RFP Doc2444896305 Information Packet.pdf
PDF 543 KB Posted
- Solicitation number
- Doc2444896305
- Issued by
- Multnomah County, Oregon
About this file
RFP Summary: Downspout Disconnection and Retrofit On-Call Services
This Request for Proposals (RFP) document is issued by the City of Portland Bureau of Environmental Services for downspout disconnection and retrofit services. The Private Property Retrofit Program seeks qualified gutter and downspout contractors to facilitate the disconnection of downspouts from the City's combined and storm-only sewers and redirect roof water to on-site stormwater management systems such as rain gardens and drywells. Services include simple downspout disconnections, connections to new standpipes, gutter rehang operations, gutter and downspout replacement, and downspout traverses. The City estimates work will be required at approximately 60 properties during the 2027/2028 fiscal year, with up to two contracts to be awarded. An optional pre-proposal meeting and site visit is scheduled for November 2, 2026 at 9:00 a.m. PT at 830 NE Floral Place, Portland, OR 97232. Written proposals are due November 27, 2026 by 4:00 p.m. Pacific Time. The short list will be posted and Phase 2 instructions shared by December 18, 2026, with a Notice of Intent to Award posted by January 8, 2027. The successful proposer(s) will enter into a three-year contract with the City, with an option for mutual extension for an additional two-year period taken individually or in multiple years.
Compensation will be based on negotiated hourly rates for personnel and equipment outlined in the Schedule of Rates and Services, with a Time and Materials contract structure. All workers performing PCEF-funded work must be paid a minimum of 180 percent of the relevant state minimum wage (currently $30.24 per hour). The contract is funded through the Portland Clean Energy Fund (PCEF). Proposers must hold a valid Construction Contractors Board (CCB) license and provide all labor, tools, equipment, transportation, insurance, and items necessary to complete work. Proposers must demonstrate proven work history with gutter and downspout repairs, modifications, and new installations on residential and small commercial properties. Evaluation of proposals will be based on Proposer Capabilities (30 percent), Corporate Responsibility (20 percent), and Pricing (5 percent), with potential Phase 2 interviews or demonstrations. Work must be completed within 15 calendar days of authorization, with site assessments performed between 8:00 a.m. and 5:00 p.m. Monday through Friday, and disconnection work between 8:00 a.m. and 6:00 p.m. Monday through Thursday.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf | ||
| EXHIBIT C - Sample project 3925 NE Laddington Ct.pdf | ||
| Attachment B.docx | DOCX document | |
| Section 5 Sample Contract.docx | DOCX document | |
| EXHIBIT A - Gutter and Downspout Work Order Example 1 and 2.pdf | ||
| EXHIBIT B - Contractor Billing Requirements.pdf | ||
| RFP Doc2444896305 Response Packet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP # Doc2444896305 1 of 19 RFP Information Packet
RFP Number Doc2444896305
Goods + Services
October 23, 2026
Request for Proposals (RFP) for
Downspout Disconnection and Retrofit On-Call Services
Project Information Packet Section 1: Opportunity Overview
Section 2: How Your Proposal Will Be Evaluated
Section 3: Scope of Work
Section 4: Exhibits
Section 5: Sample Contract
Section 6: RFP Terms and Conditions
RFP # Doc2444896305 2 of 19 RFP Information Packet
RFP at a Glance Proposals Due:
November 27, 2026 by 4:00 p.m. Pacific Time
Summary:
The goal of the Private Property Retrofit Program is to disconnect downspouts from standpipes that carry roof water directly into the City’s combined sewer and instead allow the roof water to slowly soak into landscaped areas. The Private Property Retrofit Program is working within sewer basins with existing capacity problems and is one of several approaches to reduce local sewer capacity issues. The Private Property Retrofit Program manages stormwater by disconnecting downspouts from the combined sewer system and connecting to rain gardens and other stormwater management options.
Pre-Proposal Meeting: Optional There will be an optional pre-proposal meeting and site visit scheduled for this Project on Friday 11/02/2026 at 9:00 a.m. PT at 830 NE Floral Place Portland, OR 97232
Refer to Section 1.6: Mandatory On-Site Pre-Proposal Meeting for details.
Submit Your Proposal:
City of Portland Online Procurement Center:
https://procure.portlandoregon.gov/bso/
Refer to the Proposal Response Packet: Section 7: Submission Instructions for details.
Have Questions or Need Help? Single Point of Contact:
Send questions, requests for clarification, or requests for assistance by 7 calendar days before November 27, 2026 by 4:00 p.m. Pacific Time. Any questions received after may not be answered. Only the Single Point of Contact can answer questions about this RFP.
Tristan Sakamoto Senior Procurement Specialist Procurement Services
(503) 823-8867 Tristan.Sakamoto@portlandoregon.gov https://procure.portlandoregon.gov/bso/ mailto:Tristan.Sakamoto@portlandoregon.gov
RFP # Doc2444896305 3 of 19 RFP Information Packet
Section 1: Opportunity Overview
1.1 Background
Bureau of Environmental Services Overview The City of Portland Bureau of Environmental Services is the sewer and stormwater utility for the City. Within Portland’s combined sewer basins, sewage mixes with rainwater from roofs, streets and other impervious surfaces. In separated storm only areas, polluted runoff can enter streams and rivers. A large influx of rainwater can cause local sewer capacity issues or drain pollutants to surface water bodies. BES is working to resolve local sewer capacity issues and reduce pollutant load on local water bodies.
Private Property Retrofit Program Overview The goal of the Private Property Retrofit Program is to remove downspouts from standpipes that carry roof water directly into the City’s combined and storm only sewers and instead allow the roof water to slowly soak into landscaped areas. The Private Property Retrofit Program is working within sewer basins with existing capacity problems and is one of several approaches to reduce local sewer capacity issues. The goal of the Private Property Retrofit Program is to manage stormwater on-site within targeted locations, by disconnecting downspouts from the sewer system and managing stormwater on-site through the use of rain gardens and other stormwater management options.
Needs Statement:
The Bureau of Environmental Services is seeking qualified gutter and downspout contractors to facilitate disconnection of downspouts in target areas to new on-site stormwater management systems such a rain gardens and drywells. Projects typically include but are not limited to simple downspout disconnections, connections to new standpipes, rehanging gutters to drain to new locations, gutter and downspout replacement, downspout traverses, and other gutter and downspout work required to drain roof runoff to the new stormwater systems.
See Scope of Work below for a complete list of the City’s product specifications, technical and required services, and deliverables.
1.2 Outcome Goals
1. Connect gutters and downspouts to new standpipes installed under the PPRP.
2. Disconnect downspouts to the landscape under the direction of program staff.
RFP # Doc2444896305 4 of 19 RFP Information Packet
3. Interact with PPRP project partners and provide excellent customer service and workmanship
1.3 Contract Details
Duration of contract: The successful Proposer(s) will be expected to enter a three (3) year Contract with the City. The City and successful Proposer(s) may agree, by mutual consent, to extend this Contract for an additional two (2) year period, taken individually or in multiple years.
Contract type expected: Qualifications Based, Time and Materials
Number of Contracts: Up to 2 total contracts
1.4 Estimated RFP Timeline
The timeline below is an estimate for the RFP and Contracting process.
Event Date Pre-Proposal Meeting November 02, 2026 Deadline for RFP Questions November 20, 2026 Written proposals due at 4:00 p.m. PT (for Phase 1) November 27, 2026 Short list posted and Phase 2 instructions shared [if applicable] December 18, 2026 Notice of Intent to Award Posted January 8, 2027
The City will adjust the schedule as necessary.
1.5 Grant Funding
This contract is Portland Clean Energy Fund (PCEF) funded. PCEF wage requirements are as follows:
A) PCEF Family Wage Requirements: All workers who perform work on projects funded by PCEF must be paid a minimum of 180% of the relevant state minimum wage for time worked as defined by the Oregon Bureau of Labor & Industries.
(Current Fiscal Year 27 PCEF minimum wage: $30.24 / hr)
B) Wage Records Review: The City, either directly or through designated representative, may examine and copy Contractors’ books, documents, papers, and records relating to wages paid to workers performing PCEF-funded work at any time during the contract period upon thirty (30) calendar days’ notice.
RFP # Doc2444896305 5 of 19 RFP Information Packet
1.6 Pre-Proposal Meeting
There will be an optional pre-proposal meeting and site visit scheduled for this Project on Friday 11/02/2026 at 9:00 a.m. PT at 830 NE Floral Place Portland, OR 97232
This meeting is not mandatory. You can submit a proposal without attending this meeting.
The City of Portland will make reasonable accommodation for people with disabilities. Please notify the Official RFP Contact at least two (2) Business Days prior to the event, by the City’s TTY at 503-823-6868, or by the Oregon Relay Service at 1-800-735-2900.
1.7 Addenda
The City will share more information about this RFP if something is missing or unclear. The City will share this information as an addendum (or addenda, if more than one).
Addenda issued seventy-two (72) hours or more before the due date are binding. The seventy-two (72) hour window excludes Saturdays, Sundays, and City-observed holidays.
You are responsible for complying with the addenda, even if you do not see it.
https://www.portland.gov/policies/human-resources-administrative-rules/leaves/hrar-602-holidays
RFP # Doc2444896305 6 of 19 RFP Information Packet
Section 2: How Your Proposal Will Be Evaluated
2.1 Proposal Review and Selection
Evaluation Overview The City will appoint an Evaluation Committee (Committee) to evaluate the proposals received.
To score proposals, the Committee will evaluate each proposal using the criteria below. The Committee may seek outside expertise. The Committee will require at least ten (10) Business Days to evaluate and score the proposals.
The City will decide how or when to proceed through the evaluation process. The City will also decide if additional clarifications are needed, when to begin or end negotiations, reasonable timelines, and whether to open negotiations with a lower scoring proposer.
The City can also decide to cancel the solicitation or reject all proposals.
Evaluation Process Each proposal is evaluated using these criteria:
Responsiveness, Responsibility, and Mandatory Criteria
The City will determine if you are a Responsible Proposer who has submitted a Responsive Proposal (ORS 279B.005).
Refer to Portland Public Contracting Rules for details.
The successful proposer(s) must hold a valid Construction Contractors Board (CCB) license and shall provide, at its own risk and cost, all labor, tools, equipment, transportation, insurance, and other items needed to perform these tasks.
The successful respondent shall include in their proposal the cost to obtain or maintain all permits, certifications and licenses that may be required to perform the services in the Contract.
Proven work history doing gutter and downspout repairs, modifications, and new installations on residential and small commercial properties.
https://www.portland.gov/policies/public-contracting-rules
RFP # Doc2444896305 7 of 19 RFP Information Packet
Evaluation Phase 1–Written Scoring
Proposals that meet responsiveness, responsibility, and mandatory requirements will be evaluated in Evaluation Phase 1. The Committee will conduct a detailed review of the written proposals:
Phase 1 Evaluation Criteria
Evaluation Criteria Percent of total points
Percent of points for sub-criteria
Proposer Capabilities 30 — Project Team 15 — Project Approach 20 — References 10 — Pricing 5 Corporate Responsibility 20 —
Equal Employment Opportunity and Access in Subcontracting 5
Equal Opportunity Employer and Community Involvement 10
Sustainable Business Practices — 5 Total 100%
Short Listing
At the end of any evaluation phase, the Evaluation Committee may focus on only a limited number of proposals by developing a “short list” based on the scores. The number of proposals on the short list depends on the number of proposals the Committee believes have a reasonable chance of leading to a contract award. If you are eliminated from further consideration, you will be notified by a Notice of Shortlisting posted on the City’s Procurement Website.
Subsequent Evaluation Phases The City will proceed with subsequent evaluation phases as needed. These phases may include oral interviews, demonstrations, presentations, site visits, clarification of the proposals, or other activities.
If you are invited to participate in subsequent evaluation phases, the City will share additional information and instructions a reasonable amount of time before any further evaluation is held.
Evaluation Phase 2 – Interviews, Demonstrations, or Presentations [Optional]
The scoring of Phase 2 generally will be as follows.
Phase 2 Evaluation Criteria
Evaluation Criteria % Allocation
Content of Phase 2 Evaluation 100
RFP # Doc2444896305 8 of 19 RFP Information Packet
To be determined
Additional Optional Evaluation Phases and Methods
In addition to the evaluation phases above, the City can use other methods like best and final offers, serial negotiations, and competitive simultaneous negotiations.
Proposers eliminated at any stage of the evaluation process will be notified.
Total Overall Score
At the end of each evaluation phase, the points from that phase will be added to your cumulative score to determine your Total Overall Score. The proposer with the highest Total Overall Score may be identified as the finalist.
The selection of the finalist may also be based on negotiated costs and agreeing to the City’s terms and conditions within the City’s Sample Contract.
Negotiations will follow with the finalist. If successful, negotiations may result in a final award and Contract for the work. If the Contract with the finalist cannot be reached within a time that is reasonable to the City, the City may elevate the proposer with the next highest Total Overall Score to be the finalist.
2.2 Award Review and Protest
Review The City will post a Notice of Intent to Negotiate and Award on the City's Procurement Website.
The Notice will identify the proposer(s) to which the City intends to award a contract.
Following the Notice of Intent to Negotiate and Award, the public may view proposal documents, in accordance with the Oregon Public Records Act.
If you were not awarded the Contract, you can ask for clarification or debriefing, request time to review the selection procedures, or discuss the scoring methods used by the Evaluation Committee.
Protests Proposers can challenge the City’s decision to exclude the proposer from the next step in the evaluation process, and to award a contract. If you wish to protest your elimination, you must submit a protest within seven (7) Calendar Days of the City’s posting of the Notice of Short List or Notice of Intent to Award.
Proposers can read Portland Public Contracting Rules regarding protest procedures, all of which may be found online: https://www.portland.gov/policies/public-contracting-rules.
Proposers may also learn more about protests by reviewing ORS 279B.405 and ORS 279B.410.
https://www.portland.gov/policies/public-contracting-rules
RFP # Doc2444896305 9 of 19 RFP Information Packet
Protesters may not use judicial appeal rights unless all protest and appeal rights are exhausted.
RFP # Doc2444896305 10 of 19 RFP Information Packet
Section 3: Scope of Work
1. SCOPE OF WORK: BES proposes to engage the successful Proposer(s) for the following services as further detailed below:
1. Accept work orders from City of Portland project manager or designated agents.
i. Work orders will include pre-job site assessments and consultations.
Proposers(s) are responsible for taking notes on project details and materials needed to execute work at a mutually agreed upon date by the property owner, City Project Manager and Proposer(s).
2. Proposer(s) will have frequent direct contact with private individual owners of the sites where the work is to be completed. Proposer(s) must provide enthusiastic, polite, hands-on, direct, excellent customer service to third-party property owners in the City of Portland.
3. Provide downspout disconnection services to third-party private property owners in the City of Portland:
i. Relocate downspouts to a location where simple surface disconnection onto the yard, garden, rain garden or other stormwater management option will be safe and effective, and / or
ii. Disconnect the downspout from standpipe or city sewer connections, as needed, so that the roof water flows out onto the yard, garden, rain garden or other approved stormwater management facility in a safe and effective manner.
4. Deliver confirmation and invoice to City of Portland project manager when work is complete.
The Proposer(s) will perform services on an as-needed basis as requested by the City. Proposer(s) shall furnish, at Proposer's own risk and cost, materials, equipment, transportation and other items required to make each disconnection complete.
It is estimated that disconnection work under this Price Agreement (“Contract”) will be required at up to approximately sixty (60) properties during the 2027/2028 fiscal year (July 1, 2026 to June 30, 2027). Quantities shown in Attachment B – Schedule of Rates and Services are based on the assumption of contracts being awarded to two (2) Proposer(s) and reflect the City’s estimated requirements for
RFP # Doc2444896305 11 of 19 RFP Information Packet a one-year period per contractor (up to 60 buildings during the first year). These quantities are estimates, provided only for the purpose of proposal development and pricing, and do not constitute a firm offer as to the quantity of work that will be awarded or the timing of projects that will be scheduled by the City.
Compensation for each project will be based on the negotiated hourly rates for the personnel and equipment as outlined in Attachment B.
Please include any other equipment or staffing that may reasonably be needed to complete the work as outlined in Statement of Work.
The selected Proposer(s) will be expected to enter into a Goods and Services/Time and Materials Contract with the City.
2. TECHNICAL AND REQUIRED SERVICES: The successful Proposer(s) will perform the tasks listed below for this project. The Proposer shall be expected to work closely with designated City of Portland, BES personnel to accomplish the goals and perform the tasks:
1. Assess downspout disconnection and downspout relocation
A. Meet with the City Project Manager or designee to visit each assigned property Iisted in the work order to develop final plan (Exhibit A – Example Site Plan for Disconnection and Re-Hang Work).
i. Ability to meet with the City Project Manager within five (5) days of job notice.
B. City Project Manager will authorize Proposer(s) to complete work that meets safety requirements:
i. Downspout disconnection and redirection to yards and rain gardens must meet safety standards as described in the final disconnection plan provided by City Project Manager or authorized designee, this could include specifications outlined during in-person assessments.
ii. Downspout disconnection and redirection to other stormwater facility types must be completed according to the City provided site plan. This may include establishing new connections to newly installed rain drains or other pipes.
iii. If Proposer(s) observes any on-site conditions suggesting that disconnecting a downspout might cause a drainage problem, damage to property, or pose a safety risk to the occupants, Proposer(s) will immediately stop work and notify the City’s Project Manager.
RFP # Doc2444896305 12 of 19 RFP Information Packet
iv. If a downspout is attached only to the gutter and sewer standpipe, the downspout must be secured to the house with straps.
2. Downspout Relocation and Re-hang Work may include, but is not limited to:
A. EITHER (a) leave the existing downspout in place and install a patch in the gutter to prevent water from entering the downspout OR (b) remove the existing downspout and install a patch under the gutter to prevent water from flowing onto the ground AND add a new downspout along the gutter and direct the water onto the yard, garden, rain garden or other stormwater management option.
B. Remove sections of the existing gutter.
C. Flash into existing or newly hung gutter.
D. Runout and install new sections of gutter.
E. Select standard manufacturer’s pre-painted gutter and downspouts to color-match the existing downspouts and gutter.
F. Change the slope of the existing gutter to direct water to a new or existing downspout.
G. Plug or cap any open standpipes and attach a Notification Tags referencing City Code 17.37 as provided by the City for that specific property.
H. Use a splash block to meet part of the distance safety requirement and to prevent erosion.
3. Simple Surface Disconnection at Location of Existing Downspout
A. Cut the existing downspout about 9 inches above the sewer standpipe with a hacksaw.
B. Plug or cap any open standpipe and attach a Notification Tags referencing City Code 17.37.
C. Insert the downspout into an elbow.
D. Attach a downspout pipe extension of necessary length to meet safety requirements for distance.
E. Secure the pieces with sheet metal screws.
F. Secure the downspout with straps where necessary.
G. Use a splash block to meet part of the distance safety requirement and to prevent erosion.
4. Disconnection to Rain Garden or Other Stormwater Management Facility A. Relocate and re-hang or disconnect the downspout in place to a specific point in the landscape or to a standpipe as designated by the City provided and approved site plan. The designated point of
RFP # Doc2444896305 13 of 19 RFP Information Packet disconnection will drain to the rain garden or stormwater management facility.
5. Complete disconnection work for inspection
A. Proposer(s) will complete work and provide invoices to the City of Portland Project Manager or designee within fifteen (15) calendar days from authorization of the project.
B. Materials:
i. Sewer standpipes must be sealed with a wing-nut test plug or rubber cap secured by a hose clamp.
ii. Proposer(s) may be required to place Notification Tags referencing https://www.portland.gov/code/17/37 on designated properties. Tags will be supplied by the City. City Project Manager will specify which properties should be tagged at project assignment meeting.
iii. Proposer(s) must have had experience working with K-style 4”, 5”, and 6” gutter, and various dimensions of fascia gutter.
Proposer(s) must have the experience and ability to run out K-style 5” aluminum gutter on the job site. The use of box corners or miter corners is prohibited. If Proposer(s) believe that box corners will be required to complete a specific job, Proposer(s) must obtain permission to use box corners from City Project Manager or designee prior to beginning the work.
iv. Many combinations of elbows, extensions, straps, and splash blocks may be used to safely direct water as specified in site plan. Downspout materials are to include, but not be limited to, 2x3 and 3x4 corrugated aluminum downspout and corresponding elbows and offset elbows, 2x3 plain square downspout, and 2 inch and 3 inch round downspout and corresponding elbows. Any questions regarding site-specific materials will be directed to City Project Manager or designee.
v. Proposer(s) may be required to provide splash blocks in order to complete disconnection and rehang work.
C. City Project Manager or designee will inspect work as soon as possible after project completion by Proposer(s) and the City Project Manager will notify Proposer(s) of any repairs required.
6. Manage Contacts with Property Owners and the General Public
A. As work under this Contract will occur at private residential and commercial properties, superior customer service will be essential.
https://www.portland.gov/code/17/37
RFP # Doc2444896305 14 of 19 RFP Information Packet
Proposer(s) and Proposer’s employees shall be professional, polite, and friendly and shall treat all property owners, tenants, neighbors, and other members of the public in a respectful manner. It is essential that property owners are satisfied with the performance of the work and the work completed on their property as well as the conduct of all Program staff. In addition, a property owner's satisfaction with work may result in neighboring property owners agreeing to participate in Stormwater Retrofit Programs.
B. As participation by property owners is essential to meeting the Program goals, Proposer(s) will be responsible for facilitating communication between neighboring property owners and the City Project Manager. City will provide Proposer(s) with business cards with contact information for the City Project Manager and/or flyers explaining the program. Proposer(s) will keep cards and/or flyers available at the job site, and politely offer them in response to questions from members of the public.
C. Proposer(s) may be required to notify owners or tenants before beginning the job, or schedule an appointment to accommodate access issues at specific project sites. The property owner will not always be on site, but property owner will be required to unlock gates and make arrangements for outdoor pets. When arriving at the project site, the Proposer(s) shall make all efforts to announce their presence; this may include knocking on the doors of residential project sites and greeting occupants, or announcing themselves at the public entrance of commercial job sites.
D. The Proposer(s) must be able to meet timelines on a regular basis.
When work is assigned, it must be completed within the time frame stated in this RFP. Work is typically assigned in packets of between one (1) and five (5) properties and work on each packet must be completed within fifteen (15) calendar days.
E. The Proposer(s) must understand and be able to explain the relocation and downspout disconnection work they will be doing as well as the stormwater retrofit goals of the applicable Stormwater Retrofit Program to property owners [note: the Proposer’s understanding and approach to the work at individual homes is an important aspect to the success of this project.] Proposer(s) must demonstrate superior customer service skills at all times when working with the public.
RFP # Doc2444896305 15 of 19 RFP Information Packet
7. Work Authorization A. The City's Project Manager or designee will issue all work orders.
Work on the available properties will be scheduled as evenly as possible throughout the course of the Contract period. If multiple contracts are awarded, assignment of work will be dependent upon Proposer(s) responsiveness and ability to complete the work within schedule not solely on the basis of their bid price. Site assessments for each unit of work (up to five
(5) buildings at a time) will be completed before work on those buildings is authorized.
8. Normal Hours of Work A. All site assessments shall be performed between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday. The disconnection work shall be performed between the hours of 8:00 a.m. and 6:00 p.m.
Monday through Thursday. If desired and agreeable to property owner, Proposer(s) may arrange with property owner to perform work outside of the normal hours of work designated above.
9. Emergency work
A. If a property owner contacts the Stormwater Retrofit Program regarding a problem with work that has been completed by the Proposer(s), the Project Manager or designee will gather information and determine whether or not the problem could potentially cause damage to property or pose an immediate risk to occupant safety thereby constituting an emergency requiring prompt action by the Proposer(s). If the problem is determined to be an emergency, the Project Manager or designee will contact the Proposer responsible for the original work. If the Proposer(s) does not respond within two (2) hours, another Proposer(s) will be contacted to fix the problem.
Any faulty workmanship or materials that are the direct result of work originally performed by the Proposer(s) or supplied by the Proposer(s) will be the responsibility of the Proposer(s) to correct at no additional cost to the City. Should the Proposer(s) be nonresponsive to the needs of the City, the City may contract with another Proposer(s) to correct the problem; the City may deduct the cost of correcting the faulty work from future amounts owed the Proposer(s).
RFP # Doc2444896305 16 of 19 RFP Information Packet
Should the Proposer(s) perform emergency work in order to correct a problem that is NOT the direct result of faulty workmanship originally performed by Proposer(s) (i.e.. original work was performed by another Contractor, or problem caused by factors other than faulty work), Proposer(s) will be paid an emergency call-out fee in addition to payment for time and materials to complete the work.
DELIVERY: All Services shall be FOB delivered to the project site as assigned by the City. Should installation or assembly be required, offered prices shall include all costs associated with delivery, assembly, setup, and proper disposal of packaging material. If required by the City, Proposer(s) shall furnish on-site or other Service assistance, as may be required at no additional cost to the City. Acceptance shall not relieve Proposer(s) from its responsibility under any representation or warranty. Proposer(s) must be prepared to furnish the items requested within fifteen (15) Days after receipt of an order.
Proposer(s) shall immediately notify the City, in writing, if Service delivery cannot be completed as intended. Extension beyond fifteen (15) Days must be approved by the Project Manager or Manager’s designee.
NOTE: Contractor shall email such notifications to: Project Manager, Bureau of Environmental Services. If the Services are not provided within fifteen (15) Days from the order date, the City of Portland, at its sole discretion, may obtain the Services from other sources and the successful Proposer shall be liable for the excess costs incurred, including the difference in Service pricing. Additional or repeated Service delivery problems may be cause for Contract cancellation.
Service delivery as required shall not be considered complete until all discrepancies have been corrected. Services not meeting Contract specifications shall be provided to Proposer(s) and shall be corrected at Proposer’s expense.
Acceptance occurs when the City authorizes payment of the invoice. If the City makes a payment for a Product prior to Final Acceptance, the payment does not grant a waiver of any representation or warranty by Proposer(s).
5.DELIVERY SCHEDULE: Proposer(s) shall use best efforts to deliver Product(s) and/or Services(s) on time, in accordance with the scheduled delivery date as set forth in this Contract or an individual Task/Change Order. If Proposer(s) delivers Product more than fifteen (15) Days later than the scheduled delivery date as listed in this Contract, the City may cancel the Contract without penalty.
RFP # Doc2444896305 17 of 19 RFP Information Packet
SPECIAL CONDITIONS
These “Terms and Conditions” are not to be construed as exclusive remedies or as a limitation upon rights or remedies that may be or may become available under Portland City Charter, City Code Chapters 3.06 Office of the City Administrator and 5.10 Public Contracting, and Public Contracting Rule 5.33.
Section 4: Exhibits
1. Exhibit A: Site plan / notes from City project manager exhibit (two “work order” examples)
2. Exhibit B: Invoice Example
3. Exhibit C: Visual examples of previous jobs (funky ones)
RFP # Doc2444896305 18 of 19 RFP Information Packet
Section 5: Sample Contract
RFP # Doc2444896305 19 of 19 RFP Information Packet
Section 6: RFP Terms and Conditions [Link to RFP Terms and Conditions: https://www.portland.gov/business-opportunities/documents/terms-and-conditions-rfp-sample-v11/download https://www.portland.gov/business-opportunities/documents/terms-and-conditions-rfp-sample-v11/download https://www.portland.gov/business-opportunities/documents/terms-and-conditions-rfp-sample-v11/download
| Request for Proposals (RFP) for |
| Project Information Packet |
| RFP at a Glance |
| Proposals Due: |
| Summary: |
| Pre-Proposal Meeting: Optional |
| Submit Your Proposal: |
| Have Questions or Need Help? Single Point of Contact: |
| Section 1: Opportunity Overview |
| 1.1 Background |
| Bureau of Environmental Services Overview |
| The City of Portland Bureau of Environmental Services is the sewer and stormwater utility for the City. Within Portland’s combined sewer basins, sewage mixes with rainwater from roofs, streets and other impervious surfaces. In separated storm only are... |
| Private Property Retrofit Program Overview |
| The goal of the Private Property Retrofit Program is to remove downspouts from standpipes that carry roof water directly into the City’s combined and storm only sewers and instead allow the roof water to slowly soak into landscaped areas. The Private ... |
| Needs Statement: |
| 1.2 Outcome Goals |
| 1.3 Contract Details |
| 1.4 Estimated RFP Timeline |
| 1.5 Grant Funding |
| 1.6 Pre-Proposal Meeting |
| 1.7 Addenda |
| Section 2: How Your Proposal Will Be Evaluated |
| 2.1 Proposal Review and Selection |
| Evaluation Overview |
| Evaluation Process |
| Responsiveness, Responsibility, and Mandatory Criteria |
| Evaluation Phase 1–Written Scoring |
| Short Listing |
| Subsequent Evaluation Phases |
| Evaluation Phase 2 – Interviews, Demonstrations, or Presentations [Optional] |
| Additional Optional Evaluation Phases and Methods |
| Total Overall Score |
| 2.2 Award Review and Protest |
| Review |
| Protests |
| Section 3: Scope of Work |
| The selected Proposer(s) will be expected to enter into a Goods and Services/Time and Materials Contract with the City. |
| 1. Assess downspout disconnection and downspout relocation |
| 2. Downspout Relocation and Re-hang Work may include, but is not limited to: |
| 3. Simple Surface Disconnection at Location of Existing Downspout |
| 4. Disconnection to Rain Garden or Other Stormwater Management Facility |
| 5. Complete disconnection work for inspection |
| 6. Manage Contacts with Property Owners and the General Public |
| 7. Work Authorization |
| 8. Normal Hours of Work |
| 9. Emergency work |
| SPECIAL CONDITIONS |
| Section 4: Exhibits |
| Section 5: Sample Contract |
| Section 6: RFP Terms and Conditions |