RFP ATTACH 02 - PRIME PRICING MODEL.xlsx
XLSX spreadsheet 445 KB Posted
- Solicitation number
- N6523626RE029
About this file
This is a Prime Pricing Model template for a Cost Plus Fixed Fee (CPFF) task order under the SEAPORT-NxG contract vehicle. The document provides a structured Excel-based pricing framework for the USCG Shipboard C5I Readiness, Integration, Technical Services contract (RFP N6523626RE029), with an anticipated award date of May 1, 2026. The base period is 60 months (5 twelve-month ordering periods), with no option periods. The pricing model is configured to capture labor costs across multiple sites (Washington DC, Charleston SC, and Norfolk VA) and Other Direct Costs (ODCs) including materials, travel, and miscellaneous expenses totaling approximately $17.6 million across the contract period. The template accommodates both professional and Service Contract Labor Standards (SCLS) labor categories with escalation rates set at 3% annually for direct labor, and includes provisions for indirect costs (fringe, overhead, and G&A) with detailed worksheets for labor hour estimates, rate calculations, and cost summaries by ordering period.
The pricing model is designed for a prime contractor responding to an 8(a) Set-Aside solicitation restricted to SEAPORT NxG MAC holders only. The document includes comprehensive worksheets for contractor data input, labor category pricing across five ordering periods, uncompensated overtime policies, and Section B cost breakdowns by CLIN. The model supports multiple subcontractors and includes an extensive labor category reference list with over 300 occupation codes (both professional and SCLS categories) from which contractors may select staffing. All pricing is structured as Cost-type with Level of Effort (LOE) performance metric. Questions regarding the solicitation were due April 10, 2026, and submission requires completion of labor and ODC worksheets with supporting narrative documentation in Excel format, submitted to the contract specialist Carson Rosenbaum at NIWC Atlantic.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS
| CUI // PROCURE (when filled in) |
| GENERAL INSTRUCTIONS AND INFORMATION |
PRIME CONTRACTOR PRICING MODEL
| FALSE | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE | FALSE | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE | TRUE | ||
| TASK ORDER TITLE: | United States Coast Guard (USCG) Shipboard Command, Control, Communications, Computers, Cyber, Intelligence (C5I) Readiness, Integration, Technical Services | ||||||||||||||||||
| CONTRACT: | SEAPORT-NxG | ||||||||||||||||||
| PROCUREMENT IDENTIFICATION (PID) #: | N65236-25-RFPREQ-LSUBP00006-0126 | ||||||||||||||||||
| LABOR CATEGORIES USED: | NEW | ||||||||||||||||||
| NUMBER OF OPTIONS: | Base (60 month) / No Option | ||||||||||||||||||
| INCLUDES SEPARATELY IDENTIFIABLE WORK? | NO |
| PRICING MODEL VERSION: | 1.0 |
| RFP NUMBER: | N6523626RE029 |
| CONTRACT SPECIALIST: | Carson Rosenbaum 22140 |
WORK/TASKING INFO:
| Ù ANTICIPATED AWARD DATE: | 1-May-26 | ||||||||||||||
| Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | |||||||
| POP Duration (Months): | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | 12 | |||||
| WORK ID (Supplies /Services)* | COST TYPE | LOE/COMPLETION | PWS PARAGRAPH(s) | POP | |||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP | ||||||||||||||
| END | POP | ||||||||||||||
| START | POP |
END
CPFF - Cost Plus Fixed Fee LOE All 1-May-26 30-Apr-27 1-May-27 30-Apr-28 1-May-28 30-Apr-29 1-May-29 30-Apr-30 1-May-30 30-Apr-31 1-May-31 30-Apr-32 1-May-32 30-Apr-33 1-May-33 30-Apr-34 1-May-34 30-Apr-35 1-May-35 30-Apr-36
Gov Instruction - Unhide rows if needed (do not add / delete rows)
RESTRICTION ON DISCLOSURE AND USE OF DATA
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of - or in connection with - the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract.
This restriction does not limit the Government's right to use information contained in this proposal if it is obtained from another source without restriction. All data in this proposal are subject to this restriction.
| ASSUMPTIONS: | |
| This template assumes the following: | |
| - Allocation base for FRINGE is unburdened labor | |
| - Allocation base for OH is unburdened labor + FRINGE | |
| - Allocation base for G&A is unburdened labor + FRINGE + OH |
| Please update formulas on LABOR worksheet if contractor's accounting system differs from Government assumptions. |
| Document all Pricing Model changes in the space provided at bottom of "Contractor Data Input" tab. |
| DIRECTIONS | |
| General Guidance |
- IGNORE any hidden columns, rows, or worksheets
- Populate ONLY cells highlighted yellow
- If applicable, ensure Subcontractor Models are distributed with plenty of time to collect inputs
| 1.) | Complete CONTRACTOR DATA INPUT worksheet (see FAR 31.203) | |
| - Complete Header and Proposal Team Fields | ||
| Please Note: The unique Entity Identification (UEI) number replaced the Federal Government's DUNS# as of April 2022. | GSA Background on UEI | |
| - If applicable, modify descriptions (names) for FRINGE and OH pools to match offeror's BOE. | ||
| - Select a G&A allocation base from the drop down on CONTRACTOR DATA INPUT worksheet (see FAR 31.203) | ||
| - Input all applicable indirect rates & fee | ||
| 2.) | Provide all subcontractors (if applicable) with copy of Subcontractor Pricing Model. Outputs are needed to complete Prime Labor worksheet. | |
| 3.) | Complete LABOR worksheet | |
| - Select Performer - Use pull-down to select Company Name if labor is going to be subcontracted. Rows can be added if splitting work across multiple performers / BOEs. |
- BASIS OF ESTIMATE (BOE) - Use pull-down to select BOE for Direct Labor rate (not applicable to subcontract labor)
- FRINGE POOL - Use Pull-down to select fringe rate to be applied (options established on the CONTRACTOR DATA INPUT worksheet).
- OH POOL - Use Pull-down options to select OH rate to be applied (options established on the CONTRACTOR DATA INPUT worksheet).
- DIRECT LABOR RATES - For PRIME labor will be input for the base year, all option years will be automatically calculated based on the ESCALATION RATE included in the CONTRACTOR DATA INPUT worksheet
- SUBCONTRACTOR RATES - Full rate build-up is not required for contractors, Look for yellow highlighted cells. Consider using the Sanitized Rate tab from Sub model to facilitate input.
| 4.) | Complete Additional ODC Worksheet - If applicable, Plug estimates for ODCs will be provided on the Summary tab. If additional ODCs are required follow solicitation guidance. |
| 5.) | SUMMARY worksheet - Validate Summary data (data is populated from LABOR, ADDITIONAL ODCs tabs). |
Values for MATERIAL, TRAVEL and MISC ODCs will be provided by the Government as plug numbers unless otherwise notified 6.) Complete UNCOMPENSATED OT worksheet
- If offeror's job titles are different from those in the solicitation, document on the UNCOMPENSATED OT worksheet.
- If rates are calculated using any value other than 2,080 hours per year, document number of hours per year used to calculate the hourly rate for each category on UNCOMPENSATED OT worksheet.
| 7.) | SECTION B INPUT worksheet. If applicable, Instructions provided within worksheet. |
| 8.) | Transmit entire Pricing Model in EXCEL format (complete with active formulas) along with supporting narrative to Government in accordance with solicitation instructions. |
| Controlled By: | Department of Navy | |
| Controlled by: | NIWC Atlantic / 2.2 - Contracts | |
| CUI // PROCURE (when filled in) | CUI Categories: | PROCURE |
| Limited Dissemination Control: | FEDCON | |
| POC: | Carson Rosenbaum 22140 |
&"Times New Roman,Regular"&F &"Times New Roman,Regular"&A &"Times New Roman,Regular"&P of &N https://www.gsa.gov/about-us/organization/federal-acquisition-service/technology-transformation-services/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update
CONTRACTOR DATA INPUT
| CUI // PROCURE (when filled in) | FALSE | FALSE | FALSE | FALSE | TRUE | TRUE | TRUE | TRUE | TRUE | ||
| SECTION 1 - Header Information | |||||||||||
| CONTRACTOR NAME: | Prime | ||||||||||
| CAGE: | |||||||||||
| Unique Entity Identifier (UEI) | |||||||||||
| Contractor Proposal #: | |||||||||||
| Proposal Date: | |||||||||||
| Valid until: | |||||||||||
| SECTION 2 - Proposal Team | |||||||||||
| PRIME | Prime | ||||||||||
| SUBCONTRACTOR #1 : | SUB #1 | ||||||||||
| SUBCONTRACTOR #2 : | SUB #2 | ||||||||||
| SUBCONTRACTOR #3 : | SUB #3 | ||||||||||
| SUBCONTRACTOR #4 : | SUB #4 | ||||||||||
| SUBCONTRACTOR #5 : | SUB #5 | ||||||||||
| SUBCONTRACTOR #6 : | SUB #6 | ||||||||||
| SECTION 3 - Ordering Periods and Loading Factors | Period 1 | Period 2 | Period 3 | Period 4 | Period 5 | Period 6 | Period 7 | Period 8 | Period 9 | Period 10 | |
| ESCALATION | Allocation Base | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 |
| ESCALATION - PROFESSIONAL | Direct Labor | N/A | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% |
| ESCALATION - SCLS | Direct Labor | N/A | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% | 3.00% |
| FRINGE | Allocation Base | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 |
| <FRINGE #1> | Direct Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| <FRINGE #2> | Direct Labor | ||||||||||
| <FRINGE #3> | Direct Labor | ||||||||||
| <FRINGE #4> | Direct Labor | ||||||||||
| <FRINGE #5> | Direct Labor | ||||||||||
| OVERHEAD | Allocation Base | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 |
| <OH #1> | Direct Labor + Fringe | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| <OH #2> | Direct Labor + Fringe | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| <OH #3> | Direct Labor + Fringe | ||||||||||
| <OH #4> | Direct Labor + Fringe | ||||||||||
| <OH #5> | Direct Labor + Fringe | ||||||||||
| G&A | Allocation Base | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 |
| G&A ALLOCATION METHODOLOGY: | TOTAL COST INPUT | ï Select allocation from drop down (see FAR 31.203) | |||||||||
| G&A | Total Costs | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Material Handling Rate on Sub Labor | Subcontractor Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Material Handling Rate on Material | Material Costs | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| FCCM | Allocation Base | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 |
| Facilities Capital Cost of Money (FCCM) | Direct Labor + Fringe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| FEE | Allocation Base | ALL PERIODS | |
| FEE on LABOR | Total Prime Labor Costs (Excludes FCCM) | 0.00% | |
| FEE on SUBCONTRACTOR LABOR | Total Sub Labor Costs | 0.00% | |
| FEE on ODCs | Total ODC Cost | 0.00% | Note: Some Contracts like Seaport do not allow fee on ODCs |
| CONTRACTOR CHANGES TO THE PRICING MODEL AND PROPOSAL EXPLANATIONS |
| CUI // PROCURE (when filled in) | Controlled By: | Department of Navy |
| Controlled by: | NIWC Atlantic / 2.2 - Contracts | |
| CUI Categories: | PROCURE | |
| Limited Dissemination Control: | FEDCON | |
| POC: | Prime |
Describe any changes to pricing model assumptions and/or formulas:
SUMMARY
| CONTRACTOR NAME: | Prime | CUI // PROCURE (when filled in) | ||||||||||
| RFP NUMBER: | N6523626RE029 | NO ENTRY Required (This tab pulls from Labor & Additional ODC tabs) | ||||||||||
| VALID UNTIL: | 31-Dec-99 | If applicable, MATERIAL, TRAVEL, MISC-ODCs estimates provided as described in the solicitation | ||||||||||
| FALSE | FALSE | FALSE | FALSE | TRUE | TRUE | TRUE | TRUE | TRUE | ||||
| Summary | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| HOURS | LABOR HOURS: | 2,329,200 | 465,840 | 465,840 | 465,840 | 465,840 | 465,840 | 0 | 0 | 0 | 0 | 0 |
| Prime (100.00%) | 2,329,200 | 465,840 | 465,840 | 465,840 | 465,840 | 465,840 | 0 | 0 | 0 | 0 | 0 | |
| SUB #1 (0.00%) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SUB #2 (0.00%) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SUB #3 (0.00%) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SUB #4 (0.00%) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SUB #5 (0.00%) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| SUB #6 (0.00%) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| LABOR $ | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| PRIME LABOR COST | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB LABOR COST | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fee on Prime Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fee on Sub Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TOTAL ODC COST w/FEE: | $ 17,646,962.23 | $ 3,260,097.15 | $ 3,428,100.74 | $ 3,539,596.47 | $ 3,650,240.50 | $ 3,768,927.37 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ODC $ | TOTAL ODC COST: | $ 17,646,962.23 | $ 3,260,097.15 | $ 3,428,100.74 | $ 3,539,596.47 | $ 3,650,240.50 | $ 3,768,927.37 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MATERIAL: | $ 9,531,258.71 | $ 1,795,256.15 | $ 1,849,113.83 | $ 1,904,587.25 | $ 1,961,724.87 | $ 2,020,576.61 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRAVEL: | $ 6,853,728.70 | $ 1,275,841.00 | $ 1,322,516.91 | $ 1,370,845.12 | $ 1,416,426.61 | $ 1,468,099.06 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| MISC-ODCs: | $ 1,261,974.82 | $ 189,000.00 | $ 256,470.00 | $ 264,164.10 | $ 272,089.02 | $ 280,251.69 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ADDITIONAL ODC: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Material Handling: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| G&A on ODCs: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| FEE on ODCs : | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TOTAL COST (LABOR + ODCs) : | $ 17,646,962.23 | $ 3,260,097.15 | $ 3,428,100.74 | $ 3,539,596.47 | $ 3,650,240.50 | $ 3,768,927.37 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TOTAL FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| GRAND TOTAL : | $ 17,646,962.23 | $ 3,260,097.15 | $ 3,428,100.74 | $ 3,539,596.47 | $ 3,650,240.50 | $ 3,768,927.37 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||
| Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||
| Pass-through on Sub Labor: | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | ||
| TRUE | $ 17,646,962.20 | Reconcilation error (confirm all costs have a valid work ID) | |||||||||||
| TRUE | ORDER TYPE: CPFF - Cost Plus Fixed Fee / LOE | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6000 | 6100 | 6200 | 6300 | 6400 | 6500 | 6600 | 6700 | 6800 | 6900 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7000 | 7100 | 7200 | 7300 | 7400 | 7500 | 7600 | 7700 | 7800 | 7900 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC (if applicable) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6001 | 6101 | 6201 | 6301 | 6401 | 6501 | 6601 | 6701 | 6801 | 6901 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7001 | 7101 | 7201 | 7301 | 7401 | 7501 | 7601 | 7701 | 7801 | 7901 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC (if applicable) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6002 | 6102 | 6202 | 6302 | 6402 | 6502 | 6602 | 6702 | 6802 | 6902 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7002 | 7102 | 7202 | 7302 | 7402 | 7502 | 7602 | 7702 | 7802 | 7902 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6003 | 6103 | 6203 | 6303 | 6403 | 6503 | 6603 | 6703 | 6803 | 6903 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7003 | 7103 | 7203 | 7303 | 7403 | 7503 | 7603 | 7703 | 7803 | 7903 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6004 | 6104 | 6204 | 6304 | 6404 | 6504 | 6604 | 6704 | 6804 | 6904 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7004 | 7104 | 7204 | 7304 | 7404 | 7504 | 7604 | 7704 | 7804 | 7904 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6005 | 6105 | 6205 | 6305 | 6405 | 6505 | 6605 | 6705 | 6805 | 6905 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7005 | 7105 | 7205 | 7305 | 7405 | 7505 | 7605 | 7705 | 7805 | 7905 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6006 | 6106 | 6206 | 6306 | 6406 | 6506 | 6606 | 6706 | 6806 | 6906 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7006 | 7106 | 7206 | 7306 | 7406 | 7506 | 7606 | 7706 | 7806 | 7906 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6007 | 6107 | 6207 | 6307 | 6407 | 6507 | 6607 | 6707 | 6807 | 6907 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7007 | 7107 | 7207 | 7307 | 7407 | 7507 | 7607 | 7707 | 7807 | 7907 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6008 | 6108 | 6208 | 6308 | 6408 | 6508 | 6608 | 6708 | 6808 | 6908 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7008 | 7108 | 7208 | 7308 | 7408 | 7508 | 7608 | 7708 | 7808 | 7908 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| TRUE | LABOR $ | TOTAL | 6009 | 6109 | 6209 | 6309 | 6409 | 6509 | 6609 | 6709 | 6809 | 6909 | |
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | ODCs | TOTAL | 7009 | 7109 | 7209 | 7309 | 7409 | 7509 | 7609 | 7709 | 7809 | 7909 | |
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TRUE | |||||||||||||
| TRUE | |||||||||||||
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | ||||||
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | LABOR $ | TOTAL | 6010 | 6110 | 6210 | 6310 | 6410 | ||||||
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | ODCs | TOTAL | 7010 | 7110 | 7210 | 7310 | 7410 | ||||||
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TRUE | |||||||||||||
| TRUE | |||||||||||||
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | ||||||
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | LABOR $ | TOTAL | 6011 | 6111 | 6211 | 6311 | 6411 | ||||||
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | ODCs | TOTAL | 7011 | 7111 | 7211 | 7311 | 7411 | ||||||
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | MATERIAL | $ - 0 | |||||||||||
| TRUE | TRAVEL | $ - 0 | |||||||||||
| TRUE | MISC-ODCs | $ - 0 | |||||||||||
| TRUE | Additional ODC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Material Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FEE on ODCs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL COST (LABOR + ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL FEE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | |||||||||||||
| TRUE | GRAND TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Cost/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TRUE | Fee/Hr: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TRUE | |||||||||||||
| TRUE | |||||||||||||
| TRUE | ORDER TYPE: / | ||||||||||||
| TRUE | 0 | TOTAL | Mos. 1 - 12 | Mos. 13 - 24 | Mos. 25 - 36 | Mos. 37 - 48 | Mos. 49 - 60 | ||||||
| TRUE | HOURS | LABOR HOURS: | 0 | 0 | 0 | 0 | 0 | 0 | |||||
| TRUE | Prime | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #1 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #2 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #3 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #4 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #5 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | SUB #6 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| TRUE | LABOR $ | TOTAL | 6012 | 6112 | 6212 | 6312 | 6412 | ||||||
| TRUE | TOTAL LABOR COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL LABOR COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | PRIME LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Unburdened Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | Fringe | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | OH | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FCCM (No Fee Added) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB LABOR: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB #6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | SUB Handling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | G&A (on Subs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | FEE on LABOR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | ODCs | TOTAL | 7012 | 7112 | 7212 | 7312 | 7412 | ||||||
| TRUE | TOTAL ODC COST w/FEE: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| TRUE | TOTAL ODC COST: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .