About this file
This document is an Amendment to the RFP Calendar for RFP 78-25 Vertical Lift Module (VLM) issued by the Massachusetts Bay Transportation Authority (MBTA) on 6/18/2025. The amendment provides a detailed procurement timeline for the project, including key dates such as RFP issuance on 6/4/2025, a pre-bid conference on 6/11/2025, a site visit on 6/24/2025, and various submission deadlines. The response due date is set for 7/11/2025 at 2:00 p.m., with a virtual public opening at 2:30 p.m. The estimated contract execution is scheduled for 7/25/2025, with a service start date of 9/1/2025.
The document does not provide specific pricing details or set-aside information beyond the procurement timeline. The RFP is for a Vertical Lift Module (VLM) to be installed at the MBTA's facility, with the procurement process managed through COMMBUYS, the Massachusetts electronic procurement system. The amendment is signed by Katie Kroeger, Strategic Sourcing Manager, and includes the MBTA and MassDOT letterhead, indicating this is an official government procurement document for a specialized transportation infrastructure equipment acquisition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 78-25 Vertical Lift Module _VLM_SOW.pdf | ||
| Price Response Form C.xlsx | XLSX spreadsheet | |
| RFP 78-25 Modula Life Vertical Lift Module _VLM~1.pdf | ||
| VLM_SPEC.pdf | ||
| Boston PW RFP 78-25.pdf | ||
| MBTA Minimum Insurance Requirements RFP 78-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Bay Transportation Authority Ten Park Plaza, Boston, MA 02116 www.mbta.com
6/18/2025
RFP 78-25 Vertical Lift Module (VLM)
The MBTA issues the following Amendment to the TABLE 2-1 RFP CALENDAR:
Thank you, Katie Kroeger Strategic Sourcing Manager http://www.mbta.com/