This document is a Submittal Register for a Request for Proposal (RFP) for a Multiple Award Construction Contract (MACC) at Moody Air Force Base and surrounding locations in Georgia and Florida.
The Submittal Register lists various submittals required throughout the construction project, including preconstruction submittals, product data, shop drawings, test reports, certificates, and closeout submittals for sections covering general requirements, concrete, metals, painting, electrical systems, and site work. Key submittals include a Contractor Quality Control Plan, Construction Waste Management Plan, As-Built Drawings, Operation and Maintenance Manuals, and Lightning Protection System drawings and testing. The RFP Solicitation Number is FA483024R0007, with an estimated total IDIQ value not to exceed $150,000,000 over a 5-year base period with two 1-year option periods. The contract will be awarded to 9 small business, HUBZone, and 8(a) contractors.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC), Moody AFB has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES
QSEU 23-0118
RPR, Lightning Protection System Multi FAC Building 1108
01 11 00 SD-01 Preconstruction Submittals
1.6 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals 1.3.1.1List of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals 1.4View Location Map 1.5Progress and Completion
Pictures SD-04 Samples
1.3 GColor Boards
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7.1 GAPP - Construction
1.16 GDive Operations Plan
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
RFP FA483024R0007
Attachment 3b(iii)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
01 35 26 SD-07 Certificates 1.6.1.4Crane Operators/Riggers
1.7.3.2 GStandard Lift Plan
1.7.3.3 GCritical Lift Plan
1.7.3.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet 01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports 3.9.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.3.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports Backflow Preventer Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
01 50 00 1.4.1Backflow Tester 1.4Backflow Preventers
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan SD-11 Closeout Submittals
1.10Final Construction Waste Diversion Report
01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data
SD-08 Manufacturer’s Instructions 1.5.1Instructions
SD-10 Operation and Maintenance Data
3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
1.5.1As-Built Record of Equipment and Materials 01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
01 78 23 3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.9 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
SD-11 Closeout Submittals Landfill Receipts for Demolished Materials
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications 1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
3.3.7Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data 2.4.5Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
03 30 00 2.4.4Joint Filler 2.1Formwork Materials 2.3.1Cementitious Materials 2.4.6Vapor Retarder 2.4.1Concrete Curing Materials 2.6Reinforcement 2.3.4Admixtures 2.6.5Reinforcing Fibers 1.8.1Local/Regional Materials 1.6.3.2Pumping Concrete 1.6.3.3Finishing Plan 2.4.2Nonshrink Grout
SD-04 Samples 1.6.5.1Slab Finish Sample 1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.2Aggregates
1.6.4.3 GFiber-Reinforced Concrete
3.12.2.3 GCompressive Strength Tests
3.12.2.5Unit Weight of Structural
Concrete 3.12.2.6Chloride Ion Concentration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
03 30 00 3.12.2.4Air Content 3.12.2.1Slump Tests 2.3.2Water
SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets 1.8.2Forest Stewardship Council
(FSC) Certification 1.6.7.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.4.5Joint Sealants 2.4.1Curing Compound
05 50 13 SD-02 Shop Drawings
2.4 GBollards/Pipe Guards
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-08 Manufacturer’s Instructions Application Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
09 90 00 2.1Mixing 1.8.1Manufacturer's Safety Data
Sheets SD-10 Operation and Maintenance Data
2.1 GCoatings
26 05 26.00 40 SD-03 Product Data
2.1.1 GGround Rods
GGround Wires
2.1.2 GConnectors and Fasteners
GTest Wells
2.1.3 GConductive Corrosion Inhibiting
Compounds
SD-06 Test Reports
3.2.1 GGround Resistance Tests
SD-07 Certificates
1.3.3 GGround Resistance Test
Equipment SD-11 Closeout Submittals
3.3Record Drawings 26 41 00 SD-02 Shop Drawings
GOverall Lightning Protection System
GEach Major Component SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
26 41 00 1.4.3 GLightning Protection and Grounding System Test Plan
3.4.2 GGrounding Systems Testing
SD-07 Certificates
1.4.2 GComponent UL Listed and
Labeled
1.4.4 GLightning Protection System
Inspection Certificate
31 00 00 SD-01 Preconstruction Submittals
3.2 GShoring
1.6.3 GDewatering Work Plan
SD-03 Product Data
3.6 GUtilization of Excavated Materials
1.6.1.2Rock Excavation
SD-06 Test Reports 3.10Testing 2.1Borrow Site Testing
SD-07 Certificates 3.10Testing
31 23 00.00 20 SD-01 Preconstruction Submittals 1.7.1Dewatering work plan
SD-06 Test Reports
1.6 GBorrow Site Testing
3.8.2.1Fill and backfill 3.8.2.2Density tests
33 71 01 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES
RPR, Lightning Protection System Multi FAC Building 1108
33 71 01 2.4 GConductors
2.2.1 GWood Poles
2.5 GGuy Strand
2.7 GAnchors
SD-07 Certificates
2.2.1 GWood Poles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
File details come from the government source that posted it. Updated .