RFP_Design_15311_Addendum_01.pdf
PDF 170 KB Posted
- Attached to
- RECS RFP Design Two New Holding Cells MCF-TOGO
- Solicitation number
- 2000015311
- Issued by
- Itasca County, Minnesota
About this file
This document is an Addendum #1 to a Request for Proposal (RFP) issued by the Real Estate and Construction Services (RECS) division of the Minnesota Department of Administration for design services related to two new holding cells at the MCF-Togo correctional facility in Togo, Minnesota. The RFP clarifies that a pre-bid conference will be held on-site for contractors, and that the selected vendor will be required to attend an on-site pre-construction meeting and weekly on-site meetings during the construction phase. The RFP covers architectural, electrical, mechanical HVAC, and plumbing engineering services for the design of the two new holding cells.
The RFP is project number 78TH0044 with an Event ID of 2000015311. The project is funded by the state of Minnesota and is located within Itasca County. No additional pricing, set aside, or incumbent information is provided in this Addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_A2.pdf | ||
| RFP_Design_15311_Addendum_02.pdf | ||
| Exhibit_A1.pdf | ||
| Exhibit_C_Upgrade_Holding_Cells.docx | DOCX document | |
| Exhibit_A3.pdf | ||
| RFP_Design_15311.pdf | ||
| RECS_RFP_Design_Two_New_Holding_Cells_MCF-TOGO.pdf | ||
| Exhibit_B_Upgrade_Holding_Cells.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REAL ESTATE AND CONSTRUCTION SERVICES
309 Administration Building
50 Sherburne Ave St. Paul, Minnesota 55155
Voice: (651) 201.2550
TTY: (800) 627.3529
FAX: (651) 215.6245
http://mn.gov/admin/
Addendum #1
Date: March 14, 2024
Request for Proposal: RECS RFP Design for Two Holding Cells, MCF-Togo RECS Project Number: 78TH0044 Event ID: 2000015311
Subject: RFP Clarifications
Clarifications:
1) Pre-bid Conference with contractors will be in on-site
2) Pre-construction – Attend on-site pre-construction meeting with contractor and Owner team
3) Construction Administration – we will meet weekly, on-site during construction; Other typical Construction
Phase services (attachment 5 to Exhibit A) included in the RFP
End of Addendum #1 http://mn.gov/admin/ http://mn.gov/admin/
Clarifications: