This Addendum #1 to RFP 935700-01, issued by the State of Iowa Department of Administrative Services (DAS), provides supplementary information and clarifications for the MPCF IPI Roof Replacement project at the Mt. Pleasant Correctional Facility. The addendum, dated September 7, 2023, addresses three primary areas: schedule confirmation, responses to bidder questions, and attachments. Regarding the proposal schedule, the addendum confirms that the original proposal date remains unchanged. The addendum supersedes any conflicting provisions in the original RFP dated August 18, 2023, and requires all recipients to acknowledge receipt to avoid potential disqualification from consideration.
The Q&A section clarifies several key project parameters. Existing CAD/PDF drawings will be provided to the successful design firm, though the design firm must verify their accuracy. The facility will provide access assistance to the roof, including lift and operator support if roof height exceeds 15 feet and conventional ladder access is impractical. Regarding roof replacement methodology, DAS clarified that the intent is to remove and replace metal roofing panels with like and kind materials; however, the designer may propose alternative options such as metal roof overlays or single-ply systems (EPDM or thermoplastic with simulated ribs), which will be evaluated during the design phase with the selected firm. The addendum contains no attachments and serves as the sole supplement to the original solicitation documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP935700-01 - MPCF IPI Roof Replacement.pdf | ||
| RFP 935700-01 Addendum #1 Q&A.pdf | ||
| 1169309-event.pdf.crdownload | CRDOWNLOAD file | |
| 1169309-event.pdf | ||
| RFP935700-01 - MPCF IPI Roof Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Project Name: MPCF IPI Roof Replacement
DAS#9357.00
RFP935700-01
Addendum #1
Dated: September 7, 2023
This Addendum forms a part of the Request for Proposal documents. This Addendum supersedes and supplements all portions of the original Request for Proposal dated August 18, 2023, with which it conflicts.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE REQUEST FOR PROPOSAL. FAILURE TO
DO SO MAY SUBJECT TO DISQUALIFICATION.
1. Schedule – Proposal date does not change.
2. Questions:
a. Q. Any original drawings / plans available for use? A. Existing CAD/PDF drawings will be provided to the successful design firm if they are available. Accuracy of drawings shall be verified by the design firm.
b. Q. Access to roof – can MPCF provide a lift and operator if roof height higher than 15 feet for conventional ladder? A Yes, the facility can help with getting to the roof for design.
c. Q. Will DAS consider roof overlay with metal roof or single-ply? With single ply can do either
EPDM or thermoplastic sheet with “fake” ribs heat welded to simulate metal roof. A. The intent is to remove and replace the metal roofing panels with like and kind. If the designer comes up with other options, they can be looked at during the design process with the successful design firm.
3. Attachments:
a. NONE
END OF ADDENDUM