RFP_BR Irrigation System.pdf
PDF 782 KB Posted
- Attached to
- BIRCH RUN SPORTS IRRIGATION SYSTEMS
- Solicitation number
- RFP BIRC 220000000050 2
- Issued by
- Saginaw County, Michigan
About this file
This is a Request for Proposal (RFP) issued by Birch Run Area Schools in Michigan for the design and installation of sports irrigation systems across multiple athletic facilities. The project encompasses installing new well points, sprinkler heads, and control systems at the Baseball, Softball, and Football Practice fields at the High School sports complex, as well as a new irrigation system at the Soccer field located at Marshal Green Middle School. The scope of work includes all materials, labor, installation, permits, and documentation required for compliance with local authorities having jurisdiction. Proposals must be submitted to the Office of the Superintendent at 12450 Church Street, Birch Run, Michigan 48415 by October 28, 2021 at 3:30 PM. An original and one copy of the proposal shall be submitted in a sealed envelope addressed to Mr. David Bush, Superintendent. Proposers may not withdraw their proposals for ninety (90) days from the opening date. The School District reserves the right to accept or reject any and all proposals and to award the contract to the proposer whose proposal best complies with project requirements.
The RFP requires bidders to provide comprehensive insurance coverage including Worker's Compensation at Michigan statutory limits, Commercial General Liability of $2,000,000 per occurrence, Automobile Liability of $1,000,000 each for bodily injury and property damage, and Umbrella/Excess Liability of $2,000,000. Contractors must provide a one-year warranty on system operation and include training upon system completion, with recorded instruction recommended for future district operations. The design specifications call for irrigation systems based on 55 gallons per minute (GPM) at 80 pounds per square inch (PSI), utilizing Hunter brand equipment including controllers, sprinkler heads, and PVC piping in various sizes totaling approximately 8,001 linear feet. The base bid includes expansion modules for the existing Rain Bird controller on the Softball field, while Alternate 1 offers an upgrade to a Hunter HCC controller with EZ-Decoder system and variable frequency drive pump controls. The contractor must coordinate construction timing with a new Pole Barn Storage Unit at the Soccer field and ensure the district provides 120-volt electrical power to controllers. Upon completion, the contractor must drain and winterize the system and restore existing site conditions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
2021 BIRCH RUN
SPORTS
IRRIGATION
SYSTEMS
Birch Run Area Schools October 5, 2021
Questions/Communications to:
R.C. Hendrick & Son, Inc.
Daniel J La Pan, AIA 2885 S. Graham Rd.
Saginaw, MI 48609
P: 989.781.8166
BIRCH RUN AREA SCHOOLS
Advertisement for Request for Proposals
Sports Irrigation Systems
Proposals for the Birch Run Area Schools Sports Irrigation Systems Project will be received by the Birch Run Area Schools at the Office of the Superintendent, 12450 Church Street, Birch Run, MI 48415 until Thursday, October 28, 2021 at 3:30 PM. Any proposal received after the designated closing time will be returned unopened.
The purpose of this Request for Proposal is to seek the service of qualified contractors to install new well points, sprinkler heads and controls at the Baseball, Softball and practice football at the High School sports complex and a new system to the Soccer field located at the Marshal Green Middle School. The proposal is to include all materials, installation, permits and documentation to the authorities having jurisdiction for installing this type of water supply.
An original and one (1) copy of the proposal shall be submitted in a sealed envelope addressed to Mr. David Bush, Superintendent and marked Birch Run Area Schools, Sports Irrigation Systems Project.
The School District reserves the right to accept or reject any and all proposals and to waive any technicalities or irregularities therein. The district further reserves the right to award the contract to that proposer whose proposal best complies with the project requirements. Proposers may not withdraw their proposal for a period of ninety (90) days for the date set for the opening thereof.
David Bush Superintendent
Dated: 5 October 2021
SCHEDULE A
2021 SPORTS IRRIGATION SYSTEMS PROJECT
BID FORM
TO: Mr. David Bush, Superintendent Birch Run Area Schools Birch Run, MI 48415
Having carefully reviewed the RFP and understanding the scope of work involved in the proposal proposed, we hereby propose to furnish labor, materials, tools, equipment, supervision, permits, insurance and services required for the completion of all work required for the proposal indicated in accordance with the RFP.
BASE BID PROPOSAL, Sports Irrigation Systems:
BIDDERS NAME:
ADDENDA:
And having Received and Examined the Following Addenda: (include date for acknowledgement)
Addendum Number______________, dated__________________________, 2021
Addendum Number______________, dated__________________________, 2021
SUBSTITUTIONS:
Bidder is cautioned to bid on the “Standards” specified. The following substitutions for the “Standards” specified are listed herein for consideration, and if accepted, the contract sum may be adjusted in accordance with the following:
______________________________________________Add / Deduct $___________________
______________________________________________Add / Deduct $___________________
CONTRACT:
The undersigned agrees that the above Base Bid Prices shall hold for 90 days and Alternate Prices for 120 days after receipt of proposals, to accept provisions of “Instructions to Bidders”
IRAN BUSINESS RELATIONSHIP AFFIDAVIT:
Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran Linked Business,” as that term is defined in the Act.
SUBMITTED BY:
Firm Name:
Address:
Email Address:
Signed:
Typed Name:
Date: Title:
Phone: Fax:
If bidder is a Corporation, indicate State of Incorporation:
If a Partnership, give full names of all Partners:
Please submit (1) one original copy and (1) one copy of this proposal. Contractor should retain (1) one copy for your records.
FAMILIAL DISCLOSURE STATEMENT
All bidders must complete the following familial disclosure from in compliance with MCL 380.1267 (Public Act 232 of 2004) and attach this information to the bid.
By the attached sworn and notarized statement we are disclosing the following familial relationship(s) that exist between the owner or any employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy.
The Owner shall not accept a bid that does not include this sworn and notarized disclosure statement.
Disclose any familial relationship and complete the form below in its entirety:
The following are familial relationships as described above (provide employee name, family contact name, family contact position, and familial relationship or NONE.)
Signature(s): Title: Name of Firm:
STATE OF MICHIGAN
SS COUNTY OF
On this day of ____________, 20____, before me a Notary Public in and for , Said county, personally appeared agent of the said firm
And acknowledged the same to be his free act and deed as such agent.
Notary Public
SCHEDULE B
2021 BIRCH RUN SPORTS IRRIGATION SYSTEMS PROJECT
INSURANCE REQUIREMENTS
WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE:
Worker’s Compensation: State of Michigan Statutory Limits
Employer’s Liability: $500,000 – each accident $500,000 – disease (each employee) $500,000 – disease (policy limit)
The limits for Commercial General Liability insurance including -coverage for Premises-Operations, Independent Contractors’ Protective, Products-Completed Operations, Contractual Liability, Personal Injury and Broad Form Property Damage (including coverage for Explosion, Collapse, and Underground Hazards) shall be as follows:
COMMERCIAL GENERAL LIABILITY INSURANCE:
Each occurrence $2,000,000 – aggregate
Each occurrence $2,000,000 – aggregate
Fire Damage (any one fire) $100,000
Medical Expense (any one person) $5,000
The Contractor shall furnish and maintain during the entire period of construction, a Protective/Contractual Liability policy written in the name of the Owner and Architect with the following limits:
Bodily Injury $1,000,000 – each occurrence Property Damage $1,000,000 – each occurrence Property Damage $1,000,000 – aggregate
Notes;
Products-Completed Operations Insurance shall be maintained for a minimum period of one (1) year after final payment.
The Owner and Architect shall be listed as additional insured. The Owner shall be the certificate holder.
Automobile Liability insurance (owned, non-owned and hired vehicles) for bodily injury and property damage:
AUTOMOBILE LIABILITY INSURANCE:
Bodily Injury $1,000,000 Property Damage $1,000,000
Umbrella or Excess Liability Coverage: UMBRELLA/EXCESS LIABILITY INSURANCE:
Umbrella/Excess Insurance $2,000,000 – each occurrence $2,000,000 – aggregate
SCHEDULE C
2021 BIRCH RUN SPORTS IRRIGATION SYSTEMS PROJECTS
BUILDING REQUIREMENTS
Contractor to provide a complete working yard sprinkler system at the Baseball, Softball and Football Practice fields located at the high school sports complex and at the Soccer Field located at the Marshal Green Middle School. See the attached sketchs.
Construction is to include, but not limited to;
Baseball/Football Practice Field:
Install new well to provide a minimum of 55 gpm to supply quick couplers Provide and install new Hunter irrigation system as indicated Irrigation Contractor to verify point of connection in the field Installer to verify the minimum discharge requirements of the point of connections as indicated Irrigation to arrange inspections required by local agencies and ordnances during the course of construction All wiring to meet the State Electrical Code All wire splices or connections shall be made with approved waterproof wire connectors and be placed in a valve or splice box Backflow prevention to meet State Plumbing Code Location of irrigation components is approximate, actual placement may vary slightly Contractor to tie in the existing sprinkler system already in place on the Baseball infield to the new well, Contractor to disconnect the Municipal water supply and cap that system Contractor shall restore the existing site conditions after system has been installed.
Provide proper training once the system is functional. It is recommended that the training be recorded for owners future operation Electrical power for the pump and controller is to be supplied by the district Upon completion of the project, contractor to drain and winterize system Contractor to provide a one year warranty for the system operation
Softball Field:
Connect existing well to new irrigation system as indicated Provide and install new Hunter irrigation system as indicated Irrigation Contractor to verify point of connection in the field Installer to verify the minimum discharge requirements of the point of connections as indicated Irrigation to arrange inspections required by local agencies and ordnances during the course of construction All wiring to meet the State Electrical Code All wire splices or connections shall be made with approved waterproof wire connectors and be placed in a valve or splice box Backflow prevention to meet State Plumbing Code Location of irrigation components is approximate, actual placement may vary slightly Contractor to tie in the existing sprinkler system already in place on the Baseball infield to the new well, Contractor to disconnect the Municipal water supply and cap that system Contractor shall restore the existing site conditions after system has been installed.
Provide proper training once the system is functional. It is recommended that the training be recorded for owners future operation Electrical power for the pump and controller is to be supplied by the district Upon completion of the project, contractor to drain and winterize system Contractor to provide a one year warranty for the system operation
Soccer Field:
Install new well to provide a minimum of 55 gpm to supply quick couplers Coordinate installation and location of controls with the construction of a new Pole Barn
Storage Unit Provide and install new Hunter irrigation system as indicated Irrigation Contractor to verify point of connection in the field Installer to verify the minimum discharge requirements of the point of connections as indicated Irrigation to arrange inspections required by local agencies and ordnances during the course of construction All wiring to meet the State Electrical Code All wire splices or connections shall be made with approved waterproof wire connectors and be placed in a valve or splice box Backflow prevention to meet State Plumbing Code Location of irrigation components is approximate, actual placement may vary slightly Contractor to tie in the existing sprinkler system already in place on the Baseball infield to the new well, Contractor to disconnect the Municipal water supply and cap that system Contractor shall restore the existing site conditions after system has been installed.
Provide proper training once the system is functional. It is recommended that the training be recorded for owners future operation Electrical power for the pump and controller is to be supplied by the district Upon completion of the project, contractor to drain and winterize system Contractor to provide a one year warranty for the system operation
101010 10
1010 10
101010
10 10
10 10
10 10
101010101010101010
101010101010101010
101010101010101010
101010101010101010
E x W ell
P R
W el l
BF
2"
1"
2"
2"
2"
2"1" 11
2"
2"
1"
2"
2"
1"
2"
2"
2"
2"
1"
1"
1"11 2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
2"
1"11 2"1" 11
2"
1"
2"
1"
2"
2"
1"
2"
2"
2"
1"
1"
1"
1"11 2"
2"
2"
2"
1"
2"11 2"
2"
2"
1"11 2"
2"
2"
1"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
1"
2"
2"
2"
B
EZ
1"
2"
2"
2"
2"
1"
2"
2"
2" 2"
1"
2"
2"
2"
2"
B-1 40.411
2"
B-2 40.411
2"
B-3 50.511
2"
B-4 30.311
2"
B-5 50.511
2"
B-6 40.411
2"
B-7 40.411
2"
A-1 40.411
2"
A-2 50.511
2"
A-3 40.411
2"
A-4 40.411
2"
A-5 40.411
2"
A-6 30.311
2"
A-7 30.311
2"
A-8 50.511
2"
A-9 50.511
2"
A-10 40.411
2" A-11
40.411 2"
A-12 40.411
2"
A-13 40.411
2"
A-14 50.511
2"
A-15 40.411
2" A-16
40.411 2"
A-17 40.411
2" A-18
40.411 2"
A-19 40.411
2" A-20
40.411 2"
A-21 40.411
2" A-22
40.411 2"
A-23 40.411
2"
2"
2"
1"
2"
1"
2"
2"
2"
2"
2"
1"
2"
2"
A
EZ
RS
DDD
D
DD
D
D
D
D
D
D
D
D
D D D D D D D D D
D
D
D
D
D
D
2"
2"
2" 2"
2"
2"
1"
2"
1" 2"
1"
EXISTING IRRIGATION SYSTEM CURRENTLY USES A RAIN BIRD ESPME
CONTROLLER WITH 6 CONVENTIONAL ZONES AND A WELL. THE BASE BID
SHALL INCLUDE EXPANSION MODULES FOR THE EXISTING CONTROLLER TO
ACCOMMODATE THE PROPOSED IRRIGATION SHOWN ON THE SOFTBALL FIELD.
ALTERNATE 1 SHALL PROVIDE A PRICE TO UPGRADE THE IRRIGATION
CONTROLLER TO THE HUNTER HCC WITH THE EZ-DECODER SYSTEM FOR THE
SOFTBALL FIELD AND KEEP THE EXISTING CONVENTIONAL WIRE FOR THE
FOOTBALL FIELD SYSTEM.
ALTERNATE 1 SHALL ALSO INCLUDE AN UPGRADE TO THE PUMP CONTROLS TO
A VARIABLE FREQUENCY DRIVE WITH A PRESSURE TANK IN ORDER TO
PROVIDE AN ON DEMAND WATER FOR THE QUICK COUPLERS.
EXISTING IRRIGATION IN THIS AREA TO BE
CONNECTED TO NEW IRRIGATION SYSTEM,
THE OLD SYSTEM IS CONNECTED THROUGH
THE MUNICIPAL WATER SUPPLY IN THE
BUILDING. THE CONTRACTOR SHALL
DISCONNECT AND CAP THAT MUNICIPAL
SYSTEM THEN CONNECT THE FIELD
IRRIGATION TO THE PROPOSED SYSTEM
WHICH WILL BE SUPPLIED BY A NEW WELL.
PROPOSED IRRIGATION WELL BY
OTHERS. IRRIGATION WELL SHALL
PROVIDE A MINIMUM OF 55 GPM
AND BE ABLE TO SUPPLY WATER
TO THE QUICK COUPLERS ON
DEMAND.
1"11 2"
PROPOSED IRRIGATION SYSTEM TO
WATER PRACTICE FIELD AREA.
EXACT FIELD MAY CHANGE
SLIGHTLY, CONTRACTOR SHALL
FLAG LIMITS OF IRRIGATION AND
COORDINATED WITH SCHOOL
REPRESENTATIVE TO VERIFY
LIMITS PRIOR TO CONSTRUCTION
OF NEW SYSTEM.
SCHOOL SHALL ENSURE THAT 120V POWER
SUPPLY TO CONTROLLER IS PROVIDED BY
OTHER THAN IRRIGATION CONTRACTOR.
1"2"
2"
2"
2"
2"
M FS
FS M
D
D
D
RS
SYMBOL MANUFACTURER/MODEL QTY
Hunter I-25-04 156
Hunter I-25-04-SS-HS 7
SYMBOL MANUFACTURER/MODEL QTY
Hunter PGV-151 Globe 1-1/2" 38
Hunter HQ-5RC 1" 7
Shut Off Valve, Line Size 2
Hunter ICV-G 2" 3
Febco 825Y 2" 1
Febco 825Y 2" 1
Hunter HCC-800-PL 1
Hunter HCC-800-PL 1
Hunter HCC-800-PL 1
Hunter EZ-1 41
Hunter EZDM 3
Hunter RAIN-CLIK 3
Hunter HC-200-FLOW 3
Existing Well 1
Proposed Well 1
Proposed Well 1
Irrigation Lateral Line: PVC Class 200 SDR 21 1" 2,198 l.f.
Irrigation Lateral Line: PVC Class 200 SDR 21 1 1/2" 3,564 l.f.
Irrigation Lateral Line: PVC Class 200 SDR 21 2" 1,973 l.f.
Irrigation Mainline: PVC Class 200 SDR 21 1" 273.6 l.f.
Irrigation Mainline: PVC Class 200 SDR 21 2" 1,993 l.f.
M
BF
BF2
A
B
C
D
EZ
RS
FS
Ex Well
PR Well
PR W2
Valve Number
Valve Flow
Valve Size
Valve Callout
IRRIGATION SCHEDULE
650 Stephenson Highway Troy, Michigan 48083 Phone 248.588.2100 Fax 248.588.3528 www.Siteone.com 800.347.4272
Project Name:
Birch Run Schools Athletic Fields
Design Date:
Drawn By:
REVISIONS
Description
Drawing Title:
IRRIGATION DESIGN
Customer Name:
Drawing Scale:
Project Services Number:
1" = 40'
265839
Sheet Number:
IR-1
09/24/21
J. LOVELL
Date
Birch Run, MI
IRRIGATION SPECIFICATIONS
1. IRRIGATION SYSTEM DESIGN BASED ON 55 GPM AT 80 PSI.
2. IRRIGATION DESIGN IS FROM THE POINT OF CONNECTION(POC)ONLY. THE DESIGN IS BASED ON GALLONS PER MINUTE(GPM)AND POUNDS PER SQUARE INCH(PSI)FURNISHED BY OTHERS.
3. IRRIGATION CONTRACTOR IS TO VERIFY POINT OF CONNECTION IN THE FIELD. INSTALLER IS TO CONFIRM THE MINIMUM DISCHARGE REQUIREMENTS OF THE POINT OF CONNECTION AS
INDICATED ON THE LEGEND PRIOR TO INSTALLATION.
4. THE PRESSURE REQUIREMENT AT THE POINT OF CONNECTION IS BASED ON NO MORE THAN 5 FEET OF ELEVATION CHANGE IN THE AREAS OF IRRIGATION.
5. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND ACCORDING TO LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES.
6. IRRIGATION CONTRACTOR WILL ARRANGE INSPECTIONS REQUIRED BY LOCAL AGENCIES AND ORDINANCES DURING THE COURSE OF CONSTRUCTION AS REQUIRED. ALL WIRING TO BE PER LOCAL
CODE. BACKFLOW PREVENTION TO BE PER LOCAL CODE.
7. LOCATION OF IRRIGATION COMPONENTS SHOWN ON DRAWING IS APPROXIMATE. ACTUAL PLACEMENT MAY VARY SLIGHTLY AS REQUIRED TO ACHIEVE FULL, EVEN COVERAGE.
8. ALL SPRINKLER HEADS SHALL BE INSTALLED ON 1" 3 ELBOW PVC SWING JOINTS AND PERPENDICULAR TO FINISH GRADES. EXCEPT AS OTHERWISE INDICATED.
9. INSTALL IRRIGATION MAINS WITH A MINIMUM 18" OF COVER BASED ON FINISH GRADES. INSTALL IRRIGATION LATERALS WITH MINIMUM 12" OF COVER BASED ON FINISH GRADES.
10. PIPE LOCATIONS ARE DIAGRAMMATIC. VALVES AND MAINLINE SHOWN IN PAVED AREAS ARE FOR GRAPHIC CLARITY ONLY.
11. THE IRRIGATION CONTRACTOR SHALL COMPLY WITH PIPE SIZES AS INDICATED.
12. ALL WIRE SPLICES OR CONNECTIONS SHALL BE MADE WITH APPROVED WATERPROOF WIRE CONNECTIONS AND BE IN A VALVE OR SPLICE BOX.
13. ALL CONTROL WIRING DOWNSTREAM OF THE CONTROLLER IS TO BE 14 AWG, UL APPROVED DIRECT BURY.
14. THE DESIGN IS BASED ON THE SITE INFORMATION AND/OR DRAWING SUPPLIED WITH THE DESIGN CRITERIA BEING SET(AREA TO BE IRRIGATED, EQUIPMENT MANUFACTURER AND MODEL TO BE
USED, WATER SOURCE INFORMATION, ELECTRICAL POWER AVAILABILITY, ETC...). SITEONE LANDSCAPE SUPPLY BEARS NO RESPONSIBILITY OR LIABILITY FOR ANY ERRORS IN DESIGN OR
INSTALLATION THAT ARISE DUE TO INACCURACIES IN THE ABOVE REFERENCED INFORMATION SUPPLIED TO SITEONE LANDSCAPE SUPPLY LANDSCAPES IN RELATION TO THIS PROJECT, UNLESS
OTHERWISE NOTED.
1-800-347-4272 http://www.projectservices.siteone.com
Pr oj ec t S er vi ce sTM
0' 20' 40' 80'
SCALE: 1" = 40' - 0"
SYMBOL MANUFACTURER/MODEL QTY
Hunter I-25-04 156
Hunter I-25-04-SS-HS 7
SYMBOL MANUFACTURER/MODEL QTY
Hunter PGV-151 Globe 1-1/2" 38
Hunter HQ-5RC 1" 7
Shut Off Valve, Line Size 2
Hunter ICV-G 2" 3
Febco 825Y 2" 1
Febco 825Y 2" 1
Hunter HCC-800-PL 1
Hunter HCC-800-PL 1
Hunter HCC-800-PL 1
Hunter EZ-1 41
Hunter EZDM 3
Hunter RAIN-CLIK 3
Hunter HC-200-FLOW 3
Existing Well 1
Proposed Well 1
Proposed Well 1
Irrigation Lateral Line: PVC Class 200 SDR 21 1" 2,198 l.f.
Irrigation Lateral Line: PVC Class 200 SDR 21 1 1/2" 3,564 l.f.
Irrigation Lateral Line: PVC Class 200 SDR 21 2" 1,973 l.f.
Irrigation Mainline: PVC Class 200 SDR 21 1" 273.6 l.f.
Irrigation Mainline: PVC Class 200 SDR 21 2" 1,993 l.f.
M
BF
BF2
A
B
C
D
EZ
RS
FS
Ex Well
PR Well
PR W2
Valve Number
Valve Flow
Valve Size
Valve Callout
IRRIGATION SCHEDULE
BF2
P R
W
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
1"
2"
2"
2"
2"
2"
M
FS
C-1 50.511
2"
C-2 50.511
2" C-3
50.511 2"
C-5 50.511
2" C-6 50.511
2" C-7 50.511
2" C-8
50.511 2"
C-4 50.511
2" C
EZ
RS
D
D
D
D
D
D
D
D
1"
SCHOOL SHALL ENSURE THAT 120V POWER
SUPPLY TO CONTROLLER IS PROVIDED BY
OTHER THAN IRRIGATION CONTRACTOR.
PROPOSED BARN/STRUCTURE SHALL BE
COMPLETED IN FALL OF 2021. IRRIGATION
CONTRACTOR SHALL COORDINATE
CONSTRUCTION OF FIELD IRRIGATION AT
EARLIEST POSSIBLE TIME AND THEN MAKE
CONNECTION TO THE WELL SUPPLY AND
CONTROLLER FINAL LOCATION UPON
COMPLETION OF THE BARN/STRUCTURE.
2"
WELL TO PROVIDE MINIMUM
55 GPM @ 75PSI.
D
650 Stephenson Highway Troy, Michigan 48083 Phone 248.588.2100 Fax 248.588.3528 www.Siteone.com 800.347.4272
Project Name:
Birch Run Schools Athletic Fields
Design Date:
Drawn By:
REVISIONS
Description
Drawing Title:
IRRIGATION DESIGN
Customer Name:
Drawing Scale:
Project Services Number:
1" = 40'
265839
Sheet Number:
IR-2
09/24/21
J. LOVELL
Date
Birch Run, MI
IRRIGATION SPECIFICATIONS
1. IRRIGATION SYSTEM DESIGN BASED ON 55 GPM AT 80 PSI.
2. IRRIGATION DESIGN IS FROM THE POINT OF CONNECTION(POC)ONLY. THE DESIGN IS BASED ON GALLONS PER
MINUTE(GPM)AND POUNDS PER SQUARE INCH(PSI)FURNISHED BY OTHERS.
3. IRRIGATION CONTRACTOR IS TO VERIFY POINT OF CONNECTION IN THE FIELD. INSTALLER IS TO CONFIRM THE MINIMUM
DISCHARGE REQUIREMENTS OF THE POINT OF CONNECTION AS INDICATED ON THE LEGEND PRIOR TO INSTALLATION.
4. THE PRESSURE REQUIREMENT AT THE POINT OF CONNECTION IS BASED ON NO MORE THAN 5 FEET OF ELEVATION CHANGE
IN THE AREAS OF IRRIGATION.
5. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND ACCORDING
TO LOCAL BUILDING, ELECTRICAL, AND PLUMBING CODES.
6. IRRIGATION CONTRACTOR WILL ARRANGE INSPECTIONS REQUIRED BY LOCAL AGENCIES AND ORDINANCES DURING THE
COURSE OF CONSTRUCTION AS REQUIRED. ALL WIRING TO BE PER LOCAL CODE. BACKFLOW PREVENTION TO BE PER LOCAL
CODE.
7. LOCATION OF IRRIGATION COMPONENTS SHOWN ON DRAWING IS APPROXIMATE. ACTUAL PLACEMENT MAY VARY SLIGHTLY
AS REQUIRED TO ACHIEVE FULL, EVEN COVERAGE.
8. ALL SPRINKLER HEADS SHALL BE INSTALLED ON 1" 3 ELBOW PVC SWING JOINTS AND PERPENDICULAR TO FINISH GRADES.
EXCEPT AS OTHERWISE INDICATED.
9. INSTALL IRRIGATION MAINS WITH A MINIMUM 18" OF COVER BASED ON FINISH GRADES. INSTALL IRRIGATION LATERALS WITH
MINIMUM 12" OF COVER BASED ON FINISH GRADES.
10. PIPE LOCATIONS ARE DIAGRAMMATIC. VALVES AND MAINLINE SHOWN IN PAVED AREAS ARE FOR GRAPHIC CLARITY ONLY.
11. THE IRRIGATION CONTRACTOR SHALL COMPLY WITH PIPE SIZES AS INDICATED.
12. ALL WIRE SPLICES OR CONNECTIONS SHALL BE MADE WITH APPROVED WATERPROOF WIRE CONNECTIONS AND BE IN A
VALVE OR SPLICE BOX.
13. ALL CONTROL WIRING DOWNSTREAM OF THE CONTROLLER IS TO BE 14 AWG, UL APPROVED DIRECT BURY.
14. THE DESIGN IS BASED ON THE SITE INFORMATION AND/OR DRAWING SUPPLIED WITH THE DESIGN CRITERIA BEING SET(AREA
TO BE IRRIGATED, EQUIPMENT MANUFACTURER AND MODEL TO BE USED, WATER SOURCE INFORMATION, ELECTRICAL
POWER AVAILABILITY, ETC...). SITEONE LANDSCAPE SUPPLY BEARS NO RESPONSIBILITY OR LIABILITY FOR ANY ERRORS IN
DESIGN OR INSTALLATION THAT ARISE DUE TO INACCURACIES IN THE ABOVE REFERENCED INFORMATION SUPPLIED TO
SITEONE LANDSCAPE SUPPLY LANDSCAPES IN RELATION TO THIS PROJECT, UNLESS OTHERWISE NOTED.
1-800-347-4272 http://www.projectservices.siteone.com
Pr oj ec t S er vi ce sTM
0' 20' 40' 80'
SCALE: 1" = 40' - 0"
| BirchRunHighSchoolAthleticFieldAdditions265839.pdf |
| Sheets and Views |
| BirchRun High School Athletic Field Additions#265839-IRR-1 |
| BirchRun High School Athletic Field Additions#265839-IRR-2 |