RFP Atch 1a - Moody Installation Guide Specs (Vol 1).pdf
PDF 14 MB Posted
- Attached to
- Multiple Award Construction Contract (MACC), Moody AFB Federal contract opportunity
- Solicitation number
- FA483024R0007
About this file
This document is an attachment to a Request for Proposal (RFP) for a Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for general construction requirements at Moody Air Force Base, Grand Bay Range, Grassy Pond, Spence Field, Valdosta Regional Airport in Georgia, and Avon Park Range in Florida. The estimated total MACC IDIQ value is not to exceed $150,000,000, with a single five-year ordering period and two one-year option periods. Individual task orders are estimated to be between $2,000 and $7,000,000, and may be subject to statutory cost limitations. The procurement is a competitive set-aside for 8(a), HUBZone, and Small Businesses, with the intent to award nine contracts, including three in each of the three small business categories.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC), Moody AFB has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOODY AIR FORCE BASE
GEORGIA
MOODY INSTALLATION GUIDE
SPECIFICATIONS
June 2024
VOLUME 1
DIVISIONS 01-13
RFP FA483024R0007
Attachment 1a
MOODY INSTALLATION GUIDE SPECIFICATIONS MOODYAFB
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 11/16, CHG 2: 11/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING
02 41 00 08/22 DEMOLITION
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 65 00 02/10, CHG 1: 11/13 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 85 00 11/18, CHG 1: 05/22 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
PROJECT TABLE OF CONTENTS Page 1
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING
VAULTS
05 72 00 05/18 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 18 00 08/16, CHG 1: 11/18 GLUED-LAMINATED CONSTRUCTION
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS
07 31 13 08/16, CHG 2: 08/18 ASPHALT SHINGLES
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 51 13 05/12, CHG 2: 11/18 BUILT-UP ASPHALT ROOFING
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 53 23 05/12, CHG 2: 08/18 ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING
07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD
WINDOWS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 11 69 02/10 METAL STORM DOORS
08 11 73 08/20 SLIDING FIRE DOORS
08 13 73 02/11 SLIDING METAL DOORS
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 22 20 11/19 FIBERGLASS REINFORCED PLASTIC (FRP)
DOORS AND FRAMES
PROJECT TABLE OF CONTENTS Page 2
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 32 13 08/20, CHG 1: 02/22 ALUMINUM SLIDING GLASS DOORS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 01 08/09 FORCED ENTRY RESISTANT COMPONENTS
08 34 02 08/09 BULLET-RESISTANT COMPONENTS
08 34 16 05/17 CORROSION CONTROL HANGAR DOORS
08 34 58 08/08 FILE ROOM DOORS AND FRAMES
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES
08 34 63 05/11 DETENTION HOLLOW METAL FRAMES, DOORS,
AND DOOR FRAMES
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 36 13 08/20 SECTIONAL OVERHEAD DOORS
08 36 19 08/20 VERTICAL LIFT DOORS
08 39 53 02/19, CHG 1: 05/20 BLAST RESISTANT DOORS (EARTH COVERED
MAGAZINES)
08 39 54 08/09 BLAST RESISTANT DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
08 51 23 08/20, CHG 1: 02/22 STEEL WINDOWS
08 52 00 08/20, CHG 1: 02/22 WOOD WINDOWS
08 53 00 08/20, CHG 1: 02/22 PLASTIC WINDOWS
08 56 53 08/20 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 56 63 04/06 DETENTION AND SECURITY WINDOWS
08 60 45 08/20 [SKYLIGHTS][ AND ][TRANSLUCENT PANELS]
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 71 63 04/06 DETENTION HARDWARE
08 81 00 05/19 GLAZING
08 88 53 05/11 DETENTION AND SECURITY GLAZING
08 88 58 05/14 AIR TRAFFIC CONTROL TOWER CAB GLASS
08 91 00 08/20 METAL [WALL] [AND] [DOOR] LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 23 00 08/16, CHG 1: 11/18 GYPSUM PLASTERING
09 23 82 11/19 FIREPROOF GYPSUM PLASTERING
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 26 00 08/16, CHG 1: 08/18 VENEER PLASTER
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 35 16 08/16, CHG 1: 08/18 CHEMICAL-RESISTANT QUARRY TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 64 66 08/16, CHG 1: 08/18 WOOD ATHLETIC FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 65 66 08/16, CHG 1: 08/18 RESILIENT ATHLETIC FLOORING
09 66 13 08/16, CHG 2: 11/18 PORTLAND CEMENT TERRAZZO FLOORING
09 66 16 08/16, CHG 1: 08/18 TERRAZZO FLOOR TILE
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING
09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 67 23.16 02/21 FUEL RESISTIVE RESINOUS FLOORING,
5-COAT SYSTEM
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
PROJECT TABLE OF CONTENTS Page 3
09 69 19 11/15, CHG 1: 08/18 STRINGERLESS ACCESS FLOORING
09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 59 05/11, CHG 1: 08/17 HIGH-BUILD GLAZE COATINGS
09 97 02 02/20, CHG 1: 11/21 PAINTING: HYDRAULIC STRUCTURES
09 97 13.00 40 11/19 STEEL COATINGS
09 97 13.16 05/11, CHG 2: 08/19 INTERIOR COATING OF WELDED STEEL WATER
TANKS
09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF
WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.25 05/11, CHG 1: 08/17 MAINTENANCE, REPAIR, AND COATING OF
TALL ANTENNA TOWERS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
09 97 13.28 02/10 PROTECTION OF BURIED STEEL PIPING AND
STEEL BULKHEAD TIE RODS
09 97 23 08/18 METALLIC TYPE CONDUCTIVE/SPARK
RESISTANT CONCRETE FLOOR FINISH
09 97 23.16 11/10 LINSEED OIL PROTECTION OF CONCRETE
SURFACES
09 97 23.17 08/16, CHG 1: 11/16 CORROSION INHIBITOR COATING OF
CONCRETE SURFACES
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
DIVISION 12 - FURNISHINGS
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 22 00 08/16, CHG 1: 08/18 CURTAINS AND DRAPES
12 35 30.23 20 08/11 BATHROOM CASEWORK
12 35 39 08/17, CHG 1: 08/18 COMMERCIAL KITCHEN CASEWORK
12 35 70 08/16, CHG 2: 11/18 HEALTHCARE CASEWORK
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 61 13 08/20 UPHOLSTERED AUDIENCE SEATING
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 49 20.00 10 10/07 RFI/EMI SHIELDING
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
PROJECT TABLE OF CONTENTS Page 4
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 25 02/19, CHG 1: 02/21 HIGH-EXPANSION FOAM SYSTEM, FIRE
PROTECTION
21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR
KITCHEN CABINET
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
22 05 83.63 08/22 CURED-IN-PLACE PIPE (CIPP) LINING FOR
PLUMBING APPLICATIONS
22 07 19.00 40 08/16 PLUMBING PIPING INSULATION
22 13 29 02/11 SANITARY SEWERAGE PUMPS
22 13 36 02/09 PNEUMATIC SEWAGE EJECTORS
22 14 29.00 40 05/17 SUMP PUMPS
22 15 09.00 40 05/22 GENERAL SERVICE COMPRESSED-AIR SYSTEMS
CLEANING PROCEDURES
22 15 13.16 40 11/17 HIGH-PRESSURE COMPRESSED-AIR PIPING,
PIPING COMPONENTS, AND VALVES,
STAINLESS
22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR
SYSTEMS, LOW PRESSURE
22 15 19.13 20 11/09 LARGE NONLUBRICATED RECIPROCATING AIR
COMPRESSORS (OVER 300 HP)
22 15 19.19 20 05/11 NONLUBRICATED ROTARY SCREW AIR
COMPRESSORS (100 HP AND LARGER)
22 15 26.00 20 04/06 HIGH AND MEDIUM PRESSURE COMPRESSED
AIR PIPING
22 16 19.26 20 11/09 LARGE CENTRIFUGAL AIR COMPRESSORS
(OVER 200 HP)
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 05/22 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00.00 20 02/21, CHG 1: 05/21 COMMISSIONING OF MECHANICAL SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 13.34 40 02/17 CONTROL VALVES, SELF-CONTAINED
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 08/21 REFRIGERANT PIPING
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 31 13.00 40 08/22 METAL DUCTS
PROJECT TABLE OF CONTENTS Page 5
23 33 56 02/09 SELF-ACTING BLAST VALVES
23 34 23.00 40 02/17 HVAC POWER VENTILATORS
23 35 16.17 10 05/20 MECHANICAL ENGINE[ AND WELDING FUME]
EXHAUST SYSTEMS
23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST
23 36 00.00 40 08/22 AIR TERMINAL UNITS
23 37 13.00 40 08/22 DIFFUSERS, REGISTERS, AND GRILLES
23 41 13.00 40 02/16 PANEL FILTERS
23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS
23 54 19 08/21 BUILDING HEATING SYSTEMS, WARM AIR
23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING
WATER AND STEAM HEAT EXCHANGERS
23 64 00 11/16, CHG 2: 08/18 PACKAGED WATER CHILLERS, ABSORPTION
TYPE
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 5: 11/19 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 65 00 11/16, CHG 2: 08/18 COOLING TOWERS AND REMOTE
EVAPORATIVELY-COOLED CONDENSERS
23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS
23 76 00 08/21 EVAPORATIVE COOLING SYSTEMS
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS
23 82 16.00 40 08/22 AIR COILS
23 82 19.00 40 05/17 FAN COIL UNITS
23 82 23.00 40 05/17 UNIT VENTILATORS
23 82 43.00 40 05/17 ELECTRIC DUCT HEATERS
23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES
26 05 19.10 10 05/16 INSULATED WIRE AND CABLE
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE
DEVICES
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 08/19 LIGHTING CONTROL DEVICES
26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION
26 11 16 11/21 SECONDARY UNIT SUBSTATIONS
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 12 21 05/17, CHG 2: 11/19 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 18 23.00 40 08/16 MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 22 00.00 10 10/07 480-VOLT STATION SERVICE SWITCHGEAR
PROJECT TABLE OF CONTENTS Page 6
AND TRANSFORMERS
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 23 00.00 40 11/17 SWITCHBOARDS AND SWITCHGEAR
26 24 16.00 40 08/19 PANELBOARDS
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 28 00.00 10 08/22 MOTOR CONTROL CENTERS, SWITCHBOARDS
AND PANELBOARDS
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL
INDUCTION TYPE
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC
PROTECTION (GACP) SYSTEM
26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE
INTERIOR OF STEEL WATER TANKS
26 42 19.10 11/08 CATHODIC PROTECTION SYSTEMS (IMPRESSED
CURRENT) FOR LOCK MITER GATES
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 52 00.00 40 11/17 EMERGENCY LIGHTING
26 53 00.00 40 11/15 EXIT SIGNS
26 55 53.00 40 11/14 SECURITY LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND
VISUAL NAVIGATION AIDS
26 60 13.00 40 05/19 LOW-VOLTAGE MOTORS
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 21 10.00 40 11/20 FIBER OPTIC DATA TRANSMISSION SYSTEM
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 02.00 20 02/10 FIRE ALARM REPORTING SYSTEMS - DIGITAL
COMMUNICATORS
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 10 00 02/21 SITE CLEARING
31 11 00 11/18 CLEARING AND GRUBBING
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
PROJECT TABLE OF CONTENTS Page 7
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 31 16.19 08/22 TERMITE CONTROL BARRIERS
31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 05/16, CHG 2: 08/17 RUBBER AND PAINT REMOVAL FROM AIRFIELD
PAVEMENTS
32 01 13.62 05/18 ASPHALT SURFACE TREATMENT
32 01 17.61 05/22 SEALING CRACKS IN ASPHALT PAVING
32 01 18.71 05/17 GROOVING OF AIRFIELD PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 01 29.61 05/17, CHG 1: 08/17 PARTIAL DEPTH PATCHING OF RIGID PAVING
32 01 29.62 11/18 CONCRETE PAVEMENT RAISING
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR
FLEXIBLE PAVING
32 11 23 05/22 AGGREGATE BASE COURSE AND/ORGRADED
CRUSHED AGGREGATE BASE COURSE FOR
FLEXIBLE PAVING
32 11 23.23 08/17 BASE COURSE DRAINAGE LAYERS
32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR
ROADS AND STREETS
32 11 26.19 05/20 BITUMINOUS-STABILIZED BASE AND SUBBASE
COURSES
32 11 33.13 05/20 PORTLAND CEMENT-STABILIZED BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 12 17.19 11/20 FUEL RESISTANT ASPHALT PAVING FOR
AIRFIELDS - SURFACE COURSE
32 13 14.13 08/19 CONCRETE PAVING FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS
32 13 43 05/20 PERVIOUS CONCRETE PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 18 16.13 08/17 PLAYGROUND PROTECTIVE SURFACING
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 84 23 02/21 UNDERGROUND SPRINKLERS
32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 30.16 11/21 TV INSPECTION OF SEWER LINES
33 01 30.72 11/21 RELINING SEWERS
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 01 50.55 02/21 CLEANING OF PETROLEUM STORAGE TANKS
33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 16 15 11/20 WATER STORAGE STEEL TANKS
33 26 00.00 10 04/08 RELIEF WELLS
PROJECT TABLE OF CONTENTS Page 8
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS
33 40 00 11/21 STORMWATER UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 46 16 05/18 SUBDRAINAGE PIPING
33 47 13 11/14, CHG 2: 11/15 POND AND RESERVOIR LINERS
33 51 13.00 30 05/10 NATURAL-GAS METERING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS
DISTRIBUTION PIPELINES
33 51 39 08/17 MONITORING WELLS
33 51 43 05/22 INSTRUMENTATION AND PERFORMANCE
MONITORING OF STRUCTURES
33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)
33 56 53 05/20 COMPRESSED GASES STORAGE TANKS
33 57 55 11/18, CHG 1: 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 60 02 04/08 ABOVEGROUND HEAT DISTRIBUTION SYSTEM
33 61 13 08/10, CHG 1: 02/20 PRE-ENGINEERED UNDERGROUND HEAT
DISTRIBUTION SYSTEM
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC
ENERGY DISTRIBUTION
33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE
MANHOLES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
33 63 13 04/06 EXTERIOR UNDERGROUND STEAM
DISTRIBUTION SYSTEM
33 63 13.19 02/16 CONCRETE TRENCH HYDRONIC AND STEAM
ENERGY DISTRIBUTION
33 63 14 04/06 EXTERIOR BURIED PUMPED CONDENSATE
RETURN
33 63 16 07/06 EXTERIOR SHALLOW TRENCH STEAM
DISTRIBUTION
33 63 23 04/06 EXTERIOR ABOVEGROUND STEAM DISTRIBUTION
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 01.00 40 11/14, CHG 1: 02/17 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 73 00.00 40 05/19 UTILITY TRANSFORMERS
33 75 00.00 40 11/14 SWITCHGEAR AND PROTECTION DEVICES
33 77 19.00 40 08/16 MEDIUM-VOLTAGE SWITCH
33 77 36.00 40 05/17 MEDIUM-VOLTAGE UTILITY FUSES
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP
RUNNING
41 22 13.15 02/20, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING
41 22 13.16 04/08, CHG 1: 02/20 GANTRY CRANES
41 22 13.55 02/22 CHG 1: 05/22 BRIDGE CRANES, UNDER RUNNING, AIRCRAFT
HANGAR
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 10
SECTION 01 11 00
SUMMARY OF WORK
08/15, CHG 2: 08/21
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals Salvage Plan; G1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The Contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required for a broad range of maintenance, repair, and minor construction work on various real property facilities at installations coverded under this contract, including design and engineering services incidental to construction. The Contracting Officer (CO) will conduct negotiations with the Contractor and issue individual task orders for maintenance, repair, and minor construction projects identified by the Base Civil Engineer (BCE). Individual task order projects will vary in size, as identified in the ctontract, including but not limited to trades such as carpentry, plumbing, electrical, mechanical, painting, pipe fitting, sheet metal, welding, roofing, site work, site utilities, excavation, concrete Masonry, pavement repair, asbestos and lead paint removal, security hardware installation, and demolition.
1.2.2 Location
The work performed under this contract is located at the Moody AFB, GA,and Avon Park AFR, FL.
1.3 OCCUPANCY OF PREMISES
If building(s) are to be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area by the Contractor no less than 10 working days prior to starting work.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered
SECTION 01 11 00 Page 1 during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
The Civil Engineer Work Clearance Request Program is processed electronically. The Contractor shall initiate an AF Form 103, Base Civil Engineer Work Clearance Request, for each Task Order. The Contractor shall call the Georgia Utility Protection Center at 1-800-282-7411, specify that surveys need to be marked in paint only, obtain a Dig Permit Number in order to start the AF Form 103 process, and then clearly outline the intended construction area with white utility marking paint. The Contractor will submit the dig permit information to the 23d Civil Engeneer Squadron SABER Project Manager (PM) to initiate the AF e103 for the appropriate Work Clearance Working Group members to visit the site to perform utility locate/marking services. Once the AF e103 has been approved, the SABER PM will provide one copy to the Contractor prior to commencement of any work for the project. The Contractor must have an approved copy of the AF e103 for each Task Order at each Task Order jobsite.
Verify existing utility locations indicated on contract drawings, within area of work.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 48 hours prior to starting excavation work.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area to be located within 5 miles of the construction site.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
11/11, CHG 14: 02/22
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.2.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.2.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas if requested.
1.2.2 Working Hours
Regular working hours will consist of an 9 hour period , between 7 a.m. and 4:00 p.m., Monday through Friday, excluding Government holidays.
1.2.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application no less than 72 hours prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification
SECTION 01 14 00 Page 1 provided, the Contracting Officer may approve work outside regular hours.
During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed or coordinated otherwise.
1.2.4 Occupied Building(s)
If the Contract dictates that the Contractor shall be working in an existing building or around existing buildings which are occupied the Contractor shall not enter the building(s) without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the limits of construction during the construction period.
Relocate movable furniture away from the Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect against damage, or temporarily disconnect, relocate, protect, and reinstall at the completion of the work.
1.2.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and natural gas are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 2
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
11/20, CHG 2: 05/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map
Progress and Completion Pictures
SD-04 Samples
Color Boards; G
1.3 COLOR BOARDS FOR AIR FORCE PROJECTS
Submit one set of color boards with material finishes submittals . Include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. Present the samples on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Design modules to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, submit samples not less than 12 inches square with the board. If more space is needed, more than one board per set may be submitted. Certify that the color samples have been reviewed in detail, and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated.
Submittal of color samples does not relieve the Contractor of the responsibility to submit samples required elsewhere herein.
1.4 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 10 digital photographs each week throughout the entire project
SECTION 01 30 00 Page 1 from a minimum of ten different viewpoints selected by the Contractor unless otherwise directed by the Contracting Officer. Submit photos with the monthly invoice to the Contracting Officer, cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.
Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file.
Include a date designator in file names. Photographs provided are for unrestricted use by the Government.
1.5 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by Georgia state law.
1.6 SUPERVISION
1.6.1 Superintendent Qualifications
Provide project superintendent with a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
1.6.2 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work. In addition, if a Quality Control (QC) representative is required on the Contract, then that individual must also have fluent English communication skills.
1.6.3 Duties
The project superintendent is primarily responsible for managing subcontractors and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.6.4 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
SECTION 01 30 00 Page 2
1.7 PRECONSTRUCTION CONFERENCE
Immediately after awardUpon completion of design and design acceptance by the governmentPrior to any work commencing on the site, the Contracting Officer will coordinate a time and place to meet for the Preconstruction Conference. The purpose of this conference is to discuss and develop a mutual understanding of the administrative requirements of the Contract including but not limited to: daily reporting, invoicing, value engineering, safety, base-access, outage requests, hot work permits, schedule requirements, quality control, schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and contract close-out.
Contractor must present and discuss their basic approach to scheduling the construction work and any required phasing.
1.7.1 Attendees
Contractor attendees must include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager and major subcontractors.
1.8 FACILITY TURNOVER PLANNING MEETINGS (Red Zone Meetings)
Meet with the Government to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start planning the turnover process at the Pre-Construction Conference meeting with a discussion of the Red Zone process and convene at regularly scheduled NRZ Meetings beginning at approximately 75 percent of project completion.
Include the following in the facility Turnover effort:
1.8.1 Red Zone Checklist
a. Contracting Officer will provide the Contractor a copy of the Red Zone Checklist template.
b. Prior to 75 percent completion, modify the Red Zone Checklist template by adding or deleting critical activities applicable to the project and assign planned completion dates for each activity. Submit the modified Red Zone Checklist to the Contracting Officer. The Contracting Officer may request additional activities be added to the Red Zone Checklist at any time as necessary.
1.8.2 Meetings
a. Conduct Red Zone Meetings beginning at approximately 75 percent project completion.
b. The Contracting Officer will establish the frequency of the meetings dependant on the size and complexity of the construction.
c. Using the Red Zone Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.
d. During the Red Zone Meetings discuss with the Contracting Officer any upcoming activities that require Government involvement.
e. Maintain the Red Zone Checklist by documenting the actual completion
SECTION 01 30 00 Page 3 dates as work is completed and update the Red Zone Checklist with revised planned completion dates as necessary to match progress.
Distribute copies of the current Red Zone Checklist to attendees at each Red Zone Meeting.
1.9 PARTNERING
To most effectively accomplish Task Orders, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user, CES, Contractor, key subcontractors and the Designer of Record are highly encouraged to participate in the Partnering process.
1.9.1 Team-Led (Informal) Partnering
a. The Contracting Officer will coordinate the initial Team-Led (Informal) Partnering Session with key personnel of the project team, including Contractor and Government personnel. The Partnering Session will be co-led by the CES Project Manager and Contractor's Project Manager.
b. The Initial Team-led Partnering session will be held concurrently with the Preconstruction Conference meeting. Partnering sessions will be held at a location mutually agreed to by the Contracting Officer and the Contractor, typically at a conference room on-base or at the Contractor's temporary trailer.
c. The Initial Team-Led Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer.
d. The Partners will determine the frequency of the follow-on sessions.
e. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.
1.10 MOBILIZATION
Contractor shall coordinate mobilization to the jobsite with the Government within 45 calendar days after contract award for bid-build or 30 calendar days of final site or building design approval if design-build. Mobilize is defined as having equipment AND having a physical presence of at least one person from the contractor's team on the jobsite.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 30 00 Page 4
SECTION 01 32 01.00 10
PROJECT SCHEDULE
02/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AACE INTERNATIONAL (AACE)
AACE 29R-03 (2011) Forensic Schedule Analysis
AACE 52R-06 (2006) Time Impact Analysis - As Applied in Construction
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Project Scheduler Qualifications; G
Preliminary Project Schedule; G
Initial Project Schedule; G
Periodic Schedule Update; G
1.3 PROJECT SCHEDULER QUALIFICATIONS
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports. The authorized representative must have a minimum of 2-years experience scheduling construction projects similar in size and nature to this project with scheduling software that meets the requirements of this specification. Representative must have a comprehensive knowledge of CPM scheduling principles and application.
PART 2 PRODUCTS
2.1 SOFTWARE
The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.
2.1.1 Government Default Software
The Government intends to use Primavera P6.
SECTION 01 32 01.00 10 Page 1
2.1.2 Contractor Software
Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required sdef file must be created and supported by the software manufacturer.
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15 Schedules for Construction Contracts. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of design and construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Designers, Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules. Prepare each Project Schedule using the Precedence Diagram Method (PDM).
3.2 BASIS FOR PAYMENT AND COST LOADING
The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN must equal the value of the CLIN.
3.2.1 Activity Cost Loading
Activity cost loading must be reasonable and without front-end loading.
Provide additional documentation to demonstrate reasonableness if requested by the Contracting Officer.
3.2.2 Withholdings / Payment Rejection
Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.
In the event that the Contracting Officer directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the Contracting Officer may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will
SECTION 01 32 01.00 10 Page 2 consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
3.3.2 Activity Durations
Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods.
Less than 2 percent of all non-procurement activities may have Original Durations (OD) greater than 20 work days.
3.3.3 Design and Permit Activities
Include design and permit activities with the necessary conferences and follow-up actions and design package submission dates. Include the design schedule in the project schedule, showing the sequence of events involved in carrying out the project design tasks within the specific contract period. Provide at a detailed level of scheduling sufficient to identify all major design tasks, including those that control the flow of work.
Also include review and correction periods associated with each item.
3.3.4 Procurement Activities
Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.
3.3.5 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of SD-01 Preconstruction Submittals (individual activity for each).
b. Submission, review and acceptance of features require design completion Submission, review and acceptance of design packages.
c. Submission of mechanical/electrical/information systems layout drawings.
d. Long procurement activities
e. Submission and approval of O & M manuals.
f. Submission and approval of as-built drawings.
g. Submission and approval of DD1354 data and installed equipment lists.
h. Submission and approval of testing and air balance (TAB).
i. Submission of TAB specialist design review report.
j. Submission and approval of fire protection specialist.
k. Submission and approval of Building Commissioning Plan, test data, and reports: Develop the schedule logic associated with testing and commissioning of mechanical systems to a level of detail consistent
SECTION 01 32 01.00 10 Page 3 with the contract commissioning requirements. All tasks associated with all building testing and commissioning will be completed prior to submission of building commissioning report and subsequent contract completion.
l. Air and water balancing.
m. Building commissioning - Functional Performance Testing.
n. Controls testing plan submission.
o. Controls testing.
p. Performance Verification testing.
q. Other systems testing, if required.
r. Contractor's pre-final inspection.
s. Correction of punch list from Contractor's pre-final inspection.
t. Government's pre-final inspection.
u. Correction of punch list from Government's pre-final inspection.
v. Final inspection.
3.3.6 Government Activities
Show Government and other agency activities that could impact progress.
These activities include, but are not limited to: approvals, acceptance, design reviews, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.
3.3.7 Contract Milestones and Constraints
Milestone activities are to be used for significant project events including, but not limited to, project phasing, project start and end activities, or interim completion dates. The use of artificial float constraints such as "zero free float" or "zero total float" are prohibited.
Mandatory constraints that ignore or effect network logic are prohibited.
No constrained dates are allowed in the schedule other than those specified herein. Submit additional constraints to the Contracting Officer for approval on a case by case basis.
3.3.7.1 Project Start Date Milestone and Constraint
The first activity in the project schedule must be a start milestone titled "NTP Acknowledged," which must have a "Start On" constraint date equal to the date that the NTP is acknowledged.
3.3.7.2 End Project Finish Milestone and Constraint
The last activity in the schedule must be a finish milestone titled "End Project."
Constrain the project schedule to the Contract Completion Date in such a
SECTION 01 32 01.00 10 Page 4 way that if the schedule calculates an early finish, then the float calculation for "End Project" milestone reflects positive float on the longest path. If the project schedule calculates a late finish, then the "End Project" milestone float calculation reflects negative float on the longest path. The Government is under no obligation to accelerate Government activities to support a Contractor's early completion.
3.3.7.3 Interim Completion Dates and Constraints
Constrain contractually specified interim completion dates to show negative float when the calculated late finish date of the last activity in that phase is later than the specified interim completion date.
3.3.7.3.1 Start Phase
Use a start milestone as the first activity for a project phase. Call the start milestone "Start Phase X" where "X" refers to the phase of work.
3.3.7.3.2 End Phase
Use a finish milestone as the last activity for a project phase. Call the finish milestone "End Phase X" where "X" refers to the phase of work.
3.3.8 Calendars
Schedule activities on a Calendar to which the activity logically belongs.
Develop calendars to accommodate any contract defined work period such as a 7-day calendar for Government Acceptance activities, concrete cure times, etc. Develop the default Calendar to match the physical work plan with non-work periods identified including weekends and holidays. Develop sSeasonal Calendar(s) and assign to seasonally affected activities as applicable.
If an activity is weather sensitive it should be assigned to a…