RFP.docx
DOCX document 170 KB Posted
- Attached to
- RFP for Shelters - Air Monitoring sites
- Solicitation number
- RFP 761 250000000403 1
- Issued by
- Michigan
About this file
This is a Request for Proposal (RFP) issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) for the procurement of air monitoring shelters. The State seeks five integrated metal studded modular air monitoring shelters, each measuring 8 feet wide by 10 feet long by 8 feet high, designed to house climate-controlled instruments for the State's ambient air monitoring network. The shelters must include aluminum or steel bases with lifting points, aluminum or fiberglass skins, R-11 or better insulation, a 36-inch insulated metal door, 100-amp electrical service panel, industrial HVAC with 12,000 BTU capacity, internal and external electrical outlets, LED lighting, nickel-raised rubber flooring, a 6-foot countertop, ceiling ports for monitoring equipment, gas cylinder mounts, removable roof grating, aluminum roof railing systems, and tie-down systems. The RFP was issued on November 14, 2024, with bidder questions due by November 21, 2024, and proposals due by December 6, 2024, at 3:00 p.m. Eastern. The anticipated purchase order issue date is December 19, 2024. Delivery is expected within six months of order receipt, Monday through Friday between 8:00 a.m. and 4:00 p.m., to 815 Filley Street, Lansing, Michigan 48906. Evaluation is conducted on a pass/fail basis across five criteria: dimensions, construction, utilities, interior, and exterior specifications. Award will be made to the responsive and responsible bidder receiving a pass on all criteria with the lowest price.
Pricing must be firm for the entire contract period and include all costs such as shipping, handling, and palletizing. The State will make payment via Electronic Funds Transfer within 45 calendar days of invoice receipt or final acceptance, whichever is later. All proposals will become public record immediately upon receipt and may be posted on Michigan's website after award notification. The RFP is subject to federal provisions including Clean Air Act compliance, debarment and suspension requirements, domestic preference for United States-produced materials, affirmative socioeconomic steps for subcontracting, and Byrd Anti-Lobbying certification for contracts exceeding $100,000. Bidders must submit a completed Confidential Treatment Form regardless of whether confidential information is included in their proposal. The State reserves the right to modify the RFP, conduct on-site facility visits, require oral presentations, conduct reference checks, request price concessions, issue notices of deficiency, issue clarification requests, disqualify non-responsive bids, consider prior performance, and consider total cost of ownership and economic impact to Michigan. Contracts equal to or exceeding $250,000 require State Administrative Board approval.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Michigan.gov/MiProcurement proposal instructions Department of Environment, Great Lakes, and Energy Air Monitoring Shelters Request for Proposal No. 250000000403 Solicitation Manager Name: Clayton Nurenberg Direct Phone:517-647-3847 Email: nurenbergc@michigan.gov
This is a Request for Proposal (RFP) for:
Michigan Air Monitoring Shelters
RFP Timeline
| Event |
| Time |
| Date |
| RFP issue date |
| N/A |
| Thursday, November 14, 2024 |
| Deadline for bidders to submit questions about this RFP |
| 3:00 p.m. Eastern |
| Thursday, November 21, 2024 |
| Anticipated date the State will post answers to bidder questions on www.michigan.gov/SIGMAVSS |
| N/A |
| Tuesday, November 26, 2024 |
| Proposal deadline* |
| 3:00 p.m. Eastern |
| Friday, December 6, 2024 |
| Anticipated purchase order issue date |
| N/A |
| Thursday, December 19, 2024 |
*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.
This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.
1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the RFP Structure and Documentation table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal. Note that all documents and information submitted as part of a proposal will become public record immediately upon receipt by the State. Proposals received by the State may be posted on the State’s publicly available website after bidders are notified of the award recommendation.
RFP Structure and Documentation
| Document |
| Description |
| Bidder Response Instructions |
| Cover Page |
| Provides RFP title and number, important dates, and contact information for Solicitation Manager |
| Informational |
| Proposal Instructions |
| Provides RFP instructions to bidders |
| Informational |
| Confidential Treatment Form |
| Required verification on whether bidder’s proposal contains confidential information |
| Bidder to complete and submit by proposal deadline |
| Vendor Questions Worksheet |
| Questions to bidders on background and experience |
| Bidder to complete and submit by proposal deadline |
| Schedule A – Statement of Work |
| Statement of work |
| Bidder to complete and submit by proposal deadline |
| Schedule B – Pricing |
| Pricing for goods and services sought by the State through this RFP |
| Bidder to complete and submit by proposal deadline |
| Contract Terms |
| Provides legal terms for a contract awarded through this RFP |
| Deemed accepted by bidder unless information required in the Evaluation Process section of this document is submitted by proposal deadline |
2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.
3. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS. This is the only method by which the RFP may be modified.
4. QUESTIONS. Bidder questions about this RFP must be emailed to the Solicitation Manager at nurenbergc@michigan.gov no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.
| Q # |
| Document and Section |
| Page # |
| Bidder Question |
5. DELIVERY OF PROPOSAL.
Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include but are not limited to Microsoft Word or Excel and Google Docs or Sheets). If you have issues submitting your response to this RFP, you may email your proposal package to nurenbergc@michigan.gov by the deadline.
In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF. Attachment file size is limited to 30 MB per document. Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the solicitation Closing On/Closing Date fields (Summary view/Detail view), even if a portion of the proposal has been uploaded.
Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 284-0540 or (888) 734-9749. The Solicitation Manager will not provide assistance related to the submittal of the proposal and all attachments on the day of the proposal deadline. Responsibility for a complete submission lies with the bidder. Note that all documents and information submitted in any manner as part of a proposal will become public record immediately upon receipt by the State. Proposals received may be posted by the State on the State’s publicly available website after bidders are notified of the award recommendation.
6. EVALUATION PROCESS The State will evaluate each proposal on a PASS/FAIL basis based on the following criteria:
| Criteria |
| PASS/FAIL |
| 1. |
| Meets Dimension requirements as described in below Schedule A |
| 2. |
| Meets Construction requirements as described in below Schedule A |
| 3. |
| Meets Utilities requirements as described in below Schedule A |
| 4. |
| Meets Interior requirements as described in below Schedule A |
| 5. |
| Meets Exterior requirements as described in below Schedule A |
The State may utilize all bidder information to determine fair market value for goods or services sought. If applicable, the State’s evaluation will include consideration of a bidder’s qualified disabled veterans/service-disabled veteran owned business(QDV/SDVOB) status under MCL 18.1261(8). Additional information on the SDVOB preference is available at: Michigan.gov/SDVOB The State strongly encourages strict adherence to the Contract Terms. The State reserves the right to deem a bid non-responsive for failure to accept the Contract Terms. Nevertheless, the bidder may submit proposed changes to the Contract Terms in track changes (i.e., visible edits) with an explanation of the bidder’s need for each proposed change. Failure to include track changes with an explanation of the bidder’s need for the proposed change constitutes the bidder’s acceptance of the Contract Terms. General statements, such as that the bidder reserves the right to negotiate the terms and conditions, may be considered non-responsive. Failure to respond timely to requests for proposed changes to Contract Terms during ongoing negotiations may be cause for disqualification.
The State may but is not required to conduct an on-site visit to tour and inspect the bidder’s facilities; require an oral presentation of the bidder's proposal; conduct interviews, research, reference checks, and background checks; and request additional price concessions at any point during the evaluation process.
7. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous. Failure to respond to a Notice of Deficiency timely may be cause for disqualification.
8. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.
9. RESERVATIONS. The State reserves the right to:
a. Disqualify a bidder for failure to follow these instructions.
b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.
c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.
d. Consider an otherwise disqualified proposal if no other proposals are received.
e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.
f. Consider prior performance with the State in making its award decision.
g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.
h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.
i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.
j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.
k. Award multiple, optional-use contracts, or award by Contract Activity.
l. Evaluate the proposal outside the scope identified in the Evaluation Process section of this document if the State receives only one proposal.
10. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who receives a PASS for each criterion and has the lowest price.
The State will post an Award Recommendation and Evaluation Synopsis on www.michigan.gov/SIGMAVSS or in the manner that the solicitation was originally published.
11. DEBRIEF MEETING AND BID PROTEST. The State will publish an Award Recommendation and Evaluation Synopsis which will provide instructions on how to request a debrief meeting.
If you wish to initiate a protest of the award, you must submit your written protest to nurenbergc@michigan.gov no later than 5:00 p.m., 5 business days after posting the Award Recommendation and Evaluation Synopsis on SIGMA VSS. The State reserves the right to adjust this timing and will publish any change.
Additional information about the protest process is available at DTMB - Programs and Policies (michigan.gov) under the “Bidder Protests” link.
12. STATE ADMINISTRATIVE BOARD. Contracts equal to $250,000 or greater than require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.
13. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of 180 calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment or contain all matters upon which agreement must be reached. The bidder understands that their proposal will become public record immediately upon receipt by the State. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.
14. CONFIDENTIAL TREATMENT FORM AND THE FREEDOM OF INFORMATION ACT. As a public record, all portions of the bidder’s proposal and resulting contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), MCL 15.231, et seq. However, the State may exempt some information from disclosure as permitted by law. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902,” are exempt from disclosure under FOIA. In addition, “financial or proprietary information” submitted with a bidder’s proposal is exempt from disclosure under FOIA. A bidder’s failure to comply with this Section is grounds for rejecting a bidder’s proposal as non-responsive. As a part of its proposal, each bidder must follow the procedure below.
a. SUBMIT A COMPLETED “CONFIDENTIAL TREATMENT FORM” (CT FORM) WITH YOUR BID. Completion and submission of the CT Form is required regardless of whether the bidder seeks confidential treatment of information. Failure to submit a completed CT Form may be cause for disqualification from the solicitation process. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow CT Form instructions, the proposal may be publicly disclosed in its entirety without redaction after an award recommendation.
i. Complete and sign Section 1 of the CT Form if the bidder does NOT request confidential treatment of information contained in its proposal; or
ii. Complete and sign Section 2 of the CT Form if the bidder requests confidential treatment of certain information. Bidder must also submit a “Public Copy” of the proposal with the trade secret, financial, and proprietary information redacted and clearly labeled as the “Public Copy.”
iii. Failure to complete and sign a CT Form may result in disqualification of the bidder. If a bidder fails to properly complete and submit the CT Form or otherwise fails to follow the CT Form instructions, the proposal, in its entirety, will be treated as a “Public Copy” and may be publicly disclosed by the State without redaction after bidders have been notified of an award recommendation.
b. FOIA REQUESTS. If a FOIA request is made for a bidder’s proposal, the Public Copy may be distributed to the public along with the bidder’s CT Form. The CT Form is a public document and serves as an explanation for the redactions to the Public Copy. Do not put any trade secret, financial, or proprietary information in the CT Form. Do not redact the CT Form itself.
c. NO ADVICE. The State will not advise a bidder as to the nature or content of documents entitled to protection from disclosure under FOIA or other laws, as to the interpretation of such laws, or as to the definition of trade secret or financial or proprietary information. Nothing contained in this provision will modify or amend requirements and obligations imposed on the State by FOIA or other applicable law.
d. FAILURE TO REQUEST CONFIDENTIAL TREATMENT. Failure to request material be treated as confidential as specified herein relieves the State, its agencies, and personnel from any responsibility for maintaining material in confidence.
e. Bids containing a request to maintain an entire proposal as confidential may be rejected as non-responsive. Bidders may not request confidential treatment with respect to resumes, pricing, and marketing materials. The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions. If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.
f. Bidder forever releases the State, its departments, subdivisions, officers, and employees from all claims, rights, actions, demands, damages, liabilities, expenses and fees, which arise out of or relate to the disclosure of all or a portion of bidder’s proposal submitted under this RFP. Bidder must defend, indemnify and hold the State, its departments, subdivisions, officers, and employees harmless, without limitation, from and against all actions, claims, losses, liabilities, damages, costs, attorney fees, and expenses (including those required to establish the right to indemnification), arising out of or relating to any FOIA request, including potential litigation and appeals, related to the portion of bidder’s proposal submitted under this RFP that bidder has identified as a trade secret, or financial or proprietary information. The State will notify bidder in writing if indemnification is sought. The State is entitled to: (i) regular updates on proceeding status; (ii) participate in the defense of the proceeding; (iii) employ its own counsel; and to (iv) retain control of the defense, or any portion thereof, if the State deems necessary. Bidder will not, without the State’s written consent (not to be unreasonably withheld), settle, compromise, or consent to the entry of any judgment in or otherwise seek to terminate any claim, action, or proceeding. If a State employee, official, or law is involved or challenged, the State may control the defense of that portion of the claim. Any litigation activity on behalf of the State, or any of its subdivisions under this Section, must be coordinated with the Department of Attorney General. An attorney designated to represent the State may not do so until approved by the Michigan Attorney General and appointed as a Special Assistant Attorney General.
confidential treatment form INSTRUCTIONS. A signed and dated Confidential Treatment Form (CT Form) must be submitted with your proposal, regardless of whether your proposal contains confidential information.
1. Complete either Section 1 or Section 2 of this form and sign where indicated. Do not complete both sections. Note: Completion of Section 2 is required to request confidential treatment.
2. This form must be signed by the individual who signed the bidder’s proposal.
Failure to submit a completed CT Form with your bid is grounds for rejecting the proposal as non-responsive.
In addition, failure to follow the instructions on this form or to properly complete and submit it may result in the entire proposal being publicly disclosed by the State without redaction after an award recommendation.
See the Confidential Treatment Form and the Freedom of Information Act section of the Proposal Instructions for additional information.
Section 1. CONFIDENTIAL TREATMENT IS NOT REQUESTED This section must be completed, signed, and submitted with the proposal if the bidder does not request confidential treatment of any material contained in the proposal. If this section is completed, do not complete Section 2.
By signing below, the bidder affirms that confidential treatment of material contained in their proposal is not requested.
RFP Number
RFP Title
Signature
Date
Printed Name, Title, Company
Section 2. CONFIDENTIAL TREATMENT IS REQUESTED Bidders must complete, sign, and submit this section with the proposal, to request confidential treatment of any material contained in the proposal. If this section is completed, do not complete Section 1.
Bidders must specifically identify the information to be protected as confidential and/or proprietary and state the reasons why protection is necessary. As shown in the table below, the following details are required for each confidentiality request.
1. The proposal page number, section number, and paragraph number.
2. Whether the material referenced is Trade Secret (TS), Proprietary Financial Information (FI), or Proprietary Information (PI). Bidders may not request confidential treatment of resumes, pricing, and marketing materials.
3. An explanation of the specific legal grounds that support treatment of the material as TS, FI, or PI and a complete justification as to how the material falls within the scope of an applicable FOIA exemption or relevant case law. Bidders must not simply cite an applicable exemption or case name.
4. The person at their organization authorized to respond to inquiries by the State concerning the material and their contact information.
REQUIRED: Bidders completing this section must also submit a copy of the proposal with the trade secret, financial, and proprietary information redacted and clearly label this redacted copy as the PUBLIC COPY.
(1) Proposal Page #, Section #, Paragraph # (2) Material is Trade Secret (TS), Proprietary Financial Information (FI), Proprietary Information (PI) (3) Applicable FOIA Exemption with Written Justification (4) Bidder Contact Information
Bidders may add rows or additional pages using the same format shown in the table.
State of Michigan FOIA Requests The State reserves the right to determine whether material designated as exempt by a bidder falls under MCL 18.1261 or other applicable FOIA exemptions.
If a FOIA request is made for materials that the bidder has identified as trade secret, financial, or proprietary information, the State has the final authority to determine whether the materials are exempt from disclosure under FOIA.
The State is not obligated to notify a bidder if a FOIA request for bidder’s proposal is received nor if bidder’s proposal is made available to the public. This form, and any additional justification letters, are not exempt from release under FOIA.
By signing below, the bidder affirms that confidential treatment of material contained in their proposal is requested and has attached to this form a redacted “Public Copy” of the bidder’s proposal.
RFP Number
RFP Title
Signature
Date
Printed Name, Title, Company vendor questions worksheet Provide a detailed response to each question. “You” and “company” refers to the bidder.
| Information Sought |
| Bidder Response |
1. Contact Information
Bidder’s sole contact person during the RFP process. Include name, title, address, email, and phone number.
Person authorized to receive and sign a resulting contract. Include name, title, address, email, phone number and vendor customer code in SIGMA VSS.
2. Company Background Information
Legal business name and address. Include business entity designation, e.g., sole proprietor, Inc., LLC, or LLP.
What state was the company formed in?
Phone number.
Website address.
Number of years in business.
Number of employees.
Legal business name and address of parent company, if any.
Has there been a recent change in organizational structure (e.g., management team) or control (e.g., merger or acquisition) of your company? If the answer is yes: (a) explain why the change occurred and (b) how this change has affected your company.
Discuss your company’s history. Has growth been organic, through mergers and acquisitions, or both?
Has bidder ever been debarred, suspended, or disqualified from bidding or contracting with any entity, including the State of Michigan? If yes, provide the date, the entity, and details about the situation.
Has your company been a party to litigation against the State of Michigan? If the answer is yes, then state the date of initial filing, case name and court number, and jurisdiction.
Within the last 5 years, has your company or any of its related business entities defaulted on a contract or had a contract terminated for cause? If yes, provide the date, contracting entity, type of contract, and details about the termination or default.
State your gross annual sales for each of the last 5 years.
If receiving a contract under this RFP will increase your gross revenue by more than 25% from last year’s sales, explain how the company will scale-up to manage this increase.
Describe partnerships and strategic relationships you think will bring significant value to the State.
State the physical address of the place of business that would have primary responsibility for this account if bidder is awarded a contract under this RFP.
| Bidder affirms that any business types identified on its SIGMA VSS profile, including those eligible for Geographically Disadvantaged Business Enterprise (GDBE) and Michigan Supplier Community Program (MiSC), are valid. |
| Choose an item. |
| 3. Qualified Disabled Veteran/Service-Disabled Veteran-Owned Business Program |
| Under MCL 18.1261, a “qualified disabled veteran” means a business entity that is 51% or more owned by 1 or more veterans with a service-connected disability. A “service-connected disability” means a disability incurred or aggravated in the line of duty in the active military, naval, or air service as described in 38 USC 101(16). Are you a qualified disabled veteran? |
| Choose an item. |
| To demonstrate qualification as a qualified disabled veteran, you must provide: |
(a) Proof of service and conditions of discharge (DD214 or equivalent);
(b) Proof of service-connected disability (DD214 if the disability was documented at discharge or Veterans Administration Rating Decision Letter or equivalent if the disability was documented after discharge); and
(c) Legal documents setting forth the ownership of the business entity.
In lieu of the documentation identified above, you may provide proof of certification by the National Veterans Business Development Council.
Enter the names of documents submitted with your proposal to demonstrate status as a qualified disabled veteran.
4. Participation in RFP Development or Evaluation
| Did your company, an employee, agent, or representative of your company, or any affiliated entity participate in developing any component of this solicitation? For purposes of this question, business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly: (1) either one controls or has power to control the other or (2) a third-party controls or has the power to control both. Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities or equipment, and common use of employees. |
| Choose an item. |
If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.
| If you are awarded a contract under this solicitation, in order to provide the goods or services required under a resulting contract, do you intend to partner or subcontract with a person or entity that assisted in the development of this solicitation? |
| Choose an item. |
If you enter “YES,” you are not eligible for contract award. An awarded vendor may not partner or subcontract with anyone to provide goods and services required under a resulting contract if that subcontractor or partner assisted in the development of this solicitation.
| Will your company, or an employee, agent, or representative of your company, participate in the evaluation of the proposals received in response to this RFP? |
| Choose an item. |
If you enter “YES”, you are not eligible for contract award or to work as a subcontractor for the awarded vendor.
5. Standard Contract Terms
Bidder must affirm agreement with the attached Contract Terms. If not in agreement, written exceptions in accordance with the Evaluation Process section of the Proposal Instructions must be provided with Bidder’s proposal.
6. Michigan Voluntary Protection Program
| Bidder must verify if their company is recognized in the Michigan Voluntary Protection Program (MVPP) |
| Choose an item. |
| 7. Michigan Economic Impact |
Number of employees currently employed at locations within the State of Michigan.
Number of additional employees to be employed at locations within the State of Michigan if awarded this Contract (if any)
Minimum wage paid to employees employed at locations within the State of Michigan.
Average wage paid to employees employed at locations within the State of Michigan.
Percentage of employees employed at locations within the State of Michigan that are covered by employer-provided health insurance.
8. Labor, Antidiscrimination and Environmental Laws Compliance
Bidder must disclose any violations of state or federal labor, antidiscrimination and employment laws and regulations received within the past five years.
Bidder must disclose any violations of state or federal environmental laws and regulations received within the past five years.
9. Supplier Diversity
| Does your company have a supplier diversity program or training? |
| Choose an item. |
| Bidder agrees that if Bidder is awarded a contract with a dollar amount of $500,000 or greater from this RFP, Bidder shall provide a copy of their current EEO-1 demographic report provided that Bidder meets Federal requirements to file an EEO-1 report. |
| Choose an item. |
| 10. Other |
| Classification of Employees. I certify that the company has properly classified its employees in accordance with federal/state labor and employment laws. |
| Choose an item. |
| Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude. |
| Choose an item. |
| Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury. |
| Choose an item. |
| Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012. |
| Choose an item. |
| Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451. |
| Choose an item. |
| Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies. |
| Choose an item. |
| SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan. |
| Choose an item. |
| Authorization to Verify Information Provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate. |
| Choose an item. |
| 11. Response to State Requests |
| Bidder agrees to respond, by established deadlines, to all requests from the State including but not limited to, clarification requests, notices of deficiency, and proposed changes to Contract Terms. |
| Choose an item. |
SCHEDULE A – STATEMENT OF WORK
Request for Proposal (RFP) No. 250000000403 Air Monitoring Shelters This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP, as well as the Contractor who is awarded the contract. The term “bidder” is used to identify where specific responses to the RFP are required.
The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.
BACKGROUND
EGLE operates an ambient air monitoring network in accordance with federal Clean Air Act requirements. As part of this network, EGLE deploys many instruments that can only be operated within climate controlled (shielded from moisture and having operating temperatures between 20-30 degrees Celsius) shelters. Many of EGLEs current shelters are 20 years old, and past their useable lifetime. As such, EGLE plans to replace several of these aging shelters over the next year. EGLE plans to purchase a total of five (5) shelters.
REQUIREMENTS
Air monitoring shelters to house instruments that can only be operated within climate-controlled conditions. The shelters must be shielded from moisture and temperature fluctuations.
1. General Requirements
1.1. Product Specifications
The Contractor must provide the following:
Michigan Air Monitoring Shelters Quantity: 5
Dimensions:
8’W X 10’L X 8’H
Construction:
Integrated metal studded modular air monitoring shelter Aluminum or steel base with fork truck and jack lifting points Aluminum or fiberglass skin Rubber non-leak membrane roof R-11 or better insulation in walls, ceiling, and floors Paneled interior walls and ceiling 36” insulated metal door with closer and commercial grade lever lockset keyed to our key
Utilities:
100 Amp electrical service panel Industrial controlled heating and cooling HVAC (12,000 BTU Bard or equivalent) Internal (8) and external (2) electrical outlets as specified on drawing Ample interior LED lighting with wall switch
Interior:
Solid nickel -raised rubber flooring - black 6’ Countertop ~ 29” height Preinstalled ceiling port for T640 or Met One BAM per drawing Gas cylinder mounts for 3 tanks
Exterior:
| Aluminum or galvanized metal removable non-slip roof grating or equivalent |
| Aluminum roof railing system, OSHA approved with kick plate with 28” gap for stairs |
Shelter tie-down system including four tie-down points/brackets for installation in shelter base and anchoring to concrete pads
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
1.2. Warranties
Describe any warranties included in the bid and provide the length of the warranty. Explain the process for reporting warranty issues and how the Contractor how any repairs or replacements are made, including timing. If the warranty is provided through a third-party or manufacturer, the Contractor must confirm that the manufacturer’s warranty passes through to the State. Provide the name, address, contact name, phone number and email address of the party responsible for the warranty.
The State reserves the right to require additional warranties other than those identified by the Contractor in its response to this RFP.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe their warranty process as described above:
1.3. Recall Requirements and Procedures
The Contractor must describe any recall procedures.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe their recall requirements and procedures as described above:
1.4. Quality Assurance Program
Explain your Quality Assurance Program(s).
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe their quality assurance program as described above:
1.5. Incentives
Explain any special incentives or services including, but not limited to, return policies, trade-in programs, quantity discounts, etc.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe their incentives as described above:
2. Service Levels
2.1. Time Frames
All Contract Activities must be delivered within 6 months or other timeframe agreed upon by vendor. The receipt of order date is pursuant to the Notices section of the Standard Contract Terms.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
2.2. Delivery
Delivery will be expected within 6 months, or other timeframe agreed upon by vendor, upon date of order Monday through Friday 8:00 AM – 4:00 PM. Delivery will be made at 815 Filley Street Lansing, MI 48906.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
2.3. Customer Service Toll-Free Number
The Contractor must specify its toll-free number for the State to contact the Contractor Representative who must be available for calls during the hours of 8 am to 5 pm EST Monday through Friday, at a minimum. Identify customer service availability for this proposal by hours and days of the week.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
Bidder must identify their Customer Service Toll-Free Number:
2.4. Security
The Contractor will be subject the following security procedures The Contractor’s staff may be required to make deliveries to or enter State facilities. The State may require the Contractor’s personnel to wear State issued identification badges.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
3. Pricing
3.1. Price Term
Pricing is firm for the entire length of the Contract.
4. Ordering
4.1. Authorizing Document
The appropriate authorizing document for the Contract will be a purchase order.
5. Delivery
5.1. Delivery Programs
The Contractor must explain in detail its delivery programs (e.g., standard delivery and quick ship), including any limitations such as quantity.
The Contractor must explain the transportation method (e.g., UPS, FedEx, Contractor fleet, or other third-party carrier) it intends on utilizing in delivery of the Contract Activities.
| ☐ |
| I have reviewed the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
Bidder must describe their delivery programs as described above:
5.2. Packaging and Palletizing
Packaging must be optimized to permit the lowest freight rate. Shipments must be palletized whenever possible using manufacturer's standard 4-way shipping pallets.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exception(s):
6. Acceptance
6.1. Final Acceptance
EGLE will inspect the shelters for damages when they arrive.
7. Invoice and Payment
7.1. Invoice Requirements
All invoices submitted to the State must include: (a) date; (b) purchase order; (c) quantity; (d) description of the Contract Activities; (e) unit price; (f) shipping cost (if any); (g) vendor-generated invoice number and (h) total price.
7.2. Payment Methods
The State will make payment for Contract Activities via EFT.
8. Required Functionality Relating to Data Retention, Disposal, and Retrieval The State has legal obligations to retain, dispose, and retrieve State Data along with obligations to manage and secure State Data. To meet these obligations, the Solution must allow the State to:
· retain all data for the entire length of the Contract.
· delete its data or request the deletion of its data, even data that may be stored offline or in backups.
· transfer its data back to the State or to a new vendor or new solution.
· transfer its data to the Archives of Michigan as may be required by a retention and disposal schedule.
· retrieve data, even data that may be stored offline or in backups.
Except as otherwise stated in the Contract, Contractor will not dispose of, delete, or destroy State Data without the prior written approval of the State.
Bidder must review and explain how the data retention, disposal, and retrieval requirements will be met by the solution and describe its data management capabilities (storage limitations, duration, etc.). If the Solution does not allow the State to perform these activities itself, the bidder must explain how it will support the State’s compliance with these requirements.
| ☐ |
| I confirm the above requirement and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
List all exceptions:
Bidder must review and explain how the data retention, disposal, and retrieval requirements will be met by the solution and describe its data management capabilities (storage limitations, duration, etc.). If the Solution does not allow the State to perform these activities itself, the bidder must explain how it will support the State’s compliance with these requirements.
9. Additional Requirements
9.1. Environmental and Energy Efficiency Product Standards
The Contractor must identify any energy efficient, bio-based, or otherwise environmentally friendly products used in the products. Contractor must include any relevant third-party certification, including the verification of a United States Department of Agriculture certified bio-based product label. Contractor must describe how products that meet these requirements are identified or otherwise labelled and list any exceptions to this requirement.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
Bidder must identify any of these products:
9.2. Hazardous Chemical Identification
In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.
The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
Bidder must identify any hazardous chemicals:
9.3. Mercury Content
Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
Bidder must explain mercury usage:
9.4. Brominated Flame Retardants
The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible. The Contractor must disclose whether the products contain BFRs and describe how the products are identified or otherwise labelled.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
Bidder must identify any of these products:
9.5. Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS)
The Contractor must confirm that the provided products do not intentionally contain PFAS. This consists of all components of the provided products, including product packaging.
| ☐ |
| I have reviewed the above requirements and agree with no exception. |
| ☐ |
| I have reviewed the above requirement and have noted all exception(s) below. |
Bidder must explain any PFAS products:
Enter company name here
SCHEDULE B - PRICING
Request For Proposal No. 250000000403 Air Monitoring Shelters
1. The Contractor must provide a pricing schedule for the proposed Contract Activities using the below table. The pricing schedule should be submitted in a modifiable format (e.g. Microsoft Word or Excel); however, you may also submit an additional pricing schedule in a non-modifiable format (e.g., PDF). Failure to complete the pricing schedule as requested may result in disqualification of your proposal.
2. Price proposals must include all costs, including but not limited to, any one-time or set-up charges, fees, and potential costs that Contractor may charge the State (e.g., shipping and handling, per piece pricing, and palletizing).
3. The Contractor is encouraged to offer quick payment terms. The number of days must not include processing time for payment to be received by the Contractor's financial institution.
Quick payment terms: % discount off invoice if paid within days after receipt of invoice.
4. By submitting its proposal, the Contractor certifies that the prices were arrived at independently, and without consultation, communication, or agreement with any other Contractor.
| Name |
| Quantity |
| Unit Cost |
| Total Cost |
| Air Monitoring Shelter |
| 5 |
| $ |
| $ |
| Shipping |
| 5 |
| $ |
| $ |
Total Cost
STATE OF MICHIGAN
PROCUREMENT
STANDARD CONTRACT TERMS (SHORT FORM)
Vendor is deemed to have accepted these terms upon the earliest of vendor’s: written acceptance of these terms; commencement of work; receipt of payment; or submission of a bid, proposal, or other offer in response to a solicitation.
1. General. Vendor’s failure to deliver or comply with any of these terms, may result in damages against the Vendor and the termination of the Contract.
2. Delivery, Title and Risk of Loss. Vendor must pay all costs associated with packaging, freight, and shipping, and must ship all deliverables F.O.B. destination, inside delivery, unless otherwise specified in the Contract. Title and risk of loss or damage to deliverables remains with Vendor until the deliverables have been received, inspected and accepted by the State in accordance with these terms. All containers and packaging become the State’s exclusive property upon final acceptance. Vendor shall ensure that all deliverables and services (“Deliverables”) are provided to the State by the date and time specified on the Contract. If Vendor fails to provide the Deliverables in accordance with the Contract, the State may reject the delivery and terminate the Contract without any termination charges or penalties, and Vendor must pay all associated costs, including, but not limited to, expedited routing costs, return shipping charges, the procurement of the Deliverables from another source, and any storage removal, or disposal expenses. The risk of loss of rejected or non-conforming Deliverables remains with Vendor. Rejected Deliverables not removed by Vendor within 10 calendar days will be deemed abandoned by Vendor, and the State will have the right to dispose of such Deliverables as its own property. Vendor is responsible for filing, processing, and collecting all damage claims.
3. Inspection. The State may inspect the work and activities of Vendor, and its subcontractors, at all reasonable times and places before, during and after delivery of the Deliverables. All Deliverables are subject to final inspection and acceptance by the State notwithstanding any prior payments or inspections. Final inspection will take place within 30 calendar days of the later of the delivery date, installation, or completion of services. If any Deliverables are non-conforming or defective, the State is entitled to, at its option and at Vendor’s expense: (a) a refund; (b) a credit; or (c) correction or replacement. If Vendor fails to correct defects or replace non-conforming Deliverables within 10 calendar days, the State may, in addition to its other remedies: (i) reject such Deliverables; (ii) accept such Deliverables at a discount; or (iii) make such corrections or replace such Deliverables and charge Vendor any resulting costs incurred by the State plus an additional 10% administrative fee.
4. Payment. Invoices must include an itemized statement of all charges. All undisputed amounts are payable within 45 calendar days of the later of the State’s: (a) receipt of an invoice; or (b) final acceptance of the Deliverables. The State is exempt from federal excise tax, state, and local sales taxes, and use taxes if the Contract Activities purchased under this Contract are for the State’s exclusive use. Contractor will not include the collection of taxes for which the State is exempt in any invoices or payments related to this Contract. The State is not responsible for taxes imposed or assessed on Contractor. The State may withhold payment in whole or in part for Deliverables the State determines are defective, untimely, or otherwise non-conforming to the Contract. All amounts due and payable by the State to Vendor shall be subject to deduction or setoff by the State against any claim the State may have against Vendor whether arising out of the Contract or any other transactions with the State. The State will only disburse payments through Electronic Funds Transfer (EFT). If Vendor does not register to receive payments at http://www.michigan.gov/SIGMAVSS, the State is not liable for failure to provide payment.
5. Warranties and Representations. Vendor represents and warrants: (a) all Deliverables furnished under the Contract will conform to all specifications and industry standards, and will be free from defects, including, where applicable and without limitation, defects in material, workmanship, and title; (b) Vendor is the owner or licensee of all Deliverables it licenses, sells, or develops and Vendor has the rights necessary to convey title, ownership rights, or licensed use; (c) all Deliverables are provided…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .