About this file
This is a Request for Proposal issued by the Coffee County School System in Douglas, Georgia, for data center power management equipment and services. The RFP seeks sealed proposals from authorized resellers for two APC 20kW lithium-ion uninterruptible power supplies with rack mounting components, management licenses, and installation and configuration services, or equivalent systems from any brand that meet the same functionality requirements. Additionally, the RFP requests six APC 30A power distribution units or equivalent with intelligent features including outlet-level metering, remote rebooting capability, and integrated network interface. The proposal deadline is 3:00 PM EST on Wednesday, January 21, 2026, with bids to be delivered to the Coffee County Board of Education at 211 Gaskin Ave South, Douglas, GA 31533. The RFP includes a question deadline of 3:00 PM EST on January 16, 2026, and the district will announce the selected vendor on Friday, January 30, 2026, following board approval on January 29, 2026. The contract service date is July 1, 2026, through June 30, 2027. The district requires all equipment to be new and factory-sealed with original manufacturer warranties, and has indicated that all current equipment must remain factory condition with no used, refurbished, or discontinued items accepted.
The RFP is funded through E-rate with eligible and ineligible items to be listed separately on pricing forms, and vendors must provide discounted billing with reimbursement following the Schools and Libraries Division invoicing guidelines. Evaluation criteria are weighted at 50 points for cost effectiveness of the product, 20 points for adequacy of response and proposed product, 20 points for satisfactory previous business relationships, 5 points for references, and 5 points for local or in-state vendor status. The Coffee County School System currently operates a 25.6kW maximum capacity data center with 9.3kW working load and plans significant upgrades including new PowerVault and PowerEdge servers plus twelve additional 4U servers with maximum 1500W draw each. The new UPS system will be grid-tied with a backup generator connection, and load balancing will be required during installation. The proposal pricing must remain valid for 60 days from submission, and vendors must hold a Service Provider Information Number from the Schools and Libraries Division. The district reserves the right to adjust quantities based on funding availability and will not commit to award based solely on meeting stated requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 1
Coffee County School System
Douglas, GA
Request for Proposal
Data Center Power Management
E-rate Funding Year 2026-2027
Associated 470: #260010174
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 2
INTRODUCTION and INSTRUCTIONS TO VENDORS
The Coffee County School system invites vendors to submit proposals in accordance with the terms and conditions of this Request for Proposal (RFP). This RFP provides the requirements and evaluative criteria for two (2) APC 20kW lithium ion uninterruptible power supplies, six (6) APC power distribution units, accessories and installation & configuration, or equivalent uninterruptible power supplies and power distribution units. The district requests a detailed response from all prospective certified vendors, including pricing and service descriptions, in a specified format.
Invoicing
Vendors submitting responses to this Request for Proposal agree to provide discounted billing for products and/or services associated with the projects and seek reimbursement of the discount according to the invoicing guidelines of the Schools and Libraries Division. The Owner will pay for the discounted portion of the invoice when the products and/or services listed on the invoice are delivered in accordance with the contract. Should E-rate funding not become available, the Owner stands ready to pay the full contracted amount.
Background Information
The Coffee County School System is located in Douglas, Georgia, Coffee County. Our enrollment is approximately 7500 students, and we employ nearly 1200 staff members in 14 separate locations. All sites are connected to our central data center by leased fiber.
General Conditions
This RFP is not a contract offer. Acceptance of a proposal neither commits Coffee County School System to award a contract to any vendor, even if all requirements stated in this RFP are met, nor limits our rights to negotiate in our best interest. We reserve the right to contract with a vendor for reasons other than price.
Failure to answer any questions in this RFP may subject the proposal to disqualification. Failure to meet qualifications and requirements will not necessarily subject a proposal to disqualification.
It is important that the vendor understand that this service has been included on the Coffee County School
System’s E-Rate application which, if approved, will entitle us to discounted services through the
Universal Fund.
Valid Period of Offer
The pricing, terms, and conditions stated in your submitted proposal must remain valid for 60 days from the date of delivery of the proposal to Coffee County School System.
Right of Rejection
We reserve the right to accept or reject any or all responses to this RFP and to enter into discussions and/or negotiations with one or more qualified vendors at the same time, if such actions are in the best interest of Coffee County School System.
Cost of Proposals
Expenses incurred in the preparation of proposals in response to this RFP are the sole responsibility of the vendor.
Instructions and Target Dates
The following section includes information governing the preparation and due dates of the proposal to be submitted.
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 3
PROPOSAL DELIVERY
Proposal Submission
Proposal responses should be submitted in a sealed envelope addressed to the following no later than 3:00
PM EST, Wednesday January 21, 2026. Bids must be received at the Coffee County Board of
Education by this date. Envelopes should be marked "UPS Bid." Hand delivery of bids is an option if mailing will not result in receipt of timely bid documents. No faxed or emailed copies will be accepted.
The acceptance of any or all alternatives will be at the discretion of the School System.
Send Proposals to:
Coffee County Board of Education
ATTN: Logan Evans - Director of Information Systems
211 Gaskin Ave South
Douglas, GA 31533
Feel free e-mail by January 16, 2026 (logan.evans@coffee.k12.ga.us) if you have any questions. The district is closed between December 19, 2025 and January 5, 2026, so emails questions may be addressed on or after January 5, 2026.
Calls may be made December 15-19, 2025 and on or after January 5, 2026 to Logan Evans at 912-389-
6773.
Schedule of Events
Date Event
Monday, December 15, 2025 Distribute RFP via www.coffee.k12.ga.us; USAC
Form 470
3:00 PM, Thursday, January 16, 2026 End of questions to the district about the bid
3:00 PM, Tuesday, January 21, 2026 Receipt of Proposals
3:15 PM, Tuesday, January 21, 2026 Opening of Bids, Committee Review of Bids –
Make Recommendations for Selected Vendor
5:30 PM, Thursday, January 29, 2026 Vendor Selection presented to Board of Education at January Work Session
7:00 PM, Thursday, January 29, 2026 Board of Education Approval of Vendor at January Regular Meeting
Friday, January 30, 2026 Announcement of Vendor Selection mailto:logan.evans@coffee.k12.ga.us http://www.coffee.k12.ga.us/
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 4
PROPOSAL/EVALUATION/RESPONSE PREPARATION
Required Proposal
Each proposal must include the information requested on the specified RESPONSE FORM that follows.
Evaluation Criteria
Coffee County School System evaluates and weighs the following criteria when considering our future provider of a UPS power supply system. These standards are listed in descending order of importance.
Evaluation Criteria Weight
Cost effectiveness of Product 50 points
Adequacy of the response to this RFP(Forms and
Proposed Product) 20 points
Satisfactory previous business/working relationship with the provider or its staff 20 points
References 5 points
Local or in-state vendor 5 points
Total 100 points
Specifications: UPS (Power Supplies) and Related Items
The Coffee County School System (CCSS) is requesting sealed proposals from Authorized
Resellers for:
A) Please list the different equipment, accessories, and services on a parts list table. Include SKU for each item.
a. Example table header: SKU | Description | Number | Cost/unit | Total
B) Two (2) APC 20kW Uninterruptible Power Supplies with rack mounting components, management licenses, and installation & configuration, or equivalent uninterruptible power supplies of any brand, as long as it serves the same service and functionality.
a. Lithium Ion batteries required
b. Internal redundancy (n+1) capability
c. 9U or 12U rack-mount form factor
d. Battery pack expandable (capability) for the option to increase offline runtime; no expanded battery pack needed in this bid.
e. Installation and Configuration to be included in the cost
f. Integrated Network Management capability
g. Minimum 3-year parts and labor warranty on UPS system and batteries
C) Six (6) APC Power Distribution Units (30A) or equivalent in listed features that follows;
Vertical Form Factor; Intelligent features like outlet-level metering, remote rebooting capability, integrated network interface; IEC C13 and C19 Power cord compatibility
Note: Any E-rate ineligible software or support should be included as a separate line item on the price form and described as “E-Rate ineligible”.
Additional Details:
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 5
1) The current data center is undergoing a server refresh and adding a compute load of high power. However:
a. Current data center is running 2 APC Symetra LX UPS with a bank of APC 12 lead battery bank for extended runtime
b. The current data center capacity is 25.6kW max
c. Current data center working load is 9.3kW
d. Aruba 6400 series core switch, quad power supply (4x1800W)
e. Two (2) firewalls; PA firewalls 3000 series
f. Four (4) - 2U video servers
2) Upgrades coming soon:
a. New Data Center: PowerVault ME5224 + 3 PowerEdge R660xs; Dual 800W power supplies; 2 PowerSwitch S5246
b. Adding twelve (12) 4U servers, max draw 1500W each
c. While the working load of the new data center is not precisely known, we need the potential working load of two (2) 20kW UPS supplies.
3) The new UPS system will be grid tied and connected to a backup generator system.
4) Load balancing of the server room stacks will be required on installation.
5) The new data center has single phase power with 125A breakers available.
6) Call or email for additional details as needed to meet the data center requirements.
Other Conditions
Any and all equipment, if applicable, shall be new, factory-sealed equipment currently available from the manufacturer; the District will not accept proposals of used, remanufactured, refurbished, “B stock,” returns, open-box, discontinued, “gray market,” or equipment in any condition other than new and factory-sealed with all original manufacturer warranties. The District reserves the right to adjust quantities prior to purchasing based on availability of funding, and shall have the sole discretion to evaluate, ascertain, and determine whether any item proposed or offered by any bidder is in fact an equivalent or better for any item listed. It is the vendor’s responsibility and obligation to provide documentation and other evidence that alternative equipment is functionally equivalent or better. Failure to show equal functionality may result in the disqualification of the bid.
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 6
RESPONSE FORM
STATEMENT OF VENDOR’S QUALIFICATION
To accompany proposals submitted for the Coffee County School System.
Name of Vendor’s Firm
Name of Company Representative
Business Address
Phone Number
Email Address
When Organized
Where Organized
How many years engaged in this business under the current firm name?
Partnership
Corporation
*SPIN Number:
*Vendor must provide a Service Provider Information Number assigned by the Schools and Libraries
Division (SLD)
Attachments
Please attach to this statement at least three references, including: (Key Contact name, address, title, phone number and brief description of work performed for the organization, including dates of work)
The above statements must be subscribed and sworn before a Notary Public.
Firm Name
Representative (printed name)
Signature
Title
Date
Notary Signature
SEAL/STAMP
Notary State
Commission Expiration Date
Date of Notarization
Request for Proposal – Data Center Power Management Coffee County School System
Winter 2025 7
CONTRACT PRICE FORM
Vendor Firm Name
SPIN Number
Representative (printed name)
Signature
Title
Date
Notary Signature
SEAL/STAMP
Notary State
Commission Expiration Date
Date of Notarization
To accompany proposals submitted for APC Uninterruptible Power Supplies and PDUs, or equivalent for the Coffee County School System.
Service Date:
July 1, 2026 - June 30, 2027
UPS & PDU (E-Rate Year 2026-2027)
Power Supply Package Price $___________________
Power Distribution Units Package Price $ ___________________
E-Rate Ineligible Items Price, if any $____________________
Total Price $____________________
LIST OF VENDOR'S EXCEPTIONS
Contractor shall list any exceptions to these specifications or general conditions.
The Owner reserves the right to reject any or all bids and to waive any informality in the bidding. No bid may be withdrawn for a period of thirty days subsequent to the opening of bids without written consent of the Owner.