Attachment B.docx
DOCX document 22 KB Posted
- Solicitation number
- Doc2444896305
- Issued by
- Multnomah County, Oregon
About this file
This is a Schedule of Rates and Services attachment for an Oregon state and local on-call services contract for Downspout Disconnection and Retrofit services. The contract involves labor and material rate structures for project execution. The labor categories include Project Management (covering property assessments, material procurement, administration, and billing); Construction Labor; Foreman Labor; and Emergency Call-out services. A critical requirement mandates that all construction labor be compensated at the Portland Cost of Equity Financing (PCEF) minimum wage rate of 1.8 times the Portland minimum wage, specified at $30.24 per hour for fiscal year 2027, regardless of the billed rate to the client.
The pricing structure establishes hourly rates for Project Management, Construction Labor, and Foreman Labor positions, with Emergency Call-out services billed per event. Materials are billed at cost with no markup specified in this attachment. The specific dollar amounts for each labor category and the Emergency Call-out fee are not populated in this document, indicating they were to be completed by the bidder during proposal submission. This rate schedule reflects prevailing wage compliance requirements typical of public works contracts in Oregon and establishes the framework for compensation and billing throughout the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf | ||
| EXHIBIT C - Sample project 3925 NE Laddington Ct.pdf | ||
| Section 5 Sample Contract.docx | DOCX document | |
| RFP Doc2444896305 Information Packet.pdf | ||
| EXHIBIT A - Gutter and Downspout Work Order Example 1 and 2.pdf | ||
| EXHIBIT B - Contractor Billing Requirements.pdf | ||
| RFP Doc2444896305 Response Packet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B – Schedule of Rates and Services
LABOR RATES
| ITEM # |
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| 1 |
| Project Management |
(Property Assessments, Material Procurement, Admin, Billing)
| Per Hour |
| $ |
| 2 |
| Construction Labor |
(NOTE: Regardless of billed rate, all labor will need to be compensated at the PCEF minimum wage rate requirement, which is 1.8 times the Portland minimum wage. That is $30.24/hr for FY27)
| Per Hour |
| $ |
| 3 |
| Forman Labor |
| Per Hour |
| $ |
| 4 |
| Emergency Call-out |
| Per Event |
| $ |
MATERIALS RATES
Materials billed at cost
File details come from the government source that posted it. Updated .