20SS-001A-05, Errata to the 2020 Standard Specifications
Informational
Contract Terms
Provides legal terms for a contract awarded through this RFP
Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.

4. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q #
Document and Section
Page #
Bidder Question

5. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 6 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State’s publicly available website after bidders are notified of the award recommendation.

6. MANDATORY MINIMUM REQUIREMENTS. To avoid disqualification, the bidder must provide documentation to support the following:

The qualified firms must be prequalified in the following Work Type:

J – Concrete, C, C&G Only proposals meeting the mandatory minimum requirements will be considered for evaluation.

7. EVALUATION PROCESS. The State will evaluate each proposal based on a PASS/FAIL assessment of the following factors:

1. Acceptance and completion of Schedule A-Statement of Work

2. Completion of the Confidential Treatment Form

3. Completion of the Vendor Questions Worksheet detailing relevant work experience

4. Acceptance of Standard Contract Terms listed in the Vendor Questions Worksheet, Section 6

The State may utilize all bidder information to determine fair market value for goods or services sought. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB.

The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive.

The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.

8. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

9. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

10. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.

11. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who receives a PASS for each criterion and has the lowest price. The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS.

12. DEBRIEF MEETING AND BID PROTEST. The State will post an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.

If you wish to initiate a protest of the award, you must submit your written protest to RademacherC@michigan.gov no later than 3:00 p.m., 3 calendar days after posting the Award Recommendation and Evaluation Synopsis or by 3:00 p.m. the next business day if that date falls on a state holiday or weekend. The State reserves the right to adjust this timing and will publish any change on the SIGMA VSS system.

Additional information about the protest process is available at www.michigan.gov/micontractconnect under the “Programs and Policies” link.

13. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

14. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. The bidder understands that their proposal will become public record immediately upon receipt by the State. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

15. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. As a public record, all portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, the State may exempt some information from disclosure as permitted by law. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.

SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form instructions, the proposal may be publicly disclosed in its entirety without redaction after an award recommendation.

Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or

i. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”

ii. Failure to complete and sign a CT Form may result in disqualification of the bidder. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow the CT Form instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation.

b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.

c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.

d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.

e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.

f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.

confidential treatment form INSTRUCTIONS. Complete either Section 1 or Section 2 of this CT Form and sign where indicated. This CT Form must be signed by the individual who signed the bidder’s proposal. A completed CT Form must be submitted with your proposal, regardless of whether your proposal contains confidential information.

Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form Instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation. See the Confidential Treatment Form and The Freedom of Information Act (FOIA) sections of the Proposal Instructions for additional information.

Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal.

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company

Section 2. CONFIDENTIAL TREATMENT IS REQUESTED This section must be completed, signed, and submitted with the proposal if bidder requests confidential treatment of any material contained in the proposal. Submission of a completed CT Form is required to request confidential treatment.

Provide the information in the table below. Bidder may add rows or additional pages using the same format shown in the table. Bidder must specifically identify the information to be protected as confidential and state the reasons why protection is necessary.

The CT Form will not be considered fully complete unless, for each confidentiality request, the bidder: (1) identifies the Proposal Page #, Section #, and Paragraph #, (2) identifies whether the material is a Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI), and (3) explains the specific legal grounds that support treatment of the material as TS, FI, or PI. Bidders must provide a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite to an applicable exemption or case name. Bidders must also provide the contact information for the person at their organization authorized to respond to inquiries by the State concerning the material.

Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy”.

(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information

By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.

RFP Number

RFP Title

Signature

Date

Printed Name, Title, Company vendor questions worksheet Provide a detailed response to each question. “You” and “company” refers to the bidder.

Information Sought
Bidder Response

1. Contact Information

Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.

Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.

2. Company Background Information

Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.

What state was the company formed in?

Phone number.

Website address.

Number of years in business and number of employees.

Legal business name and address of parent company, if any.

Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.

Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?

Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.

Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.

Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.

State your gross annual sales for each of the last 5 years.

If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.

Describe partnerships and strategic relationships you think will bring significant value to the State.

State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.

3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program

Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran?
Enter YES or NO.

To demonstrate qualification as a qualified disabled veteran, you must provide:

(a) Proof of service and conditions of discharge (DD214 or equivalent);

(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and

(c) Legal documents setting forth the ownership of the business entity.

In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.

Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.

4. Participation in RFP Development or Evaluation

Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees.
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation?
Enter YES or NO.

If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.

Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP?
Enter YES or NO.

If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.

5. State of Michigan Experience and Prior Experience

Does your company have experience working with the State of Michigan? If so, please provide a list (including the contract number) of the contracts you hold or have held with the State for the last 10 years.

Describe at least [3]relevant experiences from the last [5] years supporting your ability to successfully manage a contract of similar size and scope for the work described in this RFP.

Experience 1

Company name.

Contact name.

Contact role at time of project.

Contact phone.

Contact email.

City.

State.

Zip.

1. Project name and description of the scope of the project.

2. What role did your company play?

3. How is this project experience relevant to the subject of this RFP?

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 2

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

Experience 3

Company name.

Contact role at time of project.

City.

1. Project name and description of the scope of the project.

Dollar value.

Start and end date (mm/yy – mm/yy)

Status (completed, live, other – specify phase)

Results obtained.

6. Standard Contract Terms

Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.

7. Michigan Economic Impact

Number of employees currently employed at locations within the State of Michigan.

Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)

Minimum wage paid to employees employed at locations within the State of Michigan.

Average wage paid to employees employed at locations within the State of Michigan.

Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.

8. Labor and Environmental Laws Compliance

Bidder must disclose any violations of state or federal labor and employment laws and regulations received within the past five years.

Bidder must disclose any violations of state or federal environmental laws and regulations received within the past five years.

9. Supplier Diversity

Does your company have a supplier diversity program or training?
Enter YES or NO.

10. Other

Classification of Employees. I certify that the company has properly classified its employees in accordance with federal/state labor and employment laws.
Enter YES or NO.
Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.
Enter YES or NO.
Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.
Enter YES or NO.
Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.
Enter YES or NO.
Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.
Enter YES or NO.
Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.
Enter YES or NO.
SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.
Enter YES or NO.
Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.
Enter YES or NO.

Contractor must enter company name here.

SCHEDULE A – STATEMENT OF WORK CONTRACT ACTIVITIES

Curb and Gutter Repair Perry Street between Walton Rd and Woodward Loop Request for Proposal No. 220000001493 This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

IMPORTANT NOTE TO CONTRACTORS/BIDDERS: There are specific requirements for which acceptance must be simply acknowledged through a checkbox(es), and others that require further explanation. Click one checkbox and complete the entries as identified.

SCOPE

Michigan Department of Transportation (MDOT), Oakland Transportation Service Center is seeking bid proposal from qualified Contractors to perform concrete curb and gutter repairs along Perry St between Walton Rd and Woodward Loop. Work under this contract will require removal and disposal of existing concrete curb and gutter, installation of concrete curb and gutter, providing traffic control, and other work all in accordance with these Contract Provisions and attached Documents.

The Contractor will currently be listed as a MDOT Prequalified Contractor, in the following category: J – Concrete, C, C&G Reference: https://mdotjboss.state.mi.us/PSVR/PrequalifiedContractors.htm

1. REQUIREMENTS

1.1. General Requirements

Any questions regarding this work, once awarded, are to be addressed to William Bair, MDOT Program Manager: 248-431-2887, bairw@michigan.gov.

Except where otherwise indicated within this Schedule A, all materials and workmanship shall be in accordance with the Michigan Department of Transportation Standard Specifications for Construction, 2020 Edition, any relevant/applicable Frequently Used Special Provisions (2020), and any relevant/applicable Supplemental Specifications (2020).

The Contractor will not leave equipment/or store equipment overnight on any trunk line, State Right-of-Way or Public Recreational Property during the performance of this Contract. Do not operate or park equipment or store materials within a tree drip line.

The Contractor shall provide all labor, material, equipment, supervision, and any incidental services or items required to perform the scope of work.

Contractor shall take any other actions themselves or as directed by the MDOT, to protect the safety and health of the public, state employees, State property and property of the local unit of government during the performance of this Contract. The Contractor shall conduct and supervise work as to ensure its completion in accordance with the terms of this contract and the approved project schedule.

All local noise, dust, and work hour ordinances shall apply to this project. MDOT will not be responsible for any cost associated with the disposal of any service provided in this contract. MDOT will not be responsible for any citations, fines or tickets received, while performing Contract activities.

Prevailing Wages. Effective June 2018, the 1965 PA 166, Michigan’s Prevailing Wage Act was repealed for construction or maintenance projects NOT paid in whole or part with federal funds. This contract will not be impacted with federal funds.

1.2. Miss Dig / Underground Utility Notification

For the protection of underground utilities and in conformance with Public Act 174 of 2013, the Contractor shall contact MISS DIG System, Inc. by phone at 811 or 800-482-7171 or via the web at either relocate.missdig.org for single address or rte.missdig.org, a minimum of 3 business days prior to excavation, excluding weekends and holidays.

MDOT’s electrical systems are not a part of Miss Dig. Contractors shall e-mail at least 5 business days in advance for staking request to William Bair at Bairw@michigan.gov.

MDOT traffic counters are not a part of Miss Dig. Contractors shall email at least 5 business days in advance for staking request to William Bair at Bairw@michigan.gov.

MDOT signal loops are not a part of Miss Dig. Contractor shall e-mail at least 5 business days in advance for staking request to William Bair at Bairw@michigan.gov.

1.3. Bonds

Performance Bonds and Insurance are mandatory for this Contract. Due to the short duration of completion, performance bonds must be provided within five (5) days of request. The successful bidder must furnish performance and lien bonds each for not less than 100% of the total contract price. The bonds must be on the forms provided by the Department. The bonds must meet the requirements of Michigan law and the Department and include other items such as the Powers of Attorney and Endorsement as specified by the Department. The same surety responsible for writing the performance bond must write the lien bond. It is the successful bidder’s responsibility to ensure that the lien bond conforms with the terms of MCL 570.101 et seq.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

Bidder must describe how they comply with the above requirement(s):

2. DESCRIPTION OF WORK

Concrete Curb and Gutter Repair includes the following: Replace curbs with cracking, settlement, drainage problems, or significant spalling and other deterioration in accordance with 2020 MDOT Standard Specifications for Construction, except as specified herein, and as directed by MDOT. Curb and Gutter, Conc, shall be constructed as shown in the MDOT Standard Plans R-30 series. Driveway openings shall be constructed in accordance with MDOT Standard Plans R-29 series.

No separate payment will be made for any Item that is not specifically set forth on the Contractor’s Bid Form and all costs therefore shall be included in the prices named on the Contractor’s Bid Form for the various appurtenant Items of Work.

At no point shall work begin without a representative from MDOT on site.

MDOT Program Manager reserves the right to shut down any construction operations if no proper communicable notice is received.

2.1Soil Erosion. Protect storm drains and inlets from construction pollutant by placing inlet filters. Remove temporary sediment control and dispose of construction pollutant immediately after construction in a specific section is complete.
2.2Saw-cutting. Limits of each sawcut will be determined by MDOT. Relief saw cuts may be necessary to avoid unwanted damage to adjacent pavement. Sawcut existing curb and gutter full depth. Provide clean, full depth cut. All saw cutting shall be performed under wet conditions to prevent excessive airborne dust. All resulting slurry and debris shall be cleaned up the satisfaction of the MDOT.
2.3Removal. Remove curb and gutter to an existing joint or to a sawed joint. Remove it with great caution. Pull curbing straight up to avoid ripping and tearing at the adjacent road. Any damage due to removal will be contractor’s responsibility.

Replace adjacent base materials, removed with concrete, with similar material approved by the MDOT.

2.4Steel Bars. Position and support steel bars in accordance with the standard plans or as directed by MDOT.
2.5Placing Concrete. Place concrete repairs the same day as the removal of existing concrete or as approved by MDOT. Obtain MDOT’s approval for the base before placing concrete. Immediately before concrete placement, wet the faces of the existing pavement and the surface of the aggregate base with water. Cast each repair in one continuous full-depth operation.

Use MDOT Grade P-1 or P-1M as directed by the Project Manager.

2.6Texturing. Texture the surface of the repair to match texturing on the adjacent concrete pavement or as approved by MDOT.
2.7Curing. Apply curing compound immediately after free water evaporates from the concrete surface. Do not delay curing compound application for other work during concrete placing and finishing operations. Continuously apply curing compound. Apply the required curing compound in two coats, at a rate of at least 1 gallon per 25 yards for each coat.

2.8 Joints. Clean and seal using hot-poured joint sealant, any cuts caused by overcutting, the new edge of metal, any other joints as directed by MDOT.

2.9 Restoration. Backfilling. After the concrete gains the required strength, backfill, compact, and grade the remaining excavated areas. Remove inlet filters as soon as the restoration work has been completed.

2.10 Cleaning. Upon completion of the actual work of construction the Contractor shall clean up and leave in a neat condition all the premises which he has occupied during the construction period. The Contractor shall remove all milling, debris, rubbish, tools, traffic control devices, and equipment from the premises to the satisfaction of MDOT.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

3.TRAFFIC CONTROL

Maintain traffic throughout the project in accordance with the standard specifications, typical details, and supplemental specifications.

Always maintain reasonable access to all driveways. Contractor is responsible to coordinate work with residents/businesses. Delays due to residents’ lack of willingness to cooperate will not justify for extension of work and need to be reported to Program Manager immediately.

3.1 Traffic Restrictions. Maintain traffic in accordance with the maintaining traffic typicals contained herein, except as noted below. Changes or adjustments to the maintaining traffic typicals may be necessary to fit field conditions, subject to approval of the Program Manager or as determined by the Program manager. Utilize the following Maintaining Traffic Typicals:

A. 101-GEN-SPACING-CHARTS

B. 102-GEN-NOTES

C. 103-GEN-SIGN

D. WZD-125-E-8 in

E. 122-NFW-SHL-(R)

F. 123-NFW-1LC-(R)

Do not work, deliver material, or close lanes during the holiday periods as defined.

Table 1: 2021 Holiday Periods

Holiday
Start Date and Time
End Date and Time
Memorial Day
3:00 p.m. Friday, May 27th
6:00 a.m. Tuesday, May 31st
Independence Day
3:00 p.m. Friday July 1st
6:00 a.m. Tuesday, July 5th
Labor Day
3:00 p.m. Friday September 2rd
6:00 a.m. Tuesday September 6th

Perform work and lane closures within the allowable time frames as shown in Table 2, unless otherwise approved by the Program Manager.

Table 2: Perry St Traffic Restrictions

Closure Type
Start Time
End Time
M
Tu
W
Th
F
Sa
Su
00:00
07:00
0
0
0
0
0
0
0
Single Lane Closures
07:00
17:00
∞
∞
∞
∞
∞
∞
17:00
23:59
0
0
0
0
0
0
0
00:00
07:00
0
0
0
0
0
0
0
Shoulder Closures
07:00
17:00
∞
∞
∞
∞
∞
∞
17:00
23:59
0
0
0
0
0
0
0

∞ = Closure is allowed, and the frequency is not limited during the project timeframe # = The number of times closures can take place during the project timeframe

Provide at least one mile between two consecutive shoulder or lane closures in the same direction of travel. Connect closures if this distance cannot be provided.

The maximum closure length is 1 mile unless otherwise approved by the Engineer.

Contractor can work at each bound at the same time.

The quantity below reflects the maximum number of devices that are required at one time to meet Special Provisions for Maintaining Traffic (working on NB and SB Perry St. concurrently).

3.2 Work Zone Reporting

Closure requests will be filled out on the MDOT provided LCR form and sent to an email address provided by the Program Manager 5 days in advance of closure.

Daily closure updates will be called into SEMTOC (313) 965-0777 describing work zone boundaries for the day and any work that is postponed.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

4. QUALITY CONTROL

The Contractor shall be responsible to ensure that any required quality control and testing as indicated in MDOT 2020 Standard Specifications for Construction, be completed as directed by the MDOT Program Manager.

If there are damages to completed work caused by the Contractor or Subcontractors, all cost for removal and replacement of the damaged items will be borne by the Contractor. Such repairs will not be a cause for time extension.

Description
Quantity
Unit
Barricade, Type III, High Intensity, Double Sided, Lighted, Furn
8
Ea
Barricade, Type III, High Intensity, Double Sided, Lighted, Oper
8
Ea
Minor Traffic Devices
1
LSUM
Sign, Type B, Temp, Prismatic, Furn
433
Sft
Sign, Type B, Temp, Prismatic, Oper
433
Sft
Plastic Drum, Fluorescent, Furn
210
Ea
Plastic Drum, Fluorescent, Oper
210
Ea
Lighted Arrow, Type C, Furn
2
Ea
Lighted Arron, Type C, Oper
2
Ea
Portable Changeable Message Sign (PCMS)
2
Ea
☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

5. PROJECT SCHEDULE

Contractor must submit a project plan to the Program Manager for final approval. The plan must include: (a) the Contractor's organizational chart with names, title and applicable phone numbers of personnel assigned to the project, (i.e. Field Supervisor or Superintendent), (b) the project breakdown showing sub-projects, tasks, and resources required, (c) supplier of materials, (d) Maintenance of Traffic/Traffic Control (MOT), (e) equipment and (f) 24 hour emergency contact information.

The Program Manager for this project is as follows:

William Bair Michigan Department of Transportation 800 Vanguard Dr.

Pontiac, MI 48341 bairw@michigan.gov The project schedule shall exhibit the continuous progress toward completion of work once construction begins.

The Contractor's approved project schedule governs the work to be performed by the Contractor, but it is not binding on MDOT. The Contractor's project schedule does not alter or increase the obligations of MDOT as they exist under the other provisions of this contract.

Failure on the part of the Contractor to carry out the provisions of the mutually agreed upon Project Schedule as established may be considered sufficient cause to prevent the Contractor from being eligible to bid on future projects until a satisfactory rate of progress is again established.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

6. STAFFING

The Contractor must appoint a Field Supervisor, or Superintendent that will respond to State inquiries regarding this stated Contract Activities.

Contractor’s Representative must be always on-site during active construction.

Contract activities required personnel to comply with High Visibility clothing – reference attached Special Provisions.

Contractor will provide a Field Supervisor or Superintendent contact and an Emergency Contact Field Supervisor or Superintendent Employee Name:

Employee Title:

Employee Office phone:

Employee Cell phone:

Employee email:

Emergency Contact Employee Name:

Employee Title:

Employee Office phone:

Employee Cell phone:

Employee email:

7. TIME FRAMES OF WORK PROGRESS AND COMPLETION

All work must be completed by July 31, 2022. The contractor is required to remove all the equipment and traffic control devices no later than 7 days after work completion.

Work shall be completed under the continuous operations, such as: The Contractor shall maintain construction activities with downtime accounting only for rain days, regular breaks between work days, and time needed for curing, unless approved by the Program Manager otherwise.

No extension of time will be granted for delays in delivery of critical materials, unless the delay can be shown to be industry-wide and the delay affects the controlling operation or critical item of work.

After starting construction, perform and complete all the work (excluding authorized extensions of time) in consecutive 30 calendar days.

Work not completed by the completion date or within the specified time frame will incur liquidated damages at the rate specified in Section 13 Service Level Agreement.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

8. MEETINGS

After receiving Notice of Award and prior to the start of work, the Contractor must attend a preconstruction meeting with the Program Manager. The Program Manager will determine the day, time and place for the preconstruction meeting. The meeting will be conducted after project award and may be rescheduled if there are delays in the award of the project.

The named subcontractor(s) for, Designated and/or Specialty Items, as shown in the proposal, may be required to be at the preconstruction meeting if such items materially affect the work schedule.

The State may request other meetings as it deems appropriate.

The low bidder(s) for the work covered by this proposal may be required to meet with department representatives for a post-construction review meeting, as directed by MDOT. The MDOT- designated representative will schedule the meeting.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

9. COMMUNICATION

The Contractor will carry out this project under the direction and control of the MDOT Program Manager or designee.

The Contractor shall notify the Program Manager 48 hours in advance prior to the start of all work operations. This will allow time for Program Manager to mark all locations prior to start of work; and for applicable third-party quality assurance (QA) technicians to be notified of any upcoming construction activities.

At no point shall work begin without a representative from MDOT on site.

MDOT Program Manager reserves the right to shut down any construction operations if no proper communicable notice is received.

☐
I have reviewed the above requirement and agree with no exception.
☐
I have reviewed the above requirement and have noted all exception(s) below.

List all exception(s):

10. ACCEPTANCE

Submit field results for concrete temperature, slump, and air content testing to MDOT by the end of the day on which the concrete represented by those tests is placed. All concrete testing shall be performed by 3rd independent party.

The State will use the following criteria to determine acceptance of the Contract Activities.

· Visual Inspection (VI)

· The Contractor must provide a copy of a passing sampling and testing reports from an Independent Third-Party…

This is the start of the file's text. The full file is on GovTribe.