RFP Addendum 1 24068.pdf

PDF 538 KB Posted

Attached to
472/24068. TYC; Carson City CF - East Side Boilers
Solicitation number
RFP - 171 - 240000001541
Issued by
Montcalm County, Capac Village, Michigan

About this file

This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Carson City Correctional Facility, East Side Boilers project. The project will involve the replacement of all boilers, pumps, and controls, and the controls will be pneumatic to match the existing system. There is no set construction budget, and the most economical design solution will be considered. Due to the scope of work, the programming and schematic design phases are not required, and the point of beginning will be preliminary design. The proposal due date is March 28, 2024.

The addendum includes an attendance roster from the pre-proposal meeting. No pricing terms, set asides, incumbents, funding requirements, or other salient financial information is provided. The project will take place in Montcalm County and Capac Village, Michigan.

View the file

Other files

File Type Posted
SAMPLE Billable Rate Contract (Rev 221207).pdf PDF
RFP 24068.pdf PDF
Project Statement 24068.pdf PDF
LEIN Check 24068.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 1

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

March 25, 2024

PROJECT NAME

Carson City Correctional Facility, East Side Boilers

FILE NUMBER

472/24068.TYC

PROJECT DIRECTOR

Todd Cordill, RA, NCARB

PROPOSAL DUE DATE:

March 28, 2024

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

1) The controls for the boilers and controls are to be pneumatic in keeping with the existing system.

2) At this point there is not a set construction budget. The most economical design solution will be considered. All boilers, pumps, and controls are considered for replacement.

3) Due to the scope of work for this project, programming and schematic design phases are not considered necessary. The point of beginning will be preliminary design, given the scope of work.

4) The attendance roster from the pre-proposal meeting is included herein.

APPROVED BY:

Todd Cordill, RA, NCARB March 25, 2024

PROJECT DIRECTOR DATE

http://www.buy4michigan.com/

RFP Addendum.pdf
Preproposal roster

File details come from the government source that posted it. Updated .