This document is an Addendum #1 to a Request for Proposal (RFP) issued by the Real Estate and Construction Services (RECS) division of the Minnesota Department of Administration for design services related to two new holding cells at the MCF-Togo correctional facility in Togo, Minnesota. The RFP clarifies that a pre-bid conference will be held on-site for contractors, and that the selected vendor will be required to attend an on-site pre-construction meeting and weekly on-site meetings during the construction phase. The RFP covers architectural, electrical, mechanical HVAC, and plumbing engineering services for the design of the two new holding cells.

The RFP is project number 78TH0044 with an Event ID of 2000015311. The project is funded by the state of Minnesota and is located within Itasca County. No additional pricing, set aside, or incumbent information is provided in this Addendum.

View the file

Other files

File Type Posted
Exhibit_A2.pdf PDF
RFP_Design_15311_Addendum_02.pdf PDF
Exhibit_A1.pdf PDF
Exhibit_C_Upgrade_Holding_Cells.docx DOCX document
Exhibit_A3.pdf PDF
RFP_Design_15311.pdf PDF
RECS_RFP_Design_Two_New_Holding_Cells_MCF-TOGO.pdf PDF
Exhibit_B_Upgrade_Holding_Cells.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REAL ESTATE AND CONSTRUCTION SERVICES

309 Administration Building

50 Sherburne Ave St. Paul, Minnesota 55155

Voice: (651) 201.2550

TTY: (800) 627.3529

FAX: (651) 215.6245

http://mn.gov/admin/

Addendum #1

Date: March 14, 2024

Request for Proposal: RECS RFP Design for Two Holding Cells, MCF-Togo RECS Project Number: 78TH0044 Event ID: 2000015311

Subject: RFP Clarifications

Clarifications:

1) Pre-bid Conference with contractors will be in on-site

2) Pre-construction – Attend on-site pre-construction meeting with contractor and Owner team

3) Construction Administration – we will meet weekly, on-site during construction; Other typical Construction

Phase services (attachment 5 to Exhibit A) included in the RFP

End of Addendum #1 http://mn.gov/admin/ http://mn.gov/admin/