RFP Attachment 2 ACE LMR QASP.pdf
PDF 209 KB Posted
- Attached to
- Fort Novosel/HAAP ACE LMR
- Solicitation number
- 842468948
- Issued by
-
Defense Information Systems Agency
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract opportunity to modernize the Land Mobile Radio (LMR) systems at Fort Novosel, AL and Holston Army Ammunition Plant (HAAP), TN.
The QASP outlines the roles and responsibilities of the government personnel involved, the primary methods of surveillance, performance standards, and the process for documenting and addressing contractor performance. It establishes an Acceptable Quality Level (AQL) of 100% due to the critical nature of the LMR systems supporting the Army's first responders and emergency services. The QASP includes appendices with templates for a Performance Assessment Report, Customer Complaint Record, and Corrective Action Report. The related federal contract opportunity is solicitation number 842468948 for the "Fort Novosel/HAAP ACE LMR" requirement, which seeks to Engineer, Furnish, Install, Secure and Test (EFIS&T) a trunked LMR system and related services at the two locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Attachment 1 ACE LMR Price Matrix.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Controlled By: Product Lead Base Emergency Communications System (PL BECS)
CUI Category: PROCURE AND ACQUISITION
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 1 of 10 Pages
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title (Tracking Number 842468948): Land Mobile Radio (LMR) Fort Novosel, AL, and Holston Army Ammunition Plant (HAAP), TN Modernization Effort
2. Purpose:
This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored?
• How monitoring will take place.
• Who will conduct the monitoring?
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the
QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process.
The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Other Key Government Personnel- This may include performance monitors, inspectors, technical experts, workforce service division and center directorate level security personnel, requirements office, or others (i.e., users) who provide information that helps the COR monitor contractor performance.
4. Primary Method of Surveillance: Customer complaints and PL BECS quarterly visits and bi-weekly Integrated
Project Reviews (IPR).
CUI Category: PROCURE AND ACQUISITION
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 2 of 10 Pages
CUI
✓ Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
✓ Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The
AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.
5. Performance Standards: Perform all tasks stated in the Performance Work Statement (PWS) starting from Paragraphs 6 through 11.5 to include all applicable tasks listed in:
a. PWS Appendix A – Fort Novosel & HAAP System and General Requirements
b. PWS Appendix B1 – Fort Novosel Site Specific Info Tables
c. PWS Appendix B2 – HAAP Site Specific Info Tables
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action
Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 3 of 10 Pages
CUI
taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon
Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.
7. Mandatory or regulatory compliance items:
The Contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The COR and the KO will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, all Training mentioned in the PWS and report any issues to the KO.
8. Acceptable Quality Level (AQL):
The AQL for this project is 100% due to the critical support for US Army’s First Responders and Emergency
Services.
9. Evaluation Method:
The COR will document the time of verbal notification to the contractor. The COR will document the official time and date of notification on the Maintenance Call Record. The COR will review self-diagnostic systems logs, conduct a comparison with actual maintenance performance and otherwise verify and validate contractor performance. The contractor shall enter in the record the official time the project issue is restored. The COR will confirm the date and time of problem resolution in the record.
10. Performance Rating
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as
CPAR ratings).
Rating Definition Note
Exceptional
Performance meets contractual requirements and exceeds many to the Government’s benefit.
The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an
Exceptional rating. Also, there should have been NO significant weaknesses identified.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit.
The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
Satisfactory
Performance meets contractual requirements.
The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 4 of 10 Pages
CUI
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A
Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government.
A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An
Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 5 of 10 Pages
Appendix 1 - Surveillance Matrix
Performance
Standards
Acceptable
Quality
Levels
Methods of
Calculation Surveillance Results/Ratings
Information
Technology
(IT) Service
Integration and Delivery
Performance
Management
High level of satisfaction with
Contractor delivery management of LMR project services
Target Criteria:
90% of all survey respondents are
Satisfied, More
Than Satisfied, or very Satisfied
Minimum
Acceptable:
> 85% of all survey respondents are
Satisfied, More
Than Satisfied, or Very Satisfied with Contractor delivery management of all LMR Services
Calculation:
The number of users who were
Satisfied, More
Than Satisfied, or
Very Satisfied divided by the total number of completed surveys returned.
At least 5
Government personnel must complete and return surveys for the results to have at least a 90% confidence factor with a 5% error rate.
Measurement Interval:
The Measurement Interval is three (3) months for the first year and then every six (6) months thereafter.
Measurement Period:
The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month.
Source of Measurement
Data: Data will be collected from management surveys containing satisfaction criteria specified by PL
BECS and the Installation
NEC or LMR Management team.
Method of Surveillance:
Customer feedback. The
Government will issue customer satisfaction surveys to designated
Government Installation
NEC or LMR Manager
Services using a five (5) category scale. The scale is: Dissatisfied, Less than
Satisfied, Satisfied, More than Satisfied, Very
Satisfied.
Timing of Measurement:
Measurements are taken within five (5) days of the end of the Measurement
Period.
Reporting Frequency:
Reporting to commence upon Contract Award and
(Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory)
(A rollup of assessment of the
Surveillance Inspection
Results to develop an overall rating for this objective)
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 6 of 10 Pages
CUI
continue throughout the
Period of Performance.
Monthly reporting of
QASP attainment to periods survey. Quarterly survey reporting from
(xyz) during the first year, semi-annual thereafter.
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 7 of 10 Pages
Appendix 2 – Performance Assessment Report
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT
APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM
REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY
BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION
DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON
FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 8 of 10 Pages
CUI
Appendix 3 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING
NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 9 of 10 Pages
Distribution/Dissemination Control: Acquisition Sensitive
POC: Clive Flores, 703-806-8488 and Robert Good, 571-355-0643
Page 10 of 10 Pages
Appendix 4 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE