RFP_Design_15311_Addendum_02.pdf

PDF 117 KB Posted

Attached to
RECS RFP Design Two New Holding Cells MCF-TOGO
Solicitation number
2000015311
Issued by
Itasca County, Minnesota

About this file

This document is an Addendum #2 to a Request for Proposal (RFP) issued by the Minnesota Department of Administration's Real Estate and Construction Services (RECS) division for the design of two new holding cells at the MCF-Togo facility in Togo, Minnesota. The RFP seeks full architectural, electrical, mechanical HVAC, and plumbing engineering services to design the two new wet holding cells. A structural engineer will be required to evaluate and provide the necessary design documents for the cell addition.

The RFP is associated with RECS Project #78TH0044 and has an Event ID of 2000015311. The design services are required for the Minnesota Correctional Facility in Togo, which is located in Itasca County. No other details regarding pricing, set asides, incumbents, funding, or contract terms are provided in the addendum.

View the file

Other files

File Type Posted
Exhibit_A2.pdf PDF
Exhibit_A1.pdf PDF
RFP_Design_15311_Addendum_01.pdf PDF
Exhibit_C_Upgrade_Holding_Cells.docx DOCX document
Exhibit_A3.pdf PDF
RFP_Design_15311.pdf PDF
RECS_RFP_Design_Two_New_Holding_Cells_MCF-TOGO.pdf PDF
Exhibit_B_Upgrade_Holding_Cells.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REAL ESTATE AND CONSTRUCTION SERVICES

309 Administration Building

50 Sherburne Ave St. Paul, Minnesota 55155

Voice: (651) 201.2550

TTY: (800) 627.3529

FAX: (651) 215.6245

http://mn.gov/admin/

Addendum #2

Date: March 22, 2024

Request for Proposal: RECS RFP Design for Two Holding Cells, MCF-Togo RECS Project Number: 78TH0044 Event ID: 2000015311

Subject: RFP Clarification

Clarifications:

1) A structural engineer will be required in order to evaluate and provide the necessary design documents for the addition of the two new cells.

End of Addendum #2 http://mn.gov/admin/ http://mn.gov/admin/

Clarifications:

File details come from the government source that posted it. Updated .