About this file
This is a Request for Proposals (RFP) issued by the City of Peachtree City, Georgia, for the development of a comprehensive plan to guide the municipality's long-term growth, development, and implementation priorities. The city seeks qualified, experienced, and licensed individuals or firms to prepare a 2027 Comprehensive Plan Update that builds upon Peachtree City's history as a planned community while establishing forward-looking frameworks for land use, redevelopment, transportation, housing, economic development, infrastructure investment, environmental stewardship, and community facilities. The RFP was released on September 29, 2026, with a proposal submission deadline of October 29, 2026, at 3:00 p.m. EST. Questions must be submitted by October 21, 2026, with final addenda issued by October 23, 2026. Optional proposer interviews are scheduled tentatively for November 16–20, 2026, with city council approval anticipated in December 2026 and contract execution and service commencement in January 2027. The consultant shall provide a comprehensive project management plan, existing conditions assessment, draft and final comprehensive plans in multiple formats, ARC/DCA review materials, ten professionally printed copies of the adopted plan, and all supporting maps, GIS data, graphics, and engagement documentation. The overall project completion timeline is anticipated at eight months, with the entire process from authorization through adoption to be completed within twelve months.
The RFP does not specify a fixed contract price; instead, offerors must submit cost proposals using the provided Cost of Services Proposal Form detailing all-inclusive hourly rates for labor/personnel, material/equipment, and miscellaneous expenses, with a grand total cost to be determined by the selected contractor. Selection will be based on weighted evaluation criteria: qualifications and experience (25 percent), project approach and methodology (30 percent), public engagement strategy (15 percent), cost proposal (20 percent), and project management and schedule (10 percent). Prior to contract award, the selected contractor must provide proof of good financial standing and furnish certificates of insurance meeting specified requirements, including Commercial General Liability coverage of $2,000,000, Comprehensive Automobile Liability of $1,000,000, Umbrella coverage of $1,000,000, and Workers' Compensation Insurance. All contractors must comply with the Georgia Security and Immigration Compliance Act, register with E-Verify, and provide a notarized affidavit confirming participation in the federal work authorization program. Contractors are required to list any project terminations from the previous five years and must not be in arrears to Peachtree City or any other governmental entity. The city reserves the right to negotiate fees, reject any or all proposals, and cancel the RFP at its discretion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
COMPREHENSIVE PLAN FOR THE
CITY OF PEACHTREE CITY
RFP Number 27-104PDS
Request for Proposals to Develop a Comprehensive Plan for the City of Peachtree City, GA.
Released On: September 29, 2026 Due On: October 29, 2026, 3:00 pm local time
Comprehensive Plan RFP Number 27-104PDS 1 of 15
Contents
Contents
Introduction
Purpose of Proposal
Schedule
Single Point of Contact
Scope of Work
Comprehensive Plan Deliverables
Comprehensive Plan Task……………………………………………………………………………………...………….. 5
Comprehensive Plan Project Timeline
Proposal Format
Packaging of Proposal
Number of Proposal Copies
Submittal Requirements
Contents of Proposal
Offeror Qualifications & Selection Criteria
Evaluation
Terms and Conditions
RFP Information
Webpage
Financial Standing
Insurance Requirements
Required Forms
Certification of RFP Submittal and Acknowledgement of Addenda
Georgia Illegal Immigration Reform and Enforcement Act (IIREA) Form
Terminations Form
Cost of Services Proposal Form
Attachment A – RFP Certification Form
Attachment B – E-Verify Form
Attachment C – Terminations Form
Attachment D - Cost of Services Proposal
Attachment E – Links to Relevant Documents
Comprehensive Plan RFP Number 27-104PDS 2 of 15
Introduction Purpose of Proposal Chartered in 1959, Peachtree City is Georgia’s first and premier planned community. Consisting of 24 square miles and 38,000 residents, the city is also home to the largest concentration of employment and industrial corporations in Fayette County. Known nationally for its comprehensive paved path system and over 14,000 registered golf carts, the city is also home to three beautiful lakes and over 3,700 acres of preserved greenspace.
The city is seeking qualified, experienced and licensed individuals or firm to assist in updating a Comprehensive Plan.
Peachtree City (hereinafter referred to as the “City”) invites qualified firms to submit proposals for a Comprehensive Plan Update to guide the City’s long-term growth, development, and implementation priorities.
Proposals submitted in response to this solicitation must comply with the instructions and procedures contained herein.
Schedule
The Request for Proposals (RFP) schedule is as follows. The city reserves the right to alter the schedule if deemed necessary:
MILESTONE DEADLINE DATE
RFP advertised September 29, 2026
Deadline for question submission October 21, 2026, by 5:00 PM EST
Final Addenda to RFP issued (if any) October 23, 2026, by 5:00 PM EST
Deadline for submitting proposals October 29, 2026, by 3:00 PM EST
Proposer interviews (optional) Tentative November 16 through 20, 2026
Council approves selection December 2026
Executed contract & services begin
January 2027
Single Point of Contact From the issue date of the solicitation document and until a Contractor is selected and the selection is made public, Contractors are not allowed to communicate for any reason with any City staff or elected official with the exception of the Purchasing Manager, or as provided on existing contracts. For violation of this provision, the city may reject any proposal of the offending offeror.
All questions concerning this RFP must be submitted via email or writing to the city’s Purchasing Manager:
Angela Egan 151 Willowbend Road Peachtree City, GA 30269 aegan@peachtree-city.org
Questions and clarification requests must be received by October 21, 2026, at 5:00 PM EST. Answers and clarifications issued by the city will be in the form of an addendum to the proposal instructions and will be issued to all known potential offerors and placed on the city’s website no later than October 23, 2026, at 5:00 PM EST. It is the proposer’s responsibility to ensure that they have all applicable addenda prior to submittal. This may be accomplished via contact with the Purchasing Manager via email or by visiting the city’s website prior to submittal.
mailto:aegan@peachtree-city.org
Comprehensive Plan RFP Number 27-104PDS 3 of 15
Scope of Work The City of Peachtree City, Georgia (“City”) seeks professional planning services to prepare its 2027 Comprehensive Plan Update. The Plan shall build upon Peachtree City’s history as a thoughtfully planned community while establishing a forward-looking framework to guide land use, redevelopment, transportation, housing, economic development, infrastructure investment, environmental stewardship, community facilities, and quality of life.
The Consultant shall perform, at a minimum, the following services:
1. Project Management and Planning Framework
The planning framework shall incorporate best practices and innovative planning approaches tailored specifically to Peachtree City’s unique development pattern, community character, multi-use path system, environmental resources, established neighborhoods, commercial and employment centers, and future redevelopment opportunities.
2. Existing Conditions and Previous Planning Efforts
Review and analyze relevant existing plans, ordinances, policies, projects, studies, regulations, manuals, demographic information, development trends, and other documents that may influence the Comprehensive Plan.
At a minimum, the review shall consider:
• The 2022 Peachtree City Comprehensive Plan;
• Existing and/or proposed Unified Development Ordinance (UDO);
• Future Land Use and Character Area Maps;
• Transportation and Multi-Use Path Plans;
• Current Capital Improvements Element (CIE); and
• Parks and Recreation Master plans
The Consultant shall identify areas of consistency, conflict, duplication, gaps, and opportunities for improved coordination among existing City plans and policies.
3. Community Engagement and Public Participation
Develop and implement a comprehensive community engagement strategy that meets or exceeds the requirements of the Georgia Department of Community Affairs (DCA) Minimum Standards and Procedures for Local Comprehensive Planning.
The engagement strategy shall:
• Engage a broad and diverse range of community stakeholders throughout the planning process.
• Clearly communicate the purpose, process, key findings, and long-term considerations of the
Comprehensive Plan.
• Utilize a variety of traditional and innovative engagement methods, including in-person and online opportunities.
• Promote inclusive participation and outreach to underrepresented populations.
Comprehensive Plan RFP Number 27-104PDS 4 of 15
• Coordinate with City staff on communications, meeting materials, public notices, and outreach efforts.
4. Comprehensive Plan Development Work with City staff, elected officials, appointed boards, the Steering Committee, stakeholders, and the community to prepare a Comprehensive Plan that satisfies or exceeds applicable DCA requirements and establishes a clear long-range vision for Peachtree City.
The Plan shall address all required elements under applicable state planning requirements and shall include, at a minimum:
• Population;
• Community Vision and Goals;
• Community Needs and Opportunities;
• Land Use and Character Areas;
• Economic Development;
• Housing;
• Transportation and Mobility;
• Natural and Cultural Resources;
• Community Facilities and Services;
• Broadband and emerging technology, as applicable;
• Capital Improvement Element;
• Community Work Program;
• Report of Accomplishments; and
• Other required or locally desired elements.
The Consultant shall develop recommendations that are specific, practical, measurable, and capable of implementation through City policies, regulations, capital investments, partnerships, programs, and future planning initiatives.
5. Meeting and Presentation Materials The Consultant shall:
• Prepare and provide all materials necessary for public, stakeholder, Steering Committee, Planning Commission, and City Council meetings, with draft materials submitted to City staff in advance for review and approval;
• Document participation, key themes, public comments, recommendations, and resulting revisions following each engagement activity; and
• Facilitate bi-weekly coordination meetings with the Project Manager and relevant City staff and shall provide a written summary following each meeting.
6. Regulatory Compliance and Plan Approval Prepare a final Comprehensive Plan that satisfies all applicable requirements of Chapter 110-12-1, Minimum Standards and Procedures for Local Comprehensive Planning, and other applicable state and regional planning requirements.
The Consultant shall coordinate with the City, Atlanta Regional Commission (ARC), and Georgia Department of Community Affairs (DCA), as necessary, throughout the review process and shall revise the Plan to address applicable review comments.
7. Public Hearings and Adoption
Comprehensive Plan RFP Number 27-104PDS 5 of 15
In addition to community engagement activities, the Consultant shall attend required public hearings and meetings before the Planning Commission and/or City Council, as requested by the City.
The Consultant shall prepare and deliver presentations, respond to questions, document comments, and make necessary revisions through final adoption of the Comprehensive Plan.
DELIVERABLES
The Consultant shall provide, at a minimum:
1. Project Management and Engagement Plan – Project schedule, milestones, public engagement strategy, required meetings, review periods, and anticipated adoption schedule.
2. Existing Conditions, Needs and Opportunities Assessment – Analysis of relevant community conditions, trends, needs, opportunities, and priorities.
3. Draft Comprehensive Plan – Draft document for City, stakeholder, public, Planning Commission, and City Council review, provided in editable and PDF formats.
4. ARC/DCA Review and Revisions – Plan materials for formal transmittal and revisions necessary to address applicable review comments.
5. Final Comprehensive Plan – Adoption-ready Plan incorporating approved revisions, provided in editable/native, PDF, and web-optimized formats.
6. Final Project Materials – All supporting maps and GIS data, tables, datasets, graphics, engagement results, meeting materials, presentations, and executive summary in applicable editable and digital formats.
7. Printed Plans – Ten (10) professionally printed and bound copies of the adopted Comprehensive Plan, unless otherwise directed by the City.
TASKS – PLAN REVIEW, TRANSMITTAL AND ADOPTION
The Consultant shall:
1. Prepare a complete draft Comprehensive Plan for City review.
2. Present the draft Plan to the Steering Committee, Planning Commission, City Council, and public, as directed by the City.
3. Incorporate appropriate comments received through the public and City review process.
4. Prepare all materials necessary for formal transmittal to ARC and DCA.
5. Respond to applicable ARC and DCA comments and revise the Plan as necessary to obtain approval.
6. Prepare the final adoption draft.
7. Attend the required City Council adoption meeting and provide a presentation and technical assistance, as requested.
Comprehensive Plan RFP Number 27-104PDS 6 of 15
8. Following adoption, provide the City with the final adopted Comprehensive Plan and all supporting digital files, GIS data, graphics, tables, presentations, engagement documentation, and other project materials.
PROJECT TIMELINE
The overall timeline for the completion of the Comprehensive Plan is anticipated to be eight (8) months, not including the adoption process. The entire process from authorization, commencement, and approval of the Comprehensive Plan should be completed within 12 months. As a submittal requirement, the applicant will provide a project schedule showing key task target dates, including public meeting and hearings with estimated task duration. Variations from the city's established timeline should be discussed in the RFP.
Proposal Format Packaging of Proposal Clearly label the outside of the shipping package/ envelope as follows:
• Name of Firm/ Contractor submitting the proposal
• Name Primary Point of Contact for Consultant
• RFP Number RFP #26-104PDS
Number of Proposal Copies The Offeror shall submit one original (conspicuously marked “Original”), five (5) copies, and one flash drive containing an electronic copy in a single PDF document of their written proposal.
Submittal Requirements Proposals must be received no later than October 29, 2026, no later than 3:00 p.m. EST to:
Peachtree City Attn: Purchasing Manager, Angela Egan 151 Willowbend Road Peachtree City, GA 30269
All proposals must be received by the city by the due date and time; it is not sufficient to show that the submittal was mailed in time to be received before the scheduled RFP closing time.
Contents of Proposal Provide a written proposal that presents your qualifications and understanding of the work to be performed. Include all information requested, clearly identified in a table of contents as described in the paragraphs that follow. Any other information thought to be relevant but not applicable to the enumerated categories may be provided as separate appendix to the proposal.
The proposals will be opened at the time and place and the name of each Proposer shall be announced. Proposals received after the set time will not be considered.
No proposals may be withdrawn for a period of sixty days (60) after the scheduled time to receive proposals.
Comprehensive Plan RFP Number 27-104PDS 7 of 15
A. Agents and Address Identify who will be the project manager and key staff assigned if awarded. Provide resumes summarizing the qualifications and experience of the individuals who will be conducting the work.
B. Similar or Related Projects and References Describe at least two (2) jurisdictions where similar or related services have been performed within the last three (3) years and include the name, address, telephone number, and an e-mail address for reference checks.
C. Project Approach Provide a statement describing the Scope of Work as you understand it. Describe the approach, means, methods, and procedures to be used to perform the services. Include any information demonstrating understanding and insights related to the Scope of Work.
D. Start Date Provide a start date.
E. Cost of Services Provide a completed Cost of Services Proposal form, Attachment D.
F. Additional Services (Optional) Provide any other related and recommended products or services not specified in this RFP which may be considered essential or beneficial by the Contractor. These services should be priced separately from the “Cost of Services” above.
G. Required Forms The completed required forms listed below shall be initial and signed as required. Sample forms are attached at the end of the document.
(1) Certification of RFP and Acknowledgement of Addenda (Attachment A)
(2) Georgia Illegal Immigration Reform and Enforcement Act Form (Attachment B)
(3) Terminations Form (Attachment C)
H. Sample Contract Proposer shall include a proposed contract.
Forms and affidavits required by this subsection shall be considered an open public record once a public employer has entered into a contract for services; provided, however, that any information protected from public disclosure by federal law shall be redacted.
Offeror Qualifications & Selection Criteria The city may make such investigations as deemed necessary to determine the ability of the offeror to provide the supplies and/or perform the services specified.
Contractors interested in providing the services described in this RFP shall be able to demonstrate experience and staff expertise in these areas:
• Experience in developing a unified development ordinance.
• Public participation and facilitation skills
Comprehensive Plan RFP Number 27-104PDS 8 of 15
• General knowledge of various local, Georgia Statutes, and Federal Regulations as they relate to land-development–related ordinances
• Statement of availability and location of key personnel to work on study and percentage of time key staff will be assigned to project
• Resumes of key personnel proposed to participate in the project including educational background and history
• A complete list of all relevant work performed for public entities for the past ten (10) years including Client names, and year of service
• Work samples (optional)
The selection will be based on the qualifications of the consultant team, the quality and price of the Proposal.
However, Peachtree City reserves the right to call references provided in the submittal and to require phone or personal interviews with firms requiring additional evaluation. It is the city’s intention to have a panel review the sealed proposal. The following weighted criteria will be used for the evaluation:
WEIGHT % ITEM
25 Qualifications and experience
• Demonstrated expertise in zoning, subdivision, ordinance drafting, and similar projects.
• Proximity and availability of key personnel
30 Project Approach/Methodology
• Quality of the proposed process for consolidating ordinances, integrating graphics, and ensuring usability.
15 Public Engagement
• Strategy for outreach, facilitation, and incorporating community feedback.
20 Cost Proposal
10 Project Management/Schedule
• Ability to meet deadlines, coordinate with staff, and manage resources effectively.
Evaluation Peachtree City reserves the right, in its sole discretion, to reject or accept any submittal it considers to be non-responsive. Should Peachtree City fail to reach an agreement with any firm or contractor initially selected the city reserves the right to commence negotiations with the next highest ranked firm or contractor. Peachtree City may select a contractor without an interview or may choose to interview all or a limited number of applicants.
The city will exercise its discretion in awarding the contract to the company who best satisfies the needs of the city.
The city also reserves the right to reject any and all proposals and to waive any and all irregularities. The city’s policy and procedures for this process are available in the Purchasing Department for inspection.
Comprehensive Plan RFP Number 27-104PDS 9 of 15
Terms and Conditions
• No person or business entity shall on the grounds of race, color, national origin, sex, age, or handicap/disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity conducted by the city.
• The city reserves the right to reject any and all proposals, to waive any and all irregularities or informality in a proposal, and to accept or reject any item or combination of items, when to do so would be to the advantage of the city. It is also within the right of the city to reject proposals that do not contain all elements and information requested in the RFP.
• The city reserves the right to cancel this RFP at any time.
• Ownership of all data, materials, and documentation prepared for and submitted to the city in response to this request for proposal shall belong exclusively to the city and will be considered a record prepared and maintained or received in the course of operations of a public office or agency and subject to public inspection in accordance with the Georgia Open Records Act, Official Code of Georgia Annotated, Section 50-18-70, et. seq., unless otherwise provided by law.
• Proposals will not be accepted from any person, firm, or corporation who is in arrears in any debt or obligation to Peachtree City or any other governmental entity.
• Compliance with Laws: In connections with the furnishing of supplies or performance of work under the contract, the Offeror agrees to comply with the Fair Labor Standards Act, Equal Opportunity Employment Act, Georgia Security and Immigration Compliance Act, and all other applicable Federal and State laws, regulations, and executive orders to the extent that the same may be applicable and further agrees to insert the foregoing provision in all subcontractors awarded hereunder.
• Right to negotiation: The city reserves the right to negotiate with the selected Offeror the fee for the proposed scope of work and the exact terms and conditions of the contract.
• The logo of Peachtree City is protected and may not be used in submissions to the city. When using a logo, proposers should use their corporate logos only.
• Proposal Withdrawal: A submitted proposal may be withdrawn prior to the due date by a written request to the Purchasing Agent. No proposals may be withdrawn for a period of sixty
(60) days after the scheduled time to receive the proposal.
• Cost of Preparing Proposals: The cost for developing the proposal is the sole responsibility of the Offeror. Peachtree City will not provide reimbursement for such costs
• The city’s policy and procedures for this process are available in the Purchasing Department for inspection.
RFP Information
Webpage The city’s website is www.peachtree-city.org
RFP postings are available at https://www.peachtree-city.org/Bids.aspx?CatID=16 http://www.peachtree-city.org/ https://www.peachtree-city.org/Bids.aspx?CatID=16
Comprehensive Plan RFP Number 27-104PDS 10 of 15
Financial Standing Proposals will not be accepted by any person, firm or corporation who is in arrears in any debt or obligation to the city of Peachtree City or any other governmental entity.
The contractor selected must be able, if requested, to provide proof that they are in good financial standing.
Insurance Requirements Prior to the award of a contract, the Contractor shall furnish a Certificate of Coverage or other proof that it has the following insurance with the city named as additional insured that must remain in force for a period of at least one year after completion of the work:
• Commercial General Liability, Contractual Liability, Products/Complete Operations Liability, Owners and Contractors Protective Liability, Errors and Omissions, and Personal Injury Liability Insurance - $2,000,000 Combined Single Limit Bodily Injury and Property Damage – each occurrence.
• Comprehensive Automobile Liability Insurance - $1,000,000 Combined Single Limit Injury and Property Damage Liability – each occurrence.
• Umbrella - $1,000,000
• Workers’ Compensation Insurance - $100,000 Bodily Injury by Accident – each accident;
$500,000 Bodily Injury by Disease – policy limit; and $100,000 Bodily Injury by Disease – each employee.
Required Forms Certification of RFP Submittal and Acknowledgement of Addenda See Attachment A
The person that signs the RFP shall have the authority to negotiate the full scope of services on behalf of the organization and shall be authorized to bind the contract to the terms and conditions of this RFP.
Georgia Illegal Immigration Reform and Enforcement Act (IIREA) Form See Attachment B
In compliance with Georgia Security & Immigration Compliance Act of 2006 – O.C.G.A. 13-10-91, no public employer shall enter into a contract pursuant to this chapter for the physical performance of services within this state unless the contractor registers and participates in the federal work authorization program to verify information of all newly hired employees or subcontractors. Before a bid for any such service is considered by a public employer, the bid shall include a signed, notarized affidavit from the contractor attesting to the following:
(A) The affiant has registered with and is authorized to use the federal work authorization program;
(B) The user identification number and date of authorization for the affiant; and
(C) The affiant is using and will continue to use the federal work authorization program throughout the contract period.
Comprehensive Plan RFP Number 27-104PDS 11 of 15
Terminations Form See Attachment C
Interested Offerors are required to list each and every project within the previous five (5) years on which it was terminated by the jurisdiction.
Cost of Services Proposal Form See Attachment D
All offerors are required to use this form. Cost proposals for additional proposed services may be attached as a separate page.
Cost proposals for additional proposed services may be attached as a separate page.
Comprehensive Plan RFP Number 27-104PDS 12 of 15
Attachment A – RFP Certification Form The undersigned declares that she or he is an authorized agent of the company or firm listed as the primary offeror; has carefully examined all the documents contained in this Request for Proposals (RFP) solicitation for the project; and certifies to the best of her/his knowledge that this Proposal fully complies with the requirements of the RFP and all addenda and clarifications issued in regard to the
RFP.
The undersigned also hereby certifies that no person acting for or employed by Peachtree City is directly or indirectly interested in this Proposal or any subsequent proposal, or in any contract which may be made under it, or in expected profits to arise therefrom; that the undersigned Offeror has not influenced or attempted to influence any other person or corporation to file a Proposal or any subsequent proposal or any other person or corporation; and that this submission is made in good faith without collusion or connection with any other person or corporation applying for the same work under a different Proposal.
The undersigned states that she or he has the necessary licenses, certifications, and professional credentials necessary to practice their respective professions within the State of Georgia.
Acknowledgement of Addenda. By Signing below, the interested Offerors acknowledges receipt of the following addenda to this RFP:
Addenda No. (if any) _______________________________
SIGNED UNDER THE PENALTY OF PERJURY:
Signature: __________________________________________ (Signature of Authorized Agent)
Print Name: __________________________________________
Title: __________________________________________
Firm Name: __________________________________________
Date: __________________________________________
Project Name: __________________________________________
Nearest Office Location to Peachtree City: __________________________
Comprehensive Plan RFP Number 27-104PDS 13 of 15
Attachment B – E-Verify Form Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)
The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13- 10-91, attesting as follows:
a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;
b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;
c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;
d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;
e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);
f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor; and
g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers’ licenses and ID cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.
Federal Work Authorization User Identification Number Date of Authorization
Name of Contractor Name of Project
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _________, _____, 20_____ in _______________ (city), __________ (state).
Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent
SUBSCRIBED AND SWORN BEFORE ME
ON THIS THE _______ DAY OF _____________, 20______.
NOTARY PUBLIC
My Commission Expires: _____________________________
Comprehensive Plan RFP Number 27-104PDS 14 of 15
Attachment C – Terminations Form
Project Name
Contracted With Contract Amount
Start Date End Date
Reason for Termination
Project Name
Contracted With Contract Amount
Start Date End Date
Start Date End Date
Start Date End Date
Comprehensive Plan RFP Number 27-104PDS 15 of 15
Attachment D - Cost of Services Proposal The undersigned have become thoroughly familiar with the terms and conditions affecting the performance and costs of the work and hereby proposed and agrees to fully perform the work in strict accordance with the listed Scope of Work, including furnishing any and all labor, material, and equipment to provide the services, as outlined, and any other miscellaneous expenses involved.
Fee Structure for Labor/Personnel This rate should be an all-inclusive rate.
PERSONNEL ALL-INCLUSIVE HOURLY RATE
Total Cost: $________________
Fee Structure for Material/Equipment
MATERIAL/EQUIPMENT ALL-INCLUSIVE RATE
Total Cost: $_________________
Fee Structure for Miscellaneous Expenses
MISCELLANEOUS EXPENSES ALL-INCLUSIVE RATE
Total Cost: $________________
Grand Total Cost: $_____________________________
Comprehensive Plan RFP Number 27-104PDS 16 of 15
Attachment E – Link to Relevant Documents
Zoning ordinance:
https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXAZO_ARTXVLEST
PR_S1501ZOORSHCO
Official Zoning Map https://ptcgis.maps.arcgis.com/apps/webappviewer/index.html?id=f85aecbbc90147808d1496772c5ab857
Land Development Ordinance:
https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXBLADEOR
Buildings and Construction Code:
https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_CH18BUCO
Sign Code https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_CH66SI
Short-term Rental Ordinance https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXAZO_ARTIXGEPR
_S917SHTERE
chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.peachtree-city.org/DocumentCenter/View/26161/Ordinance_STR_Permit?bidId=
Annexation Ordinance https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXCAN
Comprehensive Plan:
https://www.peachtree-city.org/1186/Comprehensive-Plan https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXAZO_ARTXVLESTPR_S1501ZOORSHCO https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXAZO_ARTXVLESTPR_S1501ZOORSHCO https://ptcgis.maps.arcgis.com/apps/webappviewer/index.html?id=f85aecbbc90147808d1496772c5ab857 https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXBLADEOR https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_CH18BUCO https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_CH66SI https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXAZO_ARTIXGEPR_S917SHTERE https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXAZO_ARTIXGEPR_S917SHTERE https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances?nodeId=PTIICOOR_APXCAN https://www.peachtree-city.org/1186/Comprehensive-Plan
| Contents |
| Introduction |
| Purpose of Proposal |
| Single Point of Contact |
| Scope of Work |
| Proposal Format |
| Packaging of Proposal |
| Number of Proposal Copies |
| Submittal Requirements |
| Contents of Proposal |
| A. Agents and Address |
| B. Similar or Related Projects and References |
| C. Project Approach |
| D. Start Date |
| E. Cost of Services |
| F. Additional Services (Optional) |
| G. Required Forms |
| H. Sample Contract |
| Offeror Qualifications & Selection Criteria |
| Evaluation |
| Terms and Conditions |
| RFP Information |
| Webpage |
| Financial Standing |
| Insurance Requirements |
| Required Forms |
| Certification of RFP Submittal and Acknowledgement of Addenda |
| Georgia Illegal Immigration Reform and Enforcement Act (IIREA) Form |
| Terminations Form |
| Cost of Services Proposal Form |
| Attachment A – RFP Certification Form |
| Attachment B – E-Verify Form |
| Attachment C – Terminations Form |
| Attachment D - Cost of Services Proposal |
| Total Cost: $________________ |
| Total Cost: $_________________ |
| Total Cost: $________________ |
| Grand Total Cost: $_____________________________ |
Attachment E – Link to Relevant Documents