RFP 7252971.pdf
PDF 841 KB Posted
- Attached to
- Hancock Dredging
- Solicitation number
- N400857252971
About this file
This document is a Request for Proposal (RFP) for the Hancock Dredging project at MCAS Cherry Point, North Carolina, Project No. 7252971.
The RFP details the scope of work, which includes dredging and dredge spoil disposal to a minimum required depth, as well as additional overdepth dredging and spoil disposal. The estimated cost range is between $1,000,000 and $5,000,000, with a contract completion date of 365 days after award. The project is set aside for General MACC contractors, and only the eight specific contractors listed in the RFP are eligible to submit proposals. The proposal due date is August 28, 2024 at 12:00 PM EST. Award will be made to the contractor with the lowest priced proposal. The RFP also includes details on bond requirements, applicable wage determinations, and other federal contracting clauses and provisions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hancock Dredging REQUEST FOR PROPOSAL MCAS Cherry Point, North Carolina Project No. 7252971
06 August 2024
FEAD MCAS CHERRY POINT
POC: Linda Clark Contract Specialist (252) 466-4130
ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A
PROPOSAL FOR THIS PROJECT:
N40085-21-D-0097 Blue Rock Structures, Inc.
10689 Hwy 17 Pollocksville, NC 28573 POC: Ellen Hartness Phone: 910-743-0505 ext 102 estimating@bluerockstr.com
N40085-21-D-0098 Civil Works, Contracting, LLC 190 Raleigh St.
Wilmington, NC 28412 POC: Jeremiah Stoops Phone: 910-859-8574 Jstoops@civilworkscontracting.com BPait@civilworkscontracting.com
PPaluso@civilworkscontracting.com
DTassinari@civilworkscontracting.com
N40085-21-D-0099 Encon Desbuild JV2 LLC 8201 Corporate Drive, Ste. 720 Hyattsville, MD 20785 POC: Devang Ajmera Phone: 301-244-0711 devang@enconcorp.org
N40085-21-D-0100 Futron, Inc 14067 Crown Court Woodbridge, VA 22193 POC: Daniel Mayo Phone: 571-402-3200 daniel.mayo@futroninc.com
N40085-21-D-0101 Joyce & Associates Construction, Inc.
6994 Hwy 70 Newport, NC 28570 POC: Robert Bittner Phone: 252-223-3171 info@joyceandassoc.com
N40085-21-D-0102 Military & Federal Construction Co.
846 Bell Fork Rd.
Jacksonville, NC 28540 POC: Raymond Wray Phone: 910-353-3797 estimating@mafnc.com
N40085-21-D-0105 Reasor-Asturian JV, LLC 17 W. Maxwell Street Pensacola, FL 32501 POC: Ted Hamilton Phone: 850-530-0780 rajvrfp@asturiangroup.com
N40085-21-D-0104 Rand Enterprises, Inc 850 39th Street. Suite 101 Newport News, VA 23607 POC: Randy Biagas Phone: 757-247-1090 randy.biagas@rei-va.com john.drake@rei-va.com
N40085-21-D-0106 WB Brawley Company 3314 Jaeckle Dr. Suite 120 Wilmington, NC 28403 POC: Ryan Luckadoo Phone: 910-452-3127 rluckadoo@brawley.net rjameson@brawley.net
GENERAL REQUIREMENTS
Project No.: 7252971
Title: Hancock Dredging
NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction Contractors, 45 Million
Contract Completion Date: 365 days after award
Estimated Cost Range: Between $1,000,000 and $5,000,000
Wage Determination: General Decision Number: NC20240069 01/05/2024
Liquidated Damages: $386.00 per Calendar Day
Special Scheduling: None
Basis for Award: Lowest Price
Proposal Acceptance Period: 120 days from receipt of offers
**THIS PROJECT IS BEING ADVERTISED AS A STRADDLE PROJECT THE
PROPOSAL ACCEPTANCE PERIOD WILL BE 120 DAYS**
Site Visit: 12 August 2024 at 8:00 AM EST Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project.
Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration.
In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS
MUST BE VISIBLE
• No bonds are required for proposals less than $40K.
• Proposals valued at $40K and greater will require a payment bond only.
• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.
FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation.
FAR Clause 52.204-27, Prohibition on a Bytedance Covered Application (June 2023)
FAR Clause 52.222-50 Combating Trafficking in Persons
FAR Clause 52.204-30, Federal Acquisition Supply Chain Security Act Orders – Prohibition
FAR Clause 52.223-23 Sustainable Products and Services
DFARS 252.225-7966 Prohibition Regarding Russian Fossil Fuel Business Operators – Representation
DFARS deviation clause 252.225-7967 Prohibition Regarding Russian Fossil Fuel Business Operations
DFARS 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region—Certification, which includes a certification requirement stated below.
DFARS 252.225–7060, Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region, which prohibits contractors from providing any products mined, produced, or manufactured wholly or in part by forced labor from XUAR or from an entity that has used labor from within or transferred from XUAR as part of any forced labor programs.
Please either return an email or add the certification statement on your proposals stating the following:
“Certification from (Please enter your company name here) that you have made a good faith effort to determine that forced labor from XUAR was not or will not be used in the performance of a contract resulting from this solicitation”
Proposal Due Date: 28 August 2024 @ 12:00 PM EST **Both the proposal sheet and the Supplementary Instructions to Offeror must be submitted or the proposal will be considered non-responsive**
E-Mail Address for Proposals: is listed below:
1. roicc_chpt_ktr_bids@navy.mil
2. ericka.j.bishop.civ@us.navy.mil
3. linda.b.clark14.civ@us.navy.mil
*Note: Proposals must be sent to ALL of the above email addresses. Subject line should contain the project number and contractor information.
Proposals may also be hand-delivered to Building 87 and must be stamped/signed in by proposal due date and time.
Requests for Information (RFIs): RFIs must be submitted by the prime contractor to the email addresses above. The cut off for RFIs is 18 August 2024 by 9:00 AM EST in order to process all inquiries by the proposal due date.
The specifications and drawings are posted as attachments on https://sam.gov/.
"General Decision Number: NC20240069 01/05/2024
Superseded General Decision Number: NC20230069
State: North Carolina
Construction Type: Heavy
Counties: Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Dare, Gates, Hertford, Hyde, Jones, Martin, Pamlico, Pasquotank, Perquimans, Tyrrell and Washington Counties in North Carolina.
HEAVY CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 |into on or after January 30, | generally applies to the |2022, or the contract is | contract.
|renewed or extended (e.g., an |. The contractor must pay |option is exercised) on or | all covered workers at |after January 30, 2022: | least $17.20 per hour (or | | the applicable wage rate
| | listed on this wage | | determination, if it is | | higher) for all hours | | spent performing on the | | contract in 2024.
|If the contract was awarded on|. Executive Order 13658 |or between January 1, 2015 and| generally applies to the |January 29, 2022, and the | contract.
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least |30, 2022: | $12.90 per hour (or the | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | hours spent performing on | | that contract in 2024.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024
SUNC2011-050 08/26/2011
Rates Fringes
CARPENTER (Form Work Only).......$ 15.47 ** 1.50
CEMENT MASON/CONCRETE FINISHER...$ 13.10 ** 1.32
LABORER: Common or General......$ 9.63 ** 0.33
LABORER: Pipelayer..............$ 12.86 ** 1.73
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 14.50 ** 2.39
TRUCK DRIVER.....................$ 12.02 ** 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the
EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers.
indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
PROPOSAL COVER SHEET
Company Name:____________________________________
Company Address: ________________________________
MACC Contract Number: N40085-21-D-______________
Date: ______________
Facilities Engineering & Acquisition Division PSC Box 8006 MCAS Cheery Point, NC 28533-0006
Proposal for Project: 7252971 Hancock Dredging _____________________ Marine Corps Air Station Cherry Point, NC
Amendments Acknowledged: No Amendments Issued or Amendments_______
Subcontractors to be used*:
Subcontractor Discipline
*Insert additional lines as needed
Proposal amounts:
Item # Amount
CLIN 0001AA
CLIN 0002AB
Total $
Comments:
Dredging Design - Hancock Creek 7252971
DOCUMENT 00 22 13.00 20 Page 1
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14, CHG 3: 11/18
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items: CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for providing dredging and dredge spoil disposal to the minimum required depth specified (excluding overdepth dredging and overdepth spoil disposal), complete in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB.
CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE
FOR CLIN
0001AA (UNIT
PRICE X NO.
UNITS)
0001AA Price for providing dredging and dredge spoil disposal to the minimum required depth specified (excluding overdepth dredging and overdepth spoil disposal), complete in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AB.
Cubic Yards
(CY)
$_______ 1,725 $__________
CLIN 0001AB. Price for providing overdepth dredging and overdepth spoil disposal (excluding of required depth dredging and dredge spoil disposal), complete in accordance with the drawings and specifications, but excluding work described in Contract Line Item
(CLIN)0001AA.
Dredging Design - Hancock Creek 7252971
DOCUMENT 00 22 13.00 20 Page 2
CLIN ITEM UNIT UNIT PRICE NO. UNITS TOTAL PRICE
FOR CLIN
0001AB (UNIT
PRICE X NO.
UNITS)
0001AB Price for providing overdepth dredging and overdepth spoil disposal (excluding of required depth dredging and dredge spoil disposal), complete in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)0001AA.
Cubic Yards
(CY)
$_______ 7,965 $_______
1.2 GENERAL BID NOTES
a. Award will be made based upon the extended total sum of Contract Line Items 0001AA and 0001AB. For CLINs 0001AA and 0001AB enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --
| RFP 7252971 |
| Supp Inst |
File details come from the government source that posted it. Updated .