RFP – COOLING TOWER RENOVATION

1 MB Posted

Attached to
RFP – COOLING TOWER RENOVATION - 010422
Solicitation number
Not on record
Issued by
Fulton County, Colquitt City, Georgia

About this file

This is a Request for Sealed Proposal (RFP) issued by the City of College Park, Georgia for HVAC construction services related to cooling tower renovation at the Georgia International Convention Center (GICC). The project involves furnishing labor and materials to renovate cooling tower cells 1 and 2 of a Baltimore Aircoil Co. Model #33485-2 cooling system. The scope includes replacement of hot deck basins and weirs, interior fill cells, two new belts, two new basin drain screens, cleaning, and installation of elastomeric surface coating to cold basins in accordance with manufacturer specifications. The project requires coordination to minimize interference with building operations and must be completed to the owner's satisfaction with a full one-year warranty on all materials, labor, and workmanship. Sealed proposals were due no later than Tuesday, January 4, 2022 at 10:00 am EST at the City of College Park Purchasing Department, 3667 Main Street, College Park, Georgia 30337. A question and clarification deadline was set for December 28, 2021 at 12:00 pm EST, with addenda to be published by December 31, 2021 at 4:00 pm EST. The sealed bids were to be opened via Zoom on January 4, 2022 at 10:30 am EST.

Proposals must be submitted on a total lump sum price basis with all prices for delivery FOB freight prepaid to College Park, Georgia. The City is tax-exempt and vendors should not include sales tax. Each bid must be accompanied by a 5% bid bond, and the successful bidder must provide performance and payment bonds each for 100% of the contract amount before Notice to Proceed. Award will be made to the most responsive and responsible bidder, which may not necessarily be the lowest price, based on evaluation criteria including price adherence to specifications, delivery, and past performance with the City. A local preference policy applies whereby vendors located within College Park city limits with a business location for at least one year prior may be recommended if their bid does not exceed the lowest non-local bid by more than 3%. Required documentation includes proof of Workers' Compensation Insurance, Commercial General Liability Insurance, proof of E-Verify compliance, current professional licenses for applicable trades, references from a minimum of five similar projects, and completion of a purchasing vendor questionnaire. The City reserves the right to reject any or all bids and will make award decisions within 90 days of bid opening.

Text of this file

RFP – COOLING TOWER RENOVATION - 010422 Page 1

REQUEST FOR SEALED PROPOSAL

ADVERTISEMENT for HVAC CONSTRUCTION SERVICES

RFP – COOLING TOWER RENOVATION - 010422

The City of College Park is accepting sealed proposals from qualified vendors for COOLING TOWER RENOVATION. Proposals will be received no later than TUESDAY, JANUARY 4, 2022 at 10:00 am (EST) at the City of College Park Purchasing Department, 3667 Main Street, College Park Georgia, 30337. Proposals received after the above date and time, or in any other location other than the Purchasing Department will not be considered.

A bid packet may be obtained by clicking related solicitation link on the City of College Park website www.collegeparkga.com under the Bids / RFPs section.

Timeline

Q&A and Clarifications (email only to wmoody@collegeparkga.com) Ref: Cooling Tower Renovation

December 28, 2021 12:00 pm (EST) deadline

Addendum(s) published December 31, 2021 4:00 pm (EST)

Open Sealed Bids (via Zoom) January 4, 2022 10:30 am (EST)

Any/all addenda must be signed and dated and made a part of bid packet. It is always the vendor’s responsibility to check the City of College Park’s website for any/all addenda.

The City of College Park reserves the right to reject any or all bids based on past performance and to waive technicalities and informalities and re-advertise. All Minority, Woman and Small Businesses are strongly encouraged to apply. Only responsive bids that are determined to meet the requirements and criteria set forth by the City of College Park will be considered.

http://www.collegeparkga.com/ mailto:wmoody@collegeparkga.com

RFP – COOLING TOWER RENOVATION - 010422 Page 2

CITY OF COLLEGE PARK

PURCHASING DEPARTMENT

“GENERAL INSTRUCTION TO PROPOSER”

1. The following instructions are to be considered an integral part of this proposal; unless otherwise requested and MUST BE TYPEWRITTEN OR PRINTED IN INK. See checklist for number of submittals to provide. The person signing the bid form must initial any changes or corrections made to this proposal, using blue ink.

2. The person, firm or corporation making the proposal shall submit their bid attaching the final page of this proposal to the front of their proposal to City Hall. The cover submittal page must be complete with the bidding company’s name, bid title, bid number and bid date. No proposal may be withdrawn or modified in any way after the bid-opening deadline.

3. If descriptive literature is attached to the bid, bidding company’s name, bid title, bid number and bid date must appear on all sheets.

4. If there is any question whatsoever regarding any portion of the instructions or specifications, it shall be the bidding company’s responsibility to seek clarification immediately from the City of College Park Purchasing Department during the question period stated herein. It shall be the bidder’s responsibility to check the City’s website (www.collegeparkga.com) for any/all addenda(s). Answer(s) to all questions will be answered after the deadline for questions has expired, and posted on the City’s web site, if applicable, within the specified timeline on page one (1).

5. Any variation from the specifications must be clearly stated by the bidding company in writing and submitted with his/her proposal.

6. The apparent silence of the specifications and any supplement specifications as to any details or the omission from it of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail and that only materials of first quality and correct type, size and design are to be used. All workmanship is to be of first quality. All interpretations of this specification shall be made upon the basis of this statement.

7. The following bid shall be awarded to one “responsible” bidder on a total lump sum price basis.

An award shall be made to one vendor, or split between vendors, for the total bid. Unit prices and extensions will be verified and total checked. Unit price extension and net total must be shown.

Unit price SHALL prevail.

8. In most cases, proposals shall be evaluated on the following items, but not necessarily in this order:

a. Lowest Price (not always the winning proposal)

b. Adherence to specifications

c. Delivery of good/service(s)

i. If Applicable to Scope of Work

ii. Though delivery will be a large consideration, please be as truthful and precise with your date(s) as possible.

d. Past record of vendor’s delivery/performance to the City of College Park

9. The City of College Park desires delivery of the material or services specified at the earliest possible time after the date of award. An unreasonable delivery proposal may be cause for disqualification of a bid. Each bidder shall state a definite time and avoid using the terms ASAP or approximately so many days.

10. The bidder or contractor shall provide copies of Workers’ Compensation Insurance with a limit of not less than required by the State of Georgia or otherwise stated in the bid instructions. In addition, a copy of your Commercial General Liability Insurance (if applicable) shall be provided.

RFP – COOLING TOWER RENOVATION - 010422 Page 3

11. All prices shall be for delivery, our destination, and F.O.B. freight prepaid and allows, College Park, Georgia unless otherwise shown. (if applicable)

12. Federal or State Sales Tax is inapplicable

a. The City of College Park’s Tax Identification Number (TIN) is 58-6000542

b. The City of College Park is tax-exempt under the code of Georgia, Charter 88-18

13. Cash discounts or end of month terms should be shown separately, even if terms are net.

14. The City of College Park:

a. Reserves the right to accept or reject any or all bids, due to past performance, etc. and waive any informality. Further, the City expressly reserves the right to postpone the opening of proposal for its own convenience and to reject any or all proposals in response to this RFP without indicating any reasons for such rejection(s).

b. Request and consider the submission of proposal modifications at any time before the award is made, if such is in the best interest of the City.

c. Request clarification and/or additional information from proposers during the evaluation process.

d. Negotiate with the selected consultant to include further services not identified in this RFP.

e. In the event of contract termination, enter into contract negotiations with other qualified companies that submitted acceptable proposals, rather than redoing the proposal process for the project.

f. The City of College Park will accept or reject all bids within 90 days from the date of the bid opening

SIGNATURE: ___________________________________________ DATE: _____________________

NOTE: This solicitation document is a standard boilerplate form in addition; take into consideration this may not be modified for every solicitation.

The undersigned on the bid proposal certifies that he/she has carefully examined the instructions to bidders, terms and specifications applicable to and made a part of this proposal.

He/she further certifies; the prices shown in the schedule of items on which he/she is bidding, are in accordance with the conditions, terms and specifications of the proposal and that any exception taken thereto may disqualify the bid.

RFP – COOLING TOWER RENOVATION - 010422 Page 4

CITY OF COLLEGE PARK

PURCHASING DEPARTMENT

SIGNATURE: ______________________________________ DATE: ___________________

REF: COOLING TOWER RENOVATION

Show all exceptions and comments below

RFP – COOLING TOWER RENOVATION - 010422 Page 5

E-VERIFICATION AFFIDAVIT

The College Park contract holder, signed below, confirms and verifies its compliance with Georgia law (See OCGA § 13-10-91), and affirmatively states that the business (Sole Proprietor, Partnership, Corporation, Non-Profit, LLC Corporation, or LLC Partnership) which performs services for the College Park: (check and complete #1 or #2 below)

____ 1. Has registered with, is authorized to use, and uses the federal work authorization program commonly known as “E-Verify”, or any subsequent replacement program. Furthermore, the undersigned will continue to use the federal work authorization program throughout the contract period. The undersigned will contract for the physical performance of services for the contract only with subcontractors who present an affidavit to the contract holder with the information required by OCGA § 13-10-91, as amended. The undersigned hereby attests that its federal work authorization user identification number and date for authorization are as follows:

Federal Work Authorization User Identification Number (not Taxpayer ID)

Date of Authorization

Legal Business Name of City of College Park Contract Holder/Applicant

____ 2. Employs no employees, or otherwise does not fall within the requirements of OCGA § 13-10-91.

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on _________________________, 20____ in _______________________________ (city) _______ (state)

Signature of Authorized Owner/Officer

Printed Name and Title of Authorized Owner/Officer

NOTARY PUBLIC

My Commission Expires: _____________________

RFP – COOLING TOWER RENOVATION - 010422 Page 6

RFP DOCUMENT

REQUIREMENTS & CHECKLIST

Complete, sign and submit the following RFP documents in the order listed below. The proposal shall be submitted using the forms included in the RFP document.

1. Form of Proposal completed, signed and dated

2. RFP document requirements & checklist completed, signed and dated

3. One (1) marked “Original”, Two (2) marked “Copy” and One (1) flash drive of the proposal

4. AIA Document A310 Bid Bond (5%)

5. (NOT provided, proposer locates own agency and includes document in bid package)

6. Exceptions Sheet

7. Contract Affidavit

8. Proofs of Insurance (must be included in proposal package)

9. List of subcontractors

10. Reference Request pages

11. Any/All Addenda must be signed, dated and made a part of bid packet

12. Successful bidder acknowledges requirement to provide Performance and

Payment Bond before execution of contract

13. Current Form W-9

14. Purchasing Vendor Questionnaire

1. Is the vendor located within the city limits of College Park? _________

2. Is your company a minority-owned business? ________ if yes, which category? ____________ * Include copy of current MBE certificate(s) in packet

A “Minority Business Enterprise” (MBE) is a business, which is an independent and continuing operation for profit, performing a commercially useful function, owned and/or controlled by one or more minority group member(s).

African American Business Enterprise (AABE), Hispanic Business Enterprise (HBE), Female Business Enterprise (FBE), Asian Business Enterprise (ABE), Native American Business Enterprise (NABE)

3. Has the vendor previously conducted business with College Park? ________

4. Has your company ever been debarred from doing business with any federal, state or local agency?

_______ (If yes, on a separate sheet of paper, provide details including agency name, date(s) and reason for debarment.)

Vendor Contact Name (print) Title

Vendor Contact Signature Date

Faxed, emailed or late proposals will not be accepted

RFP – COOLING TOWER RENOVATION - 010422 Page 7

The City of College Park is not responsible for submissions not properly identified, late or undelivered mail or courier service(s).

The City of College Park Purchasing Department is seeking vendor information to create a database of current and new businesses doing business with the City of College Park. We ask that all vendors take this time to provide the following information so that we can update our records and develop a process to benefit the needs of the community. The information collected from this questionnaire will not be used in the award of bids. The City will continue to utilize a fair, equitable and impartial process and award bids based upon the lowest responsible bidder.

Vendor Name:

Vendor Category:

Physical Address:

City, State, Zip:

Telephone: Fax:

Alternate Phone:

Remit To:

City, State, Zip:

◊ A “Minority Business Enterprise” (MBE) is a business, which is an independent and continuing operation for profit, performing a commercially useful function, which is owned and/or controlled by one or more minority group member(s).

African American Business Enterprise (AABE), Hispanic Business Enterprise (HBE), Female Business Enterprise (FBE), Asian Business Enterprise (ABE), Native American Business Enterprise (NABE)

◊ An “Owned” is a minority or female owner which possesses an ownership interest 51% of the business ◊ A “Controlled” is a minority or female, which possess and exercise the legal authority and power to manage business assets, good will and daily operations of the business and actively and continuously exercise such managerial authority and power in determining the policies and directing the operations of the business.

Classification of your MBE Company (requested) _________________________________________________

RFP – COOLING TOWER RENOVATION - 010422 Page 8

Insurance Requirements

Within ten (10) days of Notice of Award, and at all times that this contract is in force, the contractor shall obtain, maintain and furnish the City of College Park, Certificates of Insurance from licensed companies doing business in the State of Georgia and acceptable to the City of College Park covering:

1. Worker’s Compensation Insurance

2. Comprehensive General Liability Insurance

3. Automobile Liability

4. Umbrella Liability Insurance

Copies of these Certificates of Insurance shall be furnished to the City of College Park prior to execution of the contract. Such policies shall be non-cancellable except on thirty-day (30) written notice to the City of College Park.

Local Preference Policy

Local preference may be given to businesses that have a business location within the geographic boundaries of the City of College Park (Fulton County) as long as all requirements of the bid have been met. Should a local vendor submit a bid proposal that is not more than three percent (3%) greater than the bid of the lowest non-local vendor for bids up to $150,000 or not more than three percent (3%) greater than the bid of the lowest non-local vendor for bids in excess of $150,000, then the local vendor’s bid shall be recommended for approval provided all requirements of the bid proposal/process have been met.

This policy shall not apply to any purchases of materials, equipment or services in excess of $1,000,000. The term business location means that the business has a staffed, fixed, physical place of business located within City of College Park City Limits and has had the same for at least one

(1) year prior to the date of the business’ submission of its proposal or bid, as applicable and has held a valid business license from the City of College Park.

Sealed Bid Delivery Service(s)

If your company elects to use a delivery service (FedEx, UPS, USPS, etc.), the City assumes no responsibility for submittals received after the advertised deadline or at any office or location other than that specified herein, whether due to mail delays, courier mistake, mishandling, or any other reason.

If proposals are delivered other than by hand delivery, it is recommended that the proposer verify delivery. Any proposal received after the specified time and date will not be considered and may be returned unopened to the Proposer.

RFP – COOLING TOWER RENOVATION - 010422 Page 9

Permits (required)

The contractor shall be responsible for all inspections and ensuring compliance with all Federal, State, and County laws and codes. The contractor shall be solely responsible for obtaining all permits. The contract awardee will need to file with the Building & Inspections with the City of College Park projects; there is no cost for the permit.

Basis of Award

The contract, if awarded, will be awarded to the most responsive and responsible bidder, which may not be the lowest response. Each bid must be accompanied by a bid bond, on a surety company’s standard bid bond form acceptable to the City in an amount no less than 5% of the amount bid.

The successful bidder will be required to furnish a performance bond and payment bond, on or before the issuance of Notice to Proceed, each for 100% of the Contract Amount. All other required contract documents must be fully completed and executed by the contractor and his/her Surety, and submitted to the Owner on or before the issuance of the Notice to Proceed.

The performance bond shall remain in effect for one (1) year after final acceptance of the work or the guaranty period under the agreement, whichever is the larger. The payment bond shall remain in effect for the period required under Georgia law for the payment bonds on public construction agreements. Do not date these bonds, the City will date this bond the same date or later than the date of the Agreement.

Professional Licenses (if applicable)

The State of Georgia requires that the following professions be required by state law to be licensed:

1. Electricians

2. Plumbers

3. Conditioned Air Contractors

4. Low voltage Contractors

Bidders and any sub-contractors performing any of the above-described work must provide a copy of current license(s) for the work they will perform on this project.

Ethics Hotline

The City of College Park has an ethics hotline for anyone with the knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities, anonymously online or by phone.

Phone: 1-844-714-0962

Online: collegeparkga.ethicspoint.com

RFP – COOLING TOWER RENOVATION - 010422 Page 10

Subcontractor

I will / will not propose to subcontract some of the work on this project? _________________ (response) I propose to subcontract work to the following:

Note:

1. The City of College Park requires the (primary) contracted vendor to complete no less than fifty-one (51) percent of the proposed projected.

2. It is the sole responsibility of the prime contractor to ensure any/all subcontractors are properly insured for the type and amount of work completing under the contract.

Subcontractor Print Name

Brief Description of Work to be Performed by Subcontractor

Percent of Work

RFP – COOLING TOWER RENOVATION - 010422 Page 11

Subcontractor Affidavit Under O.C.G.A. § 13-10-91(b)(3)

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10- 91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with _____________________________________________ (name of subcontractor) on behalf of THE CITY OF COLLEGE PARK, GEORGIA has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b).

Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice of receipt of an affidavit from any sub-subcontractor that has contracted with a sub-subcontractor to forward, within five business days of receipt, a copy of such notice to the contractor.

Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number (not Taxpayer ID)

Date of Authorization

Name of Contractor

Name of Project

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on _________________________, 20____ in _______________________________ (city) _______ (state)

Signature of Authorized Owner/Officer

Printed Name and Title of Authorized Owner/Officer

NOTARY PUBLIC

My Commission Expires: _____________________

RFP – COOLING TOWER RENOVATION - 010422 Page 12

Reference Request

The following references are from current and past government, educational and/or commercial accounts of similar size and scope. Your list should consist of a minimum of five (5) references, and will not include the City of College Park. Nor should your references be current of former City of College Park employees.

REFERENCE # 1:

Name of Company/Entity: _______________________________________________________

City/State: ___________________________________________________________________

Contact Person Name: __________________________________________________________

Contact Email: ________________________________________________________________

Contact Person Telephone Number: ________________________________________________

Date When Work Performed: _____________________________________________________

Brief Description of Work Performed _______________________________________________

REFERENCE # 2:

Name of Company/Entity: _______________________________________________________

City/State: ___________________________________________________________________

Contact Person Name: __________________________________________________________

Contact Email: ________________________________________________________________

Contact Person Telephone Number: ________________________________________________

Date When Work Performed: _____________________________________________________

RFP – COOLING TOWER RENOVATION - 010422 Page 13

REFERENCE # 3:

City/State: ___________________________________________________________________

Contact Person Name: __________________________________________________________

Contact Email: ________________________________________________________________

Contact Person Telephone Number: ________________________________________________

Date When Work Performed: _____________________________________________________

Brief Description of Work Performed _______________________________________________

REFERENCE # 4:

Name of Company/Entity: _______________________________________________________

City/State: ___________________________________________________________________

Contact Person Name: __________________________________________________________

Contact Email: ________________________________________________________________

Contact Person Telephone Number: ________________________________________________

Date When Work Performed: _____________________________________________________

REFERENCE # 5:

City/State: ___________________________________________________________________

Contact Person Name: __________________________________________________________

Contact Email: ________________________________________________________________

Contact Person Telephone Number: ________________________________________________

Date When Work Performed: _____________________________________________________

RFP – COOLING TOWER RENOVATION - 010422 Page 14

Non-Collusion

By signing below, I certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a bid for same materials, supplies or equipment, and is in all respects fair and without collusion or fraud. I understand that collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards. I agree to abide by all conditions of this bid, and certify that I am authorized to sign this bid for the bidder.

In addition, the selected company will be required to comply with all existing State and Federal laws, including applicable equal opportunity employment provisions. The Contract between the company and the City shall be construed and governed in accordance with the law of the State of Georgia and the City of College Park. The company, at its own expense, shall secure all occupational and professional licenses and permits necessary for the fulfillment of its obligations under this contract.

It shall be unethical for any City Employee or City Official to transact any business or participate directly or indirectly in a procurement contract when the City Employee or City Official knows;

the City Employee or City Official or immediate family of such has a substantial interest pertaining to the procurement contract, except that the purchase of goods and services from businesses, which a member of the city council or other City Employee has a substantial interest is authorized as per O.C.G.A. § 36-1-14, or the procurement contract is awarded pursuant to O.C.G.A. § 45-10-22 and § 45-10-24, or the transaction is excepted from said restrictions by O.C.G.A. § 45-10-25, interpreting such statutes as if they were applicable to a municipality.

Vendor Name:

Physical Address:

City, State, Zip

Phone: Fax:

Signature:

Date:

RFP – COOLING TOWER RENOVATION - 010422 Page 15

PURPOSE and SCOPE of WORK

GENERAL PURPOSE

The Georgia International Convention Center (GICC) is looking to contract a licensed and company/firm to complete a cooling tower renovation.

SCOPE of WORK

Furnish the labor and materials to renovate cooling tower and cells 1 and 2 of the GICC BAC Cooling Towers - Baltimore Aircoil Co. Model # 33485-2, Serial # U014576402.

The project will include the replacement of the top hot deck basins and weirs, the interior fill cells, two (2) new belts, two (2) new basin drain screens, and the cleaning and installation of a new elastomeric surface coating to the cold basins.

Installation is to be completed by the contract supplier in accordance with all manufacturers’ specifications. The work shall be completed to allow for the necessary operation of the cooling systems during the project.

The following will be included, but not limited to, the completion of the project:

1. Project and Jobsite Mobilization

a. Provide all labor, engineering, equipment, tools, delivery costs, freight, and materials required to complete the project.

b. Provide for the removal and replacement of all conduit and insulation to complete the project.

c. Coordinate the project to be completed in a timely manner with minimum interference to building systems and operations.

d. Supply project start up and insure equipment operation to the manufacturers specifications.

e. Project to be completed to the owner’s satisfaction.

2. Hot Water Basin Replacement

a. Remove existing galvanized hot water basin assemblies.

b. Furnish and install new manufacturers authorized hot water basin assemblies, weirs, and covers.

c. Furnish and install new distribution nozzles and metering devices.

3. Cold Water Basin Coating

a. Remove the existing fill cell materials, supports, and brackets from both cells.

b. Clean the cold-water basins and grind the surfaces to allow for the new surface coatings.

c. Repair any deficiencies found to the structure of the basin.

d. Prepare the internal surfaces to insure the proper adhesion of the coating.

e. Furnish and install new manufacturers approved elastomeric urethane membrane to the cold-water basins.

f. Include cold water basin sides, connector flumes, and the areas under the water fill.

RFP – COOLING TOWER RENOVATION - 010422 Page 16

4. Fill Materials Replacement

a. Furnish and install new Brentwood XF-75 PRO PVC fill material with integral louvers and drift eliminators

b. Furnish and install new fill brackets and supports.

5. New Belts and Basin Drain Screens

a. Furnish and install two (2) new belts, adjust and align belts.

b. Furnish and install two (2) new basin drain screens.

c. All parts provided to be manufacturers specified materials.

6. Provide Jobsite Cleanup

a. Provide dumpsters as needed to dispose of all old parts and debris materials.

b. The entire cooling tower shall be cleaned and surfaces touched up as needed to provide a like new appearance.

c. The job site shall be cleaned daily and entire area broom swept and cleaned at project completion.

7. Provide a full 1-year warranty on all materials, labor, and workmanship for the project.

RFP – COOLING TOWER RENOVATION - 010422 Page 17

Form of Proposal

To: The City of College Park College Park, GA 30337

I/We the undersigned hereby offer and agree to supply and deliver the service(s) as outlined in the Request for Proposal documents. The signatures(s) below dignify the I/We have read and agree with the procedures outlined in the Request for Proposal documents.

Proposal Submitted By:

Company Name

Address

City, State, Zip

Phone

Email

Website

Print/Type Name

Signature

Title

Date

RFP – COOLING TOWER RENOVATION - 010422 Page 18

QUOTE SHEET

Bidding Company:

Company Rep:

Project Name: Cooling Tower Renovation

ITEM DESCRIPTION LUMP SUM COST

GRAND TOTAL

BIDDERS SIGNATURE DATE

RFP – COOLING TOWER RENOVATION - 010422 Page 19

Other files

File Type Posted
Bid Open Details —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .